plastic flight operations november 07- april 08

14
PLASTIC Flight Operations November 07- April 08 K. Singer SWG April 2008

Upload: palma

Post on 05-Jan-2016

34 views

Category:

Documents


0 download

DESCRIPTION

PLASTIC Flight Operations November 07- April 08. K. Singer SWG April 2008. PLASTIC Flight Operations. 12/6/07: DOY 340 on SC B Increase MCP voltage to compensate for normal gain changes 3140V  3160V 12/20/07 DOY 355 SC A & B - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PLASTIC Flight Operations November 07- April 08

PLASTIC Flight OperationsNovember 07- April 08

K. Singer

SWG April 2008

Page 2: PLASTIC Flight Operations November 07- April 08

PLASTIC Flight Operations

• 12/6/07: DOY 340 on SC B– Increase MCP voltage to compensate for

normal gain changes – 3140V 3160V

• 12/20/07 DOY 355 SC A & B– Changed criteria for Supra-thermal to ignore

background events

Page 3: PLASTIC Flight Operations November 07- April 08

PLASTIC Flight Operations

• Flight Software load 3.2.7 – SC A: DOY 037 (2/7/08)– SC B: DOY 063 (3/3/08)– RTLT for A: 6 minutes– RTLT for B: 7 minutes– Bypassed COP1 command counter to reduce

the load time

Page 4: PLASTIC Flight Operations November 07- April 08

Software changes

• Included every 10th block of the EEPROM read back which was previously missing

• Corrected timestamp on science data packets

Page 5: PLASTIC Flight Operations November 07- April 08

• Momentum dumps have gone smoothly—DPU has been disabling and enabling high voltages on Entrance System as necessary.

• Gain on MCP is changing more slowly since initial scrubbing and is stable.

• We are using SECCHI roll calibration data for our own calibration purposes.

Page 6: PLASTIC Flight Operations November 07- April 08

PLASTIC Flight Operations

• SC A: DOY 104 (04/13/08)– At 11:58 UT PLASTIC reset

Page 7: PLASTIC Flight Operations November 07- April 08

PAC VM (V)

PAC CM (mA)

MCP VM (V)

MCP CM (mA)

SSD VM (V)

SSD HV BIAS (V)

SSD POS ANALOG (V)

SSD NEG ANALOG (V)

SSD V POS DIG (V)

11:58 UT

Page 8: PLASTIC Flight Operations November 07- April 08

PLASTIC Flight Operations

• SC A: DOY 105– Start turning on HV’s

• SC A: DOY 106-108– Continue stepping up HV’s

• SC A: DOY 108– Start data collection

Page 9: PLASTIC Flight Operations November 07- April 08
Page 10: PLASTIC Flight Operations November 07- April 08

SSD Temperatures

Page 11: PLASTIC Flight Operations November 07- April 08

SSD Temperatures since launch SC B

• ~6 degree temperature change since Nov ‘06• Delta distance to Sun: 0.1 AU

Page 12: PLASTIC Flight Operations November 07- April 08

ACE

Temperatures

• Increase in temperature is due to the degradation of the thermal blanket and not the solar cycle

NOAA.gov

Page 13: PLASTIC Flight Operations November 07- April 08

SSD Temperatures since launch SC A

• ~11 degree temperature change since Nov ‘06• Since January 2007 Delta distance to Sun 0.01 AU• Exterior radiator

Page 14: PLASTIC Flight Operations November 07- April 08

Any questions?