pixel cabling issues general optical cables copper cables ( power & control ) things to be done
DESCRIPTION
K. Gabathuler March 2005. PIXEL CABLING ISSUES General Optical Cables Copper Cables ( Power & Control ) Things to be done. PP1. PP0. USC55. Service Tube. Gallery. ~ 4-5 m. 0.6m. ~ 40 m. ~ 40 m. Optical Cabling and Patch Panels M eeting with F. Vasey March 9, 2005. PP1. PP0. - PowerPoint PPT PresentationTRANSCRIPT
March 2005 1
PIXEL CABLING ISSUES•General•Optical Cables•Copper Cables (Power & Control)•Things to be done
Service Tube
PP0 PP1
GalleryUSC55
0.6m ~ 4-5 m ~ 40 m ~ 40 m
K. Gabathuler March 2005
March 2005 2
Optical Cabling and Patch PanelsMeeting with F. Vasey March 9, 2005
9612
1
Strip Tracker
9612
1
Pixel
2 m
12
PP1
PP1PP0
0.6 m ~4-5 m ~50 m?Special pixel cables
PP0
Do not splice, butuse MU connectoras in Strip Tracker
March 2005 3
Laser/PIN MU connector2.0 m, cannot be changed
introduce loops (r > 3 cm)
4 cm
MU
-SR
12
way
ada
pter
Position and length of loops, andposition of MU-SR 12 way adaptermust be carefully chosen in z!
59 m
m
From laser/PIN-diode to MU connector
AOH AOH
All in service tube
barrel: z=50-70 cm
barrel: z=200-250 cm
March 2005 4
March 2005 5
0.3 m, fixed
~ 0.3 – 0.7 m, to be determined
MU
-SR
12
way
ada
pter
From MU-SR 12 way adapter to PP0
12-ribbonconnector PP0
March 2005 6
From PP0 to PP1special cables for pixel,F. Vasey will get tender for us.
A total of 260 ribbons.
Lengths determined from mock-up.
On the way from PP0 to PP1, thereis sorting into readout/control/spare//beam-monitoring groups.
12-ribbonconnector
12-ribbonconnector~ 4-5 m
March 2005 7
PP1
Ribbonsfrom PP0Multi-ribbon
cables toFED/Cs
March 2005 8
From PP1 To USC55
March 2005 9
From PP1 to USX55: 34 multi-ribbon cables
FED/FEC
PP1
March 2005 10
Si Tracker FED/FEC patch-panel
March 2005 11
March 2005 12
Copper Cables
Separate power cables(2.5V only) for:• Portcards incl. CCU• All PCB’s on barrel service tubeNeeded for power-upsequence
Control cables for:• T-sensors• H-sensors37 pin connectore.g. 9 T or 8 T + 1 Hfor one cable
Can we reducenumber of cables ?
empty
empty
March 2005 13
Things to be done soon:• Study position of MU-SR 12 way adapters and the fiber loops in service tube
• Determine lengths of cables going from MU-SR 12 way adapters to PP0
• Determine lengths of pigtails of multi-ribbon cables on FED/FEC side
• Decide on number of control cables
• Alick: Determine number of cables required for beam-monitoring (lumi-monitor?)
• Forward people: Please check all this for your system; irreversible decisions must be taken by May 2005.
March 2005 14
Diamond MFS Adaptor Qualification
• Brass pre-alignment piece• Steel screw (not removable)• Mount adapted to PP1
cassette.
9612
1
PP1
March 2005 15
FED patch-panel• 3D study underway
• March 2004: Report + proposal for prototype fabrication
• Production of terminated multi-ribbon cable dependent on successful outcome of complete study