pl p l pl... · jaw crusher cone crusher electric station screen deck explosives phones shop doors...
TRANSCRIPT
F
F
PL
PLPL
PL
PLPL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
LIFE OF MINE BOUNDARYOF UNDERGROUND WORKINGSFOR ALL LEVELS188.3± ACRES
FUTURE UNDERGROUND AREA(LEVEL 1)
TO BE AFFECTECED 2015-202033.5± ACRES
SETTLING POND AREA29.0± ACRES
SURFACE EXCAVATIONAREAS ANDMISCELLANEOUSAFFECTED AREA11.9± ACRES
OFFICE, PLANT ANDSTOCKPILE AREA22.6± ACRES
RECLAIMEDAREA
3-E
POND FIL
L
CULVER
T PIPE
TOEXISTINGSEPARATORS
FROMPLANT
CULVERT PIPE
LITTL
E PON
D
NOTES:
LEGEND
1. BASE MAP PREPARED BY LOCKWOOD MAPPING, INC.JOB # 6789, DATED 12/12/95.
2. SITE LOCATED ON NYSDOT 7.5 QUAD. DOVER PLAINS, NY.
3. DATUM: MEAN SEAL LEVEL.
4. PROPERTY LINES ARE APPROXIMATE AS SHOWN.
5. TOE OF BERM ALONG NEW ENTRANCE TO BE 25 FEETFROM ALL PROPERTY LINES.
6. HAY BALES AND SILT FENCES TO BE PLACED AT TOE OFPROPOSED BERM AS NEEDED.
7. ROLLED EROSION CONTROL FABRIC WILL BE USEDAS NECESSARY.
8. BERM VEGETATION MIX TO BE SEEDED AT 50 - 75 POUNDSPER ACRE.
9. UNDERGROUND MINE SURVEY MAP SUPPLIED BY WINGDALEMATERIALS AND FIELD CHECKED BY CPI. MAY 2015.
12/3/03 UNDERGROUND UPDATE JRH
9/28/04 PROPOSED NEW HAUL ROAD JRH
F
5/4/04 POND FILL DETAIL JRH WELL & STOPE DETAIL
12/1/04 HAUL ROAD DETAILS JRH
7/6/06 HAUL ROAD REVISIONS JRH
9/18/06 ENTRANCE AND BERM JRHREVISIONS
14N
BRO
ADW
AYT5
APPROXIMATE EXTENT OFUNDERGROUND MINING
(LEVEL 1)95.7± ACRES
8/11/09 UNDERGROUND WORKINGS JAS UPDATED
FANS
PRIMARY ESCAPE
SECONDARY ESCAPE
EVACUATION ALARM
MINE MAP
END OF WORKING FACE
MINE OUTLINE
STOPPINGS
STOPE
AIR CURTAINS
LEGEND (UNDERGROUND MINE)
HAZARD AREA
SHOP
SUMP AREA
POND FILL AREA
WATER PUMP
CONVEYOR LINE
JAW CRUSHER
CONE CRUSHER
ELECTRIC STATION
SCREEN DECK
EXPLOSIVES
PHONES
SHOP DOORS
GATES
SHOP BULKHEAD
E
TAG BOARD
NON-ACTIVE AREA
MAP
EVAC
PHONE
1D
1D
1D
8M
7M
6M
5M
4M
3M
2M
1M
1E
1W
2W
3W
4W
5W
6W
7W
0N
1N
2N
3N
4N
5N
6N
7N
8N
9N
10N
11N
12N
13N
15N
14N
16N
17N
18N
20N
21N
3N
4N
5N
6N
7N
8N
9N
10N
11N
12N
13N
15N
14N
6N
7N
8N
9N
0N
1N
2N
3N
4N
5N
3N
4N
5N
6N
7N
8N
9N
10N
11N
12N
13N
15N
14N
16N
17N
18N
19N
20N
21N
1N
2N
0N
1N
3N
4N
5N
6N
7N
8N
9N
10N
11N
12N
13N
15N
14N
16N
17N
18N
19N
20N
21N
2N
T0
T1
T2
T3
T4
BRO
ADW
AY
T1
T2
T3
T4
BRO
ADW
AYT5
T6
T7
T8
T2
T3
T4
BRO
ADW
AYT5
T6
T7
T8
T9
T2
T3
T4
BRO
ADW
AYT5
T6
T7
T8
T9
T3
T4
BRO
ADW
AYT5
T6
T7
T8
T9
T4
BRO
ADW
AYT5
T6
1E
MAIN
1W
2W
3W
4W
5W
6W
1E
MAIN
1W
2W
3W
4W
1E
MAIN
1W
2W
2E
3E
4E
5E
6E
2E
3E
4E
5E
6E
2E
3E
4E
3E
4E
5E
3E
4E
5E
T7
E
E
E
E
T10
T9
T9
T8
17N
T15
16N
T14
T13
T12
T11
17N
18N
19N
16N
15N
15N
14N
T16
T15
12N
13N
T14
T13
14N
13N
T10
12N
T11T1
2
11N
10N
T10
9N
8N
T11T1
2T13T1
4
9N
10N
11N
T15
8N
7N
6N
5N
4N
T15
T14
T13
3N
2N
T16
T16
T10
5N
6N
7N
T11
4N
T12
3N
2N
T10
1N
0N
T11T1
2T13
T16
T14
1N
T15
0N
T10
T8
19N
Emulsio
n
#35-123 ANFO
Trailer #1
191
MAIN
Booste
rs#ATL6
873Bla
sting Caps
#-95-48
100,
000c
fm
1N
6/5/15 UNDERGROUND WORKINGS JAS UPDATED
EXISTING HAUL ROAD2.5± ACRES
WINGDALE MINE
JUNE 2015LEVEL 1
ACREAGE SUMMARY
PERMIT TERM 2015-2020 SURFAE AFFECTED AREA
OFFICE, PLANT AND STOCKPILE AREA....................................................................................22.6 ± ACRES
SETTLING POND AREA............................................................................29.0± ACRES
SURFACE EXCAVATION, AND MISCELLANEOUS AREA................................................................11.9 ± ACRES
EQUIPMENT STORAGE / STOCKPILE AREA.........................................1.6 ± ACRES
EXISTING HAUL ROAD............................................................................. 2.5 ± ACRES
VISUAL / NOISE BERM .............................................................................. 1.9 ± ACRES
-CURRENTLY AFFECTED AREA (4/1/75 TO PRESENT).........................69.5 ± ACRES
-LIFE OF MINE BOUNDARY FOR ALL UNDERGROUND WORKINGS..................................................................188.3±ARES
UNDERGROUND AFFECTED AREA LEVEL 1
APPROXIMATE EXTENT OF LEVEL 1 UNDERGROUND..................... 95.7 ± ACRES
FUTURE UNDERGROUND AREALEVEL 1 TO BE AFFECTED 2015-2020.......................................................33.5 ± ACRES
P:\CAD Drawings\Peckham Materials\wingdale 2009 DEC renewal\dwg\MPM_2015_RENEW_L1.dwg, 6/23/2015 3:58:35 PM, PDF-XChange for AcroPlot Proa.pc3
PL
PLPL
PL
PLPL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
SETTLING POND AREA29.0± ACRES
SURFACE EXCAVATIONAREAS ANDMISCELLANEOUSAFFECTED AREA11.9± ACRES
OFFICE, PLANT ANDSTOCKPILE AREA22.6± ACRES
RECLAIMEDAREA
3-E
FROMPLANT
NOTES:
LEGEND
1. BASE MAP PREPARED BY LOCKWOOD MAPPING, INC.JOB # 6789, DATED 12/12/95.
2. SITE LOCATED ON NYSDOT 7.5 QUAD. DOVER PLAINS, NY.
3. DATUM: MEAN SEAL LEVEL.
4. PROPERTY LINES ARE APPROXIMATE AS SHOWN.
5. TOE OF BERM ALONG NEW ENTRANCE TO BE 25 FEETFROM ALL PROPERTY LINES.
6. HAY BALES AND SILT FENCES TO BE PLACED AT TOE OFPROPOSED BERM AS NEEDED.
7. ROLLED EROSION CONTROL FABRIC WILL BE USEDAS NECESSARY.
8. BERM VEGETATION MIX TO BE SEEDED AT 50 - 75 POUNDSPER ACRE.
9. UNDERGROUND MINE SURVEY MAP SUPPLIED BY WINGDALEMATERIALS AND FIELD CHECKED BY CPI. May 2015.
12/3/03 UNDERGROUND UPDATE JRH
9/28/04 PROPOSED NEW HAUL ROAD JRH
5/4/04 POND FILL DETAIL JRH WELL & STOPE DETAIL
12/1/04 HAUL ROAD DETAILS JRH
7/6/06 HAUL ROAD REVISIONS JRH
EQUIPMENT STORAGE/STOCKPILE AREA1.6± ACRES
9/18/06 ENTRANCE AND BERM JRHREVISIONS
APPROXIMATE EXTENT OFUNDERGROUND MININGLEVEL 2 (Includes Ramps)49.6± ACRES
8/11/09 UNDERGROUND WORKINGS JAS UPDATED
17N
18N
7N
8N
9N
10N
11N
12N
13N
T2
T3
T4
BRO
ADW
AY
T3
T4
17N
18N
17N
18N
17N18
N
6N
T5
T6
T7
T5
T6
T7
11N
10N
12N
13N
9N
8N
7N
6N
T10
T9
T8
T10
T9
T8
T10
T9
T8
6W
T7
T6
T5
T3
T2
T1
T7
T6
T4
T3
T2
T1
T0
2N
1N
4N
3N
1N
0N
2N
1N
0N
4N
3N
4N
T10
T9
T8
5N
T7
T8
T9
T10
T10
T9
T8
T7
1N
2N
3N
T64N T5
T5
BRO
ADW
AY
4N
T3
3N
2N
1N
T4
T1
T2
0N
T3
T2
T1
T0
1N
5N
6W 4N
5W
T6
T9
T8
T10
T10
T9
T8
14N
14N
BRO
ADW
AY
EVAC
MAP
FANS
PRIMARY ESCAPE
SECONDARY ESCAPE
EVACUATION ALARM
MINE MAP
END OF WORKING FACE
MINE OUTLINE
STOPPINGS
STOPE
AIR CURTAINS
LEGEND
PHONE PHONE
WINGDALE MINE
JUNE 2015LEVEL 2
UNMINED AREA
7N
8N
9N
10N
11N
12N
13N
T2
T3
T4
BRO
ADW
AY
T3
T4
6N
T5
T6
T7
T5
T6
T7
11N
10N
12N
13N
9N
8N
7N
6N
T10
T9
T8
T9
T8
T10
T9
T8
6W
T7
T6
T5
T3 T2
T1
T7
T6
T5
BRO
ADW
AY
T4
T3
T2
T1
T0
2N
1N
4N
3N
1N
2N
1N
0N
4N
3N
4N
T10
T9
T8
5N
T7
T8
T10
T10
0N
1N
2N
3N
T64N T5
T5
BRO
ADW
AY
4N T3
3N
2N
1N
T4
T1
T2
0N
T3
T2
T1
T0
1N
5N
6W 4N
5W
T6
T9
T8
T10
T10
T9
T8
14N
14N
BRO
ADW
AY
15N
6 37.
1 2
7 14.
1 2
6 74.
6 2
6 34.
1 4
2 5T U
R N
624.
6
6 22.
6 46 37.
1 2
6 19.
0 462
0
622
622
623
623
625.
2625.
2
624.
262
5.2
6 25.
2 462
662
7
626
627
628
629
627
628
629
630
631.
2
631.
2
631.
2
6 30.
2 4
6 29.
2 4
6 28.
2 4
6 27.
1 2
6 27.
2 0
6 27.
2 3
627.
1
6 31.
2 463
2.3
T17
T16
T10
18N
19N
20N
T7
T6
T5
BRO
ADW
AY
18N
19N
T4
16N
17N
T4
BRO
ADW
AYT5
T6
16N
17N
T7
T8
T9
15N
5N
5N
T11
17N
18N
19N
16N
15N
14N
13N
12N
T11
11N
10N
9N
8N
T11
5N
6N
7N
T11
4N
3N
2N
1N
0N
T11
T18
T17
T16
T15
16N
T14
T13
T12
15N
14N
16N
15N
14N
13N
T18
12N T17
T16
T15
12N
13N
T14
T13
T12
T12T1
3T14
9N
10N
11N
T15
8N
7N
6N
5N
4N
T15
T14
T13
3N
2N
T16T1
7T18
5N
6N
7N
T17
T16
T12
T12T1
3
T18
9N
8N
11N
10N
4N
3N
2N
1N
T18
T17
T16
T14
1N
T15
0N
Ram
p1
Ram
p2
Brea
kRo
om
Ram
p18
Ram
p17
LIFE OF MINE BOUNDARYOF UNDERGROUND WORKINGSFOR ALL LEVELS188.3± ACRES
FUTURE UNDERGROUND AREA(LEVEL 2 DEVELOPMENT)TO BE AFFECTECED 2015-202038.3± ACRES
5/27/15 UNDERGROUND WORKINGS JAS UPDATED
EXISTING HAUL ROAD2.5± ACRES
ACREAGE SUMMARY
PERMIT TERM 2015-2020 SURFAE AFFECTED AREA
OFFICE, PLANT AND STOCKPILE AREA....................................................................................22.6 ± ACRES
SETTLING POND AREA............................................................................29.0± ACRES
SURFACE EXCAVATION, AND MISCELLANEOUS AREA................................................................11.9 ± ACRES
EQUIPMENT STORAGE / STOCKPILE AREA.........................................1.6 ± ACRES
EXISTING HAUL ROAD............................................................................. 2.5 ± ACRES
VISUAL / NOISE BERM .............................................................................. 1.9 ± ACRES
-CURRENTLY AFFECTED AREA (4/1/75 TO PRESENT).........................69.5 ± ACRES
-LIFE OF MINE BOUNDARY FOR ALL UNDERGROUND WORKINGS..................................................................188.3±ARES
UNDERGROUND AFFECTED AREA LEVEL 2
APPROXIMATE EXTENT OF LEVEL 2 UNDERGROUND..................... 49.6 ± ACRES
FUTURE UNDERGROUND AREALEVEL 2 TO BE AFFECTED 2015-2020.......................................................38.3 ± ACRES
P:\CAD Drawings\Peckham Materials\wingdale 2009 DEC renewal\dwg\MPM_2015_RENEW_L2.dwg, 6/23/2015 4:00:25 PM, PDF-XChange for AcroPlot Proaa.pc3
PL
PLPL
PL
PLPL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
SETTLING POND AREA29.0± ACRES
SURFACE EXCAVATIONAREAS ANDMISCELLANEOUSAFFECTED AREA11.9± ACRES
OFFICE, PLANT ANDSTOCKPILE AREA22.6± ACRES
RECLAIMEDAREA
3-E
FROMPLANT
NOTES:
LEGEND
1. BASE MAP PREPARED BY LOCKWOOD MAPPING, INC.JOB # 6789, DATED 12/12/95.
2. SITE LOCATED ON NYSDOT 7.5 QUAD. DOVER PLAINS, NY.
3. DATUM: MEAN SEAL LEVEL.
4. PROPERTY LINES ARE APPROXIMATE AS SHOWN.
5. TOE OF BERM ALONG NEW ENTRANCE TO BE 25 FEETFROM ALL PROPERTY LINES.
6. HAY BALES AND SILT FENCES TO BE PLACED AT TOE OFPROPOSED BERM AS NEEDED.
7. ROLLED EROSION CONTROL FABRIC WILL BE USEDAS NECESSARY.
8. BERM VEGETATION MIX TO BE SEEDED AT 50 - 75 POUNDSPER ACRE.
9. UNDERGROUND MINE SURVEY MAP SUPPLIED BY WINGDALEMATERIALS AND FIELD CHECKED BY CPI. May 2015.
12/3/03 UNDERGROUND UPDATE JRH
9/28/04 PROPOSED NEW HAUL ROAD JRH
5/4/04 POND FILL DETAIL JRH WELL & STOPE DETAIL
12/1/04 HAUL ROAD DETAILS JRH
7/6/06 HAUL ROAD REVISIONS JRH
EQUIPMENT STORAGE/STOCKPILE AREA1.6± ACRES
9/18/06 ENTRANCE AND BERM JRHREVISIONS
8/11/09 UNDERGROUND WORKINGS JAS UPDATED
7N
8N
9N
10N
11N
12N
13N
T2
T3
T4
BRO
ADW
AY
T3
T4
6N
T5
T6
T7
T5
T6
T7
11N
10N
12N
9N
8N
7N
6N
T9
T8
T9
T8
4N
T7
T9
4N T5
4N
T3
T1
T2 6W
T9
T8
T9
T8
14N
14N
BRO
ADW
AY
EVAC
MAP
FANS
PRIMARY ESCAPE
SECONDARY ESCAPE
EVACUATION ALARM
MINE MAP
END OF WORKING FACE
MINE OUTLINE
STOPPINGS
STOPE
AIR CURTAINS
LEGEND
PHONE PHONE
WINGDALE MINE
JUNE 2015LEVEL 3
UNMINED AREA
7N
8N
9N
10N
11N
12N
13N
T2
T3
T4
BRO
ADW
AY
T3
T4
6N
T5
T6
T7
T5
T6
T7
11N
10N
12N
13N
9N
8N
7N
6N
T9
T9
T8
T9
BRO
ADW
AY
T4
4N
T8
T6
T5
T8
14N
14N
BRO
ADW
AY
15N
18N
18N
19N
16N
17N
T4
BRO
ADW
AYT5
T6
16N
17N
T7
T8
15N
5N
5N
Ram
p1
Ram
p2
Ram
p18
Ram
p17
LIFE OF MINE BOUNDARYOF UNDERGROUND WORKINGSFOR ALL LEVELS188.3± ACRES
5/27/15 UNDERGROUND WORKINGS JAS UPDATED
EXISTING HAUL ROAD2.5± ACRES
ACREAGE SUMMARY
PERMIT TERM 2015-2020 SURFACE AFFECTED AREA
OFFICE, PLANT AND STOCKPILE AREA....................................................................................22.6 ± ACRES
SETTLING POND AREA............................................................................29.0± ACRES
SURFACE EXCAVATION, AND MISCELLANEOUS AREA................................................................11.9 ± ACRES
EQUIPMENT STORAGE / STOCKPILE AREA.........................................1.6 ± ACRES
EXISTING HAUL ROAD............................................................................. 2.5 ± ACRES
VISUAL / NOISE BERM .............................................................................. 1.9 ± ACRES
-CURRENTLY AFFECTED AREA (4/1/75 TO PRESENT).........................69.5 ± ACRES
-LIFE OF MINE BOUNDARY FOR ALL UNDERGROUND WORKINGS..................................................................188.3±ARES
UNDERGROUND AFFECTED AREA LEVEL 3
FUTURE UNDERGROUND AREALEVEL 3 TO BE AFFECTED 2015-2020.......................................................36.4 ± ACRES
P:\CAD Drawings\Peckham Materials\wingdale 2009 DEC renewal\dwg\MPM_2015_RENEW_L3.dwg, 6/23/2015 4:02:08 PM, PDF-XChange for AcroPlot Proaaa.pc3