planning for a resilient future · 2019-04-10 · planning for a resilient future executing a...
TRANSCRIPT
![Page 1: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/1.jpg)
Planning for a Resilient FutureExecuting a Successful Risk Mitigation Study
The VA Boston Healthcare System Case Study
March 29, 2019
![Page 2: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/2.jpg)
Team Introductions
Michael J. Chonko, PE, CEMPrincipalSMRT Architects and Engineers
William Heil, PE, LEED APPrincipalSMRT Architects and Engineers
Jamie RomaniakDeputy Director, Engineering ServicesVA Boston
![Page 3: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/3.jpg)
Agenda
How we got here
Risk Mitigation Project
Key Vulnerabilities
Analyze and Assess
Safeguarding the VA Campuses: Patients, Family & Staff
Key Takeaways
Q&A
![Page 4: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/4.jpg)
1.1M square feet
17 levels
VA Jamaica Plain Campus
![Page 5: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/5.jpg)
PLACEHOLDER FOR VIDEO CLIP(removed for email optimization)
![Page 6: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/6.jpg)
Day before President’s day 2016
44 burst pipes / 200,000 s.f. damaged
Sunday, February 14, 2016
![Page 7: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/7.jpg)
![Page 8: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/8.jpg)
![Page 9: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/9.jpg)
Risk Mitigation Project
![Page 10: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/10.jpg)
Risk Mitigation Project
Study included:
3 campuses
46 buildings
2.7 million s.f.
![Page 11: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/11.jpg)
Risk Mitigation Project
VAMC Jamaica Plain
VAMC West Roxbury
VAMC Brockton
VA Healthcare Facilities
![Page 12: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/12.jpg)
Campus Intro: VA Jamaica Plain
![Page 13: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/13.jpg)
Campus Intro: VA Jamaica Plain
![Page 14: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/14.jpg)
Campus Intro: VA West Roxbury
![Page 15: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/15.jpg)
Campus Intro: VA West Roxbury
![Page 16: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/16.jpg)
Campus Intro: VA Brockton
![Page 17: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/17.jpg)
Campus Intro: VA Brockton
![Page 18: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/18.jpg)
Key Vulnerabilities
![Page 19: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/19.jpg)
Key Vulnerabilities
Critical / healthcare facility
Weather
Acts of terrorism / violence
Failing building systems
Fire / explosion
Epidemic / pandemic
Single points of failure
![Page 20: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/20.jpg)
Key Areas
Site
Building Envelope
Structural Systems
Utilities and Building Services
Building Systems
Security
![Page 21: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/21.jpg)
Assess & Analyze
![Page 22: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/22.jpg)
Assess & Analyze
Codes / Guidelines
Data collection / field work
Risk / severity ranking
Mitigation options
Costs
Organization & communication
Prioritize
![Page 23: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/23.jpg)
Assess & Analyze
Codes / Guidelines:1.3 Applicable Codes, VA Guidelines and Standards International Building Code (IBC) 2015 International Mechanical Code (IMC) 2015 National Electrical Code (NEC), NFPA 70, 2017 National Fire Alarm and Signaling Code, NFPA 72, 2016 International Plumbing Code (IPC), 2015 NFPA 101 Life Safety Code, 2015 NFPA 13: Standard for the Installation of Sprinkler Systems, 2016 NFPA 14: Standard for the Installation of Standpipe and Hose Systems, 2012 NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900 NFPA 99 Standard for Healthcare Facilities Code, 2015 OSHA Standards 29 CFR Energy Policy Act of 2005 (EPAct) 248 CMR: Board of State Examiners of Plumbers and Gas Fitters, 2009 Joint Commission on Accreditation
VA Requirements listed in the Architectural Design Manual (August 1, 2014) : American National Standards Institute (ANSI) American Society for Testing Materials (ASTM) ASHRAE Standard 170-2008 shall determine indoor design temperature setpoints ASHRAE Standard 90.1 – 2007 shall be used as a baseline for computing energy
savings. ASHRAE/IESNA/ASHE Standard 170 – 2008: Ventilation of Health Care Facilities ANSI/ASHRAE Standard 62.1 – 2007: Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 15-2007: Safety Standard for Refrigeration Systems ASHRAE Guideline 1.1 – 2007: HVAC & R Technical Requirements for the
Commissioning Process ASHRAE Guideline 0 – 2005: The Commissioning Process NFPA 70 E – Standard for Electrical Safety Requirements for Employee
W k l 2012 2015
![Page 24: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/24.jpg)
Key Findings
![Page 25: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/25.jpg)
Site
![Page 26: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/26.jpg)
Site
![Page 27: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/27.jpg)
Site
![Page 28: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/28.jpg)
Site
![Page 29: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/29.jpg)
Building Envelope
![Page 30: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/30.jpg)
Building Envelope
![Page 31: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/31.jpg)
Building Envelope
![Page 32: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/32.jpg)
Building Envelope
![Page 33: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/33.jpg)
Structural Systems
![Page 34: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/34.jpg)
Utilities and Building Services
![Page 35: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/35.jpg)
Utilities and Building Services
![Page 36: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/36.jpg)
Utilities and Building Services
![Page 37: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/37.jpg)
Utilities and Building Services
![Page 38: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/38.jpg)
Building Systems
![Page 39: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/39.jpg)
Building Systems
![Page 40: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/40.jpg)
Building Systems
![Page 41: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/41.jpg)
Building Systems
![Page 42: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/42.jpg)
Building Systems
![Page 43: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/43.jpg)
Building Systems
![Page 44: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/44.jpg)
Building Systems
![Page 45: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/45.jpg)
Building Systems
![Page 46: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/46.jpg)
Building Systems
![Page 47: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/47.jpg)
Building Systems
![Page 48: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/48.jpg)
Building Systems
![Page 49: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/49.jpg)
Building Systems
![Page 50: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/50.jpg)
Building Systems
![Page 51: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/51.jpg)
Building Systems
![Page 52: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/52.jpg)
Building Systems
![Page 53: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/53.jpg)
Building Systems
![Page 54: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/54.jpg)
Building Systems
![Page 55: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/55.jpg)
Building Systems
![Page 56: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/56.jpg)
Building Systems
![Page 57: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/57.jpg)
Building Systems
![Page 58: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/58.jpg)
Building Systems
![Page 59: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/59.jpg)
Building Systems
![Page 60: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/60.jpg)
Building Systems
![Page 61: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/61.jpg)
Building Systems
![Page 62: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/62.jpg)
Building Systems
![Page 63: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/63.jpg)
Building Systems
![Page 64: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/64.jpg)
Building Systems
![Page 65: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/65.jpg)
Security
![Page 66: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/66.jpg)
Communication
“The single biggest problem in communication is the illusion it has taken place.”
- George Bernard Shaw
![Page 67: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/67.jpg)
Risk Severity Impact Risk Probability Scale
Catastrophic Hazardous Major Minor Negligible
A B C D E
Is expected to occur in most circumstances Frequent 5 5A 5B 5C 5D 5E
Will probably occur Likely 4 4A 4B 4C 4D 4E
Might occur at some time in the future Occasional 3 3A 3B 3C 3D 3E
Could occur but is doubtful Seldom 2 2A 2B 2C 2D 2E
May occur but only in exceptional circumstances Improbable 1 1A 1B 1C 1D 1E
Communication Tools
![Page 68: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/68.jpg)
Communication Tools
Risk StatementProbability Severity Potential Mitigation
Opinion of Cost to
MitigateRemarksRisk # Location Equipment Deficiency Consequences/Hospital Services Impacted
2.13 Building 8 Stormwater runoff enters building during heavy storm events.
Water can damage/impact ability of boiler plant systems to function. Causing main hospital facilities to be non-operational.
4 A Site regrading and provide stormwater improvements. $870,000
8.5.1
Site and undefined area of surrounding neighborhood
Service Entrance Cable Damage to service entrance
Loss of communications on entire campus, No access to patient data and operations
systems.4 A
Contract for diverse service. Recommend "dark Fiber" loop between W. Roxbury/Brockton/Jamaica
Plain. Insure that cable feeding the campus follows a separate path than the
existing.
$1,310,000 Cable cut has recently occurred.
![Page 69: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/69.jpg)
Key Takeaways
Organization / Coordination
Rigorous analyses
Communication
Applies to every facility, large or small
![Page 70: Planning for a Resilient Future · 2019-04-10 · Planning for a Resilient Future Executing a Successful Risk Mitigation Study The VA Boston Healthcare System Case Study. March 29,](https://reader033.vdocuments.site/reader033/viewer/2022053000/5f04ee1d7e708231d4106a78/html5/thumbnails/70.jpg)
Questions?