pilot project for developing a national action plan for strategic implementation

40
PILOT PROJECT FOR DEVELOPING A NATIONAL ACTION PLAN FOR STRATEGIC IMPLEMENTATION OF THE GHS IN THE GAMBIA

Upload: aiko-hull

Post on 30-Dec-2015

24 views

Category:

Documents


0 download

DESCRIPTION

PILOT PROJECT FOR DEVELOPING A NATIONAL ACTION PLAN FOR STRATEGIC IMPLEMENTATION OF THE GHS IN THE GAMBIA. PRESENTED BY Mr. MOMODOU CANTEH, TECHNICAL DIRECTOR, NEA. BACKGROUND THE GAMBIA. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

PILOT PROJECT FOR DEVELOPING A NATIONAL

ACTION PLAN FOR STRATEGIC IMPLEMENTATION OF THE GHS IN

THE GAMBIA

Page 2: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

PRESENTED BYMr. MOMODOU CANTEH,TECHNICAL DIRECTOR, NEA

Page 3: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

BACKGROUND

THE GAMBIA

Page 4: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

- LARGE PROPORTION OF PEOPLE EMPLOYED IN AGRICULTURAL SECTOR - COMMERCIAL AND SUBSISTENCE PRODUCTION

- CROP AND LIVESTOCK PRODUCTION AND FISHERIES CHARACTERIZE THE AGRICULTURAL SECTOR

- THE INDUSTRIAL SECTOR IS CLASSIFIED INTO FORMAL AND NON-FORMAL MANUFACTURING, BUILDING CONSTRUCTION AND TOURISM.

Page 5: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

-PRODUCTION OF CHEMICALS IN THE GAMBIA IS MINIMAL

-HOWEVER, IT IMPORTS A LARGE QUANTITY OF CHEMICALS(AGRICULTURAL, INDUSTRIAL, CONSUMER, ETC) TO MEET

THE CHALLENGES

Page 6: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

-PETROLEUM PRODUCTS ARE IMPORTED -COUNTRY DEPENDS VERY HEAVILY ON CHEMICALS TO ENHANCE

AGRICULTURAL PRODUCTIVITY.

Page 7: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

- CHEMICALS EQUALLY HEAVILY USED IN THE PUBLIC HEALTH SECTOR TO CONTROL ARTHROPOD VECTORS OF HUMAN DISEASES.

Page 8: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

NATIONAL CAPACITY BUILDING PROJECT TO DEVELOP A NATIONAL GHS IMPLEMENTATION STRATEGY 

Page 9: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

-THE GAMBIA RECOGNISES THE IMPORTANCE OF CHEMICAL HAZARD COMMUNICATION AS A KEY TOOL FOR PROTECTING HUMAN HEALTH AND THE ENVIRONMENT.

-SIGNED A MEMORANDUM OF

AGREEMENT

Page 10: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

-WITHIN THE FRAMEWORK OF MOA THE GAMBIA WILL PREPARE GROUND FOR FULL IMPLEMENTATION OF GHS BY 2008.

GHS WILL THUS:

-CONTRIBUTE TO PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT FROM DANGEROUS CHEMICALS, AND

FACILITATE TRADE IN CHEMICALS BETWEEN COUNTRIES.

Page 11: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

KEY PROJECT PHASES AND ACTIVITIES FOUR MAJOR PHASES:1. NATIONAL PLANNING AND COORDINATION.

2. PLANNING FOR PHASE 1 2.1 PREPARATION OF A GHS SITUATION AND GAP ANALYSIS

2.2 COMPREHENSIBILITY TESTING

  

Page 12: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

4. DEVELOPMENT OF A STRATEGIC PLAN FOR NATIONAL GHS IMPLEMENTATION BY 2008

4.1 NATIONAL REVIEW WORKSHOP

Page 13: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

3. TARGETED GHS CAPACITY DEVELOPMENT 3.1 GHS TRAINING WORKSHOP 3.2 DEVELOPMENT OF A DRAFT LEGISLATION FOR GHS IMPLEMENTATION.

3.3 CAPACITY BUILDING AND STRATEGY

3.4 DEVELOPMENT OF INDUSTRY CAPACITY BUILDING AND STRATEGY

3.5 DEVELOPMENT FOR CIVIL SOCIETY CAPACITY BUILDING AND STRATEGY 

NATIONAL

Page 14: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

1.NATIONAL PLANNING AND COORDINATION.

- PRESENCE OF A MULTI- SECTORAL ENFORCEMENT OF HAZARDOUS CHEMICALS AND BOARD FOR PESTICIDES CONTROL AND MANAGEMENT ACT HAS ENHANCED THE ESTABLISHMENT OF A NATIONAL COORDINATION STRUCTURE

Page 15: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

- STAKEHOLDERS CONTACTED TO CONSTITUTE THE NATIONAL COMMITTEE FOR THE STRATEGIC IMPLEMENTATION OF THE GHS.

Page 16: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

STRUCTURE

STRUCTURE

PIU – PROJECT IMPLEMENTATION UNITY

PCC – PROJECT COORDINATION COMMITTEE

STAKEHOLDERS

Page 17: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

THE NATIONAL GHS COMMITTEE NOW

COMPRISES ORGANISATIONS THAT DIRECTLY DEAL WITH EACH OF THE FOUR SECTORS OF TRANSPORT, INDUSTRIAL PRODUCTION, AGRICULTURE AND CONSUMER CHEMICALS:

 

Page 18: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

     National Agricultural Research Institute (NARI)

    

- NATIONAL AGRICULTURAL DEVELOPMENT AGENCY(NADA)- DEPARTMENT OF STATE FOR THE INTERIOR- THE GAMBIA RED CROSS- THE GAMBIA CHAMBER OF COMMERCE AND INDUSTRY- THE CUSTOMS AND EXCISE DEPARTMENT- FIRE AND AMBULANCE SERVICES

Page 19: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

 

- ATTORNEY GENERALS CHAMBERS- NATIONAL TRANSPORT CONTROL ASSOCIATION- THE ASSOCIATION OF HEALTH AND ENVIRONMENTAL JOURNALISTS- STANDARDS AND CONSUMER PROTECTION BOARD- THE GAMBIA WORKERS CONFEDERATION- AGRICULTURAL WORKERS ASSOCIATION

Page 20: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION
Page 21: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

2. PLANNING FOR PHASE 1

2.1 NATIONAL GHS SITUATION AND GAP ANALYSIS

Page 22: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ENACTED IN 1994) PROVIDES BOTH REGULATORY AND LEGISLATIVE FRAMEWORK FOR ENVIRONMENTAL MANAGEMENT IN THE

GAMBIA. IN THE SAME YEAR, THE HAZARDOUS CHEMICALS AND PESTICIDES CONTROL AND MANAGEMENT ACT WAS ENACTED AND A BOARD ESTABLISHED.

Page 23: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

ENFORCEMENT

THE BOARD HAS THROUGH NEA ESTABLISHED AN INSPECTORATE SUPPORTED BY A NETWORK OF DESIGNATED INSPECTORS FOR THE ENFORCEMENT OF PESTICIDE LAWS.

DESIGNATED INSPECTORS ARE APPOINTED FROM COLLABORATING DEPARTMENTS  

Page 24: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

SITUATION ANALYSIS

NATIONAL PROFILE TO ASSESS THE NATIONAL INFRASTRUCTURE TO MANAGE CHEMICALS IN 1997   IN 1999, THE GAMBIA DISPOSED OF ITS OBSOLETE PESTICIDES BY SHIPMENT TO THE

UK

Page 25: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

GAP ANALYSIS

THE ABSENCE OF A FULLY OPERATIONAL POISON RECORD CENTRES AND INSUFFICIENT GOVERNMENT STAFF KNOWLEDGE ABOUT LEGAL AND TECHNICAL ASPECTS OF GHS. 

Page 26: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

COMPREHENSIBILITY TESTING (CT) LABEL, WARNING, OR SAFETY DATA SHEET TO ADEQUATELY UNDERSTAND THE INFORMATION ENOUGH TO TAKE THE APPROPRIATE PRECAUTIONARY MEASURES  

Page 27: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

3.Project Phase 2:Targeted GHS Capacity Development  

3. TARGETED GHS CAPACITY DEVELOPMENT  

3.1 NATIONAL TRAINING WORKSHOP FOR THE DEVELOPMENT OF A NATIONAL GHS IMPLEMENTATION STRATEGY FOR CIVIL SOCIETY

 

Page 28: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

MAIN OBJECTIVE OF THE WORKSHOP WAS TO ENABLE CIVIL SOCIETY IDENTIFY CAPACITY BUILDING INTERVENTIONS NEEDED IN PROTECTING HUMAN HEALTH AND THE

ENVIRONMENT FROM CHEMICAL HAZARDS.

Page 29: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

3.2 DEVELOPMENT OF A DRAFT

LEGISLATION FOR GHS IMPLEMENTATION

- PCC HIRED THE SERVICES OF A LEGAL CONSULTANT TO DEVELOP GHS IMPLEMENTATION REGULATION

- FIRST DRAFT SUBMITTED,REVIEWED AND VALIDATED.

Page 30: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

REGULATIONS RECOMMENDED FOR INCORPORATION INTO EXISTING HAZARDOUS CHEMICALS AND PESTICIDES CONTROL AND MANAGEMENT

REGULATIONS. 

Page 31: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

CIVIL SOCIETY AND INDUSTRIAL WORKSHOP

THE GAMBIA WORKERS CONFEDERATION AND NATIONAL ENVIRONMENT AGENCY (NEA) WITH SUPPORT FROM THE UNITAR/ILO GLOBAL GHS CAPACITY BUILDING PROGRAM FUNDED BY THE GOVERNMENT OF SWITZERLAND, SUCCESSFULLY CONDUCTED A NATIONAL WORKSHOP FOR CIVIL SOCIETY.

Page 32: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

LOBBY AND AWARENESS CREATION IN INDUSTRIES

MAIN OBJECTIVE IS TO EQUIP THE INDUSTRIAL SECTOR WITH A BETTER UNDERSTANDING OF GHS PRINCIPLES

Page 33: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

THE TEAM WAS ABLE TO COVER THE ENTIRE COUNTRY, VISITING A TOTAL OF 34 INDUSTRIAL SITES AND A TOTAL NUMBER OF ABOUT 700 INDIVIDUALS INCLUDING PROPRIETORS, MANAGERS

AND INDUSTRIAL WORKERS.  

Page 34: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

ACTION PLAN DEVELOPMENT AND APPLICATION OF GHS

THE “ROAD MAP” DESIGNED AT THE CIVIL SOCIETY WORKSHOP WAS FURTHER DEVELOPED BY A TASK TEAM AND PRESENTED AS A NATIONAL DOCUMENT DEVELOPED FOR EFFECTIVE IMPLEMENTATION AND ENFORCEMENT OF GHS REGULATIONS FROM 2008 – 2010.

 

Page 35: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

A NATIONAL PLAN AND IMPLEMENTATION FRAMEWORK ON GHS FOR 2008-2010 

Page 36: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

No. ACTIVITY OBJECTIVE(S) OUTPUT RESPOSIBILITY

BUDGET (US$)

1 TRAINING

- Training needs assessment

- Training proper

- Field monitoring and Evaluation of trainees

- To conduct in-service course for Inspectors on GHS

 

- Number of designated inspectors –Phytosanitary, Customs, Health, etc. trained

NEA, NADA (National Agricultural Development Agency), Customs

180, 000

- To train more Stakeholders on GHS

- Number of stakeholders trained

NEA, NADA, Civil Society, Police

- To train Popular Theatre Groups to act and formulate songs on GHS

- Drama and songs made on GHS

NEA, NADA, Civil Society, Police, ACD

Page 37: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

No.

ACTIVITY OBJECTIVE(S) OUTPUT RESPOSIBILITY

BUDGET (US$)

2. INFORMATION,

EDUCATION &

COMMUNICATION (IEC)

 

-Sensitisation,

- Awareness

campaigns

- Monitoring and Evaluation

- Mass sensitization of Stakeholders from the four categories - Industry, Agriculture, Transport and Consumers on GHS, using:- National Radio

and Television,

- Community and Private Radios,

- Print media

(Posters, banners,T-shirts, etc.)

- Number of stakeholders sensitized on GHS

 

- Number of TV Radio notices/ shots

made

 

- Number of print media produced

NEA, NADA, Civil Society, Police, ACD (Agricultural Communication Division)

180, 000

Page 38: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

No.

ACTIVITY OBJECTIVE(S) OUTPUT RESPOSIBILITY

BUDGET (US$)

3.

LEGISLATION

- Enforcement of GHS regulations;

-Monitoring and Evaluation

-T o strengthen legal requirements on Licensing and Registration-To improve legal framework for the implementation of GHS

- Licensing and Registration improved

Attorney General’s Chambers, NEA, NADA

22, 500

4.

STRENGTHENING EXISTING

LABORATORY

-To build the capacity of lab assistants

- To equip the lab

-Five Lab assistants trained

- Facilities provided for running the lab

NEA 200, 000

TOTAL 582,500

Page 39: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

NEGOTIATED RESOLUTIONS

Complementary to the strategic plan are the Resolutions, which have been during the process negotiated and endorsed through larger stakeholder consultations. The Resolutions have been also presented at the National Review Workshop for endorsement.

Page 40: PILOT PROJECT FOR  DEVELOPING   A NATIONAL  ACTION PLAN FOR STRATEGIC IMPLEMENTATION

 NATIONAL REVIEW WORKSHOP

The workshop was attended by a fair representation of governmental, nongovernmental organizations, and Civil Society/ labour groups.