Plan A Community Playground

Upload: amie-howard

Post on 14-Dec-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Plan A Community Playground

Plan A Community Playground

Page 2: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and build a new and improved playground at University Park! The town is allowing each group to use one acre of land to plan their playground. In addition, they are providing you with a budget of $15,000 to purchase materials to build your model! Kids know playgrounds best! Decide what is most exciting, creative, safe, and within your budget! Have fun planning, designing, problem-solving, and discovering new ideas along the way!

Accountants - Get ready to watch that budget! Engineers - Put on your “design hat” and get ready to build

those models! Project Managers - Be prepared to keep everyone on task,

make decisions, and problem-solve

The Challenge:

Page 3: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

MATERIALSPizza boxesCupsTurf – green feltTape MeasuresTapeMulchSandStrawsPom-pomsGlueScissorsCraft sticksToothpicksStringConstruction paperPlay doughPipe cleanersCardboard tubes

Page 4: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

JOBSAccountant

**Responsible for budget**Make sure you do not overspend!**Handle money**Complete budget plan

Project Manager**Oversees project**Keep everyone on task**Delegate tasks and work cooperatively**Make decisions and choices if problems or concerns arise

Engineer**oversees the design elements of playground model

Page 5: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

BUDGETEach Team Receives $15,000

4 swing set……………….……..$2,000

2 swing set……………….……..$4,000

Straight Slide……………………$1,000

Tube Slide……………………….$2,000

Sandbox……………………....….$1,500

Mulch……………………….….....$2,000

Sand………………………….....…$500

Merry-Go-Round……………...…$3,500

Sports Field………………….…...$2,500

Basketball Court/Macadam…..…$2,500

Jungle Gym………………….……$5,000

Page 6: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

CATEGORY 4 3 2 1

Plan Plan is neat with clear measurements and labeling for all components.

Plan is neat with clear measurements and labeling for most components.

Plan provides clear measurements and labeling for most components.

Plan does not show measurements clearly or is not inadequately labeled.

Budget Budget is clear and accurate. All budget requirements were met.

Budget is clear and accurate. Most budget requirements were met.

Budget is somewhat clear and accurate. Some budget requirements were met.

Budget is not clear or accurate. Budget requirements were not met.

Construction -Design and Engineering

Appropriate materials were selected and creatively modified in ways that made them even better.

Appropriate materials were selected and there was an attempt at creative modification to make them even better.

Appropriate materials were selected.

Inappropriate materials were selected and contributed to a product that performed poorly.

Construction - Final Product

Great care taken in construction process so that the structure is neat, attractive and follows plans accurately.

Constuction was careful and accurate for the most part, but 1-2 details could have been refined for a more attractive product.

Construction accurately followed the plans, but 3-4 details could have been refined for a more attractive product.

Construction appears careless or haphazard. Many details need refinement for a strong or attractive product.

Powerpoint Powerpoint provides a complete record of planning, construction, modifications, and some reflection about the strategies used.

Powerpoint provides a complete record of planning, construction, testing, modifications, and reasons for modifications.

Powerpoint provides some detail about planning, construction, and modifications.

Powerpoint provides very little detail about several aspects of the planning, construction, and modification process.

Cooperative Group All team members worked cooperatively to complete the task in an organized way. Each member contributed equally to completing their task.

All team members worked cooperatively to complete the task in an organized way. Most members contibuted equally to completing their task.

Some team members worked cooperatively to complete the task in an organized way. Some team members did more work than others.

Team did not work cooperatively to complete the task. The work was not shared by each team member.

Total / 20

Page 7: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Step 1 - Plan Identify what you already know about

perimeter and area. Measure the perimeter of your playground

(pizza box) to the nearest inch. Using your measurements, draw the

geometric shape of the playground (pizza box) on graph paper, and clearly label the perimeter and area.

Ask an adult to check you work before moving on to Step 2!

Page 8: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Step 2 - Plan/Budget/Sketch

As a group, look at the options available for your playground.

Decide which items are most important for your team to have in your new playground, and what meets your budget!

Engineers/Project Managers - determine what things may or may not “fit” in your design, and start sketching them onto your graph paper within your area.

Accountants - start working the $ - on the budget sheet…can you afford everything?

Discuss/Problem-Solve your sketches and budget problems that may arise!

Show an adult your budget before moving on to Step 3!

Page 9: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Step 3 - Home Depot! Bring your budget and design to the Home Depot to

purchase your materials. Make sure you know your final total, and have your money

ready for the cashier. Do you know how much change you should get back?

Load your vehicle with your materials, and get ready to build!

Home Depot - You Can Do It…We Can Help!

Have fun Remember…Good TEAM Work

Page 10: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

STEP 4 - PowerPoint Presentation

Page 11: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and
Page 12: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Name Your Playground

List the members of your team

Page 13: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Using the drawing tools, draw the shapes and label the parts of your playground!

Merry-G0-Round

Basketball Court

Page 14: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Budget

• List every item your group purchased for your playground. List the price next to each item. Find the final total for your playground!

Example:• 2-Swing Set - $1,000• Tube Slide - $2,000

Total $

Page 15: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Be Ready To Share…

• Have a short presentation ready:

“Why our playground should be chosen for the University Park!”

Page 16: Plan A Community Playground. Wilkes-Barre and local community members are looking to 3rd grade students at Wilkes Elementary to help plan, design, and

Go back and add pictures, colors, transitions, and sound

to your presentation if you have time!