plus expressways berhad - ibtta · pdf fileplus expressways berhad 13 september 2011. ... bksp...

20
THE WORLD, Expansion and Modernization of Road Infrastructure II by PLUS EXPRESSWAYS BERHAD 13 September 2011

Upload: vuongmien

Post on 09-Mar-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

THE WORLD, Expansion and Modernization of Road Infrastructure II

by

PLUS EXPRESSWAYS BERHAD

13 September 2011

Page 2: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

MAJOR PROGRAM/ PROJECT IN THE COUNTRY

COUNTRY OVERVIEW

COMPANY OVERVIEW

INDUSTRY CHALLENGES

2

PLUS North-South Expressway, Kuala Lumpur bound

Page 3: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

Land area: 329,847 square kilometres (127,350 sq mi) separated by the South China Sea into two regions, Peninsular Malaysia and Malaysian Borneo (slightly smaller than the size of Germany and slightly bigger than Italy).

Land borders: Thailand, Indonesia, and Brunei

Population 2010: 27,565,821 (Department of Statistics Malaysia)

GDP (PPP) : USD442.01 billion - 2010 est (Source: IMF)

GDP per capita : USD8,620 - 2010 est (Source: IMF)

GDP Growth 2010: 7.2%

Country Overview

3

Page 4: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

10.2 12.7

13.2

10.5

15.7

16.4 17.4

20.9

22.0

23.6

24.6

0.0

5.0

10.0

15.0

20.0

25.0

30.0

Mill

ion

343

396 435

406

488 552

491 487

548 503

523

0

100

200

300

400

500

600

Tho

usa

nd

Veh

icle

s Country Overview

8.3%

0.4%

4.2% 5.2%

7.1%

5.3%

5.9%

6.3%

4.6%

-1.7%

7.2%

5.0%

-4.0%

-2.0%

0.0%

2.0%

4.0%

6.0%

8.0%

10.0%

GD

P G

row

th

10.3 11.7

13.2 15.0

17.2 19.6

22.3 25.0

27.1 27.6

0.0

5.0

10.0

15.0

20.0

25.0

30.0

Mill

ion

MALAYSIA GDP GROWTH 2000-2011 (est)

NEW VEHICLES REGISTERED IN MALAYSIA NUMBER OF TOURIST ARRIVALS IN MALAYSIA

POPULATION IN MALAYSIA

Page 5: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

MAJOR PROGRAM/ PROJECT IN THE COUNTRY

COUNTRY OVERVIEW

COMPANY OVERVIEW

INDUSTRY CHALLENGES

5

Persada PLUS, Corporate Office

Page 6: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

PT Lintas Marga Sedaya (Indonesia)

Cikampek-Palimanan Expressway, Indonesia

116.0 km

Jetpur Somnath Tollways Limited (India)

Jetpur-Somnath Highway, India

127.6 km

100% 15.5%

100%

94%^

38.5%

# Khazanah Nasional Berhad is the investment holding arm of the Government of Malaysia, with investments in over 50 major companies in Malaysia and abroad.

26%

100% 100%

International

Domestic

100%

55%

r

Projek Lebuhraya Utara-Selatan Berhad

(PLUS)

North-South Expressway 846 km

Expressway Lingkaran Tengah Sdn

Bhd (ELITE)

North-South Expressway Central Link

63 km

Konsortium Lebuhraya Butterworth-Kulim

(KLBK) Sdn Bhd

Butterworth-Kulim Expressway

17 km

PLUS BKSP Toll Limited (India)

Bhiwandi-Kalyan-Shil Phata Highway, India

21.6 km

# As at 12 May 2011

Primary toll road operator in Malaysia

^ PLUS Expressways holds 94.12% direct and indirect interest in PLUS BKSP via PLUS Kalyan (Mauritius) Private Limited.

PLUS Helicopter Services Sdn

Bhd

Linkedua (Malaysia) Berhad

Malaysia-Singapore Second Crossing

47 km

100%

Touch ‘n Go Sdn Bhd

49%

Indu Navayuga Infrastructure Project

Pte Ltd (India)

20%

Padalur-Trichy Highway, India

38.6 km

r UEM Group Berhad is Malaysia’s leading diversified infrastructure conglomerate with core business in expressways, engineering & construction, township/property development, and asset & facilities management .

Teras Teknologi Sdn Bhd

100%

6

Page 7: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

Largest expressway operator in Malaysia & Asia with more than 20 years of experience

PLUS started operation in 1988

Listed on Bursa Malaysia (Malaysian Stock Exchange) in 2002

Backbone of Malaysian road transport system:

Connects major industrial, commercial & transportation centres

Links major seaports and airports

States serviced by the NSE make up 81% of population and 89% of GDP in Peninsular Malaysia PLUS

Northern region

Central region

KL International

Airport

Southern region

ELITE

BKE

LINKEDUA

Length

DOMESTIC

PLUS North-South Expressway 846 km

ELITE NSE Central Link 63 km

LINKEDUA Malaysia-Singapore Second Crossing 47 km

BKE Butterworth-Kulim Expresssway 17 km

973 km

INTERNATIONAL

BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km

INIPPL Padalur-Trichy Highway 39 km

JSTL Jetpur-Somnath Highway (In progress) 127 km

LMS Cikampek-Palimanan Expressway (In progress) 116 km

TOTAL 1,277 km

Open Toll System: Generic to city highways Close Toll System: Generic to interurban highways

Page 8: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

Ranks 6th among global toll road operators and controls 60% of the Malaysian toll roads market

PLUS 52%

4%

3%

1%

Others 40%

BKE

Linkedua

Elite

Owns 60% of Malaysian toll roads in operation (by length - km)

Jasa Marga, Indonesia

Zhejiang E., China

Ranks no. 6 globally (largest in Asia) (by market capitalisation)

Source : Bloomberg as at 16/08/2011

ARR, France

CCR, Brazil

PLUS

0 2 4 6 8 10 12 14

Abertis, Spain

Atlantia Spa, Italy

USD7.3 bn

USD’bn

1

2

3

4

5

6

7

9

10

8

Jiangsu E., China

Transurban, Australia

Shandong E, China

8

Page 9: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

9

Business Results

PLUS TRAFFIC VOLUME GROWTH

12.8%

6.0%

2.3% 4.9% 3.9%

0.8% 1.6%

7.7% 5.2%

7.1% 7.7%

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Traffic Growth % GDP Growth %

4.7% CAGR

REVENUE

1,153 1,220

1,663 1,581

1,650 1,671

2,091 2,282

2,968

3,179 3,351

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

CAGR PLUS (2000-2010): 9.7%

11.3% CAGR

20% 22%

20% 21% 23%

25% 24% 23% 21% 20% 21%

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

DIRECT OPERATING COST

MYR ‘mn

Page 10: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

Socio Economic Contribution to GDP Growth, Development of Tourism, New Township and Industry

Kedah

Perak

Selangor

Negeri Sembilan

Melaka

Johor

Before

4.8%

3.9%

5.6%

4.5%

3.9%

5.2%

After

7.5%

7.3%

7.7%

7.1%

7.3%

7.7%

Penang 5.4% 7.5%

Source: Department Of Statistics Malaysia

Pulau Pinang

Bukit Merah Lake Town Lumut

Black Forest Golf & Country Club

Lost World of Tambun

Banjaran Hot Spring

Cameron Highland

Sungkai Hot Spring

Port Dickson

A Famosa Tangkak

Ayer Hitam

Danga Bay

Bandar Darul Aman

Laguna Merbuk

Rawang Country Homes

Bukit Beruntung Lembah Beringin

Cyberjaya Putra Mahkota

Seremban 2

Bandar Baru Uda

Perling

Senai

Gurun Modenas

Kulim Hi Tech

Kamunting

Perak Hi Tech

Proton City

Rawang Shah Alam

Nilai

Auto City

Pasir Gudang

Juru Industrial Area

Tg. Pelepas

TOURISM

NEW TOWNSHIP

INDUSTRY

Malaysia

GDP Growth

10

Nusajaya

States

4.7%

Page 11: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

11

COMPANY EMPLOYEES

STALL OPERATORS

MAINTENANCE CONTRACTORS •

97 572

925 4,483

15 350

Continuous Training &

Development Opportunities

> 5,500 Jobs Created

>1,000 Job Opportunities

Socio Economic Contribution to Employment Opportunities

Page 12: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

Evolution of Electronic Toll Collection (ETC) for operational efficiency

Toll started at North-South

Expressway – all cash payment

Introduction of electronic toll collection system

“PLUS Tag”

Implementation of Touch ‘n Go as the only electronic toll collection system in

Malaysia

Implementation of Smart Card system

(Vehicle Registration Number)

Proposed implementation of Multi Lane Free Flow

(MLFF)

Introduction of smart card electronic toll collection system

“Smart Tag”

1988

1994

1999 2003

2012

2015 & Beyond

Trial Smart Card system (Vehicle

Registration Number)

2009

Introduction of smart card

electronic toll collection system

“Touch ‘n Go”

1998

ETC penetration increased from 15% in 1999 to 60% in 2010 12

Page 13: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

Issues in Implementing the Multi Lane Free Flow (“MLFF”)

• Inherent risks of leakage

• Enforcement issues

• Multiple agreements involving various stakeholders

LEGAL & ENFORCEMENT

• Smart Tag system not MLFF ready

• Improvement of back end system

TECHNOLOGY & OPERATION

• Funding of new system

BUSINESS MODEL

• Migration from cash payment

CUSTOMER ACCEPTANCE

13

Page 14: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

Evolution of Road Safety Measures

Normal Containment Bridge Railing 4m spacing guardrail Median concrete NJB

2015 & beyond

Flexible post Flashing Road Stud

1990 1997

2001 2005

2007

Escape Ramp 2m spacing guardrail

2008

High Containment (TL 5) Bridge Railing

Wire Rope Barrier

Crash Cushion

2009

High Skid Resistance Rumble Strip

2010

Rolling Barrier 2011

LED signs

Innovative road safety measures

14

Page 15: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

Results and Investments on Road Safety

70

63 63 63

59

55 55 53

51

47 46

30

40

50

60

70

80

90

ACCIDENT RATE

15

-

10

20

30

40

50

60

70

MYR ‘mn

INVESTMENTS MADE FOR SAFETY FEATURES

Per 100 Million Vehicle Km Travelled

Various measures and investments on road safety have reduced the accident rate over the years

Page 16: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

MAJOR PROGRAM/ PROJECT IN THE COUNTRY

COUNTRY OVERVIEW

COMPANY OVERVIEW

INDUSTRY CHALLENGES

16

Traffic Monitoring Centre at Corporate Office

Page 17: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

In one of the main thrust of the 10th

Malaysian Economic Plan (2011-2015),

the Government of Malaysia has

recognized the formation of smart

and effective partnerships

between the public and private sectors (PPP) as a mean to facilitate the new

economic transformation

agenda.

The Malaysian Economic Plan

Current Under Construction Under Planning

Road Network 135,569km 51 projects

12 projects

Highway Network 1,722km 248km (6 projects)

52 high-impact projects worth MYR63 billion have been

identified for implementation in the 10th Malaysian Plan

Several highway projects in the pipeline at an estimated

cost of MYR19 billion (USD6.4 billion)

17

Page 18: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

MAJOR PROGRAM/ PROJECT IN THE COUNTRY

COUNTRY OVERVIEW

COMPANY OVERVIEW

INDUSTRY CHALLENGES

18

Overhead Bridge Restaurant, Sungai Buloh

Page 19: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

Industry Challenges

Public expectations on quality of highway services vs. willingness to pay

Stringent maintenance and safety requirements by authorities

Negative perception of toll increases amongst the public

Nationalization of expressways

Public / users attitude towards road safety

Competitive public tenders of toll roads – contractors’ aggressive bids (especially in India)

19

Page 20: PLUS EXPRESSWAYS BERHAD - IBTTA · PDF filePLUS EXPRESSWAYS BERHAD 13 September 2011. ... BKSP Bhiwandi-Kalyan-Shil Phata Highway 22 km ... 1999 2003 2012 2015 & Beyond

THANK YOU

20