PLM from Day OnePresented by: Amir Gluckman, Supply Chain & IT Manager, Pentalum Technologies
May 2011
2
• Wind Measurement Sensors for Wind Resources Assessment and Wind Energy Farms.
• Established: 2009
• No. of Employees: 17
• Location: Rehovot Science Park
• Actual stage: Operating prototypes.
• Certifications:
• ISO9001 certified.
• ISO1400 in process (May 2011)
• Member of AEWA & EWEA
About Pentalum
With the same cost of two 80m meteorological towers - use a SpiDAR with multiple optical heads to reduce the uncertainty of your wind measurements and
significantly increase your wind farm Annual Energy Production (AEP)
3
SpiDAR for Resource Assessments
60m-80m Metrological Mast
A high performance, low cost wind sensing LiDAR (the SpiDAR™) based on unique algorithms and
common telecom optical components for:
• Wind Turbine Control – to optimize wind turbine performance.
• Wind Resource Assessment – to lower the level of measurements uncertainty and improve micro-siting.
• Forecasting – to significantly improve the forecasting of the wind conditions, hours up to days ahead of time.
4
Pentalum’s Innovation
Use a SpiDAR with multiple optical heads for accurate on-going wind measurements that support control and optimization of the wind turbines
5
SpiDAR for Operational Wind Farms
Pentalum’s Information System
• ERP: QAD Apps (MFG/Pro)
• PLM: PTC Windchill
• eCAD: OrCad
• mCAD: Solidworks 2011
PLM from Day One – Why?
• Experience Centralization.
• Processes Unification.
• Single Point of Contact.
• eCAD / mCAD Data Management
• Internal Collaboration.
• ERP / CRM integration
• External Collaboration.
• Suppliers / Subcontractors involvement.
PLM before ERP - Why?
• R&D Product Life Cycle Monitoring from Day One.
• Most of Data Processing focused in R&D.
• R&D Mass Configuration (include changes) Processes Follow Up.
PLM - Timetable
• Concept– Client Server vs. SaaS
• Data Centralization– Virtual PDM Process
– Tech. Data Management (Active, Pending, Archive)
• Optional Software– PTC Windchill
– Siemens TeamCenter
– Dassault Enovia
– Oracle Agile
– Infor
• Chosen: PTC Windchill
December March
January February March
12-10
Data Centralization
2-12
Concept (Client Server vs. SaaS)
4-12 - 20-12
PLM Software Search
13-1 - 18-1
Benchmark
18-1
Decision
12-22 - 1-13
RFQ
18-1 - 23-1
Negotiation
21-12
“Final Two” Decision23-1
Contract
30-1 - 3-3
Installation & Implementation (Stage 1)
3-3
“Go Live”
PLM Stage 1 – Implementation Steps
• Installation
• Data Migration
• Tests
• Interfaces:
• eCAD
• mCAD
• QAD Apps
• Go Live