PLANNING OBLIGATIONS STRATEGY SUPPLEMENTARY PLANNING DOCUMENT CONSULTATION DRAFT Northampton Borough Council Planning Policy and Heritage June 2012

Upload: others

Post on 18-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

PLANNING OBLIGATIONS STRATEGY

SUPPLEMENTARY PLANNING DOCUMENT

CONSULTATION DRAFT

Northampton Borough CouncilPlanning Policy and Heritage

June 2012

Page 2: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

A ccessibility Information

If you would like a copy of this document in Large Print, Braille, Audiotape, or translation into another language please contact 01604 837 861

2

01604 837 861

Page 3: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Explanatory Notes

Document Matters

(i) Title: Northampton Planning Obligations Supplementary Planning Document

(ii) Subject Matter: To set out the Borough Council’s strategy for working with the local community, the development industry and other interested parties to secure relevant planning obligations in relation to mitigating the impacts of new development within Northampton Borough.

(iii) Representations can be made:

Online at : www.northampton.gov.uk/consultation

By Post: Northampton Borough Council, St Giles Square, Northampton, NN1 1DE

By Fax: 01604 838543

By e-mail to: [email protected]

Representations may be accompanied by a request for notification of the adoption (or otherwise) of this Supplementary Planning Document. If making such a request, please specify the address for this purpose.

Consultation (iii) This document is published for public consultation purposes. The

consultation period starts on the 21st June and ends at 17:00 (5pm) on the 26th July 2012.

(iv) The consultation will be undertaken in accordance with the Northampton Statement of Community Involvement issued Northampton Borough Council and includes:

a) An advert notice

b) Copies being made available for public viewing at the council offices, local libraries, and the council website.

c) Letters to stakeholders informing them of the draft document and where it is available

d) A facility enabling the public to respond on-line.

Sustainability Appraisal(v) This Supplementary Planning Document is accompanied by a

Sustainability Appraisal, which is also subject to consultation

3

Page 4: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Planning Obligations Supplementary Planning DocumentContents

1 Introduction

Aims of the Supplementary Planning Document Understanding Planning Obligations Relationship between Planning Obligations and Community

Infrastructure Levy Contacts

2 Planning Policy Context

National Policy Regional Policies Strategic and Local Policies Corporate Plan 2011 – 2014 Planning Obligations Framework and Guidance (NCC) Health Authorities

3 Process for Securing Planning Obligations

Pre-applications discussions Forms of planning obligations Trigger points Types of planning agreements Implementation, payments and delivery Monitoring

4 Viability

5 Requirements for Planning Obligations

PO1: Affordable housing PO2: Open space, sport and recreation PO3: Community facilities PO4: Training for employees PO5: Public Realm PO6: Conservation Areas PO7: Environmental Health and Air Quality PO8: Development and flooding PO9: Sustainable Urban Extension PO10: Planning and Monitoring Charges

5 Evidence base and references

6 Glossary

4

Page 5: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Appendices

Appendix 1: Open Space, Sport and Recreation

Map 1: Existing open space, sport and recreation

Table 1: Current and recommended open space provision Table 2: Recommended accessibility standard Table 3: Calculating maintenance costs Table 4: Open space average cost per square metre / hectare Table 5: Open space maintenance costs

Appendix 2: Other Costs

Public realm Planning and monitoring charges

Appendix 3: Map 3 - Individual air quality management area

Appendix 4: Key contacts

5

Page 6: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

1 INTRODUCTION

Aims of the Supplementary Planning Document

1.1 The aim of this Supplementary Planning Document (SPD) is to set out Northampton Borough Council’s strategy for working with the local community, the development industry and other interested parties to secure relevant planning obligations in relation to mitigating the impacts of new development within Northampton Borough.

1.2 This SPD also sets out details of how these planning obligations will be secured including the types of obligations and types of agreements.

1.3 This document is not intended to stand alone and shall be referenced in conjunction with relevant Council policies, as outlined below, and strategies (including emerging guidance) as well as having regard to Northamptonshire County Council’s Planning Obligations Framework and Guidance (March 2011). The County Council’s guidance provides developers, local planning authorities and residents with essential information on the likely impact of new development on the infrastructure and community facilities that are the direct responsibility of the County Council.

1.4 There are new developments which may be considered acceptable on its planning merits, but raises negative impacts which would not be resolved by planning conditions. In such cases, planning obligations can assist in mitigating the impact of development within the locality by requiring a developer to provide, deliver or contribute to services and infrastructure either through physical works or financial contributions.

1.5 The document therefore will:

Assist developers and their professional advisors and the local community in understanding the reasons why developer contributions will be sought and for which developments, in a transparent manner. This is particularly important for Development Management purposes, as it will also assist in clarifying and speeding up the decision making process

Ensure that any additional infrastructure required as a result of the new development is provided. Assist developers and their professional advisors and the local community in understanding the reasons why developer contributions will be sought and for which developments, in a transparent manner. This is particularly important for Development Control purposes, as it will also assist in clarifying and speeding up the decision making process

Ensure that any additional infrastructure identified as a result of the new development is provided. With the expected increase in population (through natural and projected growth), it is essential that the major regeneration projects and associated infrastructure are

6

Page 7: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

planned comprehensively and delivered in a timely and effective manner

Secure appropriate mitigation measures, where it has been demonstrated that the development will have an adverse impact on the area

Secure maintenance of infrastructure either through direct payments or agreed management arrangements. With the expected increase in population (primarily through natural growth), it is essential that major regeneration projects, proposed SUE’s and their necessary infrastructure are planned comprehensively and delivered in a timely and effective manner

Secure appropriate and proportionate mitigation measures, where it has been demonstrated that the development will have a direct adverse impact on the area

Secure ongoing maintenance of landscaping, playing pitches ,open spaces and relevant infrastructure either through direct payments(commuted sums)or agreed management arrangements

Understanding planning obligations

1.6 Northampton’s population is expected to expand through the proposals for growth contained in the West Northamptonshire Joint Core Strategy. Major new residential, commercial and leisure development will be required to support that growth, which in turn links to the need to provide additional supporting infrastructure requirements. It is essential that future developments, which creates the need for additional infrastructure requirements, contributes towards its delivery, mitigation and maintenance.

1.7 Infrastructure requirements could be required for physical infrastructure (such as roads) social infrastructure (like affordable housing, community facilities, schools and sports facilities) or green infrastructure (open space). There may also be development implications that need to be addressed through specific mitigation measures or through an agreed phasing mechanism. For instance, where it has been demonstrated that there would be an impact on flooding, appropriate mitigation measures will be sought. For large scale developments, it might be the case that schools need to be provided before all the houses are built and occupied. These issues can be addressed through planning obligations.

1.8 Planning obligations (Section 106 of the Town & Country Planning Act 1990) are legal agreements negotiated when determining planning applications. Planning obligations can be used where it is not otherwise possible to address unacceptable impacts through the implementation of a planning condition.

Relationship between Planning Obligations and Community Infrastructure Levy (CIL)

7

Page 8: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

1.9 The operation of CIL Regulations came into force on the 6 th April 2010. CIL is deemed as a fairer, more transparent approach to providing future development contributions in that almost all planning applications for new buildings or extensions, rather than just large applications, contribute towards providing the infrastructure needed to support development proposals. It will help to secure a funding stream for infrastructure, but should be regarded as complementary to other sources of funding. Mainstream funding, such as capital programmes, service provider investment programmes and government grant will continue to provide for the bulk of infrastructure planning.

1.10 The CIL Regulations introduce 3 legal tests in considering the implementation of planning obligations as follows: That the obligation is:

Necessary to make the development acceptable in planning terms Directly related to the development Fairly and reasonably related in scale and kind to the development

1.11 Whilst it is the Government’s intention to replace planning obligations for general types of community infrastructure, planning obligations will still be used for site-specific mitigation measures that are required to make a development acceptable.

1.12 CIL monies can only be spent on the infrastructure identified by Councils as being needed to support the development of their area. This should focus on new infrastructure provision but can be used to either increase the capacity of, or repair, failing existing infrastructure. It should not be used to remedy pre-existing infrastructure deficiencies unless they will be made more severe by new development.

Contacts

1.13 Planning applicants and/or their agents are strongly recommended to speak to the Borough Council in respect of their development proposals. A list of the relevant Officers to contact is provided in Appendix 3.

8

Page 9: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

2 PLANNING POLICY CONTEXT

2.1 The Town and Country Planning Act (1990) provides the statutory framework for planning obligations. Planning obligations may be sought where planning conditions are an inappropriate mechanism to enhancing the quality of development and enabling proposals that might otherwise have been refused to go ahead in a sustainable manner.

a National Policy

2.2 The National Planning Policy Framework (April 2012), reinforces the message that local planning authorities should consider whether, otherwise unacceptable development, could be made acceptable through the use of conditions or planning obligations. Planning obligations should only be sought where they meet all of the following tests:

Necessary to make the development acceptable in planning terms Directly related to the development, and Fair and reasonably relate in scale and kind of development

2.3 Planning obligations which would undermine the viability of development proposals are to be avoided. However, the Council may refuse the application if the necessary infrastructure or mitigation cannot be provided.

b Regional Policies

2.4 Policy 57 of the East Midlands Regional Plan (March 2009) states that local authorities should work with developers, statutory agencies and other local stakeholders to produce delivery plans outlining the infrastructure requirements needed to secure the implementation of Local Development Documents. These should include guidance on the appropriate levels of developer contributions, and the mechanisms for securing the delivery of such contributions.

c Strategic and Local Policies

2.5 Both the pre-submission draft of the West Northamptonshire Joint Core Strategy (WNJCS, February 2011) and the Submission Central Area Action Plan (CAAP, May 2012) contain policies on planning obligations. The adopted Northampton Local Plan (June 1997) also contains saved policies on implementing development and affordable housing, which have implications on planning obligations.

2.6 The West Northamptonshire Joint Planning Unit is the body responsible for producing the Joint Core Strategy for Northampton Borough, South Northamptonshire Council and Daventry District Council. Both the WNJCS and the CAAP contain emerging policies, which the West Northamptonshire Joint Planning Unit and Northampton Borough Council intend to submit / have submitted for independent Examination. Once

9

Page 10: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

adopted, they will replace the relevant policies contained in the Northampton Adopted Local Plan (June 1997).

2.7 In the meantime, the adopted Northampton Local Plan continues to represent a key material consideration in determining planning applications. The principles contained in this SPD provide further guidance on the approach to be taken in relation to the following saved policies contained in the adopted Northampton Local Plan:

Policy E19: Implementing development

Planning permission for residential, business or commercial development proposals will only be granted where any adverse effect or impact of the development is allowed for or mitigated and where the infrastructure, services and amenities made necessary by the development are in existence or will be provided by the developer or other agency.

Policy H32: Affordable Housing

In granting planning permission for residential developments of 40 or more dwellings, the Council will negotiate an element of affordable housing. The level of provision will depend upon the identified need for such housing in the vicinity and site / market conditions.

2.8 In addition, the Council produced a Northampton Planning Policy Statement on Affordable Housing in 2004, which builds on saved Policy H32. This Statement is intended to provide a framework for negotiations with developers for the provision of affordable housing. Key elements of this Northampton Planning Policy Statement are:

Planning Policy Statement for Affordable Housing (October 2004)

On all residential development sites above the site size threshold, a target of 35% affordable housing should be provided.

The site size threshold is set at 15 dwellings, or sites measuring 0.5 hectares or above.

The ratio of homes for affordable rent and other tenures will be negotiated on a site by site basis.

d Corporate Plan 2012 - 2015

2.9 The Corporate Plan sets out the Council’s priorities, explains what are to be achieved over the next three years and highlights what progress has been made over the last year.

10

Page 11: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

2.10 In preparing this SPD, the Council will be meeting the following priorities:

Priority 1 – Northampton on track

An economically prosperous, successful and vibrant Town The Town is nationally recognised as an economic hub and a place

to do business Increased numbers of visitors Increased job opportunities and an improvement in the quality of

jobs available A Borough Wide planning policy that will preserves the identity,

history and heritage of the Town but that encompasses the development of the Borough as a whole

Delivery with partners of major town centre regeneration projects, such as the redevelopment of Grosvenor Greyfriars, a new bus interchange and the re-design of the railway station

The Town’s history, heritage and culture is promoted and preserved

Priority 2 – Invest in safer, cleaner neighbourhoods

A cleaner Town with neighbourhoods that are tidy and well maintained

A place where people want to visit and enjoy our parks and open spaces

A place where visitors and residents from all communities feel safe, secure and protected with low levels of crime

Priority 3 – Celebrating our heritage and culture

Increased tourism Promotion, protection and improvement of our heritage and other

attractions

Priority 4 – Making every £ go further

Cost savings achieved through the use of shared services, outsourcing opportunities and reduction in the use of consultants

e Planning Obligations Framework and Guidance (Northamptonshire County Council, March 2011)

2.11 Northamptonshire County Council published its own guidance for planning obligations in relation to the services and infrastructure that they are responsible for. Northampton Borough Council will continue to consult with the County on relevant planning obligations. The Guidance sets out the County Council’s requirements for planning obligations for the following:

Schools

11

Page 12: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Transport Waste Management Fire and Rescue Community facilities including libraries, archives, social care

facilities and neighbourhood renewal

2.12 Further information can be found by accessing the document in the Northamptonshire County Council website, or by contacting the County Council direct (see Appendix 3 for details).

f Health Authorities

2.13 Health centres and surgeries are currently provided by the Primary Care Trust. By 2013, these responsibilities will be transferred to General Practitioners. Hospitals and specialist clinics are provided by NHS Trusts.

2.14 The Primary Care Trust and NHS Foundation Trust are in the process of reviewing their services and property provisions, which will subsequently have an impact on the types and size of health care provision within Northampton and beyond.

2.15 Although policies contained in the West Northamptonshire Joint Core Strategy pre-submission draft supports the provision of health facilities in the Sustainable Urban Extensions, there may be other occasions where a new health centre or an improvement to an existing centre is justified. If so, the Council will aim to consult both the PCT and NHS Foundation Trust on how best to secure planning obligations.

12

Page 13: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

3 PROCESS FOR SECURING PLANNING OBLIGATIONS

3.1 This Section outlines the approach which the Council will consider when negotiating and securing planning obligations. When determining planning applications, the Council will assess them on their individual merits, taking all material considerations into account. A planning obligation will only be imposed where planning conditions are unsuitable and the application would otherwise be refused.

a Pre-application discussions

3.2 The Council positively promotes pre-application discussions. These will assist in ensuring that any conflicting issues associated with the proposals can be highlighted in advance and resolved as early as possible in the process.

3.3 Depending on the nature of a development proposal, the Council may advise that planning obligation is required. If so, the Council will negotiate with the applicant / developer the contents of the Heads of Terms and the requirements for each S106 agreement. This will be the responsibility of the Development Management Case Officer and the Compliance Officer.

3.4 These early discussions provide an opportunity to resolve any issues or seek clarification at an early stage prior to submitting a planning application. This will be beneficial to both the Council and the developer, in terms of time and costs savings.

b Forms of planning obligations

3.5 Government guidance states that where contributions are secured through planning obligations towards the provision of facilities which are predominantly for the benefit of the users of the associated development, it may be appropriate for the developer to make provision for subsequent maintenance (i.e. physical upkeep)

3.6 Planning obligations can be provided in the following ways:

Infrastructure provision and other capital works

3.7 This could be through:

Financial contributions – developers are required to provide financial payments to the Borough Council, which will then provide the mitigation

Non-financial contribution – developers are required to meet their planning obligations by providing the matters necessary to mitigate the issue either on site or off site (for example, public open space and provision of affordable housing) including transfer of land

A combination of both

13

Page 14: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Maintenance and other revenue provision

3.8 This could be through:

Financial contributions – developers are required to provide financial contributions to the Authority so it can undertake the appropriate maintenance of capital works

Non-financial contributions – developers are required to maintain the provision by taking on this responsibility themselves or by seeking alternative arrangements.

3.9 Provision of infrastructure which may be transferred to or require consideration of future maintenance to be undertaken by the Council will require financial contribution towards the maintenance costs associated with it. The Council will therefore seek, where relevant, payments for a minimum of 15 years cost of management and maintenance, in order to bridge the gap between provision of the facility and inclusion in local authority funding streams. There may be cases where maintenance may be required in perpetuity.

Submission of Information

3.10 The developer will need to provide additional details including:

Commencement dates – this sets out the dates when developments are expected to start, including phasing

Trigger points – this sets out the details and schedules of trigger points for various stages of the development process, for instance, the expected commencement / completion date of a school building after a specified number of houses have been completed, or stages of road building and associated housing completions (for further information, see paras 3.12 – 3.13)

Other Clauses

3.11 Where the management of mitigation measures are required, the Council may negotiate for the delivery and production of the following:

Permanent agreement / obligation – for instance, limitations imposed on retail floorspace and houses being sold at affordable prices to subsequent occupants

c Trigger Points

3.12 In some cases, obligations (for example, the provision of land, schools, community facilities and open spaces) will need to be provided at specific points during the development process.

14

Page 15: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

3.13 These trigger points will be negotiated between the Council and the applicant, and may additionally be controlled by conditions, based primarily on the following:

Occupier led – this relates to the occupiers of the built development, whether it is for residential or commercial. It is usually the case that these units cannot be fully occupied without some of the infrastructure and / or associated ancillary provisions being put in place

Commencement – this ensures that the development site is appropriately serviced by appropriate infrastructure.

d Types of Planning Agreements

Bilateral / Multilateral Agreement

3.14 The Council will normally expect planning obligations to be dealt with via Bilateral / Multilateral Agreements rather than Unilateral Undertaking (see below).

3.15 A bilateral / multilateral agreement (Section 106 Agreement) is an agreement between the applicant and the Council, and occasionally third parties, for example Northamptonshire County Council as the Highways Authority, all of whom must have an interest in the land. The need for this type of agreement is usually identified during the pre-application discussion process but may be established once an application has been submitted, if there is a requirement to mitigate a specific issue. If the need for such an agreement is identified prior to the submission of the application, applicants are advised to submit a draft agreement or "heads of terms" with the initial application to speed up the decision-making process. If an agreement is required, the applicant will be advised of the main requirements and reasons.

3.16 Once it has been established that an agreement is necessary, a legal undertaking is required in writing, from the applicant’s solicitor, addressed to the Borough Solicitor, to be responsible for the Council’s relevant legal costs, whether or not the matter proceeds to completion; and evidence of ownership of the land (for registered land this is by way of Office Copy Entries obtainable from HM Land Registry, for unregistered land this is by way of an epitome of title). A copy of both must also be sent to the Case Officer responsible for the application.

3.17 Where agreement in principle is reached, the application is reported to the Council’s Planning Committee, if necessary, for authority to proceed. The recommendation made to the Planning Committee will normally include a timeframe for completion and the legal agreement to ensure it is completed within a reasonable period of time.

3.18 An additional charge may be made by the Council if it incurs any further costs in processing an agreement. This charge will reflect the level

15

Page 16: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

of work involved, including any aborted work. This charge is payable immediately prior to work being undertaken. Once an appropriate undertaking is received, the Council will prepare a draft agreement and this will be sent to the parties for ratification and final engrossment. Planning permission will be issued upon completion of the legal agreement.

Unilateral Undertaking

3.19 A unilateral undertaking is an obligation offered by the applicant to the planning authority either in support of a planning application or a planning appeal. The terms of the agreement are identified by the applicant. This is produced by the applicant's solicitor and can be entirely with no Council involvement. Only undertakings that are required to mitigate any impact of the development can be taken into account when determining the application as a material consideration. Northampton Borough Council’s Solicitor will advise, check and confirm that an undertaking is acceptable, a charge will be payable based upon the level of work involved. If a draft unilateral undertaking has not been checked for comment, then Northampton Borough Council reserves the right to either accept or reject it with reasons as appropriate.

3.20 Unilateral undertakings are not normally the Council’s preferred method of dealing with S106 Obligations and are only likely to be promoted in dealing with relatively minor issues.

e Implementation, Payments and Delivery

Transfer of land / copies of title document

3.21 Associated with any obligation to transfer land (eg for the delivery of Planning Obligations), there will be an obligation to ensure that land / property has been properly maintained (normally for at least 1 year) and in a suitable condition for adoption.

Payment

3.22 Where it is agreed that the developer provides a financial payment, the developer is required to ensure that the Council is in receipt of the sum by the contractual date. This procedure will be co-ordinated by the Compliance Officer.

Index linked

3.23 All financial obligations will be index-linked using the “All Items Index of Retail Prices”. This will ensure that the value of the obligation does not reduce over time as a result of inflation.

3.24 The Council will review the level of standard charges on an annual basis to allow for changes in inflation.

16

Page 17: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Penalties

3.25 Following the completion of a legal agreement, should the developer/landowner fail to comply with any of the obligations within the agreement, then the Council may instigate legal proceedings. All costs associated with such proceedings are expected to be incurred by the developer / landowner.

f Monitoring

Compliance Officer3.26 The Council employs a Compliance Officer who undertakes a range of tasks associated with securing, managing and implementing planning obligations. The role is responsible for negotiating Heads of Terms, making a timely response to planning applications and maintaining a developer contributions database.

17

Page 18: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

4 VIABILITY

4.1 The Council acknowledges that there are costs associated with delivering sustainable, high quality developments particularly in the current economic climate. Poor economic climate can reduce the financial viability of a proposal.

4.2 In such cases, the applicants / developers where they claim issues of viability are expected to provide comprehensive information and evidence so their claims can be properly assessed. The Council would expect an “open book” approach, this may include information such as acquisition costs, option details projected construction costs, sales / rental values and comparable land values. Valuation reports will need to be supplied by an independent valuer. In some cases, the Borough Council’s Asset Management Team or external independent valuers may be asked to review the findings. A reasonable cost would be involved and charged to the applicant/developer.

4.3 The Council however expects the developer to have considered fully the implications of planning obligations requirements prior to acquiring land/entering into options and certainly before submitting their applications. This is particularly important and standard practice in the development industry and therefore land costs , land clearing costs, and other obligation requirements which would have been reasonably known will not therefore be accepted as a valid reason for non-viability.

18

Page 19: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

5 REQUIREMENTS FOR PLANNING OBLIGATIONS

5.1 This Section outlines the Council’s requirements for identifying developer contributions.

a Affordable Housing

5.2 Affordable housing consists of social rented, affordable rented and intermediate housing, provided to eligible households whose needs are not met by the market. Affordable housing should therefore be available at a cost low enough for occupiers to afford. Such housing developments should also include the provision for housing units to remain at an affordable price for future eligible households or, if these restrictions are lifted, for the subsidy to be recycled for alternative affordable housing provision.

5.3 Northampton’s Planning Policy Statement on Affordable Housing (October 2004) builds on the saved policy contained in the adopted Northampton Local Plan (June 1997), and provides a threshold for affordable housing. This threshold is supported by the work undertaken by the West Northamptonshire Joint Planning Unit. The evidence base includes the Strategic Housing Market Assessment (2011) and a Viability Assessment. This evidence base has been used to inform the preparation of an Affordable Housing Draft Supplementary Planning Document / Interim Position, which was approved by Cabinet in January 2012 for consultation.

5.4 The threshold for the provision of affordable housing also applies to the conversion or redevelopment of buildings, whether or not they are currently in residential use. When considering whether a development meets the threshold for the provision of affordable housing, the Council would consider the gross number of proposed dwellings, not net increases. Planning applications should not try to artificially subdivide or phase sites so as to avoid or minimise the provision of affordable housing. The full requirement of affordable housing provision would be required.

PO1: Thresholds for providing affordable housing

All housing developments of 15 dwellings or more are required to provide affordable housing at a minimum of 35%.

Affordable housing should be built out alongside, and proportionately, to the amount of market housing being constructed on site at any one time. This will be required or managed by condition or through legal agreement.

The Council’s preferred approach is for affordable housing to be provided on site so that it contributes to the overall mix of housing provided. Where justified, and in exceptional circumstances, off site provision or a financial contribution in lieu of on-site provision may be acceptable as long as the

19

Page 20: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

approach contributes to the creation of mixed communities within the local authority area.

b Open space, sport and recreation

General provision and requirements

5.5 Past practice has been successful in raising awareness of the need for new public space and improving existing provision to serve the needs of new residents. Public open space will be considered as part of the overall design and layout of new development, sited where it will be overlooked, safe, usable and accessible to all residents. In addition, opportunities should be taken to retain existing areas of wildlife habitats and green corridors.

5.6 The Council undertook an Open Space, Sport and Recreation Needs Assessment and Audit (OSSR, September 2009), to assist with informing the future management of open spaces and facilitate decision making on the current and future needs for open space, sport and recreation facilities. The Audit provides a Borough wide recommended provision standard (hectares per 1000 people) for each of the following typologies:

parks and gardens; natural / semi natural open space; amenity green space; provision for children; provision for young people; allotments; and outdoor sport & facilities

5.7 This figure, along with the number of people who will occupy new housing proposals and the average cost price per hectare for each specific type of open space will then be used to calculate an estimated guide cost for providing the required level of open space, sport and recreation as part of a future housing development, where it is not to be provided on site. The average cost per square metre (hectare) of the above typologies can be found in Appendix 1.

5.8 The need for a housing development to contribute towards each typology is dependant on its location, the provision of open space in that area and the impact of the development on existing open space. Further information on the cost formula and current provision of open spaces in the four designated Analysis Areas and sources of financial costings can be found in Appendix 1.

5.9 In addition, the Council will also seek payment for the maintenance of new or existing open space provision, depending on the obligation, at the very least for a 15 year period. This figure is calculated by multiplying the annual maintenance cost for each open space typology by the quantity

20

Page 21: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

of open space provided and / or existing open space, sport and recreation within the recommended accessibility distance of the development site. For further information on calculating open space maintenance charges for new and existing open spaces as part of housing developments and sources of financial costings (see Appendix 1).

Indoor sports

5.10 The methodology for the assessment of indoor sports facilities is slightly different to the other typologies discussed in para 5.6. Specific demand modelling can be undertaken in line with Sport England parameters and Sport England tools.

5.11 The Council will use Sport England national standards to negotiate for the provision of indoor sports facilities where it has been identified that this is required to mitigate the impact of developments on existing facilities.

PO2: Open Space, Sport and Recreation

Where a housing development proposal of 15 dwellings or more, or commercial development, is found to have an impact on the existing open space, sport and recreation; or where it has been identified that additional provision will be required:

. The level and type of obligations will be dependent on current provision in the area and the proposed development’s proximity to existing provision. Payments will be determined in accordance with the recommended provision standard and maintenance formulae outlined in Appendix 1.

. The Council’s preferred approach is to require the developer to provide the additional provision on site. If it is not possible to provide this on site, they will be required to provide the facility elsewhere subject to the Council’s agreement on the location. Alternatively, the Council will seek financial payments if on site/off site provision cannot be made

. The Council’s preferred approach for the maintenance of new additional provision is for the developer to maintain for at least 15 years. This means that the developer will be responsible for the management and maintenance of the new additional facility

c Community Facilities

5.12 Northampton's network of community centres has developed in a piecemeal fashion over many years, and today, there are many providers of such facilities across the town. These include the Borough Council (which owns 21 community centres), parish councils, religious organisations and schools. The need and requirements for new community centres are determined on a case by case basis, as this is dependent on

21

Page 22: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

the availability and status of existing centres as well as the demand created by the new development proposal.

5.13 It should be noted that it is becoming increasingly accepted that a multi purpose community centre can be more beneficial and sustainable than a single use function. They provide rooms, which are flexible to accommodate the requirements of a variety of users including playgroups, sports groups, exercise classes, religious organisations and resident associations. For example, residents associations need a meeting room, playgroups, sports groups need storage spaces, religious organisations tend to require a large hall for prayer meetings, some groups require kitchens. A multi use centre could better accommodate this wide range of activities. It allows for simultaneous bookings.

5.14 In terms of management, the Council has embarked on a programme of transfer of community centres to community organisations, under 30 year leases. These leases, subject to safeguards for the Council and the local communities in the areas they serve, are set below full market value or at nominal rents. The Council will, where there is a robust case and suitable restrictions to achieve the relevant objectives, also consider the transfer of a freehold or the grant of a 125 year lease of a community centre to a public body or to a suitable community sector organisation.

PO3: Community Facilities

Where the developer is required to provide a new community centre, the Council’s preferred location will be dependent on the availability of existing community centres within the proximity of the development area.

The Council will negotiate for the community centre to be built by the developer and for the centre to be managed by either the developer or an alternative organisation, company or groups chosen by the developer. For the latter, the Council will seek pump priming payments to ensure that the appointed group will be able financially supported at the start of the management process.

The Council will also seek to ensure that the developer will remain responsible for the maintenance and management of the community centre in perpetuity.

d Education, Skills and Training

5.15 Northamptonshire County Council has a statutory responsibility for education provision in the County, for children between the ages of 5 and 16 years and for places for 16 – 19 year old in sixth forms and sixth form colleges. They also have a statutory responsibility to provide pre-school places for children aged 3 and over. The County Council will therefore seek contributions from residential developments towards schools (Northamptonshire County Council’s Planning Obligations Framework and

22

Page 23: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Guidance, March 2011). For housing proposals, the Borough Council will continue to engage with the County Council to ensure that the relevant obligations are met.

5.16 With the expected increase in developments over the next 15 years, there will be opportunities for people to obtain work in the construction industry.

5.17 West Northamptonshire Development Corporation, Northamptonshire Enterprise Partnership, Moulton College and Construction Skills created Construction Futures, a training scheme linking construction training with the determination of planning applications. This training scheme enables local young people to directly benefit from new development, learning new skills and obtaining vital work experience alongside a formal college course. Students at Moulton College studying for a diploma on courses such as carpentry and joinery can benefit from on-site work experience as part of their objective in gaining future employment. Construction training requirements for planning proposals are initially identified, and the applicant, or its contractor, is then invited to select trainees from Moulton College’s first year construction trainees.

PO4: Training for employees

The Council will seek to negotiate the delivery of a construction training scheme as part of the development process including payment for administration of the scheme. The construction of the development will generate employment opportunities, and the Council will work with developers / applicants to identify and agree the number of trainees which can be accommodated on site for work placement.

e Environmental Assets

Public Realm

5.18 Public realm relates to that part of the built environment where the public have free access, including pedestrianised streets and public squares. Improved public realm, particularly within the town centre, will contribute towards a safer, modern and more attractive environment.

5.19 The Council published a Public Realm Improvement Framework (2007), which outlines proposed recommendations for public realm improvements in the Central Area of Northampton. Recommendations contained in this document have been used to inform policy formulation for the Central Area Action Plan.

5.20 Where identified, the Council will negotiate with developers towards the delivery of public realm improvements in the Central Area and the rest of Northampton (Appendix 2 refers).

PO5: Public Realm

23

Page 24: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

The Council will negotiate for financial contributions to be provided towards the delivery of major improvements to the public realm for Northampton, and in particular, for Northampton’s Central Area. Within the Central Area, contributions will be sought primarily for Abington Street, Market Square and the Grosvenor Centre Development Site. Public realm improvements will be sought in accordance with the recommendations contained in the:

. Central Area Action Plan and

. Public Realm Implementation Framework

Heritage Assets

5.21 Northampton currently has a wide and varied historic environment, which includes 20 Conservation Areas. These Conservation Areas offer a collection of buildings, streets and open spaces, some of which are unique to Northampton. It is accepted that Conservation Areas do need to change over time, particularly with the growth expected in Northampton. However, these changes should only happen if the developments are sympathetic or enhance the architectural and aesthetic qualities of the area. To secure this, 11 of the 20 Conservation Areas currently have Management Plans. Conservation Area Appraisals and Management Plans provide details on how relevant parts of the Conservation Area can be preserved and enhanced, particularly where new developments are expected to take place.

5.22 Further information on the Conservation Areas and Management Plans can be found by accessing the Borough Council’s website or by contacting the Council direct (see Appendix 3).

PO6: Conservation Areas

The Council will negotiate developer payments to mitigate the effect of development where it considers that it will have an adverse impact on the setting of a Conservation Area.

f Air Quality

5.23 All new developments are expected to comply with the relevant policies associated with sustainable development standards which will contribute towards the reduction in climate change. For Northampton, all new developments also have the potential to impact on local air quality either as a result of increases in traffic or as a new point source.

5.24 In 2010, the Council undertook a review of the air quality within each of the 11 Air Quality Management Areas (AQMAs) declared in Northampton Borough (see Map 2). Whilst this review has demonstrated that the air quality may be considered acceptable in 4 of these AQMAs, 7 still remain. There are areas near Northampton’s roads where public exposure is high, including those in the Central Area (including Bridge Street, Victoria Promenade and Harborough Road), where concentrations

24

Page 25: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

of nitrogen dioxide exceed the relevant objective limit. Any new development has the potential to worsen the air quality within such areas.

5.25 For other development areas where there are no declared AQMAs, it may still be identified that the proposed development could potentially impact on air quality. Furthermore, it should also be considered that for some smaller developments, whilst individually these may not have a negative air quality impact, cumulatively a larger number of smaller to medium sized developments could also be detrimental to air quality. To address these, the Council will require the developer to undertake the appropriate mitigation measure(s). There are a number of measures which can help mitigate against the impact of development. These will require discussion with Northamptonshire County Council. A list of suggestive measures is detailed below:

Contribution to wider air quality measures included in the Air Quality Action Plan

Provision of air quality monitoring equipment The use of, or promoting the use of, cleaner fuels for fleets of

vehicles associated with the new development, for example, electric, hybrid, liquid petroleum gas, compressed natural gas, bio-fuels or diesel fuelled vehicles fitted with particulate traps and catalytic reduction technologies

Vehicle maintenance, driver training and emissions testing regimes for fleets of cars, lorries or buses associated with a development

Minimising the need to travel Use of lower emission vehicles, for example, vehicles meeting

specified Euro-class emission standards Traffic management Implementation of travel plans, car sharing schemes and other

similar measures Improvements in public transport, walking and cycling in the local

area Limiting the number of parking spaces associated with a

development Managing the use of parking spaces Provision of secure cycle parking and associated changing facilities Use of Environmental Management Systems and Air Quality

Strategies Use of pollution abatement technologies Controlling air quality during the construction phase Use of energy efficiency and renewable energy measures Choice of ventilation provision / design

PO7: Environmental Health and Air Quality

Where it has been demonstrated that the development will have a detrimental impact on air quality, the developer will be required to provide appropriate mitigating and offsetting measures. The obligation(s) will be dependent on the types of mitigating measures agreed.

25

Page 26: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

g Flooding

5.26 Northampton suffered one of its worst cases of flooding in 1998. Since then, efforts have been made to construct additional and more effective flood defence infrastructure to ensure that the likelihood of this happening again is minimised.

5.27 In addition, as Northampton’s population is set to increase and the developments that are expected to take place can increase the amount of impermeable areas, further sustainable measures have been identified to minimise the problem and/or mitigate them. For instance, developments will increase surface water run offs unless mitigation measures and / or flood defence infrastructure are in place. Flood mitigation takes several forms including bunds/embankments, canalised channels, culverts and flood storage areas. Where it has been demonstrated that flood mitigation measures are necessary, the Council will seek the provision of appropriate mitigation measures and maintenance.

PO8: Development and Flooding

The Council’s preferred approach is for the developer to provide the mitigation measure(s).

The Council will also seek to negotiate for the developer to prepare a Management Plan, outlining how the applicable mitigation measure(s) will be managed and maintained. The developer will be responsible for securing the management and maintenance of the mitigation measure.

h Sustainable Urban Extensions

5.28 There are 7 Sustainable Urban Extensions (SUEs) proposed on the urban edge of Northampton within the pre-submission draft West Northamptonshire Joint Core Strategy (February 2011). These are:

Northampton North Northampton West Northampton South Northampton South of Brackmills Northampton King’s Heath Northampton North of Whitehills Northampton Upton Park

5.29 These SUEs represent the most sustainable and sequentially preferable location for new development beyond the existing urban area. Some of these sites are located in their entirety in the administrative boundary of Northampton Borough. Others, including Northampton North of Whitehills, Northampton North, Northampton West and Northampton South are located within adjoining local authority boundaries on the periphery of Northampton. They are contiguous with the urban area of

26

Page 27: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Northampton and are proposed to meet Northampton’s future housing needs.

5.30 The SUEs vary in size ranging from 1,000 to 3,500 dwellings. These are large scale developments which will have an impact on the wider infrastructure and amenities of the surrounding area. In delivering the proposed SUEs, it is essential that the appropriate level of planning obligations be sought to mitigate any impacts resulting from these large scale developments. The obligations sought will reflect the development implications beyond the immediate administrative boundary.

PO9: Sustainable Urban Extensions

Northampton Borough Council will work with key partners and stakeholders to deliver the Sustainable Urban Extensions. The Council will seek pro rata planning obligations for developments which will form part of the Northampton conurbation to mitigate the effects of the development within the Borough.

i Planning and Monitoring Charges

5.31 Contributions will be sought towards the resource that Officers within the Planning Service take to secure planning obligations (see Appendix 2). This will include the time taken to prepare and negotiate the planning obligations.

PO10: Planning and monitoring charges

The Council will seek financial contributions to cover planning and monitoring costs. This figure will be adjusted annually.

27

Page 28: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

5 EVIDENCE BASE AND REFERENCES

National

National Planning Policy Framework (March 2012)

Regional

East Midlands Regional Plan (March 2009)

Strategic

West Northamptonshire Joint Core Strategy pre-submission draft (February 2011)

Local

Corporate Asset Management Strategy (2012-2015), Northampton Borough Council Cabinet 14th December 2012

Central Area Action Plan - submission (May 2012) Northampton Adopted Local Plan (June 1997)

Technical Evidence (in chronological order)

2011 Air Quality Further Assessment for Northampton Borough Council (NBC, November 2011)

Northamptonshire County Council Planning Obligations Framework and Guidance (March 2011)

Infrastructure Delivery Plan Final Report (WNDC/West Northamptonshire Joint Planning Unit, February 2011)

Developer Contributions SPD (South Northamptonshire Council, December 2010)

Northampton Level 2 Strategic Flood Risk Assessment (Scott Wilson, March 2010)

Open Space Sport and Recreation Study (PMP, September 2009) Arts, Museums and New Development – A Standard Charge

Approach (Arts Council England, Museum Libraries and Archives Council, March 2009)

Cultural Mapping Document for West Northamptonshire (Tom Fleming Creative Consultancy, November 2008)

Public Realm Implementation Framework (BDP, 2007)

28

Page 29: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

6 GLOSSARY

AQMA Air Quality Management AreaBID Business Improvement DistrictCAAP Central Area Action PlanFRA / SFRA Flood Risk Assessment / Strategic Flood Risk

AssessmentOSSR Open Space, Sport and Recreation SA Sustainability AppraisalSEA Strategic Environmental AppraisalSPD Supplementary Planning DocumentWNDC West Northamptonshire Development CorporationWNJCS West Northamptonshire Joint Core Strategy

29

Page 30: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

APPENDIX 1: OPEN SPACE, SPORT AND RECREATION

1. Introduction

This Appendix:

identifies the Open Space Analysis Areas within the Borough and the current provision of open space in each area

outlines the desired provision standards for each typology of open space in Northampton, but does not set standards for cemeteries and burial grounds, civic spaces or green corridors

provides the formulae and an example of how to calculate the cost of new open space provision and the cost of maintenance of this open space to aid Section 106 negotiations on new housing development above 15 dwellings.

This Appendix applies to the following typologies and definitions:

Open Space Typology Definition PG: Park & Gardens including urban parks, country parks and formal

gardensNSN: Natural and Semi Natural Open Space

including woodlands, urban forestry, scrub, grasslands (eg downlands, commons and meadows) wetlands, open and running water, wastelands and derelict open land and rock areas (eg cliffs, quarries and pits).

AGS: Amenity Greenspace

(most commonly, but not exclusively in housing areas) – including informal recreation spaces, green spaces in and around housing, domestic gardens and village greens

Children: Provision for Children

Equipped children’s play areas and adventure playgrounds that are perceived to cater for children under 9

YP: Provision for young people

Facilities for young people serve children over the age of 8 and may include BMX tracks, Multi Use Games Areas (MUGA) and play areas designed for older children.

All: Allotments community gardens, and city (urban) farmsOSF: Outdoor Sports Facilities

allotments, community gardens, and city (urban) farms

30

Page 31: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

2. Calculating the amount and cost of NEW open space provision

The Open Space, Sport and Recreation Needs Assessment and Audit (OSSR) (PMP, 2009) divides the Borough into 4 open space analysis areas, see Map 2 below. The applicant needs to identify which area their housing development proposal lies by using this Map.

After an applicant has identified which area their housing development proposal lies, they can cross reference current provisions of open space in that area, by using Table 1. If there is an under provision in any of the open space typologies, a contribution from the developer will be required. If there is no under provision, the Council will seek planning obligations in relation to maintenance of existing open space, sport and recreation.

31

Page 32: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Map 1 - Open Space Analysis Areas

32

Page 33: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Table 1: Current and Recommended Open Space Provision (Source: OSSR, 2009)

33

Page 34: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Example: Development of 25 dwellings in Analysis Area 1

Stage 1: Estimating number of residents within a new development

Dwellings x 2.4 average occupancy = residents 25 x 2.4 = 60 residents

Stage 2: Calculating the Open Space requirements and the cost of delivery

The table below shows that for this example, there is an under provision of all open space typologies within Analysis Area 1 when compared to the Borough-wide provision standard. Therefore on this occasion the formula must be completed for all open space typologies. Open SpaceTypology

Identify Existing Provision Analysis Area (See Table 1)

(ha per 1000 pop)

Provision Standard

(ha per 1000 pop)

÷ Population

(1000)

x No. of residents in new development

= Total OS requirements

(hectares)

x Average cost per hectare (Go to Table 4)

= Total OS cost (£)

PG 0.74 (deficient) 1.05 ÷ 1000 x 60 = 0.063 x 260,000 = 16,380NSN 0.64 (deficient) 1.57 ÷ 1000 x 60 = 0.094 x 140,000 = 13,160AGS 0.65 (deficient) 1.37 ÷ 1000 x 60 = 0.082 x 95,000 = 7,790Children 0.021(deficient) 0.04 ÷ 1000 x 60 = 0.002 x 675,000 = 1,350YP 0.003 (deficient) 0.03 ÷ 1000 x 60 = 0.002 x 1,033.800 = 2,068Allotment 0.00 (deficient) 0.42 ÷ 1000 x 60 = 0.025 x 100,000 = 2,500OSF 0.68 (deficient) 1.62 ÷ 1000 x 60 = 0.097 x 245,000 = 23,765

Total 0.364 Total £67,013

Stage 3: Calculating maintenance cost of new Open Space Provision

Open Space Typology

Total OS requirements(hectares)

x Maintenance cost per hectare (Go to Table 5)

= Total open space maintenance cost (£)*

PG 0.063 x 1,910 = 120.33NSN 0.094 x 2,902 = 272.788AGS 0.082 x 2,902 = 237.964Children 0.002 x 176,400 = 352.8YP 0.002 x 176,400 = 352.8Allotment 0.025 x 2,902 = 72.55OSF 0.097 x 5,200 = 504.4

1,913.632

* The yearly rise in inflation will need to be factored into maintenance charges over the agreed period the obligation would apply (minimum 15 years).

34

Page 35: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Open Space Provision and Cost Calculation Template – To be completed by the applicant

Stage 1: Estimating number of residents within a new development

Dwellings x 2.4 average occupancy = residents

Stage 2: Calculating the Open Space requirements and the cost of delivery (Template)

Open SpaceTypology

Identify Current Provision Analysis Area (See Table 1)

(ha per 1000 pop)

Provision Standard

(ha per 1000 pop)

÷ Population

(1000)

x No. of residents in new development

= Total OS requirements

(hectares)

x Average cost per hectare (Go to Table 4)

= Total OS cost (£)

PG 1.05 ÷ 1000 x = x =NSN 1.57 ÷ 1000 x = x =AGS 1.37 ÷ 1000 x = x =Children 0.04 ÷ 1000 x = x =YP 0.03 ÷ 1000 x = x =All 0.42 ÷ 1000 x = x =OSF 1.62 ÷ 1000 x = x =

Total Total £Stage 3: Calculating maintenance cost of new Open Space Provision (Template)

Open Space Typology

Total OS requirements(hectares)

x Maintenance cost per hectare (Go to Table 5)

= Total open space maintenance cost (£)*

PG x =NSN x =AGS x =Children x =YP x =All x =OSF x =

Total*

* The yearly rise in inflation will need to be factored into maintenance charges over the agreed period the obligation would apply (minimum 15 years).

35

Page 36: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

3. Calculating maintenance cost for EXISTING open space, sport and recreation

Housing proposals of 15 dwellings or more will be required to contribute to the maintenance of existing each open space typology if located within the recommended accessibility distance shown in Table 2.

Table 2: Recommended Accessibility Standard

Open Space Typology Recommended Accessibility Standard

PG: Park & Gardens 480 metresNSN: Natural and Semi Natural Open Space

720 metres

AGS: Amenity Greenspace 240 metresChildren: Provision for Children

240 metres

YP: Provision for young people

480 metres

All: Allotments 720 metresOSF: Outdoor Sports Facilities

720 metres

(Source: OSSR, PMP 2009).

36

Page 37: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Table 3: Calculating Maintenance Costs

Example: 25 dwellings in Analysis Area 1 (assuming all within recommended distance standard)

Open Space Typology within recommended radius of development site

£ Cost of maintenance per hectare (Go to Table 5)

x Recommended

provision standard (ha per thousand population)

= Maintenance cost per

thousand persons per

year

÷ 1,000 = Maintenance

Cost per person per

year

x No of people

per dwelling

2.4

= Maintenance

cost per dwelling per

year

x

No of dwellings

= Total £ *

PG 1,910 x 1.05 = 2,005.5 ÷ 1,000 = 2.0055 x 2.4 = 4.8132 x 25 = 120.33NSN 2,902 x 1.57 = 4,556.14 ÷ 1,000 = 4.556 x 2.4 = 10.935 x 25 = 273.38AGS 2,902 x 1.37 = 3,975.74 ÷ 1,000 = 3.9757 x 2.4 = 9.542 x 25 = 238.6Children 176,400 x 0.04 = 7,056 ÷ 1,000 = 7.056 x 2.4 = 16.93 x 25 = 423.25YP 176,400 x 0.03 = 5,292 ÷ 1,000 = 5.292 x 2.4 = 12.70 x 25 = 317.50All 2,902 x 0.42 = 1,219 ÷ 1,000 = 1.219 x 2.4 = 2.93 x 25 = 73.25OSF 5,200 x 1.62 = 8,424 ÷ 1,000 = 8.424 x 2.4 = 20.22 x 25 = 505.50

1,951.81 per year *

* The yearly rise in inflation will need to be factored into maintenance charges over the agreed period (minimum 15 years).

37

Page 38: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Calculation Template for Maintaining Existing Open Space

Open Space Typology within recommended radius of development site

£ Cost of maintenance per hectare (Go to Table 5)

x Recommendedprovision

standard (ha per thousand population)

= Maintenance cost per

thousand persons per

year

÷ 1,000 = Maintenance

Cost per person per

year

x No of people

per dwelling

2.4

= Maintenance

cost per dwelling per

year

x

No of dwellings

= Total £*

PG x 1.05 = ÷ 1,000 = x 2.4 = x =NSN x 1.57 = ÷ 1,000 = x 2.4 = x =AGS x 1.37 = ÷ 1,000 = x 2.4 = x =Children x 0.04 = ÷ 1,000 = x 2.4 = x =YP x 0.03 = ÷ 1,000 = x 2.4 = x =All x 0.42 = ÷ 1,000 = x 2.4 = x =OSF x 1.62 = ÷ 1,000 = x 2.4 = x =

Total £*

* The yearly rise in inflation will need to be factored into maintenance charges over the agreed period (minimum 15 years).

38

Page 39: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Table 4: Open Space Average Costs per square metre / hectare

Open Space Typology Average Cost Per sqm

Average Cost per hectare

Park & Gardens £26 £260,000Natural and Semi Natural Open Space

£14 £140,000

Amenity Greenspace £9.50 - £15 £95,000 - £150,000

Provision for Children £67.50 £675,000

Provision for young people £108.38 £1,033,800

Allotments £10 £100,000

Outdoor Sports Facilities £24.50 £245,000

Source: NBC Asset Management

Table 5: Open Space Maintenance Costs

Open Space Typology

Specific typology Annual Maintenance Costs (£ per sq.m)

Annual Maintenance Costs (£ per hectare)

PG: Park & Gardens

General maintenance

0.1910 1,910

Shrubs (allow minimum 20% cover)

0.6276 6,276

Individual tree (newly planted) – allow minimum 2 / 100 sq.m

3.302 33,020

NSN: Natural and Semi Natural Open Space / Amenity Green Space / Allotments

General maintenance

0.2902 2,902

Shrubs (allow minimum 10% cover)

0.6276 6,276

Individual tree (newly planted) –

6.604 66,040

Page 40: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

allow minimum 4 / 100 sq.m

Children: Provision for Children

LEAP 17.64 176,400

NEAP or LEAP / NEAP

17.64 176,400

Cleanse play area 0.21 2,100YP: Provision for young people

NEAP or LEAP / NEAP

17.64 176,400

MUGA (Multi use games area)

5.63 56,300

Skate park 1.25 12,500Cleanse play area etc

0.21 2,100

OSF: Outdoor Sports Facilities

Synthetic pitch 0.52 5,200

Football pitch (adult) 3,325 per pitch annually

3,325 per pitch annually

Source: NBC Contractor Enterprise (January 2012)

Enterprise is currently contracted to undertake maintenance of open space, sport and recreation for Northampton Borough Council.

LEAP: Local Equipped Area for PlayNEAP: Neighbourhood Equipped Area for Play

40

Page 41: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Appendix 2: Other Costs

a. Public Realm Costs

As a starting point, the Council will seek £80 per square metre for public realm improvements to Abington Street and Market Square, where Yorkstone is expected to be the preferred material. This will complement the public realm improvement works undertaken along Black Lion Hill and Gold Street.

The Council will negotiate the following rates for public realm projects in Northampton:

b. Planning and Monitoring Charges

The Council will seek a minimum of £76.21 per hour to cover planning and monitoring costs, which will be adjusted annually.

Indicative Rates/ m2

Yorkstone Paving 50mm thick £83/m2

Concrete Paving Slabs 50mm thick £26/m2

Concrete Paving Blocks 50mm thick £30/m2

Tarmac Footpaths, inc. Edgings £60/m2

Topsoil and Grass Seed £10/m2

Topsoil and Turf £13/m2

Source: NBC Asset Management

41

Page 42: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Appendix 3: Map 2 - Individual Air Quality Management Area(Source: NBC Environmental Health)

42

Page 43: PLANNING OBLIGATIONS STRATEGY - Northampton · Web view: Northampton Planning Obligations Supplementary Planning Document. Subject Matter: To set out the Borough Council’s strategy

Appendix 4: Key Contacts

Northampton Borough Council

Planning Policy and Heritage 01604 837279

Development Control 01604 838014

Enforcement and Compliance 01604 838548

Natural and Built Heritage 01604 837637

Environmental Health 01604 837648

Northamptonshire County Council

Planning Obligations Section 01604 366634