USVI Solar 1 Project budget Project type $20,000,000 Heavy Civil Rework cost avoided Saved per week per person SAVINGS WITH PLANGRID We couldn't have worked as quickly if we didn't have PlanGrid. — Samuel Ley, Energy Systems Engineer $70,000 2 hrs AES Distributed Energy St. Thomas, Vi�gin Islands www.plangrid.com 02

Upload: plangrid

Post on 20-Jan-2017

116 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: Plan grid quick look case study 0PlanGrid Project Success Story: AES Distributed Energy, USVI Solar 1

USVI Solar 1

Project budget

Project type

$20,000,000

Heavy Civil

Rework cost avoided

Saved per week per person

SAVINGS WITH PLANGRID

We couldn't have worked as quickly if we didn't have PlanGrid.

— Samuel Ley, Energy Systems Engineer

$70,000 2 hrs

AES Distributed Energy

St. Thomas, Vi�gin Islands