PlanGridTurner Construction Presentation
to Building Technology Group
July 9, 2014
![Page 3: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/3.jpg)
AgendaOverviewCostProject Set-UpDocument Management
(RFIs/Submittals)Progress PhotosPunchlist and Other FunctionsOwner Turnover
![Page 4: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/4.jpg)
OverviewBrief HistoryPurpose: “Digital Drawing Set”
Advantages: Slip Sheeting/Versions, Speed, Portability
Disadvantages: PermissionsCreated Primarily for Tablet UseUser Friendly InterfaceFast Rendering & Uploads/DownloadsRelatively InexpensiveGreat Customer Service
![Page 5: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/5.jpg)
Cost
Sheets add up just like a normal set of plansUsers currently only pay if using on a Tablet
![Page 6: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/6.jpg)
Terms to KnowSheet: 1 Page of a drawing set Version: Set of drawings released at one timeTag: Identifier used to quickly find sheets
Local Annotation: Notes only seen by youMaster Annotation: Notes seen by everyone
Collaborator: User with limited accessAdministrator: User with unlimited access
![Page 7: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/7.jpg)
Computer DemonstrationProject Set Up
Uploading SheetsTagging SheetsUploading Attachments
Issues ReportsProject SettingsInviting Other Users
![Page 8: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/8.jpg)
Collaborator vs. AdministratorCan assign punch itemsCan change punch item’s status to “Pending” or “In Review” (IF
the issue is assigned to them)Can only close self-assigned punch items.Can archive and permanently delete personal punch itemsCan create MyTagsCan remove themselves from projectsCannot archive and permanently delete master punch itemsCannot attach documentsCannot upload drawingsCannot delete sheetsCannot delete projectsCannot push annotations to masterCannot edit sheet name, description, and versionCannot edit project tags
![Page 9: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/9.jpg)
Tablet DemonstrationBasic NavigationAnnotationsHyperlinkingPunchesPhotos
![Page 10: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/10.jpg)
VersionsStart with Initial SetUpload and add revised drawings Annotations pushed to master will remain on
updated drawingsAttachments are unlimited, does not add to
drawing count
![Page 11: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/11.jpg)
RFI TrackingFilter Status Assigned
To/ Action On
Action Step
Contractor Create clarification punch/issue under a red “?” symbol and assign to Designer
Open Designer Write answer to clarification in description field with name/date and switch to “in review” and assign to Originator of RFI
In Review Contractor Make notes in PlanGrid on what changed and give field staff a heads up. Change status to “pending” and assign to Project Engineer
Pending Project Engineer
Write the official RFI. Designer approves it and Project Engineer sends to the subs as official change. Changes status to closed, assigns to Field Staff, and references RFI # in desc.
Closed Field Staff Clouds RFI on Drawing with Link
![Page 12: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/12.jpg)
Punch List StatusOpen: Problem has been seen, signified by a solid
circle In Review: Problem has been seen by assignee,
signified by a dotted circlePending: Problem has been solved by assignee,
signified by dotted circle with slash through the center
Closed: Original creator has seen the solved problem and decides that it has been corrected, signified by a solid circle with a solid slash through the circle
![Page 13: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/13.jpg)
Turnover BenefitsOwner can use the existing project on
PlanGridAs-built folders
Zipped and CustomizableZipped files
PhotosPunchlist Attachments Drawing log
![Page 14: PlanGrid Presentation for Building Technology Group](https://reader036.vdocuments.site/reader036/viewer/2022070514/5881fc961a28abb4748b6ae3/html5/thumbnails/14.jpg)
ConclusionFuture Benefits
Preconstruction to construction