STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
HIGHWAY DIVISION 6
PLANS – REVISED – 1-29-19 Letting Date: February 6, 2019
CONTRACT ID: DF00248
TIP NO.: ------
FEDERAL AID NO.: STATE FUNDED
WBS ELEMENT NO.: 2020CPT.06.12.10431.1 & 2020CPT.06.12.20431.1
ROUTE NO.: NC 55, NC 217 & VARIOUS SR ROUTES
LOCATION: VARIOUS
COUNTY: HARNETT
LENGTH OF PROJECT: 26.84 MILES
TYPE OF WORK: RESURFACING, WIDENING, MILLING & PVT. MKGS.
This electronic collection of documents is provided
for the convenience of the user
and is Not a Certified Document –
The documents contained herein were originally issued
and sealed by the individuals whose names and license
numbers appear on each page, on the dates appearing
with their signature on that page.
This file or an individual page
shall not be considered a certified document.
1711
1700
1865
1827
1910
1853
1722
1703
1724
1723
1725
1901
1900
1876
1726
2009
2007
2012
2011
1715
1727
1907
1726
1720
1703
1721
1721
1703
1911
1725
1720
2011
20102006
2005
1700
1700
1700
1702
1701
17012004
1568
2009
2060
2007
2011
2013
1769
17692006
2014
2065
2077
2078
2008
2005
2005
2003
2003
2076
2015
2088
1769
2091
2090
2009
2003
2002
2084
2084
2057
2001
2068
2071
2054
2062
2084
1532
1571
1572
1523
1522
1531
1580
2002
2062
1525
1567
1918
2182
21822183
1769
2227
2226
23082307
1623
1624
SlocombCrossroads
Coats
pop 2,238
2005
1703
1703
1623
2004
1561
.43
.95
.21
.19
.36
.81
1.2
3
.47
1.2
1
.09
.22
.19
.87
.53
1.39
.18
1.0
2
.46
.75
1.19
1.03
.51
1.08
.86
.55
.62
1.08
.60
.48
.72
1.47
.20
.21
.73
1.08
.93
.25
.69
.74
.52
.66
.43
.31
2.02
.97
1.12
.98.23
.52
.24
.92
.09
.30
.08
.38
Lisa St.Park
St.Su
mmit
St.
Pope
St. Pope
St.
DooleySt.
Lemon St.
LemonSt.
Williams
St.
Poole
St.
Washin
gto
n
Dr.
Par-ish St.
Erwin St.
Graham
St.
Par-ish
St.
South St.
Hamer St.
Lynn
St.Derek
St.
Erwin St.
Dunn
St. Durane
Dr.
Denise
Av.
Ida
St.Jack-
sonSt.
Isa-
bella
St.
Orange
St.
Mason
St.
Mason
St.
McLean
St.
Sally St.
Jay St.
Debbie
St.
Honeycutt
Rd.
Pat-
terson
St.T
urn
er
Cir.
Railroad
St.
Maple
St.
Ash
St.
Willo
wDr.
Marlin
Ln.
Colt
Av.
Re
min
gto
n
Dr.
Johns
on
St.
Eldridge
Beasley
Chelsea
Beale
Green
Acres
Rd.
Walnut
Dr.
Pinevie
wDr.
Maple
Dr.
Wom
ack
Dr.
Allen
Dr.
Porter
Dr.BarnesDr.
Hicks St.
Gilbert
St.
Price
St.N.St.
M St.
L St.
14th
K St. K St.
12th
11th
10th
16th
St.
15th
St.
Crab
Old
Farm
Rd.
Mas
onic
Rd.
N.
Carrie
St.
Min
nie
St.
W.
Orange
St.
Hard
Luck
Rd.
Gentry
Sch.
Rd.
Friendly
Western
HillSt.
WestDonaldSt.
Kellys
Count
St.
Park
wood
Cir.
Caudell
Ln.
McKoy
Rd.
Bolton Rd.
Duvall
Ln.
Langsto
nHoward
Ln.
Don
Phelps Cir.
LuckLn.
Harm
on
Ln.
Hawley St.
Russ
Dr.
Church
St.
Carrie
St.
2.43
.47
1.0
.25
.36
1.3
3
.33
.78
.90
Erwin
1.9
2
.43
.12
.29
.52
1.0
8
.53
.41
.8
.3
.1
.40
.13
.20
.14
.07.3
2
.38
.70
.66
.53
.15
.10
.53
.21
.69
.29
.67
.80
.49
.63
1.2
1
.212314
.16
.20
Anna St
Anna S
t
Ariel S
t
Buies Creek
Dr Mckoy
Rd
Dorm R
dDay
.07
CirHartwell
Meado
w L
nCountry
.19
Dr
Huntington
John Lee Rd
McLa
mb
Rd
.52
1.75
W Washington
N M
cKinle
y St
S M
cKinle
y St
Partin
.48
.26
.40.68
1.0
.15
.08
.22
.13
Stewart
McKin
ney
St.
13th
Stewart
St.
St.
St.
2092
Campbell
Coll.
Arbor Crest Ln.
Laurel Wood Ln.
MainSt.
St.
Hamer
St.
Eagle
Rd.
Willia
ms
Rd.
Winc
hesterAv
e.
Rd.
Whip
poorwill
Delma
Grimes
Rd.
Cane
Mill
Rd.
Cra
wford
Rd.
Bennett
Rd.
Fleming
Rd.
McLed
ge
Rd.
Brickmill
Rd.
Meado
wlark
Old
Fairg
round
Maynard
Lake
Rd.
N St.
Old
Wire
Rd.
MannRd.
Cla
yhole
Rd.
Cla
yhole
Rd.
Turlington
Rd.
Red
Hill
Churc
h
Rd.
Rd.
Rd.
Skeet
Range
Rd.
Daniels
Rd.
Duke
Rd.
Circle
Dr.
Scramble
Rd.
Tilghman
Brinkley
Fairgro
und
Ne
w
Path
Rd.
Erwin
Access
Rd.
Brya
nt Rd.
Three
Brid
ge
Rd.
Ashe
Ave.
Rd.
BrickyardLn.
BurtSt. Kivett
Rd.
Stewart
TownRd.
Leslie
Camp
Av.
Ho
ward
Ln.
Pine C
one
Ln.
Cir.
Hatc
her
St.
Wade Stewart
Mars
hbanks
St.
Mae
Byrd
Rd.
Highland
Dr.
McLam
b
Rd.
McLa
mb
Rd.
Taylor
Rd.
Airport
Rd.
La
mm
Av.
Harvell
Rd.
Tart
Rd.
Hall
Rd.
Bla
ckberry
Rd.
Old
Wire
Rd.
Curtis
Dr.
Cra
wford
Rd.
Avery
Rd.
Lin
coln
St.
Cra
wford
Rd.
Chapel
Rd.
Prospect
Church
Rd.
Park
Dr.
Suggs
Rd.
Pope
St.
Oak
Grove
Poole
Rd.
Erwin
Chap
el
Rd.
1.2
.1
.1
.2
.2
.2
.08
.49
.51
.17
.32
.52
.47
.10
.90
.53
.31
.60
.50
.34
.30
.90
.29
.26
.02
.21
.54
.03
.14
.71 .10
.20
.09
.62
.68
.30
.15
.20
.50
.21
.01
.02
1.2
2
.1
.1
.4
.2
1.1
.3
1.1
0
.60
.10
.15
.22
.32
.37
.04
.07
1.23
.52
.29
.18
.28
.10
.06
.03.36.07 .06
.08
.11
.09
.10
.33
.34
.14
.45
.11
.10
.10
.03
.12
.30
.10 .02
.19
.19
.17
.10
.08
.06
.31
.10
.12.05
.21
.17.0
4
.08
.15.23
.24
.41
Devotional
Sch.
Red Hill
CH.
Gardens
Harnett County
Airport
Elem.
.06
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
19-
DE
C-2018 11:2
9H:\
DD
C\
DD
C
Work
Files\
Projects\
Let\
Resurfacing\2018
Fall\
D2\
C2\
Harnett\
HA
RN
ET
T_
MS_
EN
G.d
gn
jnbutler
AT
D6
CA
D293564
8/17/99
3
2
1314
1
42155
421
421
27
55
55
2727
FALL 2018 RESURFACING
HARNETT COUNTY
2020CPT.06.12.10431.1,etc 3
REPLACE AS DIRECTED BY ENGINEER.REMOVE FAILING PAVED SHOULDERS AND
WIDENING TO MAKE THE TOTAL PAVEMENT WIDTH 22’.*NOTE: MAP 14 - TIE INTO EXISITING INSIDE CURVE
1908
1735
1898
1905
1775
1775
1779
2024
2027
2024
2023
2025
1779
2026
2021
2089
2079
1779
1779
1779
2087
1919
2303
19251924
1923
1922
1921
2309
2099
1916
.20
.49
.28
1.72
.23
1.1
2
.13
.27
.26
.04
.16 .47
.15 .51
.46
.27
.11
.17
.41
.47
1.5
6
.39
Salt
Market
St.
EnnisSt.
WrenchSt.
MasonRd.
Mason
Rd.
Old Cut-off Rd.
Moulton
.08
1.8
3
1.76
1.82
1.7
2
.57
.45
1.1
7
.45
.22
.28
.13
.13
.47
.31
.63
Chicaro
Rd.
Roosevelt
Rd.
Rd.
Messer
Rd.
Holiday
Rd.
Beaver
Da
m
Rd.
Byrd
Mill
Rd.
Rd.
Covin
gto
n
Rd.
Salt
Market
St.
Bumpus Creek
Access
Loop
Robin
Beaver
Rd.
Tita
n
Roberts
Rd.
Mill
Pond
.48
.42
.35
.06
.08
.32
1.5
4.5
.06
.20.07
.23
.19
.28
.12
.03
.21
.10
.09
.07
.09
.04
.21
.31
.09
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
14-
DE
C-2018 13:4
3H:\
DD
C\
DD
C
Work
Files\
Projects\
Let\
Resurfacing\2018
Fall\
D2\
C2\
Harnett\
HA
RN
ET
T_
MS_
EN
G.d
gn
jnbutler
AT
D6
CA
D293564
8/17/99
18 17
16
15
4
217
217
217
217
2020CPT.06.12.10431.1,etc 4
FALL 2018 RESURFACING
HARNETT COUNTY
1793
1002
1811
1784
1788
1915
1866
1913
1912
1851
1793
1794
1811
1811
1873
1785
1002
1780
1791
1785
1837
1828
1793
1926
1927
1838
1872
1.2
2
1.6
5
.74
MaySt.
LillySt.
Oakd
aleSt.
CedarCreek
St.
1.2
4
.31
.19
.08
.50
.21
.16
1.0
2
.23
.82
.57
.20
1.0
9
.24
301
301
Am
mons
Rd.
Phillip
sRd.
McKay
Branch
Rd.
Fairvie
w
Rd.
Dr.
Coleridg
e
Dr.
Fran
cis
Dr.
Access
Alp
hin
Rd. R
d.
Access
Rd.
Access
Rd.
Pope
Rd.
Ma Kitchen
Rd.
EmmettRd.
Long
Branch
Rd.
Long
Branch
Rd.
BearsLn.
Warren
Rd.
Gateway
Dr.
.8
.56
.35.2
0
.20
.08
.10
.11
.30
.19
.20
.25
.20
.22
.20.1
3
1.0
0
.12
.61
.06
.20
.08
.53
.27
.38
FC
A
FC
ACS
X
Wordsworth
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
14-
DE
C-2018 13:4
4H:\
DD
C\
DD
C
Work
Files\
Projects\
Let\
Resurfacing\2018
Fall\
D2\
C2\
Harnett\
HA
RN
ET
T_
MS_
EN
G.d
gn
jnbutler
AT
D6
CA
D293564
8/17/99
10
12
11
5
421
95
71
2020CPT.06.12.10431.1,etc 5
FALL 2018 RESURFACING
HARNETT COUNTY
.92
1.06
.17
1.3
2
.17
.36
1213
1229
1211
1229
1243
1211
1212
1242
.81
.91
2.35
.63
1211
1212
1213
1.8
9
1211
.89
.51
2.2
2
.78
.91
.15
.39
2527
Page
Rd.
Page
Brid
ge
Rd.
McDougal
Buchanan
Rd.
Doc’s
Ch.
Rd.
Rd.McDougal
Rd.
Bella
Bridge
Jesse
Rd.
Jesse
Rd.
Buie
Rd.
McD
ougal
Rd.
.4
WilliamsChapel
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
14-
DE
C-2018 13:4
4H:\
DD
C\
DD
C
Work
Files\
Projects\
Let\
Resurfacing\2018
Fall\
D2\
C2\
Harnett\
HA
RN
ET
T_
MS_
EN
G.d
gn
jnbutler
AT
D6
CA
D293564
8/17/99
6
27
27
27
2020CPT.06.12.10431.1,etc 6
FALL 2018 RESURFACING
HARNETT COUNTY
1265
1266
1263
1314
1262
12571257
1259
1258
1258
1248
1291 1291
1291
1236
1237
1238
1314
1316
1265
1314
1274
1274
1264
1260
1261
1257
1314
1263
1265
12651275
1369
Mamers
Luart
1291
1251
1291
1257
.07
.66.98
1.90
.22
1.14
.76
1.23
2.00
1.3
5
1.7
3
1.17
1.0
5
2.0
5
.75
.68
.45
1382
1384
1383 .09
.14
.12
.25
.06
.73
.09
SP 8147
SP 8152
SP 8151
SP 8148
SP 8149
Hicks
Rd.
Dean
Rd.
Brown
Rd.Bayles
Rd.
Newton
Rd.
South
River
Rd.
Joe
Collin
s
Rd. Joe CollinsRd.
Old US421
Rd.
Rd.
Rd.
Rd.
Peach
Bra
nch
Rd.
Moccasin
Bra
nch
Rd.
Raven
Rock
Rd.
Cu
mmin
gs
Rd.
Nordan
Old
US
Neill
B.
Tho
mas
Rd.
W.
Cool
Sprin
gRd.
Medical
Center
Rd.
Rd.
Cool
Sprin
gs
Rd.
Raven
Rock
Rd.
Moccasin
.2
.10
.18
.42
.17
.40
.29
1.30
.90
.28
.54
.02
1.15
.10
.60
.63
.70
.23
1.1
0
.10
.04
.31
.80
.60
.79
.52
.60
.25
.07
1.80
Cedar RockCh.
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
14-
DE
C-2018 13:4
4H:\
DD
C\
DD
C
Work
Files\
Projects\
Let\
Resurfacing\2018
Fall\
D2\
C2\
Harnett\
HA
RN
ET
T_
MS_
EN
G.d
gn
jnbutler
AT
D6
CA
D293564
8/17/99
8
7
2020CPT.06.12.10431.1,etc
421
421
7
FALL 2018 RESURFACING
HARNETT COUNTY
1006
1538
1535
1542
1514
1537
15351532
1516
1534
1534
15161516
2003
15421513
1520
2002
2084
1006
1006
1532
1532
1532
1571
1572
1569
1570
1523
1522
1521
1531
1580
2002
1533
1516
1516
1535
1521
1525
1579
1625
1623
1624
Buies
Creek
.99
.13.9
3
.63
1.4
4
.93
.76
2.06
3.1
8
Tysin
ger
Rd.
McGregor
Rd.
Hardees
St.
Gauldin
Ln.
Park
wood
Cir.
Caudell
Ln.
Dr.McKoy
Rd.
Hawley St.
1.2
5
1.40
1520
.201623
Anna St
Anna S
t
Ariel S
t
Linsey Ct Johnson Rd
Sherif
Rd N.
Old Sta
ge
Buies Creek
Dr Mckoy
Rd
Dorm R
dDay
.07
CirHartwell
CirHartwell
Johnson
.28.33
Rd
.52
Fir Tree Ln
.33
.22
.13
Stewart
Campbell
Coll.
Johnson
Far
Rd.
Gregory
Cir.
Gre
gory
Cir.
Old
Church
Rd.
BrickyardLn.
BurtSt. Kivett
Rd.
Stewart
Camp
Av.
Sheriff
Chesterfield
Rd.
Mitchell
Rd.
Mitchell
Rd.
Mabry
Rd.
Upchurch
Boykin
Rd.
Coats
Rd.
Oakgro
ve
Churc
h
Old
Lake
Old
Buis
Creek
Rd.
Rd.
Pope
St.
Grove
Church
Rd.
Old
Sta
ge
Rd.
.57
.30
.31
.67
.18
.35
.18
.22
1.42
.7
.25
1.0
8
.52
.21
.29
.35
.35
.66
.10
.06
.03.36.07 .06
.45
.11
.10
.03
.12.10 .02
1.67
.21
.04
.08
.15.07
.23
.07
.24
.41
Sch.Elem.
Bill
Birch
Rd.
River
River Grove Ln.
.06
RE
VISIO
NS
SHEET NO.PROJECT REFERENCE NO.
19-
DE
C-2018 11:3
0H:\
DD
C\
DD
C
Work
Files\
Projects\
Let\
Resurfacing\2018
Fall\
D2\
C2\
Harnett\
HA
RN
ET
T_
MS_
EN
G.d
gn
jnbutler
AT
D6
CA
D293564
8/17/99
9
2020CPT.06.12.10431.1,etc 8
FALL 2018 RESURFACING
HARNETT COUNTY
REPLACE AS DIRECTED BY ENGINEER.REMOVE FAILING PAVED SHOULDERS AND
WIDENING TO MAKE THE TOTAL PAVEMENT WIDTH 22’.*NOTE: MAP 9 - TIE INTO EXISITING INSIDE CURVE
1915
1002
1780
1791
1828
1780
1777
1790
1780
1781
1778
1778
1777
1926
.26
1.0
4
1.2
4
.31
.19
.20
301
301
Am
mons
McKay
Old
Hamilton
Rd.
Dorman
Rd.
Mid
dle
Road
Arrowhead
Rd.
Rd.
EmmettRd.
Long
Branch
BearsLn.
1.0
0
.12
.61
.06
.20
.25
1.4
9
1.0
4
.20
1.2
5
1.48
1.87
.08
.53
.27
.38
Smith Grove
CS
X
RAIL
RO
AD
RE
VISIO
NS
20-
DE
C-2018 14:0
8H:\
DD
C\
DD
C
Work
Files\
Projects\
Let\
Resurfacing\2018
Fall\
D2\
C2\
Harnett\
HA
RN
ET
T_
MS_
EN
G.d
gn
jnbutler
AT
D6
CA
D293564
8/17/99
82
SHEET NO.PROJECT REFERENCE NO.
2020CPT.06.12.10431.1,etc 9
FALL 2018 RESURFACING
HARNETT COUNTY
19
21
20
SHEET NO.PROJECT REFERENCE NO.
6/2/99
21-
DE
C-2018 07:2
8H:\
DD
C\
DD
C
Work
Files\
Projects\
Let\
Resurfacing\2018
Fall\
D2\
C2\
Harnett\
Resurf
Typicals.d
gn
$$$$
US
ER
NA
ME$$$$
2020CPT.06.12.10431.1,etc 10
-Y--L-
OPERATION. STRUCTURES. RESURFACING WILL BE ACCOMPLISHED AT THE SAME TIME AS THE MILLING CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS ANDPERFORM THE WORK IN ACCORDANCE WITH SECTION 607 OF THE JANUARY 2012 NORTH
OF EACH RESURFACING MAP.WHERE THE BRIDGE WILL NOT BE RESURFACED, AND AT THE BEGINNING AND ENDING POINTLOCATIONS SHALL INCLUDE TIES INTO EXISTING CONCRETE PAVEMENT, AT BRIDGE APPROACHES
WITH THE FOLLOWING SKETCH AS DIRECTED BY THE ENGINEER.FOR SURFACE MIXES OVER 1" IN THICKNESS, MILL THE EXISTING PAVEMENT IN ACCORDANCE
NOTES TO CONTRACTOR
MILL EXISTING PAVEMENT
APPROX. THICKNESSOF SURFACE COURSE
BEGINNING OR ENDING OF MAP,
EXISTING CONCRETE PAVEMENT OR
NON-RESURFACEABLE BRIDGE DECKS
MILLING AT PAVEMENT TIE-INS DETAIL
75’
DIRECTED BY THE ENGINEERNEAREST JOINT, OR AS
MILL TO END OF C&G,
AS NEEDED, OR AS DIRECTED BY THE ENGINEERSMOOTH TIE-INS, CURB RADII AND STREET INTERSECTIONS, INCLUDES INCIDENTAL MILLING AT THE ENDS OF SECTIONS FOR
MILLING AT CURB AND GUTTER INTERSECTIONS
T
4’ - 10’
2’ - 4’
AND BASE
EXISTING PAVEMENT
DISPOSED OF BY THE CONTRACTOR IN AN APPROVED DISPOSAL SITE.
BORROW PITS OR FROM NCDOT STOCKPILES. ANY EXCESS MATERIAL SHALL BE
WIDENING OPERATIONS WITHIN THE PROJECT LIMITS, FROM NCDOT APPROVED
REQUIRED BORROW MATERIAL MAY BE OBTAINED BY THE CONTRACTOR FROM 4.
MATERIAL WILL NOT BE ALLOWED.
EROSION. PULLING DITCHES OR CUTTING SHOULDERS TO GENERATE BORROW
ALONG THE EDGE OF PAVEMENT AND THE DITCH SHOULDER POINT TO MINIMIZE
A VEGETATIVE BUFFER SHALL BE MAINTAINED BETWEEN THE DISTURBED AREA 3.
WIDENING MACHINE OR SIMILAR DEVICE.
AGGREGATE SHOULDER BORROW (ASB) MATERIAL SHALL BE PLACED USING A 2.
FROM ROADWAY.
560.02, WITH A MINIMUM SLOPE OF 1" PER FOOT TO ENSURE POSITIVE DRAINAGE AWAY
SHOULDER SHALL BE RECONSTRUCTED AS SHOWN IN STD. DWG. NO. 560.01 & 1.
NOTES:
SHOULDER RECONSTRUCTION
TYP. SHOULDER WIDTH
DRAINAGE.
ENSURE POSITIVE
TIE TO EX. GRADE.
SHOULDER WEDGE
D
R1T TV4 V4
TT
C3 C3
E1 E1
C2TT
PTPC
100’ MIN100’ MIN
2’ WIDENING
INSIDE CURVE WIDENING
V2 V2C3
C3
TT
D D
U
D DD
U
D
U
D DD DD
U
D DD
U
BRIDGE MILLING
EX. CONC. BRIDGE DECK
V4
EX. PAVEMENTEX. AWS
V2
EX. PAVEMENT
MAPS 6, 8, 19 & 21
U EXISTING ASPHALT
R1
V1
PAVEMENT SCHEDULE
C2AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD.
T
V3
1�" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
C3AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD.
1�" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C,
EXISTING CONCRETE ISLAND
V2
AS DIRECTED BY THE ENGINEER
AS DIRECTED BY THE ENGINEER
DEPTH, LENGTH & WIDTH VARIES
EXISTING PAVEMENT
PATCHING TO BE PERFORMED PRIOR TO MILL AND FILL OPERATION
PATCHING EXISTING PAVEMENT
ACBC TYPE B25.0B OR ACSC TYPE S9.5B OR S9.5C
TYPICAL SECTION NO. 1
55’
1" MILLING (FULL WIDTH)
0"-1�" MILLING (10’ CURB MILLING)
0’-1" MILLING (10’ CURB MILLING)
V4 1�" MILLING (FULL WIDTH)
C1 1" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD.
E1AT AN AVERAGE RATE OF 627 LBS. PER SQ. YD.
5�" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C,
24’-49’
TYPICAL SECTION NO. 4
22’
TYPICAL SECTION NO. 5
TYPICAL SECTION NO. 3
36’
AGGREGATE SHOULDER BORROW
2’ 2’
2’2’
TYPICAL SECTION NO. 2
2’2’ EXIST 2’2’
2’2’
SHEET NO.PROJECT REFERENCE NO.
6/2/99
20-
DE
C-2018 14:12
H:\
DD
C\
DD
C
Work
Files\
Projects\
Let\
Resurfacing\2018
Fall\
D2\
C2\
Harnett\
Resurf
Typicals.d
gn
$$$$
US
ER
NA
ME$$$$
2020CPT.06.12.10431.1,etc 11
-Y--L-
OPERATION. STRUCTURES. RESURFACING WILL BE ACCOMPLISHED AT THE SAME TIME AS THE MILLING CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS ANDPERFORM THE WORK IN ACCORDANCE WITH SECTION 607 OF THE JANUARY 2012 NORTH
OF EACH RESURFACING MAP.WHERE THE BRIDGE WILL NOT BE RESURFACED, AND AT THE BEGINNING AND ENDING POINTLOCATIONS SHALL INCLUDE TIES INTO EXISTING CONCRETE PAVEMENT, AT BRIDGE APPROACHES
WITH THE FOLLOWING SKETCH AS DIRECTED BY THE ENGINEER.FOR SURFACE MIXES OVER 1" IN THICKNESS, MILL THE EXISTING PAVEMENT IN ACCORDANCE
NOTES TO CONTRACTOR
MILL EXISTING PAVEMENT
APPROX. THICKNESSOF SURFACE COURSE
BEGINNING OR ENDING OF MAP,
EXISTING CONCRETE PAVEMENT OR
NON-RESURFACEABLE BRIDGE DECKS
MILLING AT PAVEMENT TIE-INS DETAIL
75’
DIRECTED BY THE ENGINEERNEAREST JOINT, OR AS
MILL TO END OF C&G,
AS NEEDED, OR AS DIRECTED BY THE ENGINEERSMOOTH TIE-INS, CURB RADII AND STREET INTERSECTIONS, INCLUDES INCIDENTAL MILLING AT THE ENDS OF SECTIONS FOR
MILLING AT CURB AND GUTTER INTERSECTIONS
TT C2
TT V4 C3
C1
V1 V1C1
V3C1
D DD
E1UE1
D DD
U
D
U
D
U
D
U
T
4’ - 10’
2’ - 4’
AND BASE
EXISTING PAVEMENT
DISPOSED OF BY THE CONTRACTOR IN AN APPROVED DISPOSAL SITE.
BORROW PITS OR FROM NCDOT STOCKPILES. ANY EXCESS MATERIAL SHALL BE
WIDENING OPERATIONS WITHIN THE PROJECT LIMITS, FROM NCDOT APPROVED
REQUIRED BORROW MATERIAL MAY BE OBTAINED BY THE CONTRACTOR FROM 4.
MATERIAL WILL NOT BE ALLOWED.
EROSION. PULLING DITCHES OR CUTTING SHOULDERS TO GENERATE BORROW
ALONG THE EDGE OF PAVEMENT AND THE DITCH SHOULDER POINT TO MINIMIZE
A VEGETATIVE BUFFER SHALL BE MAINTAINED BETWEEN THE DISTURBED AREA 3.
WIDENING MACHINE OR SIMILAR DEVICE.
AGGREGATE SHOULDER BORROW (ASB) MATERIAL SHALL BE PLACED USING A 2.
FROM ROADWAY.
560.02, WITH A MINIMUM SLOPE OF 1" PER FOOT TO ENSURE POSITIVE DRAINAGE AWAY
SHOULDER SHALL BE RECONSTRUCTED AS SHOWN IN STD. DWG. NO. 560.01 & 1.
NOTES:
SHOULDER RECONSTRUCTION
TYP. SHOULDER WIDTH
DRAINAGE.
ENSURE POSITIVE
TIE TO EX. GRADE.
SHOULDER WEDGE
PTPC
100’ MIN100’ MIN
2’ WIDENING
INSIDE CURVE WIDENING
BRIDGE MILLING
EX. CONC. BRIDGE DECK
V4
EX. PAVEMENTEX. AWS
V2
EX. PAVEMENT
MAPS 6, 8, 19 & 21
V2 C3
D
U
T
D
18’-20’
TYPICAL SECTION NO. 6
2’2’
TYPICAL SECTION NO. 7
26’-38’
TYPICAL SECTION NO. 8
20’
TYPICAL SECTION NO. 9
30’-37’
TYPICAL SECTION NO. 10
20’-68’
U EXISTING ASPHALT
R1
V1
PAVEMENT SCHEDULE
C2AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD.
T
V3
1�" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
C3AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD.
1�" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C,
EXISTING CONCRETE ISLAND
V2
1" MILLING (FULL WIDTH)
0"-1�" MILLING (10’ CURB MILLING)
0’-1" MILLING (10’ CURB MILLING)
V4 1�" MILLING (FULL WIDTH)
C1 1" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD.
E1AT AN AVERAGE RATE OF 627 LBS. PER SQ. YD.
5�" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C,
AGGREGATE SHOULDER BORROW
2’2’
AS DIRECTED BY THE ENGINEER
AS DIRECTED BY THE ENGINEER
DEPTH, LENGTH & WIDTH VARIES
EXISTING PAVEMENT
PATCHING TO BE PERFORMED PRIOR TO MILL AND FILL OPERATION
PATCHING EXISTING PAVEMENT
ACBC TYPE B25.0B OR ACSC TYPE S9.5B OR S9.5C
TYPICAL SECTION NO. 11
37’ 2’
7-19-11
a
a
s:usr/details/stand/shoulderwedgedetail.dgn
a
a
DETAILS
SHOULDER WEDGE
10/16/12
3) THE SHOULDER WEDGE DEVICE MAY BE DISENGAGED AT PAVED DRIVEWAYS AND SIDE STREETS.
2) BACKFILL SHOULDER WITH APPROVED MATERIAL.
1) DETAIL DOES NOT APPLY TO OGAFC AND ULTRA-THIN BONDED WEARING COURSE.
NOTES:
a
a
SHOULDER W/ RUTTING
EXISTING UNIMPROVED
DROP OFF
RUT
Rutted Shoulder)
(Resurfacing Adjacent toT.SPELL
ASPHALT OVERLAY
SHOULDER
EXISTING UNIMPROVED
SHEET NO.PROJECT REFERENCE NO.
CHECKED BY:
FILE SPEC.:
DATE:
DATE:
FAX 919-250-4119Office 919-707-6950
DATE:ORIGINAL BY:
MODIFIED BY:
CONTRACT STANDARDSAND DEVELOPMENT UNIT
$$$$$$
SY
STIM
E$$$$$
$$$$$$$$$$$$$$$$
DG
N$$$$$$$$$$$$$$$$
$$$$
US
ER
NA
ME$$$$
ASPHALT OVERLAY
SHOULDER
EXISTING UNIMPROVED
SHOULDER WEDGE
SHOULDER WEDGE DETAIL
PROPOSED PAVEMENT
MATERIAL
APPROVED BACKFILL
SHOULDER WEDGE
SHOULDER WEDGE DETAIL
EXISTING PAVEMENT
MATERIAL
APPROVED BACKFILL
(Resurfacing Projects w/ NO Widening)
- SHOULDER WEDGE ANGLE = 30°
ASPHALT OVERLAY
SHOULDER WEDGE
EXISTING PAVEMENT
MATERIAL
APPROVED BACKFILL
SHOULDER WEDGE DETAIL
with Existing Paved Shoulder having no dropoffs)
(Resurfacing Projects w/ Widening or
122020CPT.06.12.10431.1, etc
DIRECTION OF TRAFFIC FLOW
STATIONARY SIGN
LEGEND
User:r
mgarrett
C:\
Users\r
mgarrett\
Do
wnlo
ads\
Resurfacin
g_
Adv
Warn_2
Ln (2).dgn
3/19/2015
DE
PA
RT
EN
OF ANSP
O
RT
ATI
ON
TA
E
OF
NORTH
R
OL
NA
WO
RK
ZO
NE
TRAFFIC
C
ON
TR
OL
DIV
ISIO
NOF HIG
HW
AY
ST
S
CA
I
M
T
TR
SHEET NO.PROJ. REFERENCE NO.
LIMITS
CONSTRUCTION
Y2
LIMITS
CONSTRUCTION
Y1
5
3
1
2
48’’ X 24’’
END
ROAD WORK
G20-2 A
48’’ X 48’’AHEAD
ROAD
W20-1
WORK1
2
ROAD
48’’ X 48’’
UNDER
CONST
48’’ X 48’’
LOW/SOFTSHOULDER
48’’ X 48’’W20-7 A
48’’ X 48’’
AHEAD
ROAD
W20-1
WORK
PLACED 250’ IN ADVANCE OF FLAGGER.
W7-3aP24’’ X 18’’XX MILES
NEXT
3
4
5
CONSTRUCTION LIMITS AND THEN SPACE 1 MILE THEREAFTER.
THEREAFTER. IF NO -Y- LINES EXIST, PLACE 2ND SET � MILE FROM THE
PLACE INITIALLY AT THE CONSTRUCTION LIMITS AND SPACED 1 MILE APART
INSTALL WHEN -Y- LINES ARE WITHIN 0.5 MILES FROM "END ROAD WORK" SIGN.
WITHIN 500’ OF EACH APPROACH. A MAXIMUM OF 2 SIGN SETS PER MILE. DO NOT
ARE SEPARATED BY 0.25 MILES OR LESS, TREAT AS A SINGLE UNIT AND INSTALL
EACH -Y- LINE APPROACH AS SHOWN ABOVE. FOR MULTIPLE -Y- LINES THAT
SUBDIVISION ROADS ARE NOT "THROUGH" ROADWAYS. INSTALL 500’ +/- FROM
THESE ARE FOR -Y- LINES THAT ARE "THROUGH" ROADWAYS. DEAD END AND
PLACE 500’ FOLLOWING THE END OF CONSTRUCTION LIMITS.
ROUND UP TO NEXT WHOLE NUMBER.(NO FRACTIONAL OR DECIMAL NUMBERS)
#2 SIGN ONLY USED WHEN RESURFACING LIMITS ARE 2 OR MORE MILES IN LENGTH.
ONLY USED ON -Y- LINES IF RESURFACING LIMITS EXTEND 1000’ ALONG -Y- LINE.
PLACE 1000’ PRIOR TO BEGINNING OF CONSTRUCTION LIMITS.
-Y- LINE AS SHOWN BELOW. REMOVE UPON COMPLETION OF WORK.
-Y- LINE, ADVANCE WARNING PORTABLE SIGNS SHALL BE USED ALONG THE
WHEN PAVING/CONSTRUCTION ACTIVITIES PROCEED ACROSS AN UNSIGNED
3) DEAD END ROADS
2) SUBDIVISION ROADS
1) LESS THAN 1000’ OF RESURFACING ALONG -Y- LINE
FOLLOWING -Y- LINE CONDITIONS:
NO REQUIRED STATIONARY SIGNING FOR THE
PLACED 500’ IN ADVANCE OF FLAGGER.
PL
AC
EM
EN
T
PE
R
DI
RE
CTI
ON
SI
GNI
NG
NO
TE
S
AN
D
MAINLINE (-L-) SIGNING -Y- LINE SIGNING
(SEE NOTE BELOW)
(SEE NOTE BELOW)
1 MILE SPACING
1000’ OR MORE
1000’ OR MORE
(SEE NOTE BELOW)
SIGNING FOR RESURFACING PROJECTS
(SEE NOTE BELOW)
1
2
3
5 4 3 3 4
1
5
4
5
1
334
2 LANE ROADWAYS
RURAL AND SUBURBAN
FOR
ADVANCE WARNING SIGNS
RESURFACING
SP 13107
SP 13106
2020CPT.06.12.10431.1, etc 13
DIRECTION OF TRAFFIC FLOW
STATIONARY SIGN
LEGEND
User:r
mgarrett
C:\
Users\r
mgarrett\
Do
wnlo
ads\
Resurfacin
g_
Adv
Warn_
Ur
Su_Shldr.d
gn
3/23/2015
DE
PA
RT
EN
OF ANSP
O
RT
ATI
ON
TA
E
OF
NORTH
R
OL
NA
WO
RK
ZO
NE
TRAFFIC
C
ON
TR
OL
DIV
ISIO
NOF HIG
HW
AY
ST
S
CA
I
M
T
TR
SHEET NO.PROJ. REFERENCE NO.
LIMITS
CONSTRUCTION
Y2
LIMITS
CONSTRUCTION
Y1
5
3
1
2
48’’ X 24’’
END
ROAD WORK
G20-2 A
48’’ X 48’’AHEAD
ROAD
W20-1
WORK1
2
ROAD
48’’ X 48’’
UNDER
CONST
48’’ X 48’’
LOW/SOFTSHOULDER
48’’ X 48’’W20-7 A
48’’ X 48’’
AHEAD
ROAD
W20-1
WORK
PLACED 250’ IN ADVANCE OF FLAGGER.
W7-3aP24’’ X 18’’XX MILES
NEXT
3
4
5
CONSTRUCTION LIMITS AND THEN SPACE 1 MILE THEREAFTER.
THEREAFTER. IF NO -Y- LINES EXIST, PLACE 2ND SET � MILE FROM THE
PLACE INITIALLY AT THE CONSTRUCTION LIMITS AND SPACED 1 MILE APART
INSTALL WHEN -Y- LINES ARE WITHIN 0.5 MILES FROM "END ROAD WORK" SIGN.
WITHIN 500’ OF EACH APPROACH. A MAXIMUM OF 2 SIGN SETS PER MILE. DO NOT
ARE SEPARATED BY 0.25 MILES OR LESS, TREAT AS A SINGLE UNIT AND INSTALL
EACH -Y- LINE APPROACH AS SHOWN ABOVE. FOR MULTIPLE -Y- LINES THAT
SUBDIVISION ROADS ARE NOT "THROUGH" ROADWAYS. INSTALL 500’ +/- FROM
THESE ARE FOR -Y- LINES THAT ARE "THROUGH" ROADWAYS. DEAD END AND
PLACE 500’ FOLLOWING THE END OF CONSTRUCTION LIMITS.
ROUND UP TO NEXT WHOLE NUMBER.(NO FRACTIONAL OR DECIMAL NUMBERS)
#2 SIGN ONLY USED WHEN RESURFACING LIMITS ARE 2 OR MORE MILES IN LENGTH.
ONLY USED ON -Y- LINES IF RESURFACING LIMITS EXTEND 1000’ ALONG -Y- LINE.
PLACE 1000’ PRIOR TO BEGINNING OF CONSTRUCTION LIMITS.
-Y- LINE AS SHOWN BELOW. REMOVE UPON COMPLETION OF WORK.
-Y- LINE, ADVANCE WARNING PORTABLE SIGNS SHALL BE USED ALONG THE
WHEN PAVING/CONSTRUCTION ACTIVITIES PROCEED ACROSS AN UNSIGNED
3) DEAD END ROADS
2) SUBDIVISION ROADS
1) LESS THAN 1000’ OF RESURFACING ALONG -Y- LINE
FOLLOWING -Y- LINE CONDITIONS:
NO REQUIRED STATIONARY SIGNING FOR THE
PLACED 500’ IN ADVANCE OF FLAGGER.
PL
AC
EM
EN
T
PE
R
DI
RE
CTI
ON
SI
GNI
NG
NO
TE
S
AN
D
MAINLINE (-L-) SIGNING -Y- LINE SIGNING
(SEE NOTE BELOW)
(SEE NOTE BELOW)
1 MILE SPACING
1000’ OR MORE
1000’ OR MORE
SIGNING FOR RESURFACING PROJECTS
1
2
3
5 4 3 3 4
1
5
4
5
1
334
SP 13107
SP 13106
(SEE NOTE 1)
W/ SHOULDER SECTIONS
MULTI-LANE ROADWAYS
FOR RURAL AND SUBURBAN
ADVANCE WARNING SIGNS
RESURFACING
THE INTERSECTION.
APPROACHES FROM THE SIDE STREETS WHEN PAVING PROCEEDS THROUGH
"ROAD WORK AHEAD" (W20-1) SIGNS 500’ IN ADVANCE ALONG BOTH
INTERSECTIONS AS DIRECTED BY THE ENGINEER. PROVIDE PORTABLE
1) MAY USE LAW ENFORCEMENT TO CONTROL TRAFFIC AT SIGNALIZED
NOTES:
2020CPT.06.12.10431.1, etc 14
User:r
mgarrett
C:\
Users\r
mgarrett\
Do
wnlo
ads\
Resurfacin
g_
Adv
Warn_
Ur
Su (2).dgn
4/8/2015
DE
PA
RT
EN
OF ANSP
O
RT
ATI
ON
TA
E
OF
NORTH
R
OL
NA
WO
RK
ZO
NE
TRAFFIC
C
ON
TR
OL
DIV
ISIO
NOF HIG
HW
AY
ST
S
CA
I
M
T
TR
SHEET NO.PROJ. REFERENCE NO.
LEGEND
STATIONARY SIGN
FLOWDIRECTION OF TRAFFIC
1000’ +/- LIMITSCONSTRUCTION
FACILITIES
URBAN / SUBURBAN
WARNING SIGNS FOR
RESURFACING ADVANCE
NOTES:
BEGIN
48’’ X 48’’
ROAD
WORKSP-11299
W7-3aP
36’’ X 30’’
NEXT
XX MILES
URBAN / SUBURBAN WORKZONES
48’’ X 24’’
END
ROAD WORK G20-2 A
(SEE NOTE 4)
(SEE NOTE 4)
(SEE NOTE 4)
OTHER ITEMS OF WORK INCLUDED IN THE TEMPORARY TRAFFIC CONTROL (LUMP SUM) PAY ITEM.
CAN BE OBTAINED WITHIN THE MEDIAN AREAS.THESE PORTABLE SIGNS ARE INCIDENTAL TO THE
MULTI-LANE ROADWAYS WITH SPEED LIMITS 45 MPH AND GREATER WHERE LATERAL CLEARANCE
W8-15 w/MOTORCYCLE PLAQUE MOUNTED BELOW. THESE ARE TO BE DOUBLE INDICATED ON
BUT NOT LIMITED TO "ROUGH ROAD" W8-8, "UNEVEN LANES" W8-11, "GROOVED PAVEMENT"
SHALL BE USED TO WARN DRIVERS OF THE PRESENT CONDITIONS. THESE ARE TO INCLUDE,
8) IF MILLED AREAS ARE NOT PAVED BACK BY THE END OF THE WORK DAY, PORTABLE SIGNS
SECTION 104 OF THE NCDOT STANDARD SPECIFICATIONS AS EXTRA WORK.
7) IF STATIONARY GENERAL WARNING SIGNS ARE USED, THEY WILL BE PAID FOR PER
6) SIGN MOUNT LOCATIONS SHALL NOT BLOCK SIDEWALKS OR DRIVEWAYS.
CLEARANCE WITHIN THE MEDIAN AREA USE SHOULDER MOUNTS ONLY.
EDGE OF PAVEMENT OR THE FACE OF THE CURB. WHEN UNABLE TO OBTAIN THE LATERAL
5) LATERAL CLEARANCE AT ALL SIGN LOCATIONS SHALL BE 2’ AS MEASURED FROM THE
INTERSECTION.
ALONG BOTH APPROACHES FROM THE SIDE STREETS WHEN PAVING PROCEEDS THROUGH THE
BY THE ENGINEER. PROVIDE PORTABLE "ROAD WORK AHEAD" (W20-1) SIGNS 500’ IN ADVANCE
4) MAY USE LAW ENFORCEMENT TO CONTROL TRAFFIC AT SIGNALIZED INTERSECTIONS AS DIRECTED
3) ADVANCE WARNING SIGNS NOT REQUIRED ON NON-SIGNALIZED SIDE STREETS.
APPROVED.
RECOMMENDATIONS. THESE SYSTEMS SHALL BE NCHRP 350 COMPLIANT AND NCDOT
SUPPORT LARGER AREAS ON A SINGLE SUPPORT. FOLLOW MANUFACTURER’S
WOOD OR U-CHANNEL SUPPORTS. PERFORATED SQUARE TUBING SUPPORT SYSTEMS MAY
2) MOUNT SIGNS THAT ARE LARGER THAN 10 SQUARE FEET IN AREA ON TWO OR MORE
WITH SPEED LIMITS OF 40 MPH OR LESS.
1) 48" x 48" SIZED SIGNS (SP- 11299) MAY BE REDUCED TO 36" X 36" ON ROADWAYS
2020CPT.06.12.10431.1, etc 15
D
D
D1
L2
L2
D2
D1
L1
L1
"Stretch" Operation
D2
L
L
L
L
70 ft
Low Speed Detection
L
L L
L1 L1
L2L1
Inductive Loop
edge of stop line
behind leading
Locate loop slightly Note:
6
5
4
3
of Turns
Number
High Speed Detection
/
Side Street Detection
Right Turn Lane DetectionLeft Turn Lane Detection
L
L
OR
OR
Presence Loop Placement at Stop Lines
L1
50 ft
L2OR
Presence Loop Detection Queue Loop Detection
Recommended Number of Turns
Quadrupole loops: Use 2-4-2 turns
NO
R
TH
CAROL
IN
A
ENGINEER
PROFESSION
A
L
23489
SEAL
PA
MEL
A L. ALEXA
NDE
R
SHEET NO.PROJECT REFERENCE NO.
SEAL
PREPARED BY:
SIG. INVENTORY NO.
SCALEREVISIONS
REVIEWED BY:
INIT. DATE
REVIEWED BY:
DATE
PLAN DATE:
January 2015 JPG
PLA
N/A
pale
xander
S:\
IT
S&
SU
\IT
S S
ignals
\Sig
nal
Desig
n S
ecti
on\E
aste
rn R
egio
n\l
oopty
pic
al2
015.d
gn
30-JA
N-2015 1
2:3
9
Channelized TurnStandard Turn
Typical Signal Loop Locations
< 250
250-375
375-525
ft
Lead-in
Length of
> 525
Lead-in > 150’, use 3 turns
Lead-in < 150’, use 2 turns
6’ X 15’ Loops:
detectors/channels
Wired to separate
Quadrupole loop
L = 6ft X 40ft
L = 6ft X 40ft Quadrupole loop L1 = 6ft X 15ft Queue detector
L2 = 6ft X 40ft Quadrupole loop
Wired in series
L = 6ft X 6ft
Quadrupole loop, wired separately
L = 6ft X 40ft
(<35 mph)(>40 mph)
40
45
50
55
170, and 2070L Controllers
Wired separately for TS2,
Controllers
Wired in series for TS1
L = 6ft X 6ft
Volume Density Operation
250
300
355
420
Speed Limit
mph ftSpeed Limit
mph
40
45
50
55
250
ft ft
300
355
420
80
90
100
110
Wired in series
L1 = 6ft X 6ft
Wired in series
L2 = 6ft X 6ft
Wired separately
L2 = 6ft X 6ft [Minimum] Presence loop
L1 = 6ft X 40ft Quadrupole loop
Wide Radius Turn
Shared Lane/
L1
Wide Radius Turn
L
(when wired separately):
Single 6’ X 6’ loop
lane
3) for an exclusive right turn
protected/permissive left turn
2) loop detects a permissive or
roadway
from edge of intersecting
1) stop line is greater than 15’
following conditions:
of stop line under any of the
Loop may be located in advance
TN
T
T
IN
DE
PA
RT
M
EN OF T RA
SP
OR
TA
IO
N
ST
A
E O
FNORTH CAR
OL
A
noi
sivi
D yt
efa
S dna
ytiliboM noitat
ro
ps
nar
T
noitceS ngiseD l
angi
S
750 N. Greenfield Pkwy, Garner, NC 27529
Prepared in the Offices of:
1/30/2015
2020CPT.06.12.10431.1, etc 16
PROJECT REFERENCE NO. SHEET NO.
8
TWO LANE - TWO WAY ROADWAY - 55 MPH
ROADWAY WIDTH LANE WIDTH SHOULDER WIDTH
18’ 9’ * 0’
20’ 10’ * 0’
22’ 10’ 1’
24’ 10’ 2’
26’ 11’ 2’
28’ 12’ 2’
32’ 12’ 4’
* May vary due to pavement width
this table and detail unless otherwise directed by the Engineer.
Contractor shall place the new pavement markings in accordance with
GUIDELINES FOR LANE WIDTHS ON RESURFACING PROJECTS
MPH OR LESS
TWO LANE - TWO WAY ROADWAY 50
ROADWAY WIDTH LANE WIDTH SHOULDER WIDTH
18’ 9’ * 0’
20’ 10’ * 0’
22’ 10’ 1’
24’ 10’ 2’
26’ 11’ 2’
28’ 11’ 3’
32’ 11’ 5’
* May vary due to pavement width
(NOT TO SCALE)
SCHEMATIC OF ROADWAY
WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE
WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE
WID
TH
SH
OU
LD
ER
WID
TH
LA
NE
WID
TH
SH
OU
LD
ER
WID
TH
LA
NE
RO
AD
WA
Y W
IDT
H
CL OF ROADWAY
2017CPT.06.11.10091.1, etc2020CPT.06.12.10431.1, etc 17
SHEET NO. TOTAL NO.
18
1245000000-E 1260000000-E 1330000000-E 1491000000-E 1519000000-E 1520000000-E 1523000000-E 1524000000-E 1575000000-E 1704000000-E 2830000000-N 2845000000-N 7444000000-E
LENGTH WIDTH SHOULDER
RECONSTRUCTI
ON
AGGREGATE
SHOULDER
BORROW
1½"
MILLING
1" MILLING 0" TO 1.5"
MILLING
0" TO 1"
MILLING
INCIDENTAL
MILLING
BASE COURSE,
B25.0C
SURFACE
COURSE, S9.5B
LEVELING
COURSE, S9.5B
SURFACE
COURSE, S9.5C
LEVELING
COURSE, S9.5C
ASPHALT
BINDER FOR
PLANT MIX
PATCHING
EXISTING
PAVEMENT
ADJ. OF
MANHOLES
ADJ. OF METER
OR VALVE BOX
INDUCTIVE
LOOP SAWCUT
MI FT SMI TON SY SY SY SY SY TONS TONS TONS TONS TONS TONS TONS EA EA LF
2020CPT.06.12.10431.1 Harnett 1 NC 55
FROM US HWY 421 MP 7.30 TO END
MEDIAN ISLAND MP 7.40 1 2 2WD NO NO 0.1 50 0.20 32 3,004 44 265 4 16 3 350.00
0.1 0.20 32 3,004 44 265 4 16 3 350.00
2020CPT.06.12.10431.1 Harnett 2 NC 55
FROM END MEDIAN ISLAND MP 7.40
TO BEGIN CURB & GUTTER MP 12.07 2 2 2WU NO NO 4.67 24 9.30 1,510 400 6,051 83 368 140 2 2
4.67 9.30 1,510 400 6,051 83 368 140 2 2
2020CPT.06.12.10431.1 Harnett 3 NC 55
FROM BEGIN CURB & GUTTER (SR
2006) MP 12.07 TO NC 27 MP 12.82 3 3 2WU NO NO 0.75 36 8,800 267 1,406 20 85 23 23 10 1,150.00
0.75 8,800 267 1,406 20 85 23 23 10 1,150.00
2020CPT.06.12.10431.1 Harnett 4 NC 217
FROM CUMBERLAND COUNTY LINE
MP 0.00 TO SR 1779 MP 4.21 2 2 2WU NO NO 4.21 28 8.40 1,362 1,178 5,969 87 364 126 1 225.00
4.21 8.40 1,362 1,178 5,969 87 364 126 1 225.00
9.73 17.90 2,904 3,004 8,800 1,889 13,691 194 833 292 25 13 1,725.00
2020CPT.06.12.20431.1 Harnett 5 SR 1002
FROM I-5877 PROJECT LIMITS MP
1.58 TO US 301 MP 2.11 7 2 2WU NO NO 0.53 26 1.10 171 10,525 133 918 10 56 16 1 350.00
0.53 1.10 171 10,525 133 918 10 56 16 1 350.00
2020CPT.06.12.20431.1 Harnett 6 SR 1213
FROM NC 27 MP 0.00 TO SR 1229
MP 1.89 4 2 2WU NO NO 1.82 18 3.60 589 1,473 66
1.82 3.60 589 1,473 66
2020CPT.06.12.20431.1 Harnett 7 SR 1314
FROM SR 1291 MP 0.00 TO US 421
MP 0.43 6 2 2WU NO NO 0.43 18 0.90 139 89 316 566 7 52 13
0.43 0.90 139 89 316 566 7 52 13
2020CPT.06.12.20431.1 Harnett 8 SR 1314
FROM US 421 MP 0.43 TO END
MAINTANCE MP 3.55 5 2 2WU NO NO 3.12 22 6.20 1,009 178 229 3,432 50 243 94 2
3.12 6.20 1,009 178 229 3,432 50 243 94 2
2020CPT.06.12.20431.1 Harnett 9 SR 1516
FROM NC 27 MP 0.00 TO SR 1542
MP 3.40 4 2 2WU NO NO 3.41 18 6.80 1,103 2,509 113
3.41 6.80 1,103 2,509 113
2020CPT.06.12.20431.1 Harnett 10 SR 1866
FROM SR 1793 MP 0.00 TO DEAD
END MP 0.27 8 2 2WU NO NO 0.27 20 44 182 3 12 8 1
0.27 44 182 3 12 8 1
2020CPT.06.12.20431.1 Harnett 11 SR 1912
FROM SR 1793 MP 0.00 TO DEAD
END MP 0.29 9 2 2WU NO NO 0.29 30 3,403 44 325 4 21 9 1
0.29 3,403 44 325 4 21 9 1
2020CPT.06.12.20431.1 Harnett 12 SR 1913
FROM SR 1912 MP 0.00 TO DEAD
END MP 0.20 9 2 2WU NO NO 0.2 30 2,347 228 3 15 6 1
0.2 2,347 228 3 15 6 1
2020CPT.06.12.20431.1 Harnett 13 SR 1918
FROM SR 1703 MP 0.00 TO CUL-DE-
SAC MP 0.20 10 2 2WU NO NO 0.2 20 2,581 44 153 2 10 10 1
0.2 2,581 44 153 2 10 10 1
2020CPT.06.12.20431.1 Harnett 14 SR 2006
FROM NC 55 MP 0.00 TO SR 1769
MP 3.74 6 2 2WU NO NO 3.67 18 7.30 1,187 400 2,362 4,730 59 427 110 1
3.67 7.30 1,187 400 2,362 4,730 59 427 110 1
2020CPT.06.12.20431.1 Harnett 15 SR 2079
FROM SR 1779 MP 0.00 TO DEAD
END MP 0.28 8 2 2WU NO NO 0.28 20 44 189 3 13 8 1
0.28 44 189 3 13 8 1
2020CPT.06.12.20431.1 Harnett 16 SR 2087
FROM SR 1779 MP 0.00 TO SR 2089
MP 0.28 8 2 2WU NO NO 0.28 18 44 171 2 11 8 1
0.28 44 171 2 11 8 1
2020CPT.06.12.20431.1 Harnett 17 SR 2089
FROM SR 2087 MP 0.00 TO SR 2303
MP 0.19 8 2 2WU NO NO 0.19 18 110 2 7 6 5
0.19 110 2 7 6 5
2020CPT.06.12.20431.1 Harnett 18 SR 2303
FROM SR 2089 MP 0.00 TO SR 1779
MP 0.13 8 2 2WU NO NO 0.13 18 44 84 1 6 4 3
0.13 44 84 1 6 4 3
2020CPT.06.12.20431.1 Harnett 19 SR 1777
FROM SR 1780 MP 0.00 TO NC 82
MP 1.46 7 2 2WU NO NO 1.46 23 2.90 472 19,700 89 54 1,694 25 106 44
1.46 2.90 472 19,700 89 54 1,694 25 106 44
2020CPT.06.12.20431.1 Harnett 20 SR 1780
FROM US 301 MP 0.00 TO RR TRACK
PAVEMENT JT MP 0.35 2, 11 2 2WU NO NO 0.35 37 0.70 103 411 44 692 10 42 8 1 350.00
0.35 0.70 103 411 44 692 10 42 8 1 350.00
2020CPT.06.12.20431.1 Harnett 21 SR 1780
FROM RR TRACK PAVEMENT JT MP
0.40 TO SR 1777 MP 0.88 2 2 2WU NO NO 0.48 24 1.10 167 1,056 1,215 35 732 8 46 14
0.48 1.10 167 1,056 1,215 35 732 8 46 14
17.11 30.60 4,940 31,281 2,581 411 5,750 2,412 6,978 10,170 136 4,036 53 1,246 358 3 16 700.00
26.84 48.50 7,844 34,285 2,581 9,211 5,750 4,301 6,978 10,170 136 17,727 247 2,079 650 28 29 2,425.00
TOTAL FOR MAP NO. 1
PROJECT NO COUNTY MAP NO ROUTE LANES LANE
TYPE
FINAL
SURFACE
TESTING
REQUIRED
WARM MIX
ASPHALT
REQUIRED
DESCRIPTION TYP NO
TOTAL FOR MAP NO. 2
TOTAL FOR MAP NO. 3
TOTAL FOR MAP NO. 4
TOTAL FOR MAP NO. 5
TOTAL FOR MAP NO. 6
TOTAL FOR PROJ NO. 2020CPT.06.12.10431.1
TOTAL FOR PROJ NO. 2020CPT.06.12.20431.1
3,004
TOTAL FOR MAP NO. 13
TOTAL FOR MAP NO. 14
TOTAL FOR MAP NO. 15
TOTAL FOR MAP NO. 16
TOTAL FOR MAP NO. 17
TOTAL FOR MAP NO. 18
TOTAL FOR MAP NO. 7
TOTAL FOR MAP NO. 8
TOTAL FOR MAP NO. 9
TOTAL FOR MAP NO. 10
TOTAL FOR MAP NO. 11
TOTAL FOR MAP NO. 12
S U M M A R Y O F Q U A N T I T I E S
PROJECT NO.
2020CPT.06.12.10431.1, 2020CPT.06.12.20431.1
36,866GRAND TOTAL
1308000000-E
6,161
8,800
14,961
TOTAL FOR MAP NO. 19
TOTAL FOR MAP NO. 20
TOTAL FOR MAP NO. 21
1297000000-E
33,862
SHEET NO. TOTAL NO.
19
4413000000-E 4457000000-N 4510000000-N 4695000000-E 4697000000-E 4705000000-E 4710000000-E
LENGTH WIDTH WORK ZONE
ADVANCE/GE
NERAL
WARNING
SIGNING
TEMPORARY
TRAFFIC
CONTROL
LAW
ENFORCEMEN
T
4" X 90 M
WHITE
THERMO
4" X 90 M
YELLOW
THERMO
4" X 120 M
WHITE
THERMO
4" X 120 M
YELLOW
THERMO
8" X 90 M
WHITE
THERMO
8" X 120 M
WHITE
THERMO
12" X 90 M
WHITE
THERMO
12" X 90 M
YELLOW
THERMO
16" X 120 M
WHITE
THERMO
24" X 120 M
WHITE
THERMO
THERMO MSG
SCHOOL 120
M
THERMO RXR
120 M
THERMO LT
ARROW 90
M
THERMO RT
ARROW 90
M
THERMO STR
ARROW 90 M
THERMO STR
& RT ARROW
90 M
4" WHITE
PAINT
4" YELLOW
PAINT
CRYSTAL &
RED MARKERS
YELLOW &
YELLOW
MARKERS
MI FT SF LS HR LF LF LF LF LF LF LF LF LF LF EA EA EA EA EA EA LF LF EA EA
2020CPT.06.12.10431.1 Harnett 1 NC 55
FROM US HWY 421 MP 7.30 TO END
MEDIAN ISLAND MP 7.40 1 2 2WD 0.1 50 11 1.00 40 1,056 800 1,000 380 37 3 3 1 1 60
0.1 11 1 40 1,056 800 1,000 380 37 3 3 1 1 60
2020CPT.06.12.10431.1 Harnett 2 NC 55
FROM END MEDIAN ISLAND MP 7.40
TO BEGIN CURB & GUTTER MP 12.07 2 2 2WU 4.67 24 523 49,315 780 46,796 1,210 100 12 5 2 35 387
4.67 523 49,315 780 46,796 1,210 100 12 5 2 35 387
2020CPT.06.12.10431.1 Harnett 3 NC 55
FROM BEGIN CURB & GUTTER (SR
2006) MP 12.07 TO NC 27 MP 12.82 3 3 2WU 0.75 36 84 390 12,672 195 75 7 24 6 21 110
0.75 84 390 12,672 195 75 7 24 6 21 110
2020CPT.06.12.10431.1 Harnett 4 NC 217
FROM CUMBERLAND COUNTY LINE
MP 0.00 TO SR 1779 MP 4.21 2 2 2WU 4.21 28 472 44,457 200 37,787 420 60 2 2 9 285
4.21 472 44,457 200 37,787 420 60 2 2 9 285
9.73 1,090 1 40 94,828 800 2,370 97,255 380 195 1,210 420 272 12 17 29 1 9 125 782
2020CPT.06.12.20431.1 Harnett 5 SR 1002
FROM I-5877 PROJECT LIMITS MP
1.58 TO US 301 MP 2.11 7 2 2WU 0.53 26 59 7,708 860 8,451 560 50 4 3 2 33 90
0.53 59 7,708 860 8,451 560 50 4 3 2 33 90
2020CPT.06.12.20431.1 Harnett 6 SR 1213
FROM NC 27 MP 0.00 TO SR 1229
MP 1.89 4 2 2WU 1.82 18 204 19,219 16,335
1.82 204 19,219 16,335
2020CPT.06.12.20431.1 Harnett 7 SR 1314
FROM SR 1291 MP 0.00 TO US 421
MP 0.43 6 2 2WU 0.43 18 48 4,540 3,859
0.43 48 4,540 3,859
2020CPT.06.12.20431.1 Harnett 8 SR 1314
FROM US 421 MP 0.43 TO END
MAINTANCE MP 3.55 5 2 2WU 3.12 22 349 32,947 28,004
3.12 349 32,947 28,004
2020CPT.06.12.20431.1 Harnett 9 SR 1516
FROM NC 27 MP 0.00 TO SR 1542
MP 3.40 4 2 2WU 3.41 18 382 36,009 30,606
3.41 382 36,009 30,606
2020CPT.06.12.20431.1 Harnett 10 SR 1866
FROM SR 1793 MP 0.00 TO DEAD
END MP 0.27 8 2 2WU 0.27 20 30
0.27 30
2020CPT.06.12.20431.1 Harnett 11 SR 1912
FROM SR 1793 MP 0.00 TO DEAD
END MP 0.29 9 2 2WU 0.29 30 32
0.29 32
2020CPT.06.12.20431.1 Harnett 12 SR 1913
FROM SR 1912 MP 0.00 TO DEAD
END MP 0.20 9 2 2WU 0.2 30 22
0.2 22
2020CPT.06.12.20431.1 Harnett 13 SR 1918
FROM SR 1703 MP 0.00 TO CUL-DE-
SAC MP 0.20 10 2 2WU 0.2 20 22
0.2 22
2020CPT.06.12.20431.1 Harnett 14 SR 2006
FROM NC 55 MP 0.00 TO SR 1769
MP 3.74 6 2 2WU 3.67 18 411 38,754 33,134
3.67 411 38,754 33,134
2020CPT.06.12.20431.1 Harnett 15 SR 2079
FROM SR 1779 MP 0.00 TO DEAD
END MP 0.28 8 2 2WU 0.28 20 31
0.28 31
2020CPT.06.12.20431.1 Harnett 16 SR 2087
FROM SR 1779 MP 0.00 TO SR 2089
MP 0.28 8 2 2WU 0.28 18 31
0.28 31
2020CPT.06.12.20431.1 Harnett 17 SR 2089
FROM SR 2087 MP 0.00 TO SR 2303
MP 0.19 8 2 2WU 0.19 18 21
0.19 21
2020CPT.06.12.20431.1 Harnett 18 SR 2303
FROM SR 2089 MP 0.00 TO SR 1779
MP 0.13 8 2 2WU 0.13 18 15
0.13 15
2020CPT.06.12.20431.1 Harnett 19 SR 1777
FROM SR 1780 MP 0.00 TO NC 82
MP 1.46 7 2 2WU 1.46 23 164 15,418 13,106
1.46 164 15,418 13,106
2020CPT.06.12.20431.1 Harnett 20 SR 1780
FROM US 301 MP 0.00 TO RR TRACK
PAVEMENT JT MP 0.35 2, 11 2 2WU 0.35 37 47 3,696 555 3,810 230 95 165 2 7 3 2 33 20
0.35 47 3,696 555 3,810 230 95 165 2 7 3 2 33 20
2020CPT.06.12.20431.1 Harnett 21 SR 1780
FROM RR TRACK PAVEMENT JT MP
0.40 TO SR 1777 MP 0.88 2 2 2WU 0.48 24 54 5,597 5,958 95 65 2 50
0.48 54 5,597 5,958 95 65 2 50
17.11 1,922 17,001 1,415 18,219 790 190 280 4 11 6 4 146,887 125,044 66 160
26.84 3,012 1 40 111,829 800 3,785 115,474 380 195 1,210 1,210 190 552 12 4 28 35 1 13 146,887 125,044 191 942
TOTAL FOR MAP NO. 3
PROJECT NO COUNTY MAP NO ROUTE LANES LANE
TYPE
TOTAL FOR MAP NO. 1
TOTAL FOR MAP NO. 2
DESCRIPTION TYP NO
TOTAL FOR MAP NO. 4
TOTAL FOR MAP NO. 5
TOTAL FOR MAP NO. 6
TOTAL FOR MAP NO. 7
TOTAL FOR MAP NO. 8
TOTAL FOR MAP NO. 18
TOTAL FOR MAP NO. 19
TOTAL FOR MAP NO. 20
TOTAL FOR MAP NO. 9
TOTAL FOR MAP NO. 10
TOTAL FOR MAP NO. 11
TOTAL FOR MAP NO. 12
TOTAL FOR MAP NO. 13
TOTAL FOR MAP NO. 14
GRAND TOTAL
4686000000-E
19,634
99,625
119,259
TOTAL FOR MAP NO. 21
4685000000-E
17,001TOTAL FOR PROJ NO. 2020CPT.06.12.20431.1
95,628TOTAL FOR PROJ NO. 2020CPT.06.12.10431.1
TOTAL FOR MAP NO. 15
TOTAL FOR MAP NO. 16
TOTAL FOR MAP NO. 17
PROJECT NO.
2020CPT.06.12.10431.1, 2020CPT.06.12.20431.1
4725000000-E
21
56
4810000000-E
271,931
4900000000-N
226
907
1,133
T H E R M O P L A S T I C A N D P A I N T Q U A N T I T I E S
77 271,931
4700000000-E
790
1,630
2,420
4721000000-E
4
12
16112,629