Stormwater Management Facility Construction Certification Requirements Guidelines Planter Box Photo Requirements for Certification: Clear pictures of planter box length, width and depth. Pictures of applied waterproofing material. Perforated underdrain pipe (3/8” holes (4 rows) drilled every 6” on center or as required by approved plan). Depth of #57 stone with clear picture of measurements. Depth of choker stone with clear picture of measurements. Depth of bio-soil with clear picture of measurements (MUST be from approved vendor). Mulch with clear picture of measurements (as required by approved plans). Clear picture of ponding depth measurement from top of mulch or top of soil (as required by approved plans). Clear picture of freeboard (top of the overflow to top of the planter box wall). Clear picture of number of plants in each planter box. Downspout location with appropriate splash block or rocks installed. Downspout must drain onto the splash block or rocks and downspout must be located away from overflow pipe, preferably on the opposite end of the planter box. Approved Soil Vendor List: https://topics.arlingtonva.us/building/stormwater- management-notices-to-industry/ Listed under Bioretention Photos submitted to Arlington County become the property of Arlington County. Send As-built Certifications for review to: [email protected] Planter Box Requirements *Remember: Planter box construction must follow the approved plan. Provide receipts for materials used, including (but not limited to): Waterproofing material #57 stone Choker stone Filter media (showing media is from an approved vendor) Mulch Species and quantities of plants that were installed R.C. Fields & Associates, Inc.

Upload: others

Post on 17-Jul-2020

7 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Planter Box Requirements - Amazon Web Services · Stormwater Management Facility Construction Certification Requirements Guidelines Planter Box Photo Requirements for Certification:

Stormwater Management Facility

Construction Certification Requirements Guidelines

Planter Box Photo Requirements

for Certification:

Clear pictures of planter box length, width

and depth.

Pictures of applied waterproofing

material.

Perforated underdrain pipe (3/8” holes (4

rows) drilled every 6” on center or as

required by approved plan).

Depth of #57 stone with clear picture of

measurements.

Depth of choker stone with clear picture of

measurements.

Depth of bio-soil with clear picture of

measurements (MUST be from

approved vendor).

Mulch with clear picture of measurements

(as required by approved plans).

Clear picture of ponding depth measurement

from top of mulch or top of soil (as required

by approved plans).

Clear picture of freeboard (top of the

overflow to top of the planter box wall).

Clear picture of number of plants in each

planter box.

Downspout location with appropriate splash

block or rocks installed.

Downspout must drain onto the splash block

or rocks and downspout must be located

away from overflow pipe, preferably on the

opposite end of the planter box.

Approved Soil Vendor List:

https://topics.arlingtonva.us/building/stormwater-

management-notices-to-industry/

Listed under Bioretention

Photos submitted to Arlington County become the property of

Arlington County.

Send As-built Certifications for review to:

[email protected]

Planter Box

Requirements

*Remember: Planter box construction must follow

the approved plan.

Provide receipts for materials used,

including (but not limited to):

Waterproofing material

#57 stone

Choker stone

Filter media (showing media is from an

approved vendor)

Mulch

Species and quantities of plants that were

installed

R.C

. Field

s & A

ssociates, In

c.

Page 2: Planter Box Requirements - Amazon Web Services · Stormwater Management Facility Construction Certification Requirements Guidelines Planter Box Photo Requirements for Certification:

Clear width dimensions

Clear length dimensions

Label if multiple

boxes (every photo)

Clear depth dimensions

Choker stone depth

*Remember: Photos must be clear enough that

the depth measurements are legible.

Photo showing clear freeboard depth measurement

Bio-soil depth; uncompacted soil

Overall photo to show

number of plants

12

Downspout and splash

rocks or block

Close-up photo showing clear ponding depth

measurement.

13

Waterproofing and perforated

underdrain

#57 stone depth

measurement

Close-up of depth

Close-up of depth

Close-up showing clear depth measurement of mulch

WS

D H

om

es; McG

ettigan

& D

alton

WS

D H

om

es; McG

ettigan

& D

alton

W

SD

Hom

es; McG

ettigan

& D

alton

WS

D H

om

es; McG

ettigan

& D

alton

WS

D H

om

es; McG

ettigan

& D

alton

WS

D H

om

es; McG

ettigan

& D

alton

WS

D H

om

es; McG

ettigan

& D

alton

WS

D H

om

es; McG

ettigan

& D

alton

WS

D H

om

es; McG

ettigan

& D

alton

WS

D H

om

es; McG

ettigan

& D

alton

R

.C. F

ields &

Asso

ciates, Inc.

R.C

. Field

s & A

ssociates, In

c.

R.C

. Field

s & A

ssociates, In

c.

R.C

. Field

s & A

ssociates, In

c.

R.C

. Field

s & A

ssociates, In

c.