planning for sustainable dredging and sediment management
TRANSCRIPT
.
Planning for Sustainable Dredging
And
Sediment Management
Harbors, Navigation & Environment Seminar
And GreenPort Americas 2010
May 4-6, 2010
03M-0097.2
Sustainable Sediment Management (SSM)
What is it?
Comprehensive approach for addressing the long-term management/conservation of sediments within a watershed to maintain current (and future?) beneficialuses while addressing regionalEnvironmental, Economic, and Social concerns.
03M-0097.3
Sustainable Sediment Management
Key Features:
Sediment is a resource not a waste
Emphasis on conservation andbeneficial use
Requires integrated, cross-programmatic coordination
03M-0097.4
Component of
Sediment
Management
Traditional Approach Sustainable Approach
Scoping/Goal
Development
Relatively small geographic scope
Relatively short temporal scope
Based primarily on regulatory
requirements
Goals focused on fixing specific
problems
Watershed or basin-level
Long-term perspective
Based upon the needs of a broad range of
stakeholders
Goals developed through interactive process with
stakeholders
Goals reflect balance of social, environmental and
economic objectives
Stakeholder
Engagement/
Communication
Limited, public-hearing style
engagement
Primarily one-way flow of information
Focused on presentation of results
Relatively narrow set of stakeholders
Communication limited to certain
stages of process
Starts very early in process; continues throughout
process
Designed to generate collaboration and buy-in
Two-way flow of information encouraged
Broad range of stakeholders sought for
engagement
Communication occurs throughout process
Alternatives
Identification
Driven by regulatory requirements
Relatively narrow set of alternatives
considered
Alternatives generated by “experts”
Driven by stakeholder feedback
All ideas considered valid initially to consider broad
range of alternatives
Considered within long-term, large-scale context
Consider options that represent “geo-mimicry”
o Working with nature
o Building with nature
o Operating with nature
03M-0097.5
Component of
Sediment
Management
Traditional Approach Sustainable Approach
Analytical
Approach
Limited to environmental and
economic issues that can be
quantified
Designed to inform experts who will
make decisions
Impacts considered in a “stovepiped”
fashion – driven by regulations
Limited consideration of uncertainties
Starts with foundation of sediment budget
Driven by issues of concern to stakeholders
Considers social and environmental issues that
may be difficult to quantify
Integrates consideration of ecosystem services
Based upon system-wide considerations, including
synergies and interactions
Considers uncertainties
Designed to help range of stakeholders
understand the implications of alternatives
Decision-Making Decisions made by small group of
decision-makers
Decision-making occurs “behind
closed doors”
Broad-based decision-making process
Significant stakeholder engagement and
communication during decision-making
Connection to sustainability drivers explored
during decision-making
Implementation Driven by schedule and budget
Impacts of implementation processes
not considered
Considers social and environmental impacts of
implementation processes
Customized approaches to reflect local needs
Flexible approaches to allow for adaptation as
implementation proceeds
Monitoring Limited
Focused on functioning of engineered
systems
Wide range of impacts monitored
Metrics reflect goals established at outset
Designed to keep stakeholders informed and
provide basis for adjusting approaches as
implementation proceeds
03M-0097.6
Sustainable Sediment Management Strategies
“System-based approach”
Integrated management of littoral, estuarine, and riverine sediments
Consider climate change
Local project decisions based on effects to system
Engages many stakeholders
Potential economic and environmental impacts beyond project site
03M-0097.7
Historical Present
03M-0097.8
Sustainable Sediment Management Components (examples)
Dredging and dredged material placement
Building structures that divert or trap sediment
Erosion protection for shorelines
Sand and gravel mining
03M-0097.9
Sustainable Dredged Material Management (SDMM) Objectives
Regional approach
Identify sediment budget for region
Identify and inventory dredging requirements
Projected new work and maintenance
Federal
State
Local
Industrial/Private
Identify and inventory material placement capabilities
and capacities of existing sites
Active management/monitoring is essential to optimize
capacity at existing sites
03M-0097.10
SDMM Objectives (continued)
Identify potential beneficial use projects
Identify potential beneficial use products/markets
Develop ranking criteria to prioritize dredging and placement/beneficial use options
Establish (or utilize existing) stakeholder groups (Regulators, environmental groups, citizen groups, trade/business groups, etc.)
03M-0097.11
Beneficial Uses Habitat restoration/enhancement
(wetland, upland, island, and aquatic);
Aquaculture
Parks and recreation (commercial and
non-commercial);
Agriculture/horticulture/forestry;
Mine and quarry reclamation;
Landfill cover for solid waste
management;
Beach Nourishment/Shoreline
stabilization;
Industrial and commercial use;
Material transfer (fill, dikes, roads, etc.);
Construction material; and
Multipurpose/innovative land-use
concepts.
Habitat creation
Shoreline Stabilization
Reclamation
Beach Nourishment
03M-0097.12
SDMM Objectives (continued)
Thorough evaluation of alternatives & trade-off
analysis
Environmental benefit
Capacity
Cost
Regulatory acceptability
Technical risk
Develop and maintain a public outreach
campaign
03M-0097.13
SDMM Historic Challenges
Lack of funding for dredging, placement, and
beneficial use projects
Limited federal cost-sharing available
Conflicting agendas (sometimes even between
Federal agencies)
Many users often competing for limited placement
capacity
Federal channels, state/local & private terminals
create complex dredging & placement needs
Trend is larger and deeper draft ships – many
channels need to be deepened
High environmental benefit options can be very
expensive
03M-0097.14
What is a USACE DMMP?
DMMP Addresses: Dredging needs
Disposal capabilities
Capacities of placement areas
Environmental compliance requirements
Potential for beneficial usage of dredged
materials
Indicators of continued economic justification
Regional Sediment Management
Normally 100% federally-funded
Contains an integrated NEPA document
Justifies follow-on, site-specific FS Studies
03M-0097.15
DMMP Study Flow Chart
PublicInput
Geographic AreasIdentification
AlternativesIdentification
PrimaryScreening
InitialAlternatives
List
AlternativesDevelopment
Screening CriteriaDevelopment
Trade-OffAnalysis
AlternativesEvaluation
Suite ofAlternatives
EIS &Implementation
Plan
Draft
DMMP
PublicInput
PreliminaryAssessment
NEPANotice of
Intent
Record of
Decision
Final
DMMP
Public Meetings
PublicInput
03M-0097.16
CENAB DMMP Process –Alternatives? Sustainable?
Maximize Use of Existing Placement Sites
HMI, PIERP, Open Water placement, etc.
New Placement Sites
CAD/CDF, Island Creation/Restoration, etc.
Innovative Use
Building Products, Mines/Quarries, Agricultural Placement, Shoreline & Wetland Restoration
Poplar Island
03M-0097.17
!(
!(
!(
Back
River
Magothy River
Severn River
Chester River
Eastern
Bay
South River
Gu
npow
der R
iver
Bu
sh R
iver
Sassafras River
Elk
Riv
er
Nor
thea
st R
iver
Olney
Essex
Bowie
Towson
Severn
Parole
Laurel
Easton
Carney
Arnold
Waldorf
Overlea
Odenton
Dundalk
Crofton
Clinton
Chillum
Bel Air
Arbutus
Adelphi
Glasgow
Groveton
Woodlawn
Rosedale
Pasadena
Lochearn
Friendly
Ferndale
Fairland
Elkridge
Edgewood
Columbia
Bethesda
Aberdeen
Rose Hill
Fort Hunt
Arlington
White Oak
Rossville
Parkville
Kettering
Greenbelt
Calverton
Baltimore
Alexandria
South Gate
Pikesville
Perry Hall
Lake Shore
Joppatowne
Glenn Dale
Eldersburg
Colesville
Beltsville
Aspen Hill
Washington
Westminster
Walker Mill
Takoma Park
Rosaryville
Mays Chapel
Hyattsville
Green Haven
Glen Burnie
Forestville
Coral Hills
Catonsville
Mount Vernon
Hybla Valley
South LaurelSeverna Park
Reisterstown
Randallstown
Owings Mills
North Laurel
Milford Mill
Middle River
Langley ParkCollege Park
Cockeysville
Camp Springs
Silver Spring
Riviera Beach
Ellicott City
Brooklyn Park
Bel Air South
Bel Air North
North Bethesda
New Carrollton
Havre de Grace
East Riverdale
Fort Washington
Wheaton-Glenmont
Greater Landover
Hillcrest Heights
Suitland-Silver Hill
Oxon Hill-Glassmanor
Lutherville-Timonium
Greater Upper Marlboro
Lansdowne-Baltimore Highlands
t:/dmmp/mxd/Harbor_Approach.mxd
!(
!(
Baltim
ore H
arbor; C
raighill E
ntran
ce
Back
River
Magothy River
Severn River
Chester River
Site 104 (Proposed)
Pooles Island Disposal Area
Cox Creek Disposal Area
Legend
Shoreline1840 to1860
SAV
Historic Oyster Bars
Oyster Restoration SitesBaltim
ore H
arbor; C
raighill E
ntran
ce
Chester River
Site 104 (Proposed)
Legend
Shoreline1840 to1860
SAV
Historic Oyster Bars
Oyster Restoration Sites
Web-based GIS
03M-0097.18
CENAB DMMP –Tradeoff Analysis
14,000 combinations – Optimal curve established to select recommended plan
Once suites developed meeting sufficient capacity, comparison between cost & environmental benefit
Selected most cost efficient means to achieve environmental benefit
Applied theory of acceptable legal/political risk, eliminating those too risky
03M-0097.19
Alternative Suites Development – All suites for C&D and Chesapeake Bay (MD)
All Suites
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
0 2,000 4,000 6,000 8,000 10,000 12,000
Millio
ns
Habitat Benefit Index(Based on BEWG Scores)
To
tal C
os
t
Deep Trough Suites Lg Island Suites Poplar Island Suites Norfolk Ocean Suites Artificial Island Suite
03M-0097.20
Alternative Suites Development –C&D and Chesapeake Bay (MD) Legal/Acceptable Suites
All Legal Cost-effective Suites
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
0 2,000 4,000 6,000 8,000 10,000 12,000
Millio
ns
Environmental Benefit Index(Based on BEWG scores)
To
tal C
ost
Deep Trough Suites Large Island Suites Poplar Suites Norfolk Ocean Suites Artificial Island Suite
03M-0097.21
CENAB DMMP –Recommended Plan
Chesapeake Bay Approach (VA) Channels
Existing Open Water Placement
Harbor Channels
Multiple Confined Disposal Facilities along Patapsco
C&D Canal Approach and Chesapeake Bay Approach (MD) Channels
Poplar Island Expansion
Large Island Restoration-Mid Bay
Wetland Restoration
03M-0097.22
SUMMARY
A DMMP is a valuable tool for a region’s plan for
the sustainable management of dredged
material. Maintaining a watershed focus,
applying sediment management principles, and
prioritizing beneficial use will ensure a cost
effective, environmentally sound approach that
can easily respond to the changing needs of the
region in the future.