PLATINUM GROUP METALS LTD FORM 6-K (Report of Foreign Issuer) Filed 10/20/09 for the Period Ending 10/08/09 Telephone 6048995450 CIK 0001095052 Symbol PLG SIC Code 1040 - Gold And Silver Ores Industry Metal Mining Sector Basic Materials Fiscal Year 08/31 http://www.edgar-online.com © Copyright 2013, EDGAR Online, Inc. All Rights Reserved. Distribution and use of this document restricted under EDGAR Online, Inc. Terms of Use.

Upload: others

Post on 24-Dec-2019

5 views

Category:

Documents


0 download

TRANSCRIPT

PLATINUM GROUP METALS LTD

FORM 6-K(Report of Foreign Issuer)

Filed 10/20/09 for the Period Ending 10/08/09

Telephone 6048995450

CIK 0001095052Symbol PLG

SIC Code 1040 - Gold And Silver OresIndustry Metal Mining

Sector Basic MaterialsFiscal Year 08/31

http://www.edgar-online.com© Copyright 2013, EDGAR Online, Inc. All Rights Reserved.

Distribution and use of this document restricted under EDGAR Online, Inc. Terms of Use.

FORM 6-K

SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549

Report of Foreign Private Issuer Pursuant to Rule 13a-16 or 15d-16

of the Securities Exchange Act of 1934

For the period of: August 1 to October 19, 2009

Platinum Group Metals Ltd. (SEC File No. 0-30306 )

Suite 328 – 550 Burrard Street, Vancouver BC, V6C 2B5, CANADA

Address of Principal Executive Office

Indicate by check mark whether the registrant files or will file annual reports under cover: Form 20-F [ ] Form 40-F [X]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): [ ]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): [ ]

Indicate by check mark whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934: Yes [ ] No [X] If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): 82-___________ Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Exhibit List 99.1 Material Change Report dated October 8, 2009 99.2 News Release No 09-178 99.3 News Release No 09-179 99.4 Material Change Report dated October 9, 2009 99.5 News Release No 09-180

Date: October 19, 2009 “Frank Hallam” FRANK HALLAM

DIRECTOR & CFO

FORM 51-102F3 MATERIAL CHANGE REPORT

ITEM 1. NAME AND ADDRESS OF COMPANY

PLATINUM GROUP METALS LTD. (“Platinum Group”) 328 – 550 Burrard Street Vancouver BC, V6C 2B5 Telephone: (604) 899-5450 Facsimile: (604) 484-4710

ITEM 2. DATE OF MATERIAL CHANGE October 8, 2009

ITEM 3. NEWS RELEASE A news release was disseminated on October 8 th , 2009 to the TSX as well as through various other approved public media and was SEDAR filed with the British Columbia, Alberta, Ontario and Quebec Securities Commissions.

ITEM 4. SUMMARY OF MATERIAL CHANGE Platinum Group announced that it has received an independent update to the Feasibility Study f or the Project 1 platinum mine of the Western Bushveld Joint Venture in South Africa.

ITEM 5. FULL DESCRIPTION OF MATERIAL CHANGE

(Vancouver/Johannesburg) Platinum Group Metals Ltd. (PTM-TSX; PLG-AMEX) announces results from the Independent Update to the Feasibility Study for the Project 1 Platinum mine of the Western Bushveld Joint Venture (“WBJV”) in South Africa. Platinum Group Metals Ltd holds a 74% interest in the WBJV and Wesizwe Platinum (WEZ-JSE) holds a 26% interest. Summary

• Measured and Indicated Mineral Resources increased by 0.924Moz due to additional drilling in Project 1 & 1A areas on Merensky and UG2 Platinum bearing layers or reefs.

• Reserves increased 7.35 % as a result of optimized extraction on the UG2 Reef.

• Ounces produced in concentrate at steady state increased to 275,000 ozs per year 4E (platinum, palladium, rhodium and gold) from 250,000 ozs per year as a result of improvements to the mine design and higher plant throughput.

• Revised mine plan calls for production of ore from underground in 2011 and first concentrate sales first quarter of 2013.

• Peak funding for 100% of the Project reduced by US$ 64m to US$ 443m.

• Life of Mine Capital cost estimate, over 22 years reduced by US$ 89m to US$ 595m as a result of change in design to use mostly grid power rather than self generated power and improvements in mine design compared to July 2008 original feasibility

• At a platinum price of US$ 1,343 per oz (3 year trailing average, 8 South African Rand to US$, no escalation), the Project IRR is 24% pre tax and the Project NPV of Platinum Group’s 74% share pre tax is US$ 726 m (5% discount rate NPV5) and US$ 352 m (10% discount rate NPV10) Post tax, including secondary tax, Platinum Group’s share is NPV5 US$ 431m and NPV10 US$ 188m.

• The Minister of Mineral Resources has approved the majority of the title transfers of all of the prospecting permits related to the transaction whereby Platinum Group Metals will hold a 74% right of Projects 1 and 3 of the WBJV (26% Wesizwe).

R. Michael Jones, President of Platinum Group Metals Ltd. states “The WBJV Project 1 stands out as one of the best undeveloped platinum projects in the world due to its shallow depth and high grade. We see great opportunity ahead as the demand for platinum is increasing with the recovery of the auto sector in the west and from strong new demand growth in China and India. Jewelry demand in China is also now strong once again and was reported 81% higher just a few days ago. Supply on the other hand continues to struggle to maintain current rates of production”. “Our Project is ready to move ahead with capital requirements lower than deeper alternatives. Safety, power and labour will continue to be a challenge in South Africa and we are very competitive within the world’s only true platinum field. The Updated

Feasibility Study provides a basis from which management and shareholders can test which path will bring the best rewards. We are evaluating several different alternatives right now.” Measured and Indicated Resources have increased as a result of further drilling in the Project 1 & 1A areas. These upgraded ounces have not yet been included in the mineable Reserves of the Updated Feasibility mine plan. The steady state production rate of the mine has increased from the original July 2008 Feasibility Study as a result of tightening the distance from the haulage tunnels driven below the ore to the mining horizon and increased production efficiencies. The changes lower the amount of waste that has to be mined and allows for the mining and haulage capacity of the mine systems to focus more on moving ore. This change was based on significant input from the geotechnical engineers and reviews by teams involved in production at adjacent mines. The July 2008 Feasibility Study mine design was conservative and the original access methodology remains with three sets of rapid access declines and reliable conventional mining methods being utilized making for a flexible and safe design due to multiple access. The most significant change in the capital costs of the Updated Feasibility Study is the revision of the power assumption. The company has recently received a budget quotation for the provision of power to the project from South African power utility ESKOM. This was not available at the time of the original Feasibility Study. The mine will be lower on power requirements by design as compared to nearby deeper operations. The power situation in South Africa has stabilized and it is not deemed necessary by the qualified persons to provide for 100% reserve capacity and approximately 25% reserve has been provided for in the Updated Feasibility Study. The WBJV Project 1 Mine will create about 3,100 new jobs at full production and will have a positive effect on the local economy. It is envisaged that the mining and processing operations will be contractor based. The Ministerial approval, in respect of the transfer of prospecting permits (Section 11 Transfers) for the WBJV is moving through the process positively. Section 11 transfers for the majority of the WBJV mineral rights have been received and the final transfers are expected shortly. Formal registration of these new titles will take some months to administer and complete and these can be completed in parallel with the lodging of the Mining Right Application. Under current prospecting permits, underground development for access and basic infrastructure work can commence. Operating costs and underground development costs have increased as a result primarily of mining related cost including labour increases. Operating Cost estimates have increased from US$ 438 per 4E oz in concentrate to US$ 526 per 4E oz in concentrate. The results of this Updated Feasibility Study represent the culmination of more than 5 months of work by independent engineers from Turnberry Projects of South Africa, Platinum Group Metals’ own engineers from South Africa and Canada, and a team of specialists from several South African firms and review of the mechanized access for the mine design from Wardrop Engineering Inc. of Canada. This is in addition to the 18 months for the Feasibility Study completed in July 2008. The WBJV Project 1 is located in the heart of the Western Bushveld area of South Africa where 70% of the world’s platinum is produced from the Merensky and UG2 Platinum Reefs, the same two horizons to be mined in the Updated Feasibility Study. The partners in the WBJV are project operator Platinum Group Metals Ltd. (74%) and JSE listed Wesizwe Platinum (26%). Financial Details

The following tables set out the key details of the Updated Independent Feasibility Study

METAL PRICES & EXCHANGE RATE Case A 3 Year Trailing Prices

Case B Recent Prices

Platinum (US$/oz) 1,343 1,295 Palladium (US$/oz) 322 296 Rhodium (US$/oz) 4,951 1,650

Gold (US$/oz) 807 997 Copper (US$/tonne) 6,428 6,250 Nickel (US$/tonne) 25,529 18,000

Rand/US$ 8.00 8.00

FINANCIAL PARAMETERS AND INDICATORS at R8.00 Basket Prices 4E Pt, Pd, Rh, Au

R/kg Case A

US$/oz Case A

R/kg Case B

US$/oz Case B

Basket Price Merensky Reef 304,751 1,185 263,526 1,025

Basket Price UG2 Reef 368,571 1,433 274,639 1,068

Smelter and Refinery Discount Smelter Discount US$/oz Case A

US$/oz Case B

Reduction in Basket Price MR 15.16% $180 $155 Reduction in Basket Price UG2 15.16% $217 $162 Received Basket Price for MR 15.16% $1,005 $869 Received Basket Price for UG2 15.16% $1,216 $906

TAXES Government Royalty Payment: PGM (% of Revenue) 3% Government Royalty Payment: Base Metals (% of Revenue) 2% Company Tax (% of Profit) 28% Secondary Tax on Companies (STC) (% of profit) 10%

EVALUATION (NET PRESENT VALUE) NPV 5% Discount

NPV 10% Discount

3 Year Trailing Price (Case A) R (Million) 7,848 3,804 (Pre-tax) US$ (Million) 981 475

IRR 23.54%

3 Year Trailing Price (Case A) R (Million) 4,660 2,031 (Post Tax) US$ (Million) 582 254

IRR 18.94%

Recent Prices (Case B) R (Million) 3,671 1,330 (Pre-tax) US$ (Million) 459 166

IRR 15.63%

Recent Prices (Case B) R (Million) 2,016 425 (Post Tax) US$ (Million) 252 53

IRR 12.15%

CAPITAL COST Rand US$ Peak funding Case A 3,545,237,000 443,125,000 Peak funding Case B 3,727,106,000 465,888,000

Total Life of Mine Capital Costs 4,760,280,000 595,035,000

WORKING COSTS EXCLUDING SMELTER DISCOUNT US$/4E oz R / tonne milled

Cost during ramp up including any power generation

$543 R717

Cost at steady state grid power post 2013 $521 R491 Life of Mine Average $526 R525

Sensitivity Three Year Trailing Metals Prices

Mineral Resources – (MR- Merensky Reef; UG2- Upper Group 2 Reef).

The Mineral Resources reported in this Updated Feasibility Study have not been previously disclosed. This updated Resource is based on the additional drilling done in Project 1 & 1A areas. The Resource update was done to conform to a minimum 80cm resource cut which is in line with that used by producing mines in the area. Sampling practice, bore hole data, other factors and quality control and assurance are as reported previously. The Resources are estimated by kriging of approximately 231 boreholes plus deflections and are reported under SAMREC. The categories are the same as CIM categories. Quality controls include chain of custody, insertion of blanks and duplicates and check assays as previously disclosed. The Independent Qualified Person for the Mineral Resources is Charles Muller of Minxcon. WBJV Project 1

PRE-TAX Parameter Change in Parameter Change in Parameter Change in Parameter PGM Basket Price -20% 0% 20% IRR (pre-tax) 14.5% 23.5% 31.2% NPV (5% Discount) R(M) 3,494 7,848 12,202 US$ (M) 437 981 1,525 Opex -20% 0% 20% IRR (after tax) 27.5% 23.5% 19.4% NPV (5% Discount) R (M) 9,835 7,848 5,861 US$ (M) 1,229 981 733 Capex -20% 0% 20% IRR (after tax) 28.4% 23.5% 19.9% NPV (5% Discount) R (M) 8,635 7,848 7,061 US$ (M) 1,079 981 883 POST-TAX Parameter Change in Parameter Change in Parameter Change in Parameter PGM Basket Price -20% 0% 20% IRR (post-tax) 11.3% 18.9% 25.3% NPV (5% Discount) R (M) 1,892 4,660 7,393 US$ (M) 236 583 924 Opex -20% 0% 20% IRR (post-tax) 22.3% 18.9% 15.4% NPV (5% Discount) R (M) 5,917 4,660 3,393 US$ (M) 740 583 424 Capex -20% 0% 20% IRR (post-tax) 23.0% 18.9% 15.9% NPV (5% Discount) R (M) 5,202 4,660 4,111 US$ (M) 650 583 514

Measured Mineral Resource (4E)

Cut-off (cm.g/t)

Million Tonnes (Mt) Grade 4E (g/t) Mining Width

(m) Tonnes PGE

(4E) Moz PGE’s

(4E) Project 1 MR 300 6.603 8.38 1.33 55.333 1.779 Project 1 UG2 300 7.464 4.26 1.34 31.797 1.022

Total Measured 300 14.067 6.19 1.34 87.130 2.801

Prill Splits Pt Pt (g/t) Pd Pd (g/t) Rh Rh (g/t) Au Au (g/t) Project 1 MR 64% 5.36 27% 2.26 4% 0.34 5% 0.42 Project 1 UG2 63% 2.68 26% 1.11 10% 0.43 1% 0.04

Indicated Mineral Resource (4E)

Cut-off (cm.g/t)

Million Tonnes (Mt)

Grade 4E (g/t)

Mining Width (m)

Tonnes PGE (4E)

Moz PGE’s (4E)

Project 1 & 1A MR 300 11.183 7.25 1.24 81.077 2.607 Project 1 & 1A UG2 300 19.209 4.46 1.39 85.672 2.754

Total Indicated 300 30.392 5.49 1.34 166.749 5.361

Mineral Reserves – derived from the Measured & Indicated Resources and not in addition to them.

A Probable Reserve is the economically mineable part of an Indicated, and in some circumstances a Measured Resource, demonstrated by at least a Pre-Feasibility Study including adequate information on mining, processing, metallurgy, and economic and other factors that demonstrate, at the time of reporting, that economic extraction can be justified. A Proven Reserve is the economically mineable part of a Measured Resource demonstrated by the same level and factors as above. A Proven Mineral Reserve implies that there is a high degree of confidence. The current Mineral Reserve used for mine planning purposes has not yet taken the updated Resource into account. The 7.35% Mineral Reserve tonnage increase has been achieved by an optimised extraction ratio on the UG2. The conversion to Mineral Reserves was undertaken at 3.5g/t stope cut-off grade. Each stope has been fully diluted for mine modeling purposes by way of planned dilution and additional dilution for all aspects of the mining process. The estimated resulting grade to the mill is 1% higher on the Merensky Reef and the same on the UG2 contrasted from the July 2008 Feasibility Study estimate of mill head grade. The Inferred Resources are outside and in addition to the reserves. The Independent Qualified Person for the Statement of Reserves is Tim Spindler.

The prill splits as shown above are the same percentages as for the earlier reported Measured and Indicated Resources. These prill spilt grams per tonne are provided to satisfy the requirements of the BCSC and are not in compliance with SAMREC best practice. The splits have a lower confidence level when compared to the 4E grades. The reserves are stated with certain risk factors including, but not limited to, mining project risks as highlighted in the “Risks and Opportunities” section as well in the disclosure statement. Mine Plan Details

Improvements have been made to mine design and the projected maximum output has been increased to fully utilize the availability and flexibility of three separate decline systems. The mining of UG2 material has increased due to increased panel length and better overall extraction ratio. The Updated Feasibility Study has removed the overall constraint of 48,000 tonnes per month per decline system. Basic production parameters have remained unchanged. This has resulted in a higher steady state production level of approximately 156,000 reef tonnes per month

Prill Splits Pt Pt (g/t) Pd Pd (g/t) Rh Rh (g/t) Au Au (g/t) Project 1 & 1A MR 64% 4.64 27% 1.96 4% 0.29 5% 0.36 Project 1 & 1A UG2 63% 2.81 26% 1.16 10% 0.45 1% 0.04

Inferred Mineral Resource (4E)

Cut-off (cm.g/t)

Million Tonnes (Mt)

Grade 4E (g/t)

Mining Width (m)

Tonnes PGE (4E)

Moz PGE’s (4E)

Project 1 MR 300 0.154 8.96 1.06 1.380 0.044 Project 1 UG2 300 0.022 3.91 0.83 0.086 0.003 Total Inferred 300 0.176 8.33 1.03 1.466 0.047

Prill Splits Pt Pt (g/t) Pd Pd (g/t) Rh Rh (g/t) Au Au (g/t) Project 1 MR 64% 5.73 27% 2.42 4% 0.36 5% 0.45 Project 1 UG2 63% 2.46 26% 1.02 10% 0.39 1% 0.04

Merensky UG2

Tonnes (000) 4E Content 4E Tonnes (000) 4E Content 4E t g/t tonne Moz t g/t tonnes Moz

Merensky Proven UG2 Proven 6,678 5.61 37.478 1.21 5,086 3.37 17.126 0.55

Merensky Probable UG2 Probable 11,333 5.44 61.677 1.98 8,449 3.41 28.831 0.93

Total Merensky Mineral Reserves Total UG2 Mineral Reserves 18,011 5.51 99.155 3.19 13,535 3.40 45.957 1.48

Prill Splits Pt Pt (g/t) Pd Pd (g/t) Rh Rh (g/t) Au Au (g/t) Project 1 & 1A MR 64% 3.52 27% 1.49 4% 0.22 5% 0.28

Project 1 & 1A UG2 63% 2.15 26% 0.88 10% 0.34 1% 0.03

compared to 140,000 reef tonnes per month in the previous design. This will require each individual decline system to produce approximately 57,000 tonnes per month. Although similar systems often produce between 80,000 and 100,000 reef tonnes per month, 57,000 reef tonnes per month is considered to be realistic given the strike width available from each decline system , which provides 13 years of steady state tonnage production. First ore is reached by development 13 months from the commencement of underground work. First ore will be processed in the concentrator in first quarter 2013 subject to the installation of grid power from ESKOM. Ore will be stockpiled from mining until the concentrator is operational and this Updated Feasibility Study has not included the possibility of ore sales. Mining is only scheduled on the Mineral Reserves. The updated Resource which includes additional Indicated and Measured categories and the lower grade UG2 Resources also provide some future opportunities. The mining and development plan includes conventional hand held drilling utilizing electrical drills and scrapers as well as winch cleaning similar to the successful conventional mining operations at the adjacent mines. Declines and primary access to the deposit are designed for development with mechanized equipment. Ore is initially to be hauled out of the mine with mechanized equipment and assisted later by conveyor from year 4 of the planned mine life to end of mine life. The Merensky Reef will be mined at widths between 93cm and 176cm and the UG2 Reef will be mined at widths between 105cm and 205cm. At the recommended mining rate and modifying factors the mine plan generates between 234,000 to 300,000 4E ozs in concentrate per year. During 9 years of peak production approximately 275,000 4E ozs per annum in concentrate are produced from the Merensky Reef horizon. The mine has a 22 year planned mine life. Infrastructure and Metal Recovery

The Updated Feasibility Study design for metallurgical extraction utilizes a standard plant design similar to other nearby plants in the Bushveld complex operating on the same reefs. The plant is designed with circuits that can process either Merensky Reef, UG2 Reef or a controlled blended feed. The Merensky Reef is the target of initial mining because of its higher 4E grade and low chrome content. The concentrator has been designed and re-costed, based on treating the optimal 140,000 tonnes per month. The revised mine plan has increased this treatment rate to 160,000 tonnes per month and for the concentrator to treat this increased quantity of reef, the recovery has been reduced with a discount of up to 2.5% for treatment in excess of nominal “name plate” capacity. Metallurgical testing and the published experience of the adjacent operating mines support a “name plate” capacity plant recovery rate estimate of 87.5% of platinum, palladium, rhodium and gold on the Merensky Reef and 82.5% on the UG2 Reef. Recoveries of 45% for nickel and 70% for copper are also modeled for the Merensky Reef. Ruthenium and Iridium are also included as minor contributors. No additional metallurgical test work has been undertaken during the Updated Feasibility Study. The mine infrastructure in the Capital cost estimates includes the entire required surface infrastructure for a stand alone mine including water, power, underground access and ventilation to establish full production. Smelter Terms

The Updated Feasibility Study includes capital and operating estimates to produce concentrate but no capital is included for smelting or refining of this concentrate. The costs associated with smelting and refining of concentrate is modeled as a deduction from revenue arising from the sale of concentrate to others. While the terms of agreements governing the sale of such concentrates within the South African PGM industry are all confidential, the Qualified Person believes deductions used in the Updated Feasibility Study financial model are indicative of deductions current in this industry. The party to whom concentrate will be sold and the terms of this potential sale are yet to be determined. Anglo Platinum has a 60 day right of first refusal to purchase all of the ore or concentrate produced by the WBJV on commercial terms. Estimated deductions in the Updated Feasibility Study include penalties and shipment charges and total approximately 15% from gross concentrate sales revenue. Should Anglo Platinum decide to purchase the concentrate produced by the Project 1 mine the structure of such purchase would be governed by the pro-forma off-take agreement included in the WBJV Agreement, however the commercial terms will be subject to negotiation. Approaches will now be made to Anglo Platinum and other parties in an attempt to secure an off-take agreement and the terms thereof based on the Updated Feasibility Study production profile. Social Development and Responsibilities

Feedback from the public consultation processes for the environmental assessment and social and labour plan development have been constructive and positive. This work has continued during 2008 and 2009 since the original July 2008 study. Consultation with the Department of Mineral Resources on the mine plan and social and labour plan has been positive. The mine capital development plan includes a significant investment in training through the life of mine, allocated to a social and labour plan to ensure maximum value from the project for all stakeholders including local residents. Based on interaction with the community, a skills and needs assessment, and our training plans, the project is planning for 3,100 jobs with a target of at least 30% from the local communities. The WBJV is committed to a strong community involvement in the project particularly as Wesizwe Platinum is a 26% partner in the project and their largest shareholder is one of the communities near the mine. The mine’s financial estimates include an accumulated charge per tonne to create a fund for eventual closure of the mine projected in approximately 2031.

Risks and Opportunities

The project is subject to a number of risks including, but not limited to, the normal project risks associated with a mining project of this type, such as geology, grade, structure, mining plans, mining width, mining dilution, rates of extraction per reef type, concentrator recovery, water supply, power supply and labour shortages and estimation risks in the capital and operating costs and exchange rates and metal prices. The estimates in September 2009 money terms are ±10% on the capital and ±10% on the operating costs and ±15% on project timing. A contingency of 10.95% of the capital cost required to reach first production included in the financial model mitigates some of the risks of a capital over run. The estimated capital costs of Platinum Group Metals Ltd.’s share of the project exceed its working capital and significant project funding is required. The transfer of the majority of the WBJV property has been approved by the Minister of the Department of Mineral Resources and final registration is in process. Final registration of title at the deeds office completes the 74% Platinum Group right and the agreements for finalization have been extended to February 2010 if required. Not all of the surface rights over the proposed infrastructure design in the Updated Feasibility Study have been purchased. Negotiations are well advanced. An allowance for the cost of this has been made. The Mineral Petroleum Development Act provides firm assistance in ensuring that access to the minerals can be achieved, however if the process under the Act is deemed necessary it may require additional time. A significant portion of the defined resources are not mined in the Updated Feasibility Study. Continued strong metal prices and implementation level engineering will provide an opportunity to re-evaluate these resources. There are other platinum mining projects in the immediate area - including the Wesizwe Platinum Project and the Styldrift Project planned for development. Potential cost savings and reduced impacts by designing combined infrastructure are being investigated. Qualified Person and Quality Assurance and Control

The Updated Feasibility Study has been completed by Gordon Cunningham (FSAIMM and ECSA) and Tim Spindler (FSAIMM and ECSA) as the projects leads of Turnberry Projects (Pty) Ltd. and Byron Stewart P.Eng of Wardrop Engineering Inc. as review for design of the underground mechanized access and footwall mining. They have been supported by the following qualified specialists and firms: Grinaker-LTA Mining Construction & Mining Engineering GRD Minproc Process Engineering & Construction Epoch Resources Mine Residue & Environmental Engineering Bluhm Burton Engineering Consulting Mine Ventilation & Refrigeration Specialists Dave Arnold & Associates Rock Mechanics Minxcon Independent Consultants in Geology As operator of the WBJV, Platinum Group Metals Ltd. is responsible for the management, exploration and engineering activities. The Mineral Resources are estimated by Charles Muller of Minxcon (SACNASP) as independent consultant and he has completed the investigation and report in compliance with Canadian National Instrument 43-101 on this and the previous announced estimate. He provides the update given here on Resources. Gordon Cunningham of Turnberry Projects (Pty) Ltd. (FSAIMM and ECSA) is the overall Qualified Person for NI 43-101 Technical Report which will support the statements made in the Updated Feasibility Study. He is a fellow with the South African Institute of Mining and Metallurgy (“SAIMM”), has had extensive experience in the assessment of mines including platinum mines and has been responsible for the mine designs and related investigations. He has over 30 years experience in project operation, project evaluation, design and feasibility work and is supported by a team of experienced engineers. Turnberry Projects has extensive experience with the design and evaluation of platinum projects and mines with past assignments including investigations ranging from metallurgical design to feasibility mine evaluation and project management. Tim Spindler of Turnberry Projects (Pty) Ltd. (FSAIMM and ECSA) is a Qualified Person for the NI43-101 Technical Report which will support the statements made in the Updated Feasibility Study relating to in stope mining and ventilation and Mineral Resource conversion to Mineral Reserve. He has had extensive experience in operations, production and consulting to mines in various operations in Southern Africa over 40 years. Byron Stewart, P.Eng, of Wardrop Engineering Inc. is the Qualified Person for the NI 43-101 Technical Report which will support the statements made in the Updated Feasibility Study relating to design of the Mine Access Development and Footwall Development using mechanised mining methods. He has had extensive experience in consulting on mechanised mine development in various operations in three continents over 35 years.

Charles Muller, Gordon Cunningham, Tim Spindler and Byron Stewart have visited the property in 2008 and they have verified the data for their respective areas. Verification has occurred to a reasonable level in accordance with good engineering practice. Conclusions

The results of the Updated Feasibility Study are robust and the total project has a 24% IRR pre-tax with a Net Present Value at a 5% discount rate of US$ 981 million based on 3 year trailing metal prices. Using recent metal prices the project IRR is 16 % pre-tax and its Net Present Value at a 5% discount rate is US$ 459 million. The mining layout uses conventional proven approaches for mining and multiple accesses which will provide good flexibility and proven productivity at low risk. The metallurgical recovery and proposed concentrate should be attractive in the current tight market for platinum group metals. The project is highly competitive contrasted to many other projects and deeper platinum development alternatives. ITEM 6. RELIANCE ON SUBSECTION 7.1 OF NATIONAL INSTRUMENT 5 1-102 N/A

ITEM 7. OMITTED INFORMATION N/A

ITEM 8. EXECUTIVE OFFICER

The following senior officer of the Issuer is knowledgeable about the material change and may be contacted by the Commission at the following telephone number: R. Michael Jones, President & CEO Phone: (604) 899-5450

ITEM 9. DATE OF REPORT October 19, 2009

UPDATED FEASIBILITY STUDY PROJECT 1 PLATINUM MINE: - RESERVES & PRODUCTION RATE INCREASED

- CAPITAL COST DECREASED (Vancouver/Johannesburg) Platinum Group Metals Ltd. (PTM-TSX; PLG-AMEX) announces results from the Independent Update to the Feasibility Study for the Project 1 Platinum mine of the Western Bushveld Joint Venture (“WBJV”) in South Africa. Platinum Group Metals Ltd holds a 74% interest in the WBJV and Wesizwe Platinum (WEZ-JSE) holds a 26% interest. Summary

• • • •

328 - 550 Burrard Street

Vancouver, BC V6C 2B5

P: 604-899-5450

F: 604-484-4710

News Release No. 09-178

Oct 08, 2009

Measured and Indicated Mineral Resources increased by 0.924Moz due to additional drilling in Project 1 & 1A areas on Merensky and UG2 Platinum bearing layers or reefs.

• • • • Reserves increased 7.35 % as a result of optimized extraction on the UG2 Reef.

• • • • Ounces produced in concentrate at steady state increased to 275,000 ozs per year 4E (platinum, palladium, rhodium and gold) from 250,000 ozs per year as a result of improvements to the mine design and higher plant throughput.

• • • • Revised mine plan calls for production of ore from underground in 2011 and first concentrate sales first quarter of 2013.

• • • • Peak funding for 100% of the Project reduced by US$ 64m to US$ 443m.

• • • • Life of Mine Capital cost estimate, over 22 years reduced by US$ 89m to US$ 595m as a result of change in design to use mostly grid power rather than self generated power and improvements in mine design compared to July 2008 original feasibility

• • • • At a platinum price of US$ 1,343 per oz (3 year trailing average, 8 South African Rand to US$, no escalation), the Project IRR is 24% pre tax and the Project NPV of Platinum Group’s 74% share pre tax is US$ 726 m (5% discount rate NPV5) and US$ 352 m (10% discount rate NPV10) Post tax, including secondary tax, Platinum Group’s share is NPV5 US$ 431m and NPV10 US$ 188m.

• • • • The Minister of Mineral Resources has approved the majority of the title transfers of all of the prospecting permits related to the transaction whereby Platinum Group Metals will hold a 74% right of Projects 1 and 3 of the WBJV (26% Wesizwe).

R. Michael Jones, President of Platinum Group Metals Ltd. states “The WBJV Project 1 stands out as one of the best undeveloped platinum projects in the world due to its shallow depth and high grade. We see great opportunity ahead as the demand for platinum is increasing with the recovery of the auto sector in the west and from strong new demand growth in China and India. Jewelry demand in China is also now strong once again and was reported 81% higher just a few days ago. Supply on the other hand continues to struggle to maintain current rates of production”. “Our Project is ready to move ahead with capital requirements lower than deeper alternatives. Safety, power and labour will continue to be a challenge in South Africa and we are very competitive within the world’s only true platinum field. The Updated Feasibility Study provides a basis from which management and shareholders can test which path will bring the best rewards. We are evaluating several different alternatives right now.” Measured and Indicated Resources have increased as a result of further drilling in the Project 1 & 1A areas. These upgraded ounces have not yet been included in the mineable Reserves of the Updated Feasibility mine plan. The steady state production rate of the mine has increased from the original July 2008 Feasibility Study as a result of tightening the

distance from the haulage tunnels driven below the ore to the mining horizon and increased production efficiencies. The changes lower the amount of waste that has to be mined and allows for the mining and haulage capacity of the mine systems to focus more on moving ore. This change was based on significant input from the geotechnical engineers and reviews by teams involved in production at adjacent mines. The July 2008 Feasibility Study mine design was conservative and the original access methodology remains with three sets of rapid access declines and reliable conventional mining methods being utilized making for a flexible and safe design due to multiple access. The most significant change in the capital costs of the Updated Feasibility Study is the revision of the power assumption. The company has recently received a budget quotation for the provision of power to the project from South African power utility ESKOM. This was not available at the time of the original Feasibility Study. The mine will be lower on power requirements by design as compared to nearby deeper operations. The power situation in South Africa has stabilized and it is not deemed necessary by the qualified persons to provide for 100% reserve capacity and approximately 25% reserve has been provided for in the Updated Feasibility Study. The WBJV Project 1 Mine will create about 3,100 new jobs at full production and will have a positive effect on the local economy. It is envisaged that the mining and processing operations will be contractor based. The Ministerial approval, in respect of the transfer of prospecting permits (Section 11 Transfers) for the WBJV is moving through the process positively. Section 11 transfers for the majority of the WBJV mineral rights have been received and the final transfers are expected shortly. Formal registration of these new titles will take some months to administer and complete and these can be completed in parallel with the lodging of the Mining Right Application. Under current prospecting permits, underground development for access and basic infrastructure work can commence. Operating costs and underground development costs have increased as a result primarily of mining related cost including labour increases. Operating Cost estimates have increased from US$ 438 per 4E oz in concentrate to US$ 526 per 4E oz in concentrate. The results of this Updated Feasibility Study represent the culmination of more than 5 months of work by independent engineers from Turnberry Projects of South Africa, Platinum Group Metals’ own engineers from South Africa and Canada, and a team of specialists from several South African firms and review of the mechanized access for the mine design from Wardrop Engineering Inc. of Canada. This is in addition to the 18 months for the Feasibility Study completed in July 2008. The WBJV Project 1 is located in the heart of the Western Bushveld area of South Africa where 70% of the world’s platinum is produced from the Merensky and UG2 Platinum Reefs, the same two horizons to be mined in the Updated Feasibility Study. The partners in the WBJV are project operator Platinum Group Metals Ltd. (74%) and JSE listed Wesizwe Platinum (26%). Financial Details

The following tables set out the key details of the Updated Independent Feasibility Study

METAL PRICES & EXCHANGE RATE Case A 3 Year Trailing Prices

Case B Recent Prices

Platinum (US$/oz) 1,343 1,295 Palladium (US$/oz) 322 296 Rhodium (US$/oz) 4,951 1,650

Gold (US$/oz) 807 997 Copper (US$/tonne) 6,428 6,250 Nickel (US$/tonne) 25,529 18,000

Rand/US$ 8.00 8.00

FINANCIAL PARAMETERS AND INDICATORS at R8.00 Basket Prices 4E Pt, Pd, Rh, Au

R/kg Case A

US$/oz Case A

R/kg Case B

US$/oz Case B

Basket Price Merensky Reef 304,751 1,185 263,526 1,025 Basket Price UG2 Reef 368,571 1,433 274,639 1,068

Smelter and Refinery Discount Smelter Discount US$/oz Case A

US$/oz Case B

Reduction in Basket Price MR 15.16% $180 $155

Sensitivity Three Year Trailing Metals Prices

Reduction in Basket Price UG2 15.16% $217 $162 Received Basket Price for MR 15.16% $1,005 $869 Received Basket Price for UG2 15.16% $1,216 $906

TAXES Government Royalty Payment: PGM (% of Revenue) 3% Government Royalty Payment: Base Metals (% of Revenue) 2% Company Tax (% of Profit) 28% Secondary Tax on Companies (STC) (% of profit) 10%

EVALUATION (NET PRESENT VALUE) NPV 5% Discount

NPV 10% Discount

3 Year Trailing Price (Case A) R (Million) 7,848 3,804 (Pre-tax) US$ (Million) 981 475

IRR 23.54%

3 Year Trailing Price (Case A) R (Million) 4,660 2,031 (Post Tax) US$ (Million) 582 254

IRR 18.94%

Recent Prices (Case B) R (Million) 3,671 1,330 (Pre-tax) US$ (Million) 459 166

IRR 15.63%

Recent Prices (Case B) R (Million) 2,016 425 (Post Tax) US$ (Million) 252 53

IRR 12.15%

CAPITAL COST Rand US$ Peak funding Case A 3,545,237,000 443,125,000 Peak funding Case B 3,727,106,000 465,888,000

Total Life of Mine Capital Costs 4,760,280,000 595,035,000

WORKING COSTS EXCLUDING SMELTER DISCOUNT US$/4E oz R / tonne milled

Cost during ramp up including any power generation

$543 R717

Cost at steady state grid power post 2013 $521 R491 Life of Mine Average $526 R525

PRE-TAX Parameter Change in Parameter Change in Parameter Change in Parameter PGM Basket Price -20% 0% 20% IRR (pre-tax) 14.5% 23.5% 31.2% NPV (5% Discount) R(M) 3,494 7,848 12,202 US$ (M) 437 981 1,525 Opex -20% 0% 20% IRR (after tax) 27.5% 23.5% 19.4% NPV (5% Discount) R (M) 9,835 7,848 5,861 US$ (M) 1,229 981 733 Capex -20% 0% 20% IRR (after tax) 28.4% 23.5% 19.9% NPV (5% Discount) R (M) 8,635 7,848 7,061 US$ (M) 1,079 981 883

Mineral Resources – (MR- Merensky Reef; UG2- Upper Group 2 Reef).

The Mineral Resources reported in this Updated Feasibility Study have not been previously disclosed. This updated Resource is based on the additional drilling done in Project 1 & 1A areas. The Resource update was done to conform to a minimum 80cm resource cut which is in line with that used by producing mines in the area. Sampling practice, bore hole data, other factors and quality control and assurance are as reported previously. The Resources are estimated by kriging of approximately 231 boreholes plus deflections and are reported under SAMREC. The categories are the same as CIM categories. Quality controls include chain of custody, insertion of blanks and duplicates and check assays as previously disclosed. The Independent Qualified Person for the Mineral Resources is Charles Muller of Minxcon. WBJV Project 1

Mineral Reserves – derived from the Measured & Indicated Resources and not in addition to them.

POST-TAX Parameter Change in Parameter Change in Parameter Change in Parameter PGM Basket Price -20% 0% 20% IRR (post-tax) 11.3% 18.9% 25.3% NPV (5% Discount) R (M) 1,892 4,660 7,393 US$ (M) 236 583 924 Opex -20% 0% 20% IRR (post-tax) 22.3% 18.9% 15.4% NPV (5% Discount) R (M) 5,917 4,660 3,393 US$ (M) 740 583 424 Capex -20% 0% 20% IRR (post-tax) 23.0% 18.9% 15.9% NPV (5% Discount) R (M) 5,202 4,660 4,111 US$ (M) 650 583 514

Measured Mineral Resource (4E)

Cut-off (cm.g/t)

Million Tonnes (Mt) Grade 4E (g/t) Mining Width

(m) Tonnes PGE

(4E) Moz PGE’s

(4E) Project 1 MR 300 6.603 8.38 1.33 55.333 1.779 Project 1 UG2 300 7.464 4.26 1.34 31.797 1.022

Total Measured 300 14.067 6.19 1.34 87.130 2.801

Prill Splits Pt Pt (g/t) Pd Pd (g/t) Rh Rh (g/t) Au Au (g/t) Project 1 MR 64% 5.36 27% 2.26 4% 0.34 5% 0.42 Project 1 UG2 63% 2.68 26% 1.11 10% 0.43 1% 0.04

Indicated Mineral Resource (4E)

Cut-off (cm.g/t)

Million Tonnes (Mt)

Grade 4E (g/t)

Mining Width (m)

Tonnes PGE (4E)

Moz PGE’s (4E)

Project 1 & 1A MR 300 11.183 7.25 1.24 81.077 2.607 Project 1 & 1A UG2 300 19.209 4.46 1.39 85.672 2.754

Total Indicated 300 30.392 5.49 1.34 166.749 5.361

Prill Splits Pt Pt (g/t) Pd Pd (g/t) Rh Rh (g/t) Au Au (g/t) Project 1 & 1A MR 64% 4.64 27% 1.96 4% 0.29 5% 0.36 Project 1 & 1A UG2 63% 2.81 26% 1.16 10% 0.45 1% 0.04

Inferred Mineral Resource (4E)

Cut-off (cm.g/t)

Million Tonnes (Mt)

Grade 4E (g/t)

Mining Width (m)

Tonnes PGE (4E)

Moz PGE’s (4E)

Project 1 MR 300 0.154 8.96 1.06 1.380 0.044 Project 1 UG2 300 0.022 3.91 0.83 0.086 0.003 Total Inferred 300 0.176 8.33 1.03 1.466 0.047

Prill Splits Pt Pt (g/t) Pd Pd (g/t) Rh Rh (g/t) Au Au (g/t) Project 1 MR 64% 5.73 27% 2.42 4% 0.36 5% 0.45 Project 1 UG2 63% 2.46 26% 1.02 10% 0.39 1% 0.04

A Probable Reserve is the economically mineable part of an Indicated, and in some circumstances a Measured Resource, demonstrated by at least a Pre-Feasibility Study including adequate information on mining, processing, metallurgy, and economic and other factors that demonstrate, at the time of reporting, that economic extraction can be justified. A Proven Reserve is the economically mineable part of a Measured Resource demonstrated by the same level and factors as above. A Proven Mineral Reserve implies that there is a high degree of confidence. The current Mineral Reserve used for mine planning purposes has not yet taken the updated Resource into account. The 7.35% Mineral Reserve tonnage increase has been achieved by an optimised extraction ratio on the UG2. The conversion to Mineral Reserves was undertaken at 3.5g/t stope cut-off grade. Each stope has been fully diluted for mine modeling purposes by way of planned dilution and additional dilution for all aspects of the mining process. The estimated resulting grade to the mill is 1% higher on the Merensky Reef and the same on the UG2 contrasted from the July 2008 Feasibility Study estimate of mill head grade. The Inferred Resources are outside and in addition to the reserves. The Independent Qualified Person for the Statement of Reserves is Tim Spindler.

The prill splits as shown above are the same percentages as for the earlier reported Measured and Indicated Resources. These prill spilt grams per tonne are provided to satisfy the requirements of the BCSC and are not in compliance with SAMREC best practice. The splits have a lower confidence level when compared to the 4E grades. The reserves are stated with certain risk factors including, but not limited to, mining project risks as highlighted in the “Risks and Opportunities” section as well in the disclosure statement. Mine Plan Details

Improvements have been made to mine design and the projected maximum output has been increased to fully utilize the availability and flexibility of three separate decline systems. The mining of UG2 material has increased due to increased panel length and better overall extraction ratio. The Updated Feasibility Study has removed the overall constraint of 48,000 tonnes per month per decline system. Basic production parameters have remained unchanged. This has resulted in a higher steady state production level of approximately 156,000 reef tonnes per month compared to 140,000 reef tonnes per month in the previous design. This will require each individual decline system to produce approximately 57,000 tonnes per month. Although similar systems often produce between 80,000 and 100,000 reef tonnes per month, 57,000 reef tonnes per month is considered to be realistic given the strike width available from each decline system , which provides 13 years of steady state tonnage production. First ore is reached by development 13 months from the commencement of underground work. First ore will be processed in the concentrator in first quarter 2013 subject to the installation of grid power from ESKOM. Ore will be stockpiled from mining until the concentrator is operational and this Updated Feasibility Study has not included the possibility of ore sales. Mining is only scheduled on the Mineral Reserves. The updated Resource which includes additional Indicated and Measured categories and the lower grade UG2 Resources also provide some future opportunities. The mining and development plan includes conventional hand held drilling utilizing electrical drills and scrapers as well as winch cleaning similar to the successful conventional mining operations at the adjacent mines. Declines and primary access to the deposit are designed for development with mechanized equipment. Ore is initially to be hauled out of the mine with mechanized equipment and assisted later by conveyor from year 4 of the planned mine life to end of mine life. The Merensky Reef will be mined at widths between 93cm and 176cm and the UG2 Reef will be mined at widths between 105cm and 205cm.

Merensky UG2

Tonnes (000) 4E Content 4E Tonnes (000) 4E Content 4E t g/t tonne Moz t g/t tonnes Moz

Merensky Proven UG2 Proven 6,678 5.61 37.478 1.21 5,086 3.37 17.126 0.55

Merensky Probable UG2 Probable 11,333 5.44 61.677 1.98 8,449 3.41 28.831 0.93

Total Merensky Mineral Reserves Total UG2 Mineral Reserves 18,011 5.51 99.155 3.19 13,535 3.40 45.957 1.48

Prill Splits Pt Pt (g/t) Pd Pd (g/t) Rh Rh (g/t) Au Au (g/t) Project 1 & 1A MR 64% 3.52 27% 1.49 4% 0.22 5% 0.28

Project 1 & 1A UG2 63% 2.15 26% 0.88 10% 0.34 1% 0.03

At the recommended mining rate and modifying factors the mine plan generates between 234,000 to 300,000 4E ozs in concentrate per year. During 9 years of peak production approximately 275,000 4E ozs per annum in concentrate are produced from the Merensky Reef horizon. The mine has a 22 year planned mine life. Infrastructure and Metal Recovery

The Updated Feasibility Study design for metallurgical extraction utilizes a standard plant design similar to other nearby plants in the Bushveld complex operating on the same reefs. The plant is designed with circuits that can process either Merensky Reef, UG2 Reef or a controlled blended feed. The Merensky Reef is the target of initial mining because of its higher 4E grade and low chrome content. The concentrator has been designed and re-costed, based on treating the optimal 140,000 tonnes per month. The revised mine plan has increased this treatment rate to 160,000 tonnes per month and for the concentrator to treat this increased quantity of reef, the recovery has been reduced with a discount of up to 2.5% for treatment in excess of nominal “name plate” capacity. Metallurgical testing and the published experience of the adjacent operating mines support a “name plate” capacity plant recovery rate estimate of 87.5% of platinum, palladium, rhodium and gold on the Merensky Reef and 82.5% on the UG2 Reef. Recoveries of 45% for nickel and 70% for copper are also modeled for the Merensky Reef. Ruthenium and Iridium are also included as minor contributors. No additional metallurgical test work has been undertaken during the Updated Feasibility Study. The mine infrastructure in the Capital cost estimates includes the entire required surface infrastructure for a stand alone mine including water, power, underground access and ventilation to establish full production. Smelter Terms

The Updated Feasibility Study includes capital and operating estimates to produce concentrate but no capital is included for smelting or refining of this concentrate. The costs associated with smelting and refining of concentrate is modeled as a deduction from revenue arising from the sale of concentrate to others. While the terms of agreements governing the sale of such concentrates within the South African PGM industry are all confidential, the Qualified Person believes deductions used in the Updated Feasibility Study financial model are indicative of deductions current in this industry. The party to whom concentrate will be sold and the terms of this potential sale are yet to be determined. Anglo Platinum has a 60 day right of first refusal to purchase all of the ore or concentrate produced by the WBJV on commercial terms. Estimated deductions in the Updated Feasibility Study include penalties and shipment charges and total approximately 15% from gross concentrate sales revenue. Should Anglo Platinum decide to purchase the concentrate produced by the Project 1 mine the structure of such purchase would be governed by the pro-forma off-take agreement included in the WBJV Agreement, however the commercial terms will be subject to negotiation. Approaches will now be made to Anglo Platinum and other parties in an attempt to secure an off-take agreement and the terms thereof based on the Updated Feasibility Study production profile. Social Development and Responsibilities

Feedback from the public consultation processes for the environmental assessment and social and labour plan development have been constructive and positive. This work has continued during 2008 and 2009 since the original July 2008 study. Consultation with the Department of Mineral Resources on the mine plan and social and labour plan has been positive. The mine capital development plan includes a significant investment in training through the life of mine, allocated to a social and labour plan to ensure maximum value from the project for all stakeholders including local residents. Based on interaction with the community, a skills and needs assessment, and our training plans, the project is planning for 3,100 jobs with a target of at least 30% from the local communities. The WBJV is committed to a strong community involvement in the project particularly as Wesizwe Platinum is a 26% partner in the project and their largest shareholder is one of the communities near the mine. The mine’s financial estimates include an accumulated charge per tonne to create a fund for eventual closure of the mine projected in approximately 2031. Risks and Opportunities

The project is subject to a number of risks including, but not limited to, the normal project risks associated with a mining project of this type, such as geology, grade, structure, mining plans, mining width, mining dilution, rates of extraction per reef type, concentrator recovery, water supply, power supply and labour shortages and estimation risks in the capital and operating costs and exchange rates and metal prices. The estimates in September 2009 money terms are ±10% on the capital and ±10% on the operating costs and ±15% on project timing. A contingency of 10.95% of the capital cost required to reach first production included in the financial model mitigates some of the risks of a capital over run. The estimated capital costs of Platinum Group Metals Ltd.’s share of the project exceed its working capital and significant project funding is required. The transfer of the majority of the WBJV property has been approved by the Minister of the Department of Mineral Resources and final registration is in process. Final registration of title at the deeds office completes the 74% Platinum Group right and the agreements for finalization have been extended to February 2010 if required. Not all of the surface rights over the proposed infrastructure design in the Updated Feasibility Study have been purchased. Negotiations are well advanced. An allowance for the cost of this has been made. The Mineral Petroleum Development Act

provides firm assistance in ensuring that access to the minerals can be achieved, however if the process under the Act is deemed necessary it may require additional time. A significant portion of the defined resources are not mined in the Updated Feasibility Study. Continued strong metal prices and implementation level engineering will provide an opportunity to re-evaluate these resources. There are other platinum mining projects in the immediate area - including the Wesizwe Platinum Project and the Styldrift Project planned for development. Potential cost savings and reduced impacts by designing combined infrastructure are being investigated. Qualified Person and Quality Assurance and Control

The Updated Feasibility Study has been completed by Gordon Cunningham (FSAIMM and ECSA) and Tim Spindler (FSAIMM and ECSA) as the projects leads of Turnberry Projects (Pty) Ltd. and Byron Stewart P.Eng of Wardrop Engineering Inc. as review for design of the underground mechanized access and footwall mining. They have been supported by the following qualified specialists and firms: Grinaker-LTA Mining Construction & Mining Engineering GRD Minproc Process Engineering & Construction Epoch Resources Mine Residue & Environmental Engineering Bluhm Burton Engineering Consulting Mine Ventilation & Refrigeration Specialists Dave Arnold & Associates Rock Mechanics Minxcon Independent Consultants in Geology As operator of the WBJV, Platinum Group Metals Ltd. is responsible for the management, exploration and engineering activities. The Mineral Resources are estimated by Charles Muller of Minxcon (SACNASP) as independent consultant and he has completed the investigation and report in compliance with Canadian National Instrument 43-101 on this and the previous announced estimate. He provides the update given here on Resources. Gordon Cunningham of Turnberry Projects (Pty) Ltd. (FSAIMM and ECSA) is the overall Qualified Person for NI 43-101 Technical Report which will support the statements made in the Updated Feasibility Study. He is a fellow with the South African Institute of Mining and Metallurgy (“SAIMM”), has had extensive experience in the assessment of mines including platinum mines and has been responsible for the mine designs and related investigations. He has over 30 years experience in project operation, project evaluation, design and feasibility work and is supported by a team of experienced engineers. Turnberry Projects has extensive experience with the design and evaluation of platinum projects and mines with past assignments including investigations ranging from metallurgical design to feasibility mine evaluation and project management. Tim Spindler of Turnberry Projects (Pty) Ltd. (FSAIMM and ECSA) is a Qualified Person for the NI43-101 Technical Report which will support the statements made in the Updated Feasibility Study relating to in stope mining and ventilation and Mineral Resource conversion to Mineral Reserve. He has had extensive experience in operations, production and consulting to mines in various operations in Southern Africa over 40 years. Byron Stewart, P.Eng, of Wardrop Engineering Inc. is the Qualified Person for the NI 43-101 Technical Report which will support the statements made in the Updated Feasibility Study relating to design of the Mine Access Development and Footwall Development using mechanised mining methods. He has had extensive experience in consulting on mechanised mine development in various operations in three continents over 35 years. Charles Muller, Gordon Cunningham, Tim Spindler and Byron Stewart have visited the property in 2008 and they have verified the data for their respective areas. Verification has occurred to a reasonable level in accordance with good engineering practice. Conclusions

The results of the Updated Feasibility Study are robust and the total project has a 24% IRR pre-tax with a Net Present Value at a 5% discount rate of US$ 981 million based on 3 year trailing metal prices. Using recent metal prices the project IRR is 16 % pre-tax and its Net Present Value at a 5% discount rate is US$ 459 million. The mining layout uses conventional proven approaches for mining and multiple accesses which will provide good flexibility and proven productivity at low risk. The metallurgical recovery and proposed concentrate should be attractive in the current tight market for platinum group metals. The project is highly competitive contrasted to many other projects and deeper platinum development alternatives. About Platinum Group Metals Ltd.

Platinum Group Metals Ltd. is based in Vancouver BC, Canada and Johannesburg, South Africa. Platinum Group Metals Ltd. has a

management team in both Canada and South Africa, which have successful track records of more than 20 years in exploration, mine discovery, mine construction and mine operations. The Company was formed in 2000 and is focused on the development of platinum operations. In addition to the WBJV Projects the company holds a significant exploration profile including an active Joint Venture with the State Company of Japan, JOGMEC. On behalf of the Board of Platinum Group Metals Ltd.

“R. Michael Jones”

For further information contact:

R. Michael Jones, President or Kris Begic, Corporate Development Platinum Group Metals Ltd., Vancouver Tel: (604) 899-5450 / Toll Free: (866) 899-5450

President and Director The following note is mandated under SEC Guidelines:

Cautionary Note to U.S. Investors concerning estimates of Inferred Resources. This section uses the term “inferred resources”. We advise U.S. investors that while that term is recognized and required by Canadian regulations, the U.S. Securities and Exchange Commission does not recognize it. “Inferred Resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. U.S. investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.

The following note is mandated under SEC Guidelines:

Cautionary Note to U.S. Investors concerning estimates of Measured and Indicated Resources. This section uses the terms “measured” and “indicated resources”. We advise U.S. investors that while those terms are recognized and required by Canadian regulations, the U.S. Securities and Exchange Commission does not recognize them. U.S. investors are cautioned not to assume that any part of all of mineral deposits in these categories will ever be converted into reserves.

The TSX Exchange and the American Stock Exchange have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.

This press release contains forward-looking statements within the meaning of Canadian and U.S. securities laws. Such statements include, without limitation, statements regarding the timing of future activities by the Company, future anticipated exploration and development programs, the review of technical information, the discovery and delineation of mineral deposit and resources, business plans, potential mining scenarios, business trends and future operating factors. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, variations in the nature, quality and quantity of any mineral deposits that may be located, the Company’s ability to obtain any necessary permits, consents or authorizations required for its activities, the Company’s ability to produce minerals from its properties successfully or profitably, to continue its projected growth, or to be fully able to implement its business strategies. In addition, forward-looking statements are subject to various risks, including that data is incomplete and considerable additional work will be required to complete further evaluation, including but not limited to drilling, engineering and socio-economic studies and investment; no firm quotes for costs have been received; the legal right to mine the project discussed has not been confirmed or applied for and the process for such application is new in South Africa; the potential capital cost of the project is beyond the current means of the Company and there can be no assurance that financing for further work will be available. There are significant risks with respect to grade estimation, metallurgical recovery and mining plans that may result in over estimation or failure to meet targets. Availability of grid electrical power is completely outside the company control. Any estimates, plans or studies prepared by or on behalf of other companies with respect to the project have not been prepared or reviewed by the Company or the Company’s QPs and such disclosure can’t and should not be in any way be attributed to the Company or the Company’s QPs, independent or non-independent. Any reference to Project 2 does not imply that this is a stand alone area for any potential mine plan. The reader is referred to the Company’s filings with the SEC and Canadian securities regulators for disclosure regarding other risk factors. There is no certainty that any forward looking statement will come to pass and investors should not place undue reliance upon forward-looking statements. Cautionary Note to U.S. Investors: The U.S. Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this press release, such as “Measured,” “Indicated,” and “Inferred,” “resources,” that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.

U.S. investors are urged to consider closely the disclosure in our Form 40-F, File No. 0-30306, which may be secured from us, or from the SEC’s website at: http://sec.gov/edgar.shtml. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

PLATINUM GROUP METALS LTD. HOSTS WEBCAST FOR UPDATE WBJV PLATINUM PROJECT 1 INDEPENDENT FEASIBIL ITY STUDY

(Vancouver/Johannesburg) Platinum Group Metals Ltd. (PTM:TSX; PLG:NYSE-AMEX) will conduct a teleconference in conjunction with today's announcement of the Feasibility Study Update. The teleconference begins at 1:00PM Eastern Standard Time today, Thursday, October 8 th , 2009 . Members of the news media, investors and the general public are invited to access a live webcast of the conference call via a link on the Platinum Group Metals Ltd.’s website at www.platinumgroupmetals.net . The event will be archived and available for replay through to October 8 th , 2010 . About Platinum Group Metals Ltd.

Platinum Group is based in Vancouver BC, Canada and Johannesburg, South Africa. Platinum Group has a management team in both Canada and South Africa, which have successful track records of more than 20 years each in exploration, mine discovery, mine construction and mine operations. The Company was formed in 2000 and is focused on the development of platinum operations. On behalf of the Board of Platinum Group Metals Ltd.

“R. Michael Jones”

President and CEO - 30 -

For further information contact:

R. Michael Jones, President or Kris Begic, Corporate Development Platinum Group Metals Ltd., Vancouver Tel: (604) 899-5450 / Toll Free: (866) 899-5450

The Toronto Stock Exchange and the New York Stock Exchange - AMEX have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management. This press release contains forward-looking statements within the meaning of Canadian and U.S. securities laws. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. Forward-looking statements in this press release include, without limitation, statements regarding the timing, size and use of proceeds of the proposed private placement and the potential to increase the Company’s interest in certain of its projects. In addition, the results of the feasibility study may constitute forward-looking statements to the extent that they reflect estimates of mineralization, capital and operating expenses, metal prices and other factors. Although the Company believes the forward-looking statements in this press release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, variations in market conditions, the nature, quality and quantity of any mineral deposits that may be located, the Company’s ability to obtain any necessary permits, consents or authorizations required for its activities, the Company’s ability to produce minerals from its properties successfully or profitably, to continue its projected growth, or to be fully able to implement its business strategies and other risk factors described in he Company’s Form 40-F annual report, annual information form and other filings with the SEC and Canadian securities regulators, which may be viewed at www.sec.gov and www.sedar.com , respectively.

328 - 550 Burrard Street

Vancouver, BC V6C 2B5

P: 604-899-5450

F: 604-484-4710

News Release No. 09-179

Oct 08, 2009

FORM 51-102F3 MATERIAL CHANGE REPORT

ITEM 1. NAME AND ADDRESS OF COMPANY

PLATINUM GROUP METALS LTD. (“Platinum Group”) 328 – 550 Burrard Street Vancouver BC, V6C 2B5 Telephone: (604) 899-5450 Facsimile: (604) 484-4710

ITEM 2. DATE OF MATERIAL CHANGE October 9, 2009

ITEM 3. NEWS RELEASE A news release was disseminated on October 9 th , 2009 to the TSX as well as through various other approved public media and was SEDAR filed with the British Columbia, Alberta, Ontario and Quebec Securities Commissions.

ITEM 4. SUMMARY OF MATERIAL CHANGE Platinum Group announced that it has signed a second joint venture agreement with JOGMEC.

ITEM 5. FULL DESCRIPTION OF MATERIAL CHANGE

(Vancouver/Johannesburg) Platinum Group Metals Ltd., (“Platinum Group”), (PTM:TSX,

PLG:NYSE-AMEX) provides the following updates on its platinum projects including a second new

joint venture with Japan Oil Gas and Metals National Corporation (“JOGMEC”), owned by the

government of Japan, covering a new 118 square kilometres platinum exploration area.

R. Michael Jones President of Platinum Group Metals said “Our main focus right now is on advancing

the large scale reserves and mine plan at the 74% owned Western Bushveld Joint Venture. In

addition, we have quite an active, exciting exploration profile funded by partners on three extensive

areas in prime platinum territory. As power and safety become larger issues we see excellent new

exploration opportunities along strike from existing mines and our group has been pretty successful

over the years in this type of basic exploration along trend. This is how we put together the WBJV in

the first place. We are pleased to now have two active platinum joint ventures with JOGMEC.”

Waterberg – A New North-North Limb Extension Area - 74% PTM Interest Subject to

JOGMEC earn-in for 37% for $3.2M

Platinum Group announces today that it has been granted prospecting rights in September 2009 for

a new 118 square kilometre area, north of the known North Limb of the Bushveld Complex and

Platinum Group has entered into a farm-in agreement with JOGMEC for this area. Magnetic, gravity,

and general trends all indicate that the North Limb extends under shallow cover in this area. Initial

geochemical sampling by Platinum Group confirms this interpretation.

From recent work on the North Limb, presented at geological academic meetings attended by

Platinum Group geologists, it is clear that embayments or pockets in the floor of the North Limb can

play an important role in economic mineralization. A large interpreted embayment occurs in the

Waterberg area. Interestingly, the area is also on the direct line extension of the Great Dyke known

for platinum to the north in Zimbabwe and crossing into South Africa.

JOGMEC can earn a 37% interest in the project by funding $3.2m in exploration expenditures over 4

years. Platinum Group Metals Ltd. will hold a 37% interest and a private South African BEE firm will

hold a 26% interest. Platinum Group Metals will carry out the exploration programs that will

commence shortly.

War Springs Joint Venture, North Limb – 70% PTM Interest Subject to JOGMEC farm-in for

35% for $10m

Drilling is continuing along strike and at depth from the current platinum resources on the North

Limb. Platinum Group is the operator of the project being funded by the JOGMEC. JOGMEC can earn

a 35% interest by spending $10m and the JV is in its second year with total investment by JOGMEC

of approximately US$1.2m. Drilling is continuing and has intersected new styles of mineralization

and assays are pending.

Sable Joint Venture – Western Limb 74% Subject to Sable (Private) farm-in for 51% for

$5m

Initial surface exploration of mapping and soil sampling has indicated that the right layers for the

Merensky and UG2 reefs cross this large land position adjoining the Xstrata Eland Mine. The Eland

mine was purchased by Xstrata for $1 billion in 2007. Drilling plans are in progress funded by Sable

Platinum and operated by Platinum Group. Sable can earn its interest of 51% for 42M rand or

approximately US$5.0M (8R/US$). Sable is a private South African company headed by platinum

analyst Rene Hochreiter and mining financier, James Allan.

ITEM 6. RELIANCE ON SUBSECTION 7.1 OF NATIONAL INSTRUMENT 5 1-102 N/A

ITEM 7. OMITTED INFORMATION N/A

ITEM 8. EXECUTIVE OFFICER

The following senior officer of the Issuer is knowledgeable about the material change and may be contacted by the Commission at the following telephone number: R. Michael Jones, President & CEO Phone: (604) 899-5450

ITEM 9. DATE OF REPORT October 19, 2009

Platinum Exploration Projects Update

New Large Funded Joint Venture with JOGMEC

(Vancouver/Johannesburg) Platinum Group Metals Ltd., (“Platinum Group”), (PTM:TSX, PLG:NYSE-AMEX)

provides the following updates on its platinum projects including a second new joint venture with Japan Oil Gas

and Metals National Corporation (“JOGMEC”), owned by the government of Japan, covering a new 118 square

kilometres platinum exploration area. R. Michael Jones President of Platinum Group Metals said “Our main focus right now is on advancing the large

scale reserves and mine plan at the 74% owned Western Bushveld Joint Venture. In addition, we have quite an

active, exciting exploration profile funded by partners on three extensive areas in prime platinum territory. As

power and safety become larger issues we see excellent new exploration opportunities along strike from existing

mines and our group has been pretty successful over the years in this type of basic exploration along trend. This is

how we put together the WBJV in the first place. We are pleased to now have two active platinum joint ventures

with JOGMEC.” Waterberg – A New North-North Limb Extension Area - 74% PTM Interest Subject to JOGMEC earn-in

for 37% for $3.2M

Platinum Group announces today that it has been granted prospecting rights in September 2009 for a new 118

square kilometre area, north of the known North Limb of the Bushveld Complex and Platinum Group has entered

into a farm-in agreement with JOGMEC for this area. Magnetic, gravity, and general trends all indicate that the

North Limb extends under shallow cover in this area. Initial geochemical sampling by Platinum Group confirms this

interpretation. From recent work on the North Limb, presented at geological academic meetings attended by Platinum Group

geologists, it is clear that embayments or pockets in the floor of the North Limb can play an important role in

economic mineralization. A large interpreted embayment occurs in the Waterberg area. Interestingly, the area is

also on the direct line extension of the Great Dyke known for platinum to the north in Zimbabwe and crossing into

South Africa. JOGMEC can earn a 37% interest in the project by funding $3.2m in exploration expenditures over 4 years.

Platinum Group Metals Ltd. will hold a 37% interest and a private South African BEE firm will hold a 26% interest.

Platinum Group Metals will carry out the exploration programs that will commence shortly. War Springs Joint Venture, North Limb – 70% PTM Interest Subject to JOGMEC farm-in for 35% for

$10m

Drilling is continuing along strike and at depth from the current platinum resources on the North Limb. Platinum

Group is the operator of the project being funded by the JOGMEC. JOGMEC can earn a 35% interest by spending

$10m and the JV is in its second year with total investment by JOGMEC of approximately US$1.2m. Drilling is

continuing and has intersected new styles of mineralization and assays are pending. Sable Joint Venture – Western Limb 74% Subject to Sable (Private) farm-in for 51% for $5m

Initial surface exploration of mapping and soil sampling has indicated that the right layers for the Merensky and

UG2 reefs cross this large land position adjoining the Xstrata Eland Mine. The Eland mine was purchased by

Xstrata for $1 billion in 2007. Drilling plans are in progress funded by Sable Platinum and operated by Platinum

Group. Sable can earn its interest of 51% for 42M rand or approximately US$5.0M (8R/US$). Sable is a private

South African company headed by platinum analyst Rene Hochreiter and mining financier, James Allan. About Platinum Group Metals Ltd.

Platinum Group is based in Vancouver BC, Canada and Johannesburg, South Africa. The Company announced an

Updated Feasibility Study for the Western Bushveld Joint Venture including a 275,000 ounce per year mine plan on

October 8, 2009. Project construction funding for its 74% interest in the WBJV is the main focus of Platinum Group

at this time.

328 - 550 Burrard Street

Vancouver, BC V6C 2B5

P: 604-899-5450

F: 604-484-4710

News Release No. 09-180

Oct 09, 2009

Platinum Group has a management team in both Canada and South Africa, which have successful track records of

more than 20 years in exploration, mine discovery, mine construction and mine operations. The team includes

exploration geologists, mine designers and professional engineers in Canada and South Africa. The founders of

Platinum Group Metals are also co-founders of MAG Silver MAG TSX, MVG-NYSEAMEX and West Timmins Mining

WTM-TSX. On behalf of the Board of

Platinum Group Metals Ltd.

“R. Michael Jones”

President and Director

- 30 - For further information contact:

R. Michael Jones, President,

or Kris Begic, Corporate Development

Platinum Group Metals Ltd., Vancouver

Tel: (604) 899-5450 / Toll Free: (866) 899-5450

www.platinumgroupmetals.net The Toronto Stock Exchange and the NYSE Alternext U.S. LLC have not reviewed and do not accept responsibility for the accuracy or adequacy

of this news release, which has been prepared by management.

This press release contains forward-looking statements within the meaning of Canadian and U.S. securities laws. Such statements include,

without limitation, statements regarding the completion of the proposed transaction, the timing of related events, and statements regarding

planned or potential future activities of the Company and third parties. Although the Company believes that such statements are reasonable, it

can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as:

believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. All

statements that are not statements of historical fact are forward-looking statements. The Company cautions investors that any forward-looking

statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in

forward looking statements as a result of various factors, including, but not limited to, the risk that conditions precedent for the proposed

transaction will not be satisfied or that regulatory or other required approvals for the proposed transaction will not be obtained, the need for

additional financing for the Company to be able to satisfy its cash obligations under the proposed transaction and to fulfill its other obligations

and plans, metal price volatility, variations in the nature, quality and quantity of any mineral deposits that may be located, the Company’s

ability to obtain any necessary permits, consents or authorizations required for its activities, the Company’s ability to produce minerals from its

properties successfully or profitably, to continue its projected growth, or to be fully able to implement its business strategies, and the other risk

factors set forth in the Company’s most recent annual filings with the Canadian securities regulators and the U.S. Securities and Exchange

Commission, which are available at www.sedar.com and www.sec.gov .