Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G. Rumolo With input from: V. Baglin, H. Bartosik, Ph. Baudrenghien, O. Dominguez, B. Goddard, W. Höfle, E. Métral, B. Salvant, L. Tavian, et al.

Upload: amish

Post on 12-Jan-2016

47 views

Category:

Documents


2 download

DESCRIPTION

Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G . Rumolo With input from: V. Baglin, H. Bartosik, Ph. Baudrenghien, O. Dominguez, B . Goddard, W. Höfle , E. Métral , B . Salvant, L. Tavian, et al. Scrubbing history of LHC arcs. 4 hours. 29/06. 07/10. 14/10. 24-25/10. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Plans and goals of the scrubbing run

G. Arduini, G. Iadarola, G. Rumolo

With input from: V. Baglin, H. Bartosik, Ph. Baudrenghien, O. Dominguez, B. Goddard, W. Höfle, E. Métral, B. Salvant, L.

Tavian, et al.

Page 2: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

0 10 20 30 40 500

5

10

15

20x 10

13

Inte

nsi

ty

Time [h]

0 10 20 30 40 50

1.4

1.6

1.8

2

2.2

max

Time [h]

→ dmax decreased from the initial 2.1 to 1.52 in the arcs after approximately 50h machine time with 25ns beams in 2011 (injected nominal and degraded)

→ It was found to be slightly higher (1.65) in 2012, but it has already decreased to 1.55 at the end the injection tests (4h beam time, 1h between measurements)

0 10 20 30 40 500

5

10

15

20x 10

13

Inte

nsi

ty

Time [h]

0 10 20 30 40 50

1.4

1.6

1.8

2

2.2

max

Time [h]

25ns threshold @450 GeV

25ns threshold @3.5 TeV

29/06 07/10 24-25/1014/10

50ns

0 2000 4000 6000 8000 10000 12000-2

0

2

4

6

8x 10

13

Time [s]

Beam

intens

ities

0 2000 4000 6000 8000 10000 12000-5

0

5

10

Time [s]

Heat l

oad [W

/hcell]

10/07

/2012

3w p operation (50ns) 2011 + ions + Winter shut-down + 3m operation (50ns) 2012

4 hours

dmax

Scrubbing history of LHC arcs

Page 3: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Beam 1

Beam 2

Beam 2 - October 24, 2011⇒ Deterioration in SEY

confirmed by worse beam lifetime

Ju

ly 1

0, 2

01

2

Beam observations

H. Bartosik

Effect of winter stop

Page 4: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Aims of the scrubbing run and 25 ns e-cloud MDs

Collect additional information on the evolution on the Secondary Electron Yield as a function of the electron dose when low(er) SEY are achieved to determine the expected length of the scrubbing post LS1 for operation at 25 ns.

Benchmark simulations and test scenarios for the optimization of the beams (trains length, bunch intensity) and beam parameters (bunch length and transverse emittance) to enhance scrubbing dose rates.

Further reduce the SEY in the arcs and straight sections to allow ramping to 4 TeV at least a few hundred bunches for beam-beam studies and UFO studies during MD blocks 3-4)

In parallel learn on possible other differences 25 ns vs. 50 ns for heating, UFOs (and UFO conditioning)

Study (during MD block 3-4) the electron cloud build-up at 4 TeV and interplay with photoemission. In parallel learn on possible other differences 25 ns vs. 50 ns for heating, UFOs (and UFO conditioning)

Page 5: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

2 4 6 8 10 12 14

x 1010

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

Intensity [ppb]

Sc

rub

bin

g d

os

e (

50

eV

) [m

A/m

]

Effect of bunch intensity→ Scan in bunch intensity at SEYmax=1.55

Max scrubbing dose @about 8 x 1010 ppb(however, only 10% larger than at 1.3 x 1011 ppb)

Threshold value for electron cloud build up

2 4 6 8 10 12 14

x 1010

0

2

4

6

8

10

12

Intensity [ppb]

He

at

loa

d [

W/h

ce

ll]

Heat load 20% lower than at 1.3 x 1011 ppb

Choice of bunch intensity

Page 6: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Effect of bunch intensity→ Scan in bunch intensity at SEYmax=1.55

-15 -10 -5 0 5 10

0.5

1

1.5

2

2.5

3

x 109

Position [mm]

dis

trib

uti

on

[a

.u.]

Last passages

0.3e11ppb0.5e11ppb0.7e11ppb0.9e11ppb1.1e11ppb1.3e11ppb

• Electron distribution in the dipole chamber:– The central density is higher for lower intensities– The two stripes move further out with higher intensities

• Lower intensity beams also tend to be more unstable due to larger central densities they generate

• When injecting higher intensities, bunches at the end of the trains lose and eventually the whole region ±1cm around the center of the chamber is swept with electrons

Electron distribution

Choice of bunch intensity

Page 7: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

1.3 1.35 1.4 1.45 1.5 1.55 1.610

-4

10-2

100

102

SEY

Scr

ubbi

ng d

ose

(50e

V) [

mA

/m]

1.3 1.35 1.4 1.45 1.5 1.55 1.610

-4

10-2

100

102

SEY

Scr

ubbi

ng d

ose

(50e

V) [

mA

/m]

72b. per SPS train144b. per SPS train216b. per SPS train288b. per SPS train

Ideal bunches

Effect of filling scheme Scan in SEY at nominal bunch intensity 1.3 1.35 1.4 1.45 1.5 1.55 1.6

10-4

10-2

100

102

SEY

Scr

ubbi

ng d

ose

(50e

V) [

mA

/m]

1.3 1.35 1.4 1.45 1.5 1.55 1.610

-4

10-2

100

102

SEY

Scr

ubbi

ng d

ose

(50e

V) [

mA

/m]

72b. per SPS train144b. per SPS train216b. per SPS train288b. per SPS train

1.3 1.35 1.4 1.45 1.5 1.55 1.610

-4

10-2

100

102

SEY

Scr

ubbi

ng d

ose

(50e

V) [

mA

/m]

1.3 1.35 1.4 1.45 1.5 1.55 1.610

-4

10-2

100

102

SEY

Scr

ubbi

ng d

ose

(50e

V) [

mA

/m]

72b. per SPS train144b. per SPS train216b. per SPS train288b. per SPS train

Degraded bunches (as from last fill)

0 50 100 150 200 250 300 3500

2

4

6

8

10

12

14x 10

10

Inte

ns

ity

[p

pb

]

25ns bucket

Scrubbing evolution

Page 8: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Scrubbing run requirements

• Requirements for the scrubbing run:– In the injectors:

• 25 ns beam with ~1.2-1.3x1011 p/bunch with nominal emittance (possibly <3 mm)

• Trains of 288 bunches• We could possibly profit of the low gamma transition optics (Q20) beam

from SPS. Preferred.

• During the scrubbing run and 25 ns tests: • Experimental Solenoids and Dipoles should be ON. The previous 25 ns tests

were performed with the experimental magnets ON. The polarity of the LHCb dipole should be positive.

• Injection kicker solenoids should be ON. Switch them OFF when long periods without injection in order to scrub the kicker area.

• Vacuum interlock levels should be temporarily increased to few 10-6 mbar (from 4x10-7 mbar) where and if needed and compatibly with machine and experiment protection requirements

Page 9: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Scrubbing run constraints

• We do not expect issues related with intensity ramp-up related to machine protection (Estored 25 ns beam@450GeV~0.2 Estored-50 ns beam@4Tev) but monitoring of:– RF and damper HOM – MKI vacuum and temperatures – BSRT temperatures– Collimator temperatures

• TDI:– Must be moved in parking position (110 mm gap) once the filling is

stopped for periods longer than 15 minutes.– Monitoring of vacuum and temperatures will be required

Page 10: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Potential issues

• Vacuum in the injection kicker (limiting factor for Beam 2 last year) area particularly Beam 2 slowing down the injection process

• Flashover of the kickers (a MKI in point 8 is going to be replaced in order to lift the limitation in the maximum number of bunches that can be injected)

• Performance and robustness of the consolidated BSRT mirror

these were the main reasons for postponing the scrubbing run and precede it by a 50 ns intensity ramp-up after the technical stop

these might determine the efficiency of the scrubbing run and the achievable performance at 4 TeV (e-cloud wise)

Page 11: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Filling schemes for the scrubbing run

• Separation:– Between PS trains: 250 ns. To give some margin in the SPS (non

nominal inj. Kicker rise-time and avoid starting with edge bunches with reduced intensity)

– Between SPS trains: 925 ns

G. Iadarola, D. Jacquet

0 500 1000 1500 2000 2500 3000 35000

0.5

1

1.5Nb = 2100+1 pilot "25ns_2100b_30inj_2012spare"

0 500 1000 1500 2000 2500 3000 35000

0.5

1

1.5Nb = 2460+1 pilot "25ns_2460b_18inj_2012spare"

0 500 1000 1500 2000 2500 3000 35000

0.5

1

1.5Nb = 2604+1 pilot "25ns_2604b_13inj_2012spare"

0 500 1000 1500 2000 2500 3000 35000

0.5

1

1.5Nb = 2604+1 pilot "25ns_2604b_10inj_2012spare"

25 ns slot number

Aim to start with that

Page 12: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Filling schemes for the scrubbing run

• Depending on the progress, we will then switch to more optimized filling patterns

G. Iadarola, D. Jacquet

0 500 1000 1500 2000 2500 3000 35000

0.5

1

1.5Nb= 2388+1 pilot - “25ns_2388b_27inj_2012"

0 500 1000 1500 2000 2500 3000 35000

0.5

1

1.5Nb= 2604+1 pilot - "25ns_2604b_17inj_2012"

0 500 1000 1500 2000 2500 3000 35000

0.5

1

1.5Nb= 2676+1 pilot - "25ns_2676b_13inj_2012"

0 500 1000 1500 2000 2500 3000 35000

0.5

1

1.5Nb= 2748+1 pilot - "25ns_2748b_11inj_2012"

25 ns slot number

Page 13: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

25 ns MDs and scrubbing - G. Arduini et al. 13

Scrubbing run plan (all at 450 GeV!)

• Thu 4/10 08:00-12:00: Setting-up of the injection of 288 bunches with 25 ns beams for Beam 1 and in particular for Beam 2 (not done this year)

• Thu 4/10 12:00-14:00: Damper setting-up (injection of trains of 12 bunches)

• Thu 4/10 14:00 – Sun 7/10 12:00– Go through the filling schemes and accumulate electron dose– The criterion for dumping a fill will be determined according to the

observed heat load “lifetime” and filling time. In any case bunch intensities lower than 0.2-0.3x1011 will lead to dumps (LSS6 BPMs)

• Sun 7/10 – 12:00-20:00. Studies (in order of decreasing priority):– Chromaticity threshold below which the beam is unstable with trains of 72

(or more) bunches– Emittance blow-up for machine filled with trains of 72 bunches– e-cloud build-up dependence on bunch length

• Sun 7/10 20:00-24:00: Filling pattern to determine SEY in straight sections

• Mon 8/10 00:00 Start of MD319/09/2012

Page 14: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

25 ns MDs and scrubbing - G. Arduini et al. 14

Scrubbing run plan (all at 450 GeV!)

• Thu 4/10 08:00-12:00: Setting-up of the injection of 288 bunches with 25 ns beams for Beam 1 and in particular for Beam 2 (not done this year)

• Thu 4/10 12:00-14:00: Damper setting-up (injection of trains of 12 bunches)

• Thu 4/10 14:00 – Sun 7/10 12:00– Go through the filling schemes and accumulate electron dose– The criterion for dumping a fill will be determined according to the

observed heat load “lifetime” and filling time. In any case bunch intensities lower than 0.2-0.3x1011 will lead to dumps (LSS6 BPMs)

• Sun 7/10 – 12:00-20:00. Studies (in order of decreasing priority):– Chromaticity threshold below which the beam is unstable with trains of 72

(or more) bunches– Emittance blow-up for machine filled with trains of 72 bunches– e-cloud build-up dependence on bunch length

• Sun 7/10 20:00-24:00: Filling pattern to determine SEY in straight sections

• Mon 8/10 00:00 Start of MD319/09/2012

Page 15: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

25 ns MDs and scrubbing - G. Arduini et al. 15

Scrubbing run plan (all at 450 GeV!)

• Thu 4/10 08:00-12:00: Setting-up of the injection of 288 bunches with 25 ns beams for Beam 1 and in particular for Beam 2 (not done this year)

• Thu 4/10 12:00-14:00: Damper setting-up (injection of trains of 12 bunches)

• Thu 4/10 14:00 – Sun 7/10 12:00– Go through the filling schemes and accumulate electron dose– The criterion for dumping a fill will be determined according to the

observed heat load “lifetime” and filling time. In any case bunch intensities lower than 0.2-0.3x1011 will lead to dumps (LSS6 BPMs)

• Sun 7/10 – 12:00-20:00. Studies (in order of decreasing priority):– Chromaticity threshold below which the beam is unstable with trains of 72

(or more) bunches– Emittance blow-up for machine filled with trains of 72 bunches– e-cloud build-up dependence on bunch length

• Sun 7/10 20:00-24:00: Filling pattern to determine SEY in straight sections

• Mon 8/10 00:00: Start of MD319/09/2012

Page 16: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Preparation for the scrubbing run

• Transverse feedback (D. Valuch):– Larger bandwidth of the transverse feedback to be tested ahead of the

scrubbing run (few hours in stable beams) during the 50 ns run (operational development)

• BPM in LSS6 (R. Jones):– After the technical stop it might be possible to put in operation the new

logic for the LSS6 BPMs not taking into account of bunch trajectories when they are below sensitivity threshold (being tested) could be an issue if too many bunches end up below detection threshold

Page 17: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

Regular measurements during scrubbing

→ Chromaticity measurement before starting any high intensity fill

→ Beam measurements– Transverse emittance:

• LHC: Wire scanner (possible with 300 bunches?), BSRT in fast scan mode, BGI• SPS: Wire scanner in bunch-by-bunch mode at SPS extraction

– Bunch-by-bunch intensity (FBCT) and total intensity (DCBCT)– Transverse oscillations:

• BBQ and Hump buster• ADT pickup (bunch-by-bunch position)• Head-tail monitor• BLM bunch by bunch

– Longitudinal parameters:• Bunch length evolution• Longitudinal beam spectra

→ Electron cloud measurements– Heat load in the arcs, stand-alone and triplets– Bunch-by-bunch RF stable phase– Vacuum pressures (selection of gauges to be defined with vacuum team)– Electron flux measurements from BPMs (available?)

Page 18: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

4 TeV tests

1 1.1 1.2 1.3 1.4 1.5 1.610

-2

10-1

100

101

SEY

Sc

rub

bin

g d

os

e (

50

eV

) [m

A/m

]

4TeV - 72b. per SPS train7TeV - 72b. per SPS train4TeV - 288b. per SPS train7TeV - 288b. per SPS train

Page 19: Plans and goals of the scrubbing run G. Arduini, G. Iadarola, G .  Rumolo

4 TeV tests

• 2 ramps 4h flat top each ramp (up to 400b. for first, 800b. for the second)

• Criterion for the choice of the filling pattern (at the end of the scrubbing run Number of trains of 72 (or larger) bunches that do not show: )

– Sign of instability /important blow-up at injection– Pressures below 10-7 mbar– Heat loads due to e-cloud in the range of a few 100 mW/m/aperture, or

lower

• Interest in ramping 25ns beams to 4 TeV:– Study (during MD block 3-4) the electron cloud build-up at 4 TeV (interplay

with photoemission, further scrubbing). In parallel learn on possible other differences 25 ns vs. 50 ns for heating, UFOs (and UFO conditioning)

– Long-range beam-beam MDs– Experiments