Page 1: Pipe Hanger Inspection

7/27/2019 Pipe Hanger Inspection

http://slidepdf.com/reader/full/pipe-hanger-inspection 1/2w w w . n e m s t a n d a r d f a s e l . n l  

PIPE HANGER INSPECTION

Page 2: Pipe Hanger Inspection

7/27/2019 Pipe Hanger Inspection

http://slidepdf.com/reader/full/pipe-hanger-inspection 2/2

NEM Standard Fasel

Demmersweg 21 - 7556 BN

P.O. box 842 - 7550 AV Hengelo

E: [email protected]

NEM Standard Fasel

E: [email protected]

NEM Standard Fasel

E: [email protected]

NEM Standard Fasel

Manufacturing / Boiler Services

Haven Noordzijde 8

9679 TC Scheemda

E: [email protected]

NEM Standard Fasel

Alfred Marshallstraat 5

7559 SE Hengelo

w w w . n e m s t a n d a r d f a s e l . n l  

PIPE HANGER INSPECTION

Why pipe hanger inspection?

Pipes form the arteries of your company, which interconnect various production sections and

devices. Faulty or ineffective piping forms a hazard for your operating processes and the

safety of your piping network becomes an issue. Therefore, in respect of operational reliabi-

lity and the duty of care for a safe working environment, it is of paramount importance that

the piping forms a reliable part of the company infrastructure.

Your company infrastructure reliability will be increased considerably through timely, perio-

dical inspections of hangers and piping in relation to functioning and continued functioning.

What happens to your piping through time?

When assembling new piping, suf cient slope and a pre-calculated, permitted transition

are taken into account during the design. If actual slope and transition are still within the

pre-accepted margins, then processes like water drainage operate soundly and the ow

velocities are within acceptable limits. The generated forces, moments, and tensions will be

partially absorbed by spring hangers and stay within the acceptable thresholds.

However, through time, the actual situation will no longer correspond with the design situ-

ation: this is due to the weather, the environment, minor accidents, material fatigue or the

medium in the piping.

So if actual measured positions of pipe hangers and displacements deviate from the design

values, the slope of the piping alters resulting in changes in the occurring loads, moments,and tensions. This is detrimental to the mechanical and process-based reliability of the

piping network. This undermines your company operations and the safety.

What can NEM Standard Fasel do for you in this respect?

These undesirable effects can be avoided by executing a “pipe-support scan” or “pipe

hanger inspection”: problematic situations are de ned and recognised at an early stage.

NEM Standard Fasel has the knowledge, expertise and capacity to execute these inspections

inspection for your company.

However, the regime of the inspections, the intensity and nature of the inspection is not

identical for all piping. The matters we focus when determining this include:

• the signi cance of the various piping in relation to your type of business and for safety

• old-age and type of support for the various piping

• pressures, temperatures, medium and material types.

These aspects will be weighed up and an individual inspection regime will be proposed

for various piping systems. NEM Standard Fasel can illustrate this for your entire piping

infrastructure in a strategic inspection and testing plan. This secures your own duty of care,

signi cantly improves the reliability of your piping infrastructure, and at the same time,

there is a registration system in place for the movement of the piping through time.

The actual inspection is ingrained in this inspection plan. However, we can also inspect

piping traces for you, even if no such an integral plan has been drawn up. We inspect up to

a height of 9 metres without using scaffolding.

We conclude each inspection with a report; you will receive this shortly after the inspectionis completed. We are in a position to make suitable and directed suggestions on account of 

the substantial information we have relating to several pipe hanger types and brands (also

outdated types). We will supply a repair proposal if required.

E-mail [email protected]

Website  www.nemstandardfasel.nl

Emergency service outside office hours 

En e r g y Se r v i c e s &  B o i l e r S e r v i c e s  

  Energy Services +31 74 8515555

+31 30 2449244Boiler Services 

Energy Services

T: +31 74 8515555

F: +31 74 8515556

Boiler Services

Krommewetering 13 - 3543 AP

P.O. box 2435 - 3500 GK Utrecht

T: +31 30 2449211

F: +31 30 2442596

Energy Services / Boiler Services

Zwolseweg 15 - 2994 LBP.O. box 1155 - 2990 CA Barendrecht

T: +31 180 641100

F: +31 180 555969

T: +31 597 591521

F: +31 597 591862

Tools 4 Rent

T: +31 74 8515397

E: [email protected]

W: www.tools4rent.nl