plantilla para metrar - copia

4
FACTOR GIRO PISO BARRA RIGIDEZ FACT. DESPLZ. -0.278 2 A-D 0.8 -0.667 -0.222 B-C 1 -0.833 -0.250 1 C-F 1 -0.833 -0.250 D-E 0.8 -0.667 -0.167 -0.167 -0.167 -0.154 -0.192 -0.154 ENTO MP 4 -9 -0.222 2.00 2.72 2.80 -4.16 -1.88 -0.667 2.59 MP 1.54 6 -0.154 -12 -0.154 1.54 2.59

Upload: javier-motta-sernaque

Post on 07-Dec-2015

5 views

Category:

Documents


2 download

DESCRIPTION

costos

TRANSCRIPT

Page 1: Plantilla Para Metrar - Copia

FACTOR GIRO PISO BARRA RIGIDEZ FACT. DESPLZ.-0.278

2A-D 0.8 -0.667

-0.222 B-C 1 -0.833-0.250

1C-F 1 -0.833

-0.250 D-E 0.8 -0.667-0.167-0.167-0.167-0.154-0.192-0.154

MOMENTO DE EMPOTRAMIENTO

MP

4-9

-0.2222.002.722.80

-4.16-1.88

-0.667

2.59

MP 1.54

6 -0.154-12-0.154

1.542.59

Page 2: Plantilla Para Metrar - Copia

-0.667-3.80-5.05

0.000.000

0

Page 3: Plantilla Para Metrar - Copia

PRECIOS DE MATERIALES

MATERIAL UND PRECIOLADRILLO ARCILLA CARAVISTA CORRIENTE 6x12x24cm millar 320.00

LADRILLO ARCILLA HUECO 12 12x30x30cm millar 449.30

LADRILLO ARCILLA HUECO 15 15x30x30cm millar 548.93

ACERO CORRUGADO F'Y=4200 (G-60) 12 mm varilla

ACERO CORRUGADO F'Y=4200 (G-60) 1/4" - 6.5 mm varilla 7.50

ACERO CORRUGADO F'Y=4200 (G-60) 3/8" - 9.5 mm varilla 14.00

ACERO CORRUGADO F'Y=4200 (G-60) 1/2" - 12.7 mm varilla 27.50

ACERO CORRUGADO F'Y=4200 (G-60) 5/8" - 15.9 mm varilla 35.00

ACERO CORRUGADO F'Y=4200 (G-60) 3/4" - 19.1 mm varilla

ACERO CORRUGADO F'Y=4200 (G-60) 1" - 25.4 mm varilla

MADERA ENCOFRADO TORNILLO LARGA 1.43

ARENA FINA 35.00

ARENA GRUESA 40.00

CEMENTO BLS 24.50

DOSIFICACION CONCRETO

FC A/C SLUMP(PULG) DOSIFIC. EN VOLUMEN CEMENTO(BOLS)140 0.61 4 1:2.5:3.5 7.01 0.51 0.64 0.184175 0.51 3 1:2.5:2.5 8.43 0.54 0.55 0.185210 0.45 3 1:02:02 9.73 0.52 0.53 0.186245 0.38 3 1:1.5:1.5 11.5 0.5 0.51 0.187280 0.38 3 1:1:1.5 13.34 0.45 0.51 0.189

pie 2

M3

M3

ARENA(M3) PIEDRA(M3) AGUA(M3)