PIMS Global Lubricants & Greases Supply Chain Benchmarking
An Introduction
Marcus Bonse – Project Director
Omer Chowdhury – System Expert
page 2
© Malik 2016© Malik
Introduction to the project and its motivation
Lubricants manufacturers worldwide face many challenges. Economic uncertainty, high material costs,
ecological concerns and increasing competitive pressure are forcing them to re-examine all areas of
operations. Minimum cost and maximum flexibility are needed to address new market realities.
Historically, there was pressure to increase market share, capacity and complexity:
• in regions where demand for many lubricants is falling, due to lengthened vehicle service intervals
and higher oil prices, companies are now having to make tough decisions on plant and product
rationalisation.
• in regions where demand for lubricants is rising due to increasing economic development,
companies are having to achieve the operational edge necessary to build competitive advantage for
market share growth and optimal capacity and complexity management.
Over the last 23 years PIMS® has established its data-driven worldwide benchmarking process and
assembled the world’s only current database of lubricants and greases supply chains. Leading companies
use PIMS as the foundation for evidence based performance improvement.
2
page 3
© Malik 2016© Malik
Why PIMS Lubricant and Grease Plant Performance Benchmarking?
Because for almost 25 years we have provided lubes and greases manufacturers with fast,
effective and objective benchmarking, becoming trusted advisors, known for thorough data
collection and validation, good analysis and useful answers.
Because you can use PIMS deliverables to answer questions like:
• what should you do to get your operations to be world class? (process optimization)
• what levels of quality and HSE are achievable?
• what are your advantages / disadvantages versus local competitors?
• where and how should you invest? Or divest? (portfolio optimization)
• toll-blending, outsourcing, maintenance: yes or not, too much or too little?
• how do you master performance and complexity drivers?
• are your targets feasible? Is your current strategy supported by objective evidence?
Because only PIMS has valid comparative data on over 250 plants in 60 countries, from
over 40 of the world’s top oil companies, and a research-based analysis framework to
clearly show results to managers at all levels.
Because we assure data confidentiality: feedback never shows (or allows calculation of)
data on individual competitors.
page 4
© Malik 2016© Malik
PIMS Typically Identifies Savings in Excess of $500,000 (~5% OPEX) Improvement per Plant
We analyse cost, productivity, complexity, throughput and configuration to find plants that are your best
performing strategic peers as well as local competitors. This, in conjunction with our 20+ years benchmarking
experience provides you with:
• Complete understanding of the key drivers of performance;
• Objective evidence of your true competitive position;
• Quantified and prioritised areas of improvement: how much of an improvement is needed and what is the
prize?
• A stimulus for change based on clear evidence versus real competitors (under strict confidentiality);
• A basis for analysing alternative future scenarios using real experiences of others who have been there.
Firm facts to base decisions on, rather than wishful thinking
page 5
© Malik 2016© Malik
How will we work with you?
1. PIMS consultants work with you through a multi-stage process, and they will have a face-to-face meeting
with you at least 3 times (kick-off, data review, final results, see previous slide).
2. PIMS consultants will interact with key plant personnel, and validate the data with your planners and
financial accountants to develop a comprehensive profile of your plant operations, comprising over 100
key metrics.
3. PIMS then models your plant against regional and local competitors and against matching plants globally.
We identify which areas of the plant are performing strongly, and which need improvement.
4. We spell out relative pay rates, productivity levels, complexity, maintenance load, cycle times and quality
performance in each area, versus appropriate peers.
5. PIMS correct for key differences outside your control, such as scale, complexity, location, inbound
logistics, and product mix. Comparisons are "apples to apples". We give you key insights into improving
your production operations. Together, we pinpoint priority areas and help you to develop action plans for
performance improvement.
5
page 6
© Malik 2016© Malik
PIMS Benchmarks Against 235 Lubricant and 60 Grease Plants from 47 Companies Globally
Americas
68 lube plants
20 grease plants
Europe
79 lube plants
20 grease plants
Africa
19 lube plants
4 grease plants
Asia & Oceania
70 lube plants
16 grease plants
Note: Choropleth map based on the combined volume of lubricants and greases by country (Q3 2016)
0 kT 5,000 kT
page 7
© Malik 2016© Malik
PIMS Lubricant Plant Volume Distribution
0
10
20
30
40
50
60
0-20 20-40 40-60 60-80 80-100 100-120 120-140 140-200 200+
No
. of
Pla
nts
Volume (Tons '000)
• 235 lube plants.
• Over 20 are under 20kT.
• Over 20 are greater than 200kT.
page 8
© Malik 2016© Malik
PIMS Grease Plant Volume Distribution
0
2
4
6
8
10
12
14
16
18
0-2 2-4 4-6 6-8 8-10 10+
Nu
mb
er o
f p
lan
ts
Volume (Tons '000)
• 60 grease plants
• Over 20 are greater than 6kT
page 9
© Malik 2016
Methodologies Overview
Costs
Performance Metrics
Volume
Stock days Service Levels
Assets Downtime
Quality Losses
HSE Maintenance
Improvement Potential by Area of Activity
Inbound freight Input cost
Packed material receipt Bulk material receipt
Blending Laboratory
Bulk filling Packing/filling
Bulk distribution Warehousing
Grease production Pack distribution
Plant administration Allocated administration
2. Local Low Cost 3. Look-Alikes 4. Par Performance
ProductivityEnergy
efficiency
1. Regional Comparison
PIMS Delivers Comprehensive Benchmarks by Performance and Area of Activity using 4
Methodologies
page 10
© Malik 2016
PIMS also provides In-Depth Analysis of Non-Cost Metrics (1/2)
PIMS Quality Metrics
% Rejected blends
Pro
ce
ss s
tag
e
Total number of tests
Right First Time Rate No. types of equipment
Stock count
Flushings
Recovered Downgrades
Slops
LossesTestingBlend accuracy
1. Material receipt
2. In-process control
3. Product release
4. Post production
When do you test?
page 11
© Malik 2016
PIMS also provides In-Depth Analysis of Non-Cost Metrics (2/2)
PIMS Service Metrics
Number of spills
Volume of spills
Days lead time from order
to dispatch
(from stock)
% OTIF by order
% OTIF by line item
Days lead time from order
to dispatch (produced to
order)
Minimum possible days
(produced to order)
% OTIF by order
% OTIF by line item
Number of injuries
Number of lost time accidents
Number of other
environmental incidents
PIMS HSE Metrics
HSE Lead Time On Time In Full (OTIF)
page 12
© Malik 2016
PIMS Plant Complexity – How Difficult is the Job you have to do?
Volume
No. of grades/80% production
SKUs/kton
Grades/kton
% bulk
+ other attributes to a lesser degree
31.55 kTon
128/18
4.06
17.5
9%
+
+
+
+
+
Factor Contributing to ComplexityPlant X Plant Y
33.4 kTon
50/6
1.50
16
24%
+
+
+
+
+
54% 72%
Despite a similar throughput level, Plant Y is clearly more complex (it has a more difficult job to do), which is
mainly driven by the substantially higher number of grades (different formulations) in comparison to Plant X,
the marginally higher number of SKUs and the lower percentage of lubricants dispatched in bulk
page 13
© Malik 2016© Malik
Core Methodology 1: Regional Comparison (including time series)
We compare you with the your geographical/market
peers with regard to the range of products manufactured,
the types of packaging, as well as the cost in each
activity area (raw material receipt, blending, packing,
laboratory, filling and dispatch, warehousing, other
production costs and assets, G&A, etc.). What are your
peers doing differently and what are they doing better?
How is the market changing over time with regard to
both cost and product portfolio.
Plant X
Plant X
Plant Y
Regional
Avg.
Plant Y
Q1
Q2
Q3
Plant X
page 14
© Malik 2016© Malik
Core Methodology 2: Local Low Cost Peers
We compare you with the best half of your closest geographical/market peers in each activity area (raw
material receipt, blending, packing, laboratory, filling and despatch, warehousing, other production costs and
assets, G&A, etc.). What are the peers doing differently and what are they doing better?
Key messages on complexity, payroll costs, structure etc.
PIMS can amend the default definitions and boundaries of “local” areas to meet clients needs, so long as the
number of “local” observations in the database can guarantee 100% confidentiality.
Traffic-light code:
1.25 Unfavourable position
0.8 Favourable position
No immediate message
Cost metric
Non-cost metric
You Local low cost
page 15
© Malik 2016© Malik
Core Methodology 3: Look-Alikes
We compare you against the performance of the best plants that resemble your plant’s profile. Look-alikes are
the closest structural peers: based on your current profile (scale, product mix, complexity, labour cost
environment and major "givens" for configuration, e.g. % of base oil in via pipe etc.). We match you with your
peers in each activity area, and compare you with the best half (e.g. best four out of eight). Details of the
matching criteria are shown on the summary page for each activity area.
Key messages on productivity and operating performance.
C
PIMS global database
Finding plants worldwide
that match your profile
Benchmarking your activity
based performance against
best practice
Traffic-light code:
1.25 Unfavourable position
0.8 Favourable position
No immediate message
Cost metric
Non-cost metric
You Look-Alike
page 16
© Malik 2016© Malik
Beyond Conventional Benchmarking: PIMS Unique “Look-Alike” Methodology
PIMS finds plant areas from the database that are structurally similar to you (look-alikes). Matching criteria and
the quality of the match are clearly shown. Transparency is attained whilst maintaining confidentiality.
Matching criteria
Lubricant Blending Complexity
Plant X Look-alikes
Plant X
Local low
cost
Page 17
© Malik 2016
Global
Ranking=𝐴𝑐𝑡𝑢𝑎𝑙
"𝑃𝑎𝑟"
“PAR” =
expected
performance
given a plants…
Complexity
Labour Cost
Environment
Fixed
Assets
AutomationAverage
Temperature
Size
Core Methodology 4: Par Performance
Par is the expected level of unit cost given your scale, complexity, labour cost environment, fixed assets,
automation and annual average temperature based on a multiple regression model.
Plant X
page 18
© Malik 2016
PIMS Benchmarking Outcomes
Priority areas for
improvement (incl. $ value)
Regional cost and
complexity quartiles
Detailed cost and activity analysis by
plant area
Based on the 4 methodologies of analysis, PIMS recommends the top areas for change and the financial gain by
their implementation.
page 19
© Malik 2016© Malik
PIMS Deliverables
Results comprise three different level of benchmarking reports:
• The plant data appendix (PDA) is tailored for plant and country managers. It is the place where one
plant’s performance is assessed and compared in great detail against its best performing look-alikes and
local low cost peers.
• The regional report is aimed at regional managers. It shows all plants in a region (e.g. Europe)
benchmarked against each other and regional quartiles. It also tracks the plants and the regional
quartiles over time. It is the first report presented to the client as it is used in the data review stage to
spot possible mistakes in inputs.
• The Executive Summary is the final report, where all the key issues arising from the more detailed
reports are highlighted and reviewed from a different perspective. This reports also provides PIMS
suggestions and priorities (ranked by financial “prize”).
Regional
Report
(Quartiles &
Time Series)
Plant Data
Appendix
LowGranularityHigh
Executive
Summary
page 20
© Malik 2016© Malik
Project Timeline (for those who join in the main cycle)
Kick-off Data assemblyData review /
first resultsFinal data set
Results
workshop
January / February March April / May May / June July
Kick-off • Introduction & definition of local issues
• Outline timetable, data forms & glossaries
Data assembly • Assemble initial data with support from PIMS’ helpline
Data review / first
results
• Review data gathered & items for checking identified
• First comparisons on overall performance metrics
Final data set • Final data, checked and amended
Results workshop • Present and discuss the findings
• Draw inferences and set up action plans
page 21
© Malik 2016© Malik
Project Timeline (for a single plant participating out of cycle)
Kick-off Data assemblyData review /
first resultsFinal data set
Results
workshop
Monday Tuesday / Wednesday Thursday Friday morning Friday afternoon
Advantages versus participation during main cycle:
1. PIMS consultants onsite and working directly with you to assemble the data
2. Data related queries addressed in real time, therefore quick turnaround achieved
with sound data quality.
3. All your relevant plant staff interact directly with PIMS, thus developing a good
working relationship and mutual trust
4. Project completed in 5 working days, inclusive of analysis and results presentation
Malik London
PIMS Associates Limited
5 Cheapside
London EC2V 6AA
T +44 20 3161 4000
F +44 20 3161 4020
www.malik-management.comSystem-cybernetic
Malik ManagementSystems®
for mastering complexity
© Malik 2016© Malik
Marcus Bonse, Associate Partner
+41 79 8275123