Planning together!

www.palmecenter.org

Context and purpose

• Start the planning process for the period 2012-2014

• Prepare a concrete project proposal

www.palmecenter.org

Agenda

• A short introduction to The Palme Center

• The project cycle

• Four cross-cutting issues

• Introduction to LFA (method for project planning)

• Concrete project planning- step by step- with a participatory method

• The process ahead

www.palmecenter.org

The Palme CenterVision:

People in the countries with which the Palme Center has co-operation projects live in free, peaceful and democratic societies with the respect to human rights, where the prosperity is distributed equally, and where women and man are equal.

Objective for international development cooperation:

The Palme Center’s international development cooperation partner organisations and individuals engaged in them have developed the ability to activate and mobilise people in their effort to influence the development of the society they live in and thereby to improve their living conditions. www.palmecenter.org

www.palmecenter.org

The General Public/taxpayers

The Olof Palme International Center

Swedish International Development Agency (Sida)

Ministry of Foreign Affairs

Member Organizations

Partner Organizations

Econ

om

ic

Su

pp

ort

Rep

ort

ing

/eva

luati

on

s

Flowchart of Swedish International Development Cooperation

THE TARGET GROUP

report

report

report

report

report

Financial support and reporting

Narrative Indicators MoVs Assumptions

Overall

Purpose

Result area

Activities

Narrative Indicators MoVs Assumptions

Overall

Purpose

Result area

Activities

Narrative Indicators MoVs Assumptions

Overall

Project objective

Intermediate objective

Activities

Operational level/

Programme level

Project level

1

234

Aggregation of results

23

4

1

Let´s do it togheter!

www.palmecenter.org

Project planning

www.palmecenter.org

• Limited in time

• Has a separate budget

• Is guided by an objective = what to achieve

• Is managed by a team that plans and implements activities

• Is followed up to assess whether the objective was achieved

• The LFA method is used by the Palme Centre for planning the projects

What is a project?

www.palmecenter.org

The Project Cycle

Idea PlanningCompletionEvaluationActivities

www.palmecenter.org

Who shall participate?

• The project organisations• The target group• Other actors:

- who may be affected by the project- who may affect the project- decision makers

• Non-discrimination is a precondition for a rights based approach and a work for democracy, peace and

poverty reduction

www.palmecenter.org

Four cross-cutting issues

• Gender Equality and Non-discrimination • Hiv and Aids• Sustainable development• Anti-Corruption

www.palmecenter.org

Gender equality and non-discrimination All projects must include a gender analysis and an action

plan

Discuss:- How will the project affect women and men?- What is the role of women and men within your

organisation?

Action plan:- How will you work with gender equality and non-

discrimination in your project?

www.palmecenter.org

HIV and AIDS

Discuss:- Does HIV and AIDS, directly or indirectly, affect the

target group/the objective of the project?- How is the awareness of HIV and AIDS in the

organisation?

Action plan: - Address the issue of HIV/AIDS in the project- Make sure that people living with HIV can participate

equally

www.palmecenter.org

Sustainable development

Discuss: - Which environmental problems may affect the target

group/activities/objective of the project? - Will the project have any negative or positive effects on

the environment?

Action plan: - How can negative effects be reduced and positive

effects strengthened?

www.palmecenter.org

Anti-corruption

Our definition of corruption: Misuse of money or power to obtain personal,often financial, benefits

Discuss: - Describe the corruption level in your project

country/area- Discuss the risk that the project will be affected by

corruptionAction plan: - How will you handle the risk of corruption and ensure

that granted funds are not being misused?

www.palmecenter.org

LFA – Logical Framework Approach

Didn’t I say that the construction drawing was up-side-down?

Well, that’s easy to say

now!

www.palmecenter.org

The Nine Steps of LFA

1. Context analysis

2. Stakeholder Analysis

3. Problem Analysis

4. Objectives

5. Activities

6. Resource Planning

7. Indicators of objectives

8. Risk Analysis

9. Preconditions for reaching the objectives

www.palmecenter.org

Log Frame 2012-2014Overall Objective(stated by the Palme Center in the country program)

Project Objective Indicators1.2.3.

Baseline1.2.3.

Means of verification1.2.3.

Assumptions

Intermediate Objective 1

Activities connected to the objective

Indicators1.2.3.

Baseline1.2.3.

Means of verification1.2.3.

Assumptions

Intermediate Objective 2

Activities connected to the objective

Indicators1.2.3.

Baseline1.2.3.

Means of verification1.2.3.

Assumptions

Intermediate Objective 3

Activities connected to the objective

Indicators1.2.3.

Baseline1.2.3.

Means of verification1.2.3.

Assumptions

Project planning- Four sections First part: Problem, Objective and Indicators

Second part: Stakeholder analysis and context analysis

Third part: Activities and resource planning

Fourth part: Risk analysis and preconditions

www.palmecenter.org

First part

• Problem• Objective • Indicators

www.palmecenter.org

Problem analysis

• The problem analysis focuses on problems in the area where the organisation is working

• The problem should be realistic for the project to try to solve

• Defines the causes and effects of the problem (the problem tree)

• The problem analysis must be gender sensitive, how are women and men affected by the problem?

www.palmecenter.org

Program objective

Program objective for (“your” country name):

www.palmecenter.org

Group work- Problem tree

Cause Cause

EffectsEffects

Cause

ProblemProblem

www.palmecenter.org

Discuss:•What are the major problems in your area that that the project can try to solve (be realistic)?

•How are women and men affected by the problem?

•What are the causes and effects of the problem?

The Project Objective is the Reversed Image of the Problem

CauseCause

EffectsEffects

Cause

Overall objectiveOverall

objective

Problem tree Objective Tree

Indicators:

Activities:

Indicators:

Activities:

Indicators:

Activities:

Project Objective

Project Objective

ProblemProblem Indicators:

Intermediate objective

Intermediate objective

Intermediate objective

• A status or a change that has been achieved

• Not the same as an activity

• LFA projects have three levels of objectives:

• Overall objective (a vision we strive towards)

• Project objective (a state that shall be achieved by the project)

• Intermediate objective

What is an Objective?

www.palmecenter.org

• Too ambitious

• An activity instead of a objective

• Not within the area of development cooperation

• Not possible to verify

Frequent problems

www.palmecenter.org

• Specific

• Measurable

• Acceptable

• Realistic

• Time bound

The Project shall be SMART :

www.palmecenter.org

Group work- Objective tree

Intermediate objective

Overall objectiveOverall

objective

Project Objective

Project Objective

www.palmecenter.org

Discuss: •How do we want the situation to look like once we are finished (project objective)?

•Which are the intermediate objectives we need to reach in order to achieve the project goal (results)?

•The objectives should be SMART

Intermediate objective

Intermediate objective

• Assert whether the project purpose is achieved

• Function as a reality check of the project purpose

• Compare with the situation prior to project (a baseline study)

• Can be quantitative and/or qualitative

• The indicators should be gender sensitive

• The indicators should be SMART

Indicators

www.palmecenter.org

We want to achieve that … (i.e. objective)

Women have increased their influence in the local politics, with an increased income and a stronger position within the local community and within the family

…to the extent that: (indicators):• A system for dialogue between women's organisations and local

decision-makers have been introduced• Women's organisations have influenced the local politics• At least 60 percentage of the participants state that their

economical and social status within the family has increased, compare to before the project

Example of indicators

www.palmecenter.org

Group work- indicators

• Go back to the objective for your project• Formulate indicators that are relevant to be able to

reach the objective• Make sure that the indicators are gender sensitive • Use the SMART method

www.palmecenter.org

Baseline

• Defines the situation before the start of the project• Is useful when assessing if the objective has been

achieved or not • Should analyse the situation for both men, women and

marginalised groups • Only gather information that is relevant for your

project

www.palmecenter.org

Measurement methods

Different methods are relevant for different projects, some examples:

• Statistics• Interviews • Surveys

Do not forget the gender perspective!

www.palmecenter.org

Second part

Stakeholder analysisContext analysis

www.palmecenter.org

Stakeholder analysis

Who will affect/be affected by your project?1. Beneficiaries/ target group2. Project group (implementers)3. Decision-makers4. Financers

Make sure that the project empowers marginalised people

The project should challenge existing gender structures

www.palmecenter.org

Group work- Stakeholder analysis

• Which agencies, organisations, groups and people will influence/be influenced by the project?

• How will the project affect poor and marginalised people, men and women ?

• How will the target group participate in the planning, implementation and evaluation?

• How can we make sure that the target group , through the project, can claim their rights towards the duty-bearers?

www.palmecenter.org

Context analysis

• All projects are part of a wider context• The project is influenced by economic, social and

political processes• Which channels can be used by the citizens to claim

their rights?• The project group needs a clear picture of the context

when planning the project

www.palmecenter.org

Group work- Context analysis

• What are the project area´s basic development problems?

• How does it affect women, men, youths, people living with disabilities, people living with hiv etc?

• How can we make sure that marginalised people can claim their rights?

• Is our project relevant for the context?

www.palmecenter.org

Third part

Activities Resource planning

www.palmecenter.org

Plan of activities

• Our method for achieving the goals• To eliminate the causes of the focal problem• The activities should always be relevant in relation to

the objective and indicators• Often, several activities are needed in order to

eliminate the problem • The activities should empower marginalised people

and challenge existing gender structures

www.palmecenter.org

Group work- activities

• Go back to the causes of your problem (the problem tree) and the objective and indicators (the objective tree)

• How will we be able to eliminate the causes of the problem and to reach the objective and results?

• Discuss what activities that are relevant

www.palmecenter.org

Swedish project organisations

• Many projects are planned, implemented and evaluated in co-operation with a Swedish project organisation

• The role of Swedish project organisations • Added values of the Swedish project organisation?

www.palmecenter.org

Group work- Swedish organisations • What are the added values of the partnership?• How can the Swedish project organisation contribute

to the achievements of the objectives?

www.palmecenter.org

Resource planning

• All projects need resources:- Human recourses- Financial recourses- Material recourses - Time• Resources are closely connected to the activities • The Palme Centre has a budget template

www.palmecenter.org

Group work- resource planning

• Go back to your activity plan • What resources do you need to be able to carry out

the planned activities?- Human recourses- Financial recourses- Material recourses - Time• How will the target group be trained in operation and

management of project activities?

www.palmecenter.org

Fourth part

Risk analysis Preconditions

www.palmecenter.org

Risk analysis

• Analyse risks affecting the project

• There are both internal and external risks

• Risk management plan- handling and avoiding the risks

www.palmecenter.org

Risk management plan

RISK CONSEQ-UENCES

PROBABI-LITY (1-5)

IMPACT(1-5)

RISK FACTOR

ACTION PLAN

War End of the project

1 5 5 No action

Project delays

Non fulfillment of objectives, refunding

3 4 12 Realistic Activity plan

Corruption

The target group being affected, refunding

2 5 10 Strengthen the administration

Internal conflicts

Break up of project group

3 5 15 Discuss potential conflicts

www.palmecenter.org

Group work- risk analysis

RISK CONSEQ-UENCES

PROBABI-LITY (1-5)

IMPACT(1-5)

RISK FACTOR

ACTION PLAN

Preconditions

• Preconditions for reaching the objectives• Optimise the activities, in order to reach the

objectives• Question to discuss might be: - Limitation of time - Limitation of resources - Language barriers- Cultural differences

www.palmecenter.org

Group work- preconditions

Discuss the preconditions for reaching the objectives from a gender perspective:

- How can we ensure that women and men can participate on equal grounds within our project?

www.palmecenter.org

From Problem tree to LFA matrix

Programme Result AreaProgramme Result Area

Overall Objective

Project objective Indicator Baseline Means of Verification

Intermediate objectice 1/ result

Indicator Baseline Means of Verifications

Intermediate objectice 2/ result

Indicator Baseline Means of Verifications

Intermediate objectice 3/ result

Indicator Baseline Means of Verifications

PROBLEM

PROBLEM

Cause

Cause

Cause

Cause

Cause

Cause

The way forward

• What to do now?• Duties and responsibilities • Deadline for application: 15 August 2011• Visit the website, www.palmecenter.org and download

the project application 2012-2014