PLUMBING DESIGN COURSE

Engineers House Course Note

Said Elshayeb [email protected]

Page 2: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 1

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

PLUMBING DESIGN COURSE 1 PURPOSE OF PLUMBING DESIGN SYSTEM

The purpose of plumbing design system, is to provide clean water supply with a suitable capacity &pressure to

water fixtures and to drain the result outside the building safely without affecting health.

1.1 BRIEF FOR PLUMBING SYSTEMS

1. Water Supply System.

2. Sewer Drainage System.

3. Grey Water System.

4. Chemical Waste Drainage System.

5. Storm (Rain) Water Drainage System.

6. Air Conditioning Condensate System.

7. Oil & Grease Drainage System.

8. Basement Floor Drainage.

9. Irrigation System.

10. Swimming Pool System.

1.2 CODES AND STANDARDS FOR PLUMBING SYSTEM

1. UNIFORM PLUMBING CODE (UPC).

2. NATIONAL PLUMBING CODE (NPC).

3. INTERNATIONAL PLUMBING CODE (IPC).

4. AMERICAN SOCIETY OF PLUMBING ENGINEERS (ASPE).

الكود المصري لتصميم وتنفيذ خطوط المواسير لشبكات مياه الشرب والصرف الصحي. .5

.الكود المصري ألسس تصميم وشروط التنفيذ لهندسة التركيبات الصحية للمباني .6

.الكود المصري ألعمال التغذية بالمياه الساخنة وحمامات السباحة .7

الكود المصري لمحطات الرفع. .8

1.3 WATER SUPPLY SYSTEM

1. Sources of Water.

2. Estimation of Water Demand for a Certain Project.

3. Water Supply Network Component.

1.4 SOURCES OF WATER

The water network of a building/project is being supplied by using one or more of the following sources:

1. Municipal (City-Potable) Water Network. 2. Underground Water Tank. 3. Roof Water Tank.

Page 3: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 2

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

1.4.1 MUNICIPAL WATER SUPPLY NETWORK

Water is supplied from water station after filtration/treatment to fill Elevated Water Tanks, the water then supply buildings by the action of gravity.

Elevated Water Tank is re-filled by using water pumps located near to the elevated tank.

Elevated Tanks helps to avoid the intermittent operation of pumps and thus decrease operating duration of pump and increase its life time.

Figure 2 Elevated Water Tank Details

Figure 1 Elevated Water Tank

Page 4: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 3

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

1.4.1.1 FIXTURES MINIMUM OPERATING PRESSURE

1.4.1.2 FLUSH TANK / FLUSH VALVE

1.4.2 UNDERGROUND WATER TANK

Underground water tanks are used when a continuous supply of water is needed (Hospitals-Hotels-Office

Buildings…etc.).

Also water tanks is needed if the project has high water demand and thus has huge pumps which couldn’t

be obtained directly from the municipal water network.

The underground water tank is filled by municipal water network, then a pumping station is used to

elevate water to the buildings fixtures with the minimum required operating pressure.

Underground water tanks are being sized according to the desired storage duration and project

application.

Underground water tanks are commonly made of concrete.

Page 5: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 4

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Water filters maybe used before filling tanks, if the municipal water network is contaminated.(or at

Hospitals)

Figure 3 Underground Water Tank

Page 6: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 5

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

1.4.3 ROOF WATER TANK

Roof water tanks are used to minimize the capacity of underground water tank and also decreases the

operating time of ground water pumps (LIFTING PUMP).

Roof water tanks are used to supply the project by gravity so it decreases and minimizes the load on the

ground water pump (regardless of the highest floors which need small capacity pumps due to low static

pressure of water due to low water head).

Roof water tanks are made of (polyethylene-polypropylene-stainless steel-GRP)

Roof water tanks are placed at the highest point at roof floor to increase the static head as much as

possible, increasing static pressure would avoid installing an additional roof water network to supply last

floors by additional pumps.

Civil engineer should be revised for roof tank location and capacities (weight).

Underground tank supplies the roof tanks by using a lifting pump, and then roof tanks supply the system

directly by a gravity roof water network and a Booster pump for highest floors(if needed).

Page 7: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 6

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Figure 4 Plastic tanks

Figure 5 Stainless steel

Page 8: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 7

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

1.4.3.1 GRP TANK

Corrosion resistant tanks made of composite materials (Glass Reinforced Plastic).

Used when a specific capacity of water storage tank is needed (a capacity not found in plastic tanks).

Concrete Roof tanks also may be also used for very hot areas to avoid excessive heating of water or tank

damage.

If GRP tanks with large capacities will be installed at roof floor, it should be installed on columns to avoid

excessive load on roof floor which would damage roof slab.

Figure 6 GRP above-ground tank

Page 9: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 8

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

1.4.3.2 INTERMEDIATE TANK

For high rise buildings where the static head is very high, an intermediate tank would be added at an

intermediate floor of the building to supply upper floors.

Two series connected pumps would be used instead of the intermediate tank.

Page 10: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 9

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

2 ESTIMATION OF WATER DEMAND

FOR A CERTAIN PROJECT

Water demand (Capacity and storage duration) for a project should be well estimated to ensure a

continuous supply of water whenever needed by project occupants or equipment.

The water demands varies from one project to another, also storage duration varies according to project

location and municipal water supply conditions :( 1day storage for a residential building – 2 days for

hospitals etc.)

Amount of stored water should be well estimated to avoid:

(Huge capacity & high cost) if overestimation of stored water occurred, OR

Shortage of water if underestimation had occurred.

To estimate the required water capacity the following factors should be known:

1. Number of project occupants and equipment.

2. Required water demand for occupants according to the application.

3. Water Storage Duration.

2.1 NUMBER OF PROJECT OCCUPANTS& EQUIPMENTS

The water demand depends basically on the number of project occupants and equipment need to be supplied with

water (if required) such data should be known from one of the following sources:

Data from project Architect.

Furniture of drawing plans (number of rooms for hotels /hospitals – number of offices for office buildings,

etc.).

By estimating occupants number according to the total gross area of the project. (1 person occupies about

100ft2 at office building).

Page 11: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 10

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 12: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 11

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 13: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 12

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

2.2 REQUIRED WATER DEMAND ACCORDING TO APPLICATION

Page 14: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 13

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Example: Estimation of water Tank size

Estimation of water supply requirements for a hotel building (5 Stars) consists of 150 room

Solution

Number of rooms=150

Required water capacity per room=1500 lpd (liter per day including all services and staff).

Total water demand per day=150*1500=225 m3

Water demand for (2) days=225*2=450 m3

2.3 TANKS ARRANGEMENT

OPTION (1):

Install an underground tank of 2 compartments each of 225m3.

OPTION (2):

Install an underground tank of 2 compartments each of 200m3 and a roof top tanks of the remaining

50m3.

3 WATER SUPPLY NETWORKS

1. Outer Water Supply Network.

2. Water Supply Pipes& Accessories.

3. Connection of Water Supply Pipes.

4. Valves Used for Water Supply Network.

3.1 OUTER WATER SUPPLY NETWORKS

Page 15: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 14

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Main Network:

Water is being supplied to the project by a buried

municipal network which fills water tanks or

supplies the project directly.

Water meter and a stop valve Installed inside a

valve pit or another suitable location should be

provided.

Page 16: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 15

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Water supply network is being buried at a safe underground level surrounded by clean sand layers to

avoid mechanical loads.

A 15 cm clean sand bedding should be prepared below water pipe, and a minimum of 30 cm bedding

above water pipe should also be prepared.

The water supply network should be routed around the outer area of the project to supply each water

branch line.

Water supply network should be routed away from any electrical rooms or hazardous spaces.

If the water supply and drainage pipes are intersected, water supply pipes should be 30 cm above

drainage pipes.

Water supply pipes should be 2 meters away from drainage pipes.

3.2 WATER SUPPLY PIPES & ACCESSORIES

Potable water supply lines are designed to serve 30-50 years.

The allowed pipe materials for water supply pipes shall be as follow:

UPVC

Polypropylene.

High Density Polyethylene.

CPVC.

Copper.

Galvanized steel.

Ductile Iron.

In general, the lead concentration for any pipes used for water supply purposes shouldn’t exceed 0.8%.

3.2.1 WATER SUPPLY PIPES

Water supply pipe network inside the building is preferred to be at the basement floor to provide

isolating valves at the riser bases (easy accessible).

If water supply network can’t be installed at basement floor, water network is highly preferred to be

installed at roof floor for a better control of water supply risers.

Water supply riser is preferred to be routed inside a duct.

Water supply pipes inside toilets is preferred to be at the high level of toilet (in case that false ceiling is

used).

Page 17: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 16

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Figure 7 Underground water pipe

Figure 8 Clean sand bedding

Page 18: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 17

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Figure 9 Underground P.P water pipe

Figure 10 Underground HD.PE water pipe

Figure 11 Backfilling above water line

Page 19: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 18

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Figure 12 Pipe thrust block

Figure 13 Pipe sleeve

Page 20: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 19

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

3.3 CONNECTION OF POLYPROPYLENE& HD.PE PIPES

There are two ways for connecting polypropylene/High Density Polyethylene pipes:

Welding

Socket Welding.

Butt Welding.

Saddle Welding.

Threaded Connectors

Figure 14 Butt Welding

Page 21: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 20

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Figure 15 Polypropylene pipe data

Page 22: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 21

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 23: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 22

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 24: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 23

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 25: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 24

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 26: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 25

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 27: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 26

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 28: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 27

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Figure 16 Welding saddle

4 PVC PIPES ADVANTAGES

Page 29: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 28

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 30: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 29

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

4.1 CONNECTION OF PVC PIPE

All pressurized pipes are preferred to be connected by the adhesive tapes.

Page 31: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 30

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

5 VALVES USED FOR WATER SUPPLY NETWORK

Valves are used for water supply network to separate it for ease of maintenance.

Valves should be made of (copper- stainless steel- plastic – bronze) and should be coated by nickel-

chrome.

Valves should be installed at water network through a dismantling joint (Erection Joint).

Types of used valves:

Sectional Valves& valve pit/ house connection.

Air valve.

Drain Valve.

Pressure reducing valve.

5.1 SECTIONAL VALVES& VALVE BOX

Sectional valves/house connection should be installed at each branch line of the water supply network to

separate this branch when needed for maintenance.

Valves should be installed inside an accessible valve pit.

Most common sectional valves are Gate Valves- Butterfly Valves(light weight-less volume).

Sectional valves are installed for:

Each building.

Between water meter gauge.

Each home water inlet.

Each riser and branch.

Page 32: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 31

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Figure 17 House connection

Page 33: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 32

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Figure 18 Valves inside a valve pit

Page 34: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 33

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

5.2 AIR VALVE

Used to release the air from water supply network during the filling of network.

Page 35: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 34

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

5.3 DRAIN VALVE

Drain valves are installed to drain the network whenever needed for maintenance or any other reason.

Drain valves should be installed inside a valve pit.

Page 36: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 35

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 37: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 36

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

5.4 PRESSURE REDUCING VALVE

Used to decrease the pressure to operate the lines and fixtures below maximum pressure.

Should be installed inside a valve pit.

Maximum operating pressure for plumbing fixtures is 4 Bar.

6 TESTING OF WATER SUPPLY PIPES

Page 38: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 37

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن

Page 39: Plumbing Design Course - بيت المهندسين · PDF fileP a g e | 1 00201027100700 :ةكرشلا نوفيلت نسح نميأ /سدنهم دادعإ PLUMBING DESIGN COURSE 1

P a g e | 38

00201027100700: الشركة تليفون www.engineers-house.com إعداد مهندس/ أيمن حسن