Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week October 2008)

Upload: nguyentu

Post on 30-May-2018

247 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: PLTMH AIH NUSO - Kadin Indonesia 4 - Aih Nuso, Arusha.pdf · Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week

Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues

PLTMH AIH NUSO

BUMDes “ATU PECATUREN”

(commissioned second week October 2008)

Page 2: PLTMH AIH NUSO - Kadin Indonesia 4 - Aih Nuso, Arusha.pdf · Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week

IBEKA

Page 3: PLTMH AIH NUSO - Kadin Indonesia 4 - Aih Nuso, Arusha.pdf · Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week

“PUTRI BETUNG”

ELECTRIFICATION

DEVELOPMENT PLAN

> 3500 KW hydro power potentials

> +/- 35 km MV power line infrastructure

JAMUR GELE

40 kW

AIH NUSO

2 X 250 kW

AIH KAIS

3 X 500 kW

MARPUNGE

2 X 200 kW

GURAH

3 X 500 kW

+ 10 km underground to local grid

Page 4: PLTMH AIH NUSO - Kadin Indonesia 4 - Aih Nuso, Arusha.pdf · Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues PLTMH AIH NUSO BUMDes “ATU PECATUREN” (commissioned second week

> Touch screen operated> Real time monitor> Remote control

SISTIM KONTROL “PARIKESIT”Pengontrol Aliran Dijital Kemampuan Sistim Terbangkit

MHP HMI (Micro-mini hydro Human Machine Interface)