Planning of the LHC in YETS 2017-2018
and LS2The baseline frameworks of YETS 2017-2018 and LS2 including the major activities, will be reviewed.
An overview of the activities related to HL-LHC, Consolidation and Maintenance, to be implemented during LS2 will be given.
Marzia Bernardini, EN-ACE-OSS
LHC- Coordination meeting, 30th May 2017
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 2
Contents
LS2 period overview
YETS 2017-2018 duration: the frame
LHC during LS2
- Evolution of the activities approved in Plan
- HL-LHC updates
- Diodes consolidation
- Open points
Conclusions
Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017 3
LS2 period overview
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 4
Long Shutdown
Commissioning
Operation
Technical Stop
YETS 2015 EYETS 2016 YETS 2017 LS2
Time frame
• Extended YETS 2016-2017 has been completed (21 wks)
• YETS 2017-2018 will start in 7 months
• LS2 will start in a less than 2 years
Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017 5
Today
YETS 2017-2018 duration:
the frame
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 6
LHC-YETS 2017-18
• Several options have been studies, to define a baseline for a standard Year End Technical Stop
Standard YETS baseline
• The CV maintenance needs 9 wks for the standard maintenance during the YETS
• only 2 Technical stops in 2017
• reduced maintenance during the YETS 2015-2016 (LS1 completion in 2015, and 3 TS)
• TE-CRG needs 2wks for pumping, boil off and cryotuning, following the CV maintenance
• The duration of ELQA, UPS tests, powering tests and machine checkout is confirmed to 2 wks
• The LHC Machine will be emptied of Liquid Helium (20 K) before the Christmas closure12 days are needed BEFORE the Christmas closure
• UPS tests and a complete ELQA campaign on 13kA are included in the baseline
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 7
Critical path:
• 9 wks of CV maintenance
(start in parallel with cryo
empty of 2 wks)
• 2 wks Christmas closure
• Standard Cryogenics
maintenance – 6wks
(in the shadow of CV
maintenance)
• 2 wks cryo reconditioning
+ pumping + boil off +
cryo tuning + UPS & cryo
recovery + ELQA
• 2 wks UPS tests,
powering test and
machine checkout
From week 50 to week 12
13 wks
+ 2 wks Xmas closure
LHC-YETS 2017-18
LHC coordination meeting, 30th May 2017
LMC 22nd February 2017
Marzia Bernardini EN-ACE 8
Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017 9
New
update
-1 week
-1 week
+2 weeks
No change
New
From beam OFF to
Hardware Tests
Machine access
Linac4 to be added
Information for
Linac2
Time of re-
commissioning of
the injectors and the
beam availability for
the fixed targets
have been defined
by BE-OP re-
commissioning
coordinators
LHC-YETS 2017-18
LHC-YETS 2017-18
• The duration of the YETS 2017-2018 for the LHC was validated by LMC to 15 wks beam to beam
• 1 additional week (wrt v. 3.0) is therefore available for the Injectors, and it is dedicated to HWC
• In agreement with BE-OP and EN-ACE, the commissioning duration has been extended in the injectors from 3 wks to 5 wks
• There is no impact on the machine access period for the SPS, where the YETS activity on the critical path is located
• The “Length of YETS 2015-2016 / EYETS 2016-2017 / YETS 2017-2018” document is under approval
Open Points
• Radiological aspects related to CMS activities during YETS• CMS would appreciate a few days low lumi work before beam stop which acts as cooling time;
5 days would be fine, even 3 would help a lot …
• If CMS is forced to launch the yoke opening the day p-p high lumi running stops, that would expose people (not just CMS but also EN-HE and TE-VSC people) to about 5 times the dose-rate so far learned to deal with.
• Warm up of the inner triplets of LSS5 for CMS alignement at warm
• Optimisation of the beam commissioning period
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 10
LHC during LS2
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 11
LHC coordination meeting, 30th May 2017
Master schedule of LS2 EDMS ACC-PM-MS-0002 v.1.0
Marzia Bernardini EN-ACE 12
LHC-LS2 the frame
During the LS2, three main categories of activities will be implemented
- Maintenance: Cryogenics, Cooling and Ventilation, Vacuum, Electrical Systems,
Collimation, Access System, Fire detection, ODH, …
- Projects: HL-LHC & LIU
- Consolidation & additional activities: this could concern all equipment of the LHC
machine, including the consolidation of dipole diodes
The frame
- Warm up at ambient Temperature of the entire LHC Machine, and related tests
(Powering tests, ELQA, Vacuum leak tests, …)
- Cool down & related tests (Powering tests, ELQA, Vacuum leak tests, …)
- LSS3 and LSS7 according RP cool down
Radiological classification and dose rate estimates LHC
Dose rate increase as compared to EYETS 2016/17 by a factor 2-3
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 13
LHC-LS2 activities approved in Plan @ January 2017
LHC coordination meeting, 30th May 2017
Maintenance
1 wk per point,
no access,
reserved to EN-EL
for major
maintenance
Major maintenance
on all the
cryogenics system
Marzia Bernardini EN-ACE 14
LHC-LS2 : change of 20 cryomagnets
LHC coordination meeting, 30th May 2017
Quench heater failure, on magnet removed during LS1
Internal splice resistance due to no AgSn between cables and between cable/stabilizer, on magnet removed during LS1
Heavy NC – magnet to be changed
Change or modification to be approved
Warm up, cool down and related tests required on the entire LHC machine !
Marzia Bernardini EN-ACE 15
LHC coordination meeting, 30th May 2017
Consolidation
Thanks to
consolidations during
LS1 and before LS2,
no power limitations
during LS2
Marzia Bernardini EN-ACE 16
LHC-LS2 activities approved in Plan @ January 2017
17Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017
LHC-LS2: R2E activities during LS2
R2E Project • 752x New FGC Control Upgrade in Tunnel [FGCLite] – Done • 348x New FGC Control Upgrade in RR [FGCLite] • 120x New LHC600A Power Converter for RR [R2E-LHC600A-10V]• 1500x New LHC4-6-8kA Modules for RR [R2E-LHC4-6-8kA-08V]Total = [120 Racks + 400 Palettes] (Removal & Installation)
New equipment but compatible with existing equipment - Only Transport service will be needed !
LHC-FMCM RD1.LR1 & LR5 / RD34.LR3 & 7• 4x new Power Converters [SATURN]Total = 20 Racks* Rack* = Rack Equivalent (0.6m)
RR57
RR53
RR13RR17
ED
MS
N°1
731488 V
.1
18
Location Capacity (t)Travel Height
(m)Floors
Current usage
(Aug. 2015)Replacement timeslot
PX24 (ALICE) 0,63 51,21 3 733’000 Dec. 2016 - Feb. 2017, EYETS
PZ85 (LHCb) 1 103,67 2 1’058’000 Jan. 2017 - Mar. 2017, EYETS
PM54 (CMS) 3 97,05 4 847’000 Sept. 2017 – Nov. 2017, Run 2
PM85 3 99,56 2 1’030’000 Dec. 2017 – Feb. 2018, YETS
PM15 1 82,5 2 343’000 Dec. 2018 – Feb. 2019, 1st of LS2
PM25 1 45,35 2 236’000 Feb. 2019 – Apr. 2019, 2nd of LS2
PM76 3 97,18 2 829’000 Apr. 2019 – Jun. 2019, 3rd of LS2
PZ33 3 99,25 2 1’074’000 Jun. 2019 – Aug. 2019, 4th of LS2
PZ45 1 143,54 2 330’000 Aug. 2019 – Oct. 2019, 5th of LS2
PM56 1 90,01 2 1’078’000 Oct. 2019 – Dec. 2019, 6th of LS2
PM65 3 94,8 2 697’000Aug. 2020 – Oct. 2020,
Cooldown of LS2
PX15 (ATLAS) 3 91,81 3 883’000 Dec. 2020 – Jan. 2021, Last of LS2
10 weeks of interruption for each intervention
Impact of lessons learned during EYETS 2016-2017 to be defined
LHC-LS2: lifts replacement overview
Marzia Bernardini EN-ACE LHC coordination meeting, 30th May 2017
LHC coordination meeting, 30th May 2017
Upgrade and Inspections
Additional activities
Marzia Bernardini EN-ACE 19
LHC-LS2 activities approved in Plan @ January 2017
LHC coordination meeting, 30th May 2017
HL-LHC and LIU
Marzia Bernardini EN-ACE 20
Situation of theTI8 after the transfer line collimator renewal for LIU Situation of theTI2 after the transfer line collimator renewal for LIU
Present TCDI area in TI8
LHC-LS2 activities approved in Plan @ January 2017
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 21
New approved activities, mostly compatible with the present LS2 framework schedule!
LHC-LS2 new activities approved in Plan @ May’17
LHC coordination meeting, 30th May 2017 22
HL-LHC-LS2 activities Chamonix 2017 Recall
LHC coordination meeting, 30th May 2017
WP5 - Collimation
- Installation of eight Target secondary collimators TCSPM
in LSS7 for Halo cleaning
- Installation of Dispersion Supressor collimators TCLD
in LSS7 (11 T) and LSS2 (LEP)
WP8 - Collider & Experiment Interface
- Installation of a new TAXN at both sides LSS8
WP9 – Cryogenics
- Cryogenics upgrade at P4
WP11 - 11T DS dipole
- Installation of two full assemblies in LSS7
- Installation of two new connection cryostats
allowing the installation of collimators in LSS2
W12 - Beam Vacuum
- In-situ aC-coating at P2 & P8
WP13 - Beam Diagnostics
- Installation of BPW prototype at P4
WP14 - Beam Transfer & Kickers
- Installation of 6 TDIs & 2 TCDD at P2 & P8
- Coated installation in all MKIs
WP17.1 - Civil Engineering
- Building underground and surface structures at P1 & P5
- Junction of UPRs with LHC tunnels existing facilities in LSS1 and LSS5
HL-LHC-LS2 activities
Marzia Bernardini EN-ACE 23
LHC coordination meeting, 30th May 2017
HL-LHC-LS2, updates on WP17
Marzia Bernardini EN-ACE 24
Personnel safety exit (UPR) - Meeting on 10/04 with HSE and FB
• Proposal of a temporary configuration (3 manholes 1mx1m)
in order to not impact forward detector cabling and other
services
• Not well received by HSE and FB main issue is the rescue
of injured persons via the manholes.
New proposals under study:
• Excavation of doors (final configuration) from the LHC side at
the beginning of LS2 to give time for de-cabling, re-cabling,
commissioning of services (including FW detectors) and
repairing of possible tunnel damages:
Construction via a separate contract
Bigger impact on LS2 schedule and LHC machine (dust,
transport, access, passage restriction, hardware removal)
Not the favorite proposal for SMB
The cables and services rerouting (including FW
detectors) in the LHC tunnel could be anticipated to YETS
2017-2018
• Excavation of larger apertures (1.7mx1m) from the HL-LHC
side at the end of LS2. (see next slide)
UPR53Door
UPR57Door
UPR13Door
UPR17Door
UPR53Door
UPR57manhole
UPR13Manhole
UPR17Manhole
Courtesy Laurent Tavian
LHC coordination meeting, 30th May 2017
HL-LHC-LS2, updates on WP17
Marzia Bernardini EN-ACE 25
• Larger “reduced apertures” (1.7 m x 1 m) could be accepted by HSE and FB as a temporary
measure
• 50 to 60 cm of margin are existing between the excavated apertures and the critical services:
SMB and the 2 consultants are assessing the feasibility and the corresponding risk.
1700
500 -
60
0
Courtesy Laurent Tavian
LHC Chamonix Workshop 2017
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 26
Presently:
- 1 wk for powering tests at the
beginning of LS2
- HWC & training quench campaign at
the end of LS2
LHC coordination meeting, 30th May 2017 27
Courtesy Jean-Philippe
Marzia Bernardini EN-ACE
Inputs from the diodes consolidation working group
LHC coordination meeting, 30th May 2017 28
Courtesy Jean-Philippe
Assumptions
No interventions on quadrupole
Only in the arc (not LSS)
6 efficient working hours per day
4 non working weeks
1 sector opened in 2 weeks, reclosed in 3 weeks
5.5 hours to consolidate one diode (depending on solution)
(10% margin – small NCs)
10 diodes consolidated per working day [All operations]
SIT : same as SMACC
“Scaling” from SMACC for ElQA, Leak tests, welding,…
BE-OP support, especially for ElQC
3 weeks for learning
3 months for NC solving (SMACC experience)
TOTAL : 18 months
Same type of human resources as SMACC
(Staff, collaboration, FSU,…) Means oriented
Inputs from the diodes
consolidation WG
Marzia Bernardini EN-ACE
LHC coordination meeting, 30th May 2017 29
RE
18
RE
22
RE
28
UJ3
2
RE
38
RE
42
RE
48
RE
52
RE
58
RE
62
RE
68
RE
72
RE
78
RE
82
RE
88
RE
12
Arc 23 Arc 34Arc 12
MAY MAY
Arc 81Arc 78Arc 56 Arc 67Arc 45
APR
8 8
1 1
FEB FEB
2013
2013
2 2
3 3
MAR MAR
4 4
5 5
6 6
7 7
12
APR9 9
10 10
11 11
16 16
13 13
14 14
15 15
12
JUNE
17 17
JUNE18 18
19 19
AUG AUG
26 26
27 27
20 20
JULY
21 21
JULY22 22
23 23
28 28
29 29
30 30
24 24
25 25
SEPT SEPT31 31
32 32
33 33
34 34
42 42
OCT OCT
35 35
36 36
37 37
38 38
47 47
JAN JAN
48 48
43 43
DEC DEC44 44
45 45
46 46
NOV
39 39
NOV40 40
41 41
2014
2014
49 49
50 50
51 51
52 52
FEB FEB53 53
54 54
55 55
56 56
MAR MAR57 57
58 58
59 59
60 60
APR APR
61 61
62 62
63 63
64 64
69 69
JUNE JUNE70 70
71 71
72 72
MAY MAY
65 65
66 66
67 67
68 68
73 73
JULY JULY
74 74
75 75
76 76
77 77
AUG
78 78
AUG79 79
80 80
81 81
82 82
SEPT SEPT83 83
84 84
85 85
86 86
OCT OCT
87 87
88 88
NOV NOV92 92
93 93
94 94
89 89
90 90
91 91
DEC
95 95
DEC
96 96
97 97
98 98
99 99
Cool-Down
Cool-Down
Cool-Down
Cool-DownELQA
Powering tests
ELQA
UPS
ELQA
Leak tests
Powering tests
ELQA
Warm Up
Cool-Down
UPS
Preparation
Flushing
Powering tests
Powering tests
Powering tests
ELQA
Preparation
Flushing
Powering tests
ELQA
WARM UP
ELQA
POWERING TESTSUP
S
POWERING TESTS
ELECTRICAL Maint.
ELECTRICAL Maint. (No
PREPARATION
FLUSHING
COOL DOWN
FLUSHING
PREPARATION
C
1
5
R
1A
2
2
R
1
C
3
0
R
1
C
3
3
R
1
C
3
3
L
2
A
2
9
L
2
B
2
5
R
2
A
2
3
R
2 C
1
5
L
3
Q
7
R
3Q
2
3
R
3
Q
2
6
R
3
Q
2
7
R
3
B
3
2
R
3
C
1
7
R
4
B
3
1
R
4
C15R
1Powering tests
ELQA
Warm Up
ELQA
Leak tests
A22R
1
C30R
1
C33R
1
C33L
2
A29L
2
UPS
Preparation
Flushing
Warm Up
ELQA
ELQA
Leak tests
A23R
2
B25R
2
Warm up
ELQA
CSCM
ELQA
Leak tests
Q7R3
Q23R
3
A26R
3
Q27R
3
B32R
3
Preparation
Flushing
Powering tests
ELQA
C17R
4
B31R
4
UPS
UPS
Preparation
Cool-Down
Flushing
Powering tests
ELQA
ELQA
Warm Up
ELQA
Leak tests
Powering tests
ELQA
Warm Up
ELQA
Leak tests
UPS
UPS
ELQA
Powering tests
ELQA
Preparation
ELQA
Leak tests
UPS
Powering tests
ELQA
Powering tests
ELQA
Warm Up
PreparationFlushing
Flushing
UPS
Cool-Down
Powering tests
Preparation
Flushing
ELQA
Leak tests
Powering tests
ELQA
Warm Up
Electrical maintenance - No access
Christmas
Pipe
s & U
TA
Electrical maintenance - No access
Cool-Down
UPS
UPS
UPS
UPS
UPS
UPS
Q5L8
C15L
3
B30R
7
B21L
8
0 0
ELQA
Powering tests
Electrical maintenance - No access
Cabl
ing
Cam
paig
n
Cabl
ing
Cam
paig
n
AUG Tests AUG Tests
AUG Tests
AUG Tests
DSO Tests
AUG Tests
D
F
B
A
DFBA
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
QRL service Modules
Electrical maintenance - No access
Electrical maintenance - No access
SF-W
UW-
DYPB
Christmas
Test AUG (R2E)- No access
Test Fire Detection (R2E) - No access
Test Fire Detection (R2E) - No access
Test AUG (R2E) - No accessAUG TestsAUG Tests
Modification ODH (R2E) - No AccessDetection
ODH_ANNUA
AUG Tests
Electrical maintenance - No access
D
F
B
X
IC train
IC train
IC train
IC train
IC train
IC train
IC train
IC train
Train Roadmap: SMACC review Nov. 2012
Marzia Bernardini EN-ACE
Analogies wrt LS1
LHC coordination meeting, 30th May 2017 30
Detailed Train: SMACC review Nov. 2012
RE
58
RE
62
NOV
2013
AUG
SEPT
OCT
Arc 56
FEB
MAR
APR
MAY
JUNE
JULY
IC trainD
F
B
A
D
F
B
X
Powering tests
ELQA
ELQA
Leak tests
Warm up
Preparation
Flushing NOV
20
13
AUG
SEPT
OCT
FEB
MAR
APR
MAY
JUNE
JULY
Marzia Bernardini EN-ACE
Analogies wrt LS1
LHC coordination meeting, 30th May 2017 31
Daily activities: SMACC review Nov. 2012
TRAIN TRAIN
6h00 8h00 11h00 15h00
Electrical non conformities
17h0010h00
HV ELQAPreparation
ELQA
6h00
Transport et RX
23h00
Train A
Marzia Bernardini EN-ACE
Analogies wrt LS1
LHC coordination meeting, 30th May 2017
LHC-LS2 schedule in progress
Marzia Bernardini EN-ACE 32
Presented in Chamonix 2017
LHC coordination meeting, 30th May 2017 33Marzia Bernardini EN-ACE
LS2 frame schedule
LHC coordination meeting, 30th May 2017 34Marzia Bernardini EN-ACE
LS2 train for diodes consolidation
LHC coordination meeting, 30th May 2017 35Marzia Bernardini EN-ACE
LS2: magnets exchange, 11T & LEP
LHC coordination meeting, 30th May 2017 36Marzia Bernardini EN-ACE
LS2: global overview
Concerns and Open Points for LS2
• HL-LHC
• Presently the dates and the scope of the civil engineering works in the LHC machine are not defined. This could
impact the activities to be performed during the YETS 2017-2018 for cables and services rerouting
• All the activities generating dusts must be performed when the IC are closed
• The activities in preparation of LS3 should no be slowed down by the dipole diodes consolidation (impact on the
critical path of LS3)
• The strategy for the lift replacement should be re-validated following the lesson learnt during the EYETS
2016-2017
• The date of the PZ33 lift replacement should be reviewed, to cope with the dipole diodes consolidation
• The magnets to be replaced during LS2 must be defined: this could impact the workload of the special
intervention team in charge of the NC
• The replacement of the Inner Triplets in LSS1R during the LS2 should be studied
(reduced performances of the orbit correctors in R1, following the EYETS 2016-2017)
• The impact of the diodes consolidation on the HWC should be defined
• The coordination of the overall surface logistic, for all the machines and experimental areas should be
centralised (transport, storage areas, surface facilities, …)
Reminders
• The readiness of the equipment for the installation, is under the responsibility of each Group
• The worksite activity management will be performed directly by the Groups for their activities
(as during YETS and EYETS)
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 37
LHC coordination meeting, 30th May 2017
201920182017
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
EYETS YETS
Coordination meetings for the YETS
Integration studies & ECR approval process for YETS
ECRs approved(to be submitted at least 2 months before the approval )
IMP
AC
T
app
rova
l
Activities approved in PLAN tool (Version 2)
The Frame is consolidated and first draft
issued
Consolidated schedule
LS2
Integration studies & ECR approval process for LS2
ECRs approved (to be submitted at least 2 months before the approval deadline)
LS2 Schedule iterationsCoordination meetings with
Groups for LS2
Roadmap towards YETS and LS2
Marzia Bernardini EN-ACE 38
LHC coordination meeting, 30th May 2017
Roadmap towards YETS and LS2
Marzia Bernardini EN-ACE 39
Week 24 - 13th June – Activities and tests during YETS and LS2 – The frame (closed session)
TE - CRG - K. Brodzinski / G. Ferlin / A. Perin
EN - CV- S. Deleval
BE - ICS – N. Broca
EN – EL – B. Saint Sulpice / H. de Maynard
Week 25 - 20th June:
LHC-TS1 preparation: EN-ACE-OSS
Week 26 - 27th June:
LHC-TS1 preparation: EN-ACE-OSS
Week 27- LHC technical stop 1
Week 28- 11th July – Activities and tests during EYETS
Collimation - Stefano Redaelli
EN – STI – Inigo Lamas / Marco Calviani / Jerome Lendaro
EN-EL Reminder – Jean Claude Guillaume
Week 29- 18th July
EN-HE – Damien Lafarge
TE-MSC- Philippe Schwarz/Philippe Denis
EN-ACE-SU – Jean Frederic Fuchs/Dominique Missiaen
Summer Holidays !
LHC coordination meeting, 30th May 2017
Roadmap towards YETS and LS2
Marzia Bernardini EN-ACE 40
Week 34 – 22nd August
EN-ACE-OSS: YETS & LS2 Overview and Updates
Week 35 – 29th August
BE-RF – N. Schwerg
BE-BI – G. Schneider/R. Veness
TE-VSC –G. Bregliozzi / Eric Page / Jaime Perez
Week 36 - 5th September:
LHC-TS2 preparation: EN-ACE-OSS
Week 37 - 12th September:
LHC-TS2 preparation: EN-ACE-OSS
Week 38- LHC technical stop 2
Week 39 – 26th September
SMB-SE – Frederic Magnin / Christophe Biot
TE-MPE - Giorgio D’Angelo/ Reiner Denz / Richard Mompo
Week 40- 3rd OctoberEN-EL-FC: Cabling – Jean Claude Guillaume / Antonio Gonzales
TE - EPC: Power converters activities – Valerie Montabonnet / Hugues Thiesen
Week 41- 10th October
EN-HE-HH – Serge Pelletier
TE-ABT – Francesco Castronuovo/Laurent Ducimetiere
ECR Overview for YETS & LS2 – Anne Laure Perrot
Week 42- 17th October
TE-CRG Updates - K. Brodzinski / G. Ferlin / A. Perin
BE-OP – Mirko Pojer
RP Recommendations – Cristina Adorisio / Christophe Tromel
LHC coordination meeting, 30th May 2017
Roadmap towards YETS and LS2
Marzia Bernardini EN-ACE 41
Scope of the presentations
- Activities to be performed during YETS 2017-2018 AND LS2
- Contraintes generated
- Safety aspects
- Support needed
Duration 15 minutes (+10 minutes questions)
LHC coordination meeting, 30th May 2017
Reminder: General Safety instruction
Marzia Bernardini EN-ACE 42
COORDINATION & SCHEDULING of the activities in the respect and application of CERN
safety rules
Guidelines and rules implemented during technical stops and shutdowns
Follow up during coordination meetings and via IMPACT
Training for work supervisors from summer 2017
LHC coordination meeting, 30th May 2017
Contact persons inside EN-ACE
Marzia Bernardini EN-ACE 43
LHC coordination
- Marzia Bernardini
planning frame: powering
tests, Cryogenics activities,
CV surface maintenance,
ELQA tests, UPS
Activities in the ARCs
- Maria Barberan
Activities in LSS
- Sebastien Bustamante
Activities in Service Areas,
TI2 and TI8
LHC EROS (Engineering Referent for Operational Safety)
- John Etheridge
- Gerard Bailly
- Cyrille Bedel
- Michel Bonnet
- Emmanuel Paulat
EROS-Safety (Health and Safety)
Lock out
- Gerard Pastor
- Romual Bihery
LHC coordination meeting, 30th May 2017
Contact persons inside EN-ACE
Marzia Bernardini EN-ACE 44
LHC coordination meeting, 30th May 2017
• The duration of the YETS 2017-2018 is now validated to 15 wks
• The preparation of the LS2 already started
• The Plan version 2 shall be completed by June 2017, to reflect the LS2 activities
• The activities of HL-LHC are well identified, but the detailed schedule and sequencing of their implementation should be defined in 2017
• Dipole diodes consolidation
• The activities related to the dipole diodes consolidations fit in the LS2 schedule
• The duration of the complete diode consolidation is 51 wks, including the Xmas closure.3 wks are available at the beginning of the project for learning.Additional time (about 2.5 months) will be available for non conformities resolution, if needed
• The project organization should be similar to that implemented during LS1 for splices consolidation (SMACC)
• The first draft of the LHC-LS2 schedule, identifying the critical path, could be issued in Q1-’18
• The approval process of the main changes will start in 2017 and must be completed by Q1-’18
• 2017 will be a challenging year, due to the parallel preparation of technical stops, YETS 2017-2018 and LS2!
• The main concern is related to the resources availability during the LS2, to prepare and to not compromise the LHC activities for LS3
Conclusions
Marzia Bernardini EN-ACE 45
Backup slides
LHC coordination meeting, 30th May 2017Marzia Bernardini EN-ACE 47
LHC coordination meeting, 30th May 2017
P1
P2
P3
P4
P5
P6
P7
P8
WP11
DS collimation with
11 T dipoles
WP5
TCSPM
collimation
WP12
In-situ
coating
WP8
Mini TAN
WP14
D1 Mask
TDIS & MKI
WP17.1
Civil
Engineering
works
WP9
Cryo upgrade
WP13
BPW & BGV
WP11
DS collimation
with LEP
WP12
In-situ
coating
WP17.1
Civil
Engineering
works
WP14
D1 Mask
TDIS & MKI
LEN
LEP
LEP
LEN11 T11 T
HL-LHC-LS2 underground activities
48
HL-LHC LS2 junction UPRs with LHC tunnels
facilities in LSS1 and LSS5
LHC coordination meeting, 30th May 2017
UPR17
UPR13 UPR57
UPR53
Marzia Bernardini EN-ACE 49
LHC coordination meeting, 30th May 2017
LHC-LS2 schedule in progress
Marzia Bernardini EN-ACE 50
LHC coordination meeting, 30th May 2017
HL-LHC-LS2, updates on WP17
UPR17
Tunnel LHC RI171
UPR13
UPR57
UPR53
Marzia Bernardini EN-ACE 51
UPR53
The HL-LHC civil engineering schedule needs to be optimised to fit in the LS2
LS2 vs LS3 preparation: HL-LHC WP3 (1/2)
LHC coordination meeting, 30th May 2017 52Marzia Bernardini EN-ACE
LS2 vs LS3 preparation: HL-LHC WP3 (2/2)
LHC coordination meeting, 30th May 2017 53Marzia Bernardini EN-ACE
LHC coordination meeting, 30th May 2017 54Marzia Bernardini EN-ACE
LS2 vs LS3 preparation: HL-LHC WP11