PLUMBING. Presentation on Installation of a Domestic Cold Water Storage Cistern. Cold water Supply. At the end of this part you should be able to : State the requirements of pipes and fittings used in cold water systems. Explain the requirements of protecting systems against frost damage. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PLUMBING

PLUMBING

Presentation on

Installation of a Domestic Cold Water Storage Cistern

Page 2: PLUMBING

Cold water Supply

At the end of this part you should be able to :

• State the requirements of pipes and fittings used in cold water systems.

• Explain the requirements of protecting systems against frost damage.

Page 3: PLUMBING

Cat boards are used to provide a safe area to walk and work on.

There is adequate lighting to be able to work safely.

You have a safe means of exiting the roof in an emergency.

You have fire extinguishing equipment to hand.

There is adequate ventilation.

If roof insulation is to be laid a protective mask must be worn.

Cold water – Health & Safety - Working in loft spaces

Page 4: PLUMBING

Be on the look for vermin (Weal's disease).

Cold water – Health & Safety - Working in loft spaces

If working in existing or old roof spaces you should also:

Ensure you remove any old lagging to pipework is being altered and requires jointing with soldered fittings, many older types of pipe insulation are highly flammable.

Take care if old electric cables are in the work vicinity or are to be handled

Check for wasps or bees nests in the loft area.

Page 5: PLUMBING

Cold water – Storage cistern requirements

The cisterns are available in square, rectangular or circular shapes, and are produced in black to prevent algae growth.

Because of their flexible material the base of the cistern MUST be fully supported and we shall look at the requirements for this next.

(Case study p34 in handout)

Page 6: PLUMBING

Cold water– Storage cistern requirements – Construction of a cistern stand

Storage cistern are usually located in the attic space, their installation has to meet the requirements of the Water Regulations.

Ceiling

Roof joists

Base bearer to span MINIMUM of three joists

Loft insulation

Stand legs

Brace

Deck

Check for levelGood practice to place sound proofing material, it also helps protect base of cistern against any sharp objects

Page 7: PLUMBING

If the cistern is to be laid on top of roof joists insulation can be removed to help protect cistern from frost damage.

Cold water – Storage cistern requirements – Construction of a cistern stand

Page 8: PLUMBING

Cistern base should span additional joists to help spread the weight of water being carried.

Timber or ply base should be used for the cistern base.

Chipboard must never be used as this is prone to disintegrate if it becomes damp.

Cold water – Storage cistern requirements – Construction of a cistern stand

Page 9: PLUMBING

Mark cistern float valve, overflow and outlet points.

Drill holes and fit valves and fittings.

Ensure swarf and debris are removed from inside the cistern.

Do not use oil based jointing compounds to make cistern connections as this can cause contamination to the water and may also react with some types of plastic storage cisterns.

Connect pipework.

Fill and test.

Cold water – Storage cistern requirements – Construction of a cistern stand

Page 10: PLUMBING

Cold water – Storage cistern installation requirements

Cold water storage cistern cannot be installed any old how

A drill used with proper hole cutters should be used NOT a heated piece of pipe

Page 11: PLUMBING

STORAGE CISTERN

Compression outlet connector, available in various sizes.

PTFE thread tape can be used IF required. No oil based jointing compound should be used.

Two plastic washers are used to seal the outlet connector to the cistern.

Washers go here

Cold water – Storage cistern installation requirements

Page 12: PLUMBING

SIDE OUTLETS

BOTTOM OUTLETS

Cold water – Storage cistern installation requirements – pipework connections

25mm to prevent debris entering pipework

25mm to prevent debris entering pipework

25mm

25mm

Page 13: PLUMBING

Cold water – Storage cistern requirements – Installation of cistern

Cold feed to cylinder 25mm from bottom of cistern

Cold feed top cylinder in A/C

Float operated valve

Rising main

Service maintenance valve

Close fitting lidVent Rubber grommet to

seal open vent from cylinder

Overflow with dip pipe fitted a min 25mm below level of float valve

Insulation jacket

Page 14: PLUMBING

Cold water – Storage cistern requirements – Installation of cistern

Float operated valve

Insulation jacket

Installation kit

Cistern lid

Cistern

Service valve

Page 15: PLUMBING

Cold water – Storage cistern installation requirements – pipework connections

Warning & Overflow pipes

Combined warning and overflow pipe with cisterns of 1000 litres or less

More than 1000 litres and a separate warning pipe is required

50mm min

Screened overflow connection25mm min

Overflow pipe

Page 16: PLUMBING

Cold water – Storage cistern installation requirements – pipework connections

It has to be stressed that there is a fundamental difference between a Warning Pipe and an Overflow Pipe:

A Warning Pipe

This is a smaller diameter pipe used to warn of an impending overflow. It is connected to the cistern lower than the Overflow Pipe.

This is designed to take the discharge from the cistern when the inlet valve is running full bore and prevent the inlet valve from becoming submerged.

Overflow Pipe

Both pipes to have screened outlets and terminate conspicuously preferably outside.Storage cisterns to have separate warning / overflow pipes from feed and expansion cisterns used for central heating.

Page 17: PLUMBING

Cold water – Storage cistern installation requirements – pipework connections

50mm

25mm

50mm

Warning & Overflow pipe on cistern capacity over 1000 litres

Page 18: PLUMBING

If cistern supplies both hot and cold water supplies outlets must be positioned so that the hot water supply will run out before the cold …. Why ?

Cold water – Storage cistern installation requirements – pipework connections

Feed to Domestic Cold Water

(indirect)

Domestic Hot Water Cold Feed

Page 19: PLUMBING

AIRINGCUPBOARD

Incorrect pipeworkpositioning for rising main .. Why ?

Cold water – Storage cistern requirements – Installation of cistern

Page 20: PLUMBING

AIRINGCUPBOARD

Correct pipeworkpositioning

Cold water – Storage cistern requirements – Installation of cistern

Page 21: PLUMBING

Overflow pipes must be suitable to carry the water temperature that may discharge through them.

For example cisterns for solid fuel heating which may discharge boiling water should only be installed in copper.

Overflow must be one size larger than the supply it protects with the minimum size

22mm.

Must have a suitable fall to the discharge point and be well supported.

Cold water – Storage cistern requirements – Installation of cistern

Page 22: PLUMBING

Water Regulations state

350mm minimum distance

Make sure that storage cisterns and pipework meet the minimum distances required by regulations, to prevent frost damage and allow servicing of cisterns.

Cold water – Storage cistern requirements – Installation of cistern

Page 23: PLUMBING

STRAIGHT SERVICE VALVE FITTED TO

BALLVALVE

BENT SERVICE VALVE FITTED TO BALLVALVE

GATE VALVE FITTED TO CISTERN COLD WATER SUPPLY OUTLET

Cold water – Storage cistern requirements – Installation of cistern

Page 24: PLUMBING

When the system has been filled and tested for leaks, water levels and performance the system should be flushed and cleaned.

Fit pipe and cistern insulation and labelling to valves.

DHWS CFE VALVE

CLOSE TO TURN OFF HOT WATER SUPPLY

Cold water – Storage cistern requirements – Installation of cistern

Page 25: PLUMBING

Work book time

Cold water – Storage cistern requirements – Installation of cistern