pltu 2 x 3 mw nanga pinoh
DESCRIPTION
PLTU 2 X 3 MW NANGA PINOH. SITE SELECTION with PLN WILAYAH KALBAR, PLN-E, PLN RANTING NANGA PINOH KALBAR 17-21 March 2007. Alternative Lokasi PLTU cont’d. Summary of site selection. Berdasarkan analisa visual dan pembobotan maka lokasi PLTU Singkawang Baru adalah: - PowerPoint PPT PresentationTRANSCRIPT
PLTU 2 X PLTU 2 X 33 MW MWNANGA PINOHNANGA PINOH
SITE SELECTIONSITE SELECTION withwith
PLN PLN WILAYAH KALBAR, WILAYAH KALBAR, PLN-E, PLN PLN-E, PLN RANTING NANGA PINOHRANTING NANGA PINOH KALBAR KALBAR
17-21 March17-21 March 2007 2007
ALTERNATIVE-1 (KAMBUT)
Titik koordinatLatitude : 00o 18.411’ SLongitude : 111o41.780’ E
Wilayah administrative
Desa Kambut, Kel. Beru, Kec. Nanga Pinoh, Kab. Melawi, Propinsi Kalimantan Barat
ALTERNATIVE-2 (KAMBUT)
Titik koordinatLatitude : 00o16.811’ N Longitude : 111o41.791’ E
Wilayah administrative
Desa Kambut, Kel. Beru, Kec. Nanga Pinoh, Kab. Melawi, Propinsi Kalimantan Barat
ALTERNATIVE-3 (NANGKA KEBEBU)
Titik koordinatLatitude : 00o21.719’ N Longitude : 111o50.706’ E
Wilayah administrative
Desa NangaKebebu, Kec. Nanga Pinoh, Kab. Malawi, Propinsi Kalimantan Barat
Alternative Lokasi PLTU Alternative Lokasi PLTU cont’dcont’d
Summary of site selectionSummary of site selection
Weight AspectsAlternative-1
KambutAlternative-2
KambutAlternative-3
Nanga Kebebu
Technical aspects 69.16 68.56 81.01
Socio-economic aspects 28 26 32
Environmental aspects 50.70 50.70 50.70
TOTAL 147.86 145.26 163.71
Berdasarkan analisa visual dan pembobotan maka lokasi PLTU Singkawang Baru adalah:
Alternative-2 (Pantai Kura-Kura)
Peta GPSPeta GPS
Alternative Lokasi PLTUAlternative Lokasi PLTU
On Going Transmission Line 150 kV
Pantai Gosong
Pantai Kura-Kura
Pantai Pasir Panjang-2
Pelabuhan Kuala
Gambaran Peta LokasiGambaran Peta Lokasi
On Going Transmission Line 150 KV
Pantai Kura-Kura
• PRAKIRAAN TOTAL KEBUTUHAN AIR PLTUAIR PENDINGIN = 1.200 m3/hariAIR DEMIN & SERVICE = 20 m3/hari
• PRAKIRAAN TOTAL KEBUTUHAN BATUBARASELAMA 1 HARI = 120 TonSELAMA 1 BULAN = 3600 Ton
PRAKIRAAN KEBUTUHAN LAHAN UNTUK COAL YARDAKTIVE STORAGE SELAMA 10 HARI = 0,07 HaDEAD STORAGE SELAMA 1 BULAN = 0,02 Ha
• PRAKIRAAN ABU YANG DIHASILKANSELAMA 1 TAHUN = 2.500,00 TonLUAS LAHAN YANG DISEDIAKAN = 0,04 Ha
FOTO FOTO KAMBUT-1KAMBUT-1
FOTO FOTO KAMBUT-2KAMBUT-2
FOTO FOTO KABEBUKABEBU
FOTO PELABUHAN FOTO PELABUHAN PERHUBUNGANPERHUBUNGAN
Periode Ulang Nilai Ekstrim(tahun) Tinggi Gel. (m)
1 0.99 2 1.24 3 1.49 5 1.82
10 2.31 25 3.06 50 3.73 100 4.52 200 5.44
Gelombang Ekstrim Tanjung Gondol
Elevasi Penting Pasang Surut Tanjung Gondol
Hasil Penaksiran Selama 20 Tahun
Nilai Elevasi-elevasi Penting (cm)
Highest Water Spring (HWS) : 88.39 Jml. Kejadian : 1
Mean High Water Spring (MHWS) : 72.33 Jml. Kejadian : 493
Mean High Water Level (MHWL) : 29.79 Jml. Kejadian : 12707
Mean Sea Level (MSL) : -0.97 Jml. Kejadian : 175320
Mean Low Water Level (MLWL) : -33.76 Jml. Kejadian : 12693
Mean Low Water Spring (MLWS) : -55.33 Jml. Kejadian : 493
Lowest Water Spring (LWS) : -68.18 Jml. Kejadian : 1
Nilai Elevasi-elevasi Penting diikatkan pada MSL
Highest Water Spring (HWS) : 89.36 Jml. Kejadian : 1
Mean High Water Spring (MHWS) : 73.3 Jml. Kejadian : 493
Mean High Water Level (MHWL) : 30.76 Jml. Kejadian : 12707
Mean Sea Level (MSL) : .00 Jml. Kejadian : 175320
Mean Low Water Level (MLWL) : -32.79 Jml. Kejadian : 12693
Mean Low Water Spring (MLWS) : -54.36 Jml. Kejadian : 493
Lowest Water Spring (LWS) : -67.21 Jml. Kejadian : 1
Tunggang Pasang: 156.57