Piling Industry Canada

PICmagazine www.pilingindustrycanada.com

www.pilingindustrycanada.com

Issue 2 • 2015

The HubTrevi Hong Kong works on theHong Kong Boundary Crossing Facilities

Sky ViewDowntown Miamigets iconic new tower

Page 2: Piling Industry Canada Issue #2 2015

Our support systems extend far below the surfaceThe only company that offers you all four types of support systems:

We carry ASTM A252, A139, A53 B

AWWA C200, API & CSA Specifi cations

Supporting the construction industry since 1953Delta

#6-8500 River Road

Delta, BC V4G 1B5

Phone: 604.946.2655

Fax: 604.946.2630

1.866.400.PIPE

Calgary

9100 Venture Avenue S.E.

Calgary, AB T3S 0A2

Phone: 403.236.1788

Fax: 403.236.2478

1.866.441.PIPE

Edmonton

6515 - 34th Street

Edmonton, AB T2B 2V8

Phone: 780.465.0671

Fax: 780.465.2367

USA

3888 - Sound Way

Bellingham, WA 98227-9754

Phone: 866.400.7473

Fax: 866.419.4005

> Concrete Pile > Steel Pipe

> H Pile > Sheet Pile

Page 3: Piling Industry Canada Issue #2 2015

Over 40 Years Of Making Pipe And Tube Products.

We’d Like To Share That Knowledge With You.

Celebrating Forty Years of Quality Tube Products | 1-800-376-6000 | www.independencetube.com | www.itcpiling.comC H I C A G O , I L | M A R S E I L L E S , I L | D E C AT U R , A L | T R I N I T Y , A L

Independence Tube is launching a major educational initiative. Independence Tube Corporation University – ITC U. Tube and pipe products are becoming more and more a fi rst choice material for conventional as well as non-conventional applications.

On-line TrainingWe will offer on-line tutorials that will provide industry knowledge and training to empower architects, engineers, designers, fabricators and service center professionals on the manufacturing and benefi ts of HSS and the industries it supplies.

Team of ExpertsWe will have a dedicated web page where you can submit your questions. Our team of experts, including an engineer and metallurgist, will answer all your concerns.

From our rolling practices to exploring the grades and sizes we produce. We will let you determine how HSS can fi t into your next design, fabrication or structure.

School is now in session. Sign up today, it’s free.

HSS HOLLOW STRUCTURAL SECTIONS

Page 4: Piling Industry Canada Issue #2 2015

4 PIC Magazine • December 2015

Piling Industry Canada

PICmagazine www.pilingindustrycanada.com

www.pilingindustrycanada.com

Published byDEL Communications Inc.Suite 300, 6 Roslyn RoadWinnipeg, ManitobaCanada R3L 0G5

President & CEO: David Langstaff

Publisher: Jason Stefanik

Managing Editor: Carly [email protected]

Sales Manager: Dayna [email protected]

Advertising Account Executives:Jennifer HebertMichelle Raike

Production services provided by:S.G. Bennett Marketing Serviceswww.sgbennett.com

Art Director/Design: Kathy Cable

Advertising Art: Sheri Kidd,Joel Gunter, Dana Jensen

© Copyright 2015, DEL Communications Inc.All rights reserved.The contents of this pub lica tion may not be reproduced by any means, in whole or in part, without prior written consent of the publisher.

While every effort has been made to ensure the accuracy of the information contained herein and the reliability of the source, the publisher in no way guarantees nor warrants the information and is not responsible for errors, omissions or statements made by advertisers. Opinions and recommendations made by contributors or advertisers are not necessarily those of the publisher, its directors, officers or employees.

Publications mail agreement #40934510Return undeliverableCanadian addresses to:DEL Communications Inc.Suite 300, 6 Roslyn RoadWinnipeg, Manitoba, Canada R3L 0G5Email: [email protected]

Printed in Canada 12/2015

Piling Industry News 6

Sky View – Downtown Miami gets

iconic new tower and breaks a world

piling record 14

Performance Piling – New

Children’s Hospital of Saskatchewan

puts piling to the test 18

Tall Timbers – The University

of British Columbia is set to build

Canada’s tallest wooden building 20

Patented Sonic Pile –

Anchors Set to Revolutionize

Building Foundations 24

The Hub – Trevi Hong Kong

works on the Hong Kong

Boundary Crossing Facilities 28

No Substitute for Hard Work and Dedication – Davide Trevisani

takes home DFI’s DaVinci

Legends Award 32

LRFD versus ASD for Driven Piles – The code

drives the methodology 36

Design-Build – Optimizing value

and foundations in the commercial,

infrastructure, and industrial

markets 38

Stir It Up – ABI rigs utilized

in soil mixing 42

A Level Playing Field? –

Not necessarily so for telescopic

boom crawler crane design and

lifting performance 44

Money 101 – Improving your

financial literacy can improve

your business 48

Index to Advertisers 49

Free Directory Listing Form 50

In this issue

Page 5: Piling Industry Canada Issue #2 2015

YOU CAN

ON US!BUILD

DRIVEN. HELICAL. CONCRETE. MICRO. ANCHORS. THE CHOICE IS YOURS.

OFFERING OUR PILING, ENGINEERING, & BRIDGE CONSTRUCTION SERVICES NATIONWIDE

FORT ST. JOHN • GRANDE PRAIRE • CALGARY • REGINA • ST. JOHN’S • GOOSE BAY

Page 6: Piling Industry Canada Issue #2 2015

PilingIndustry News

6 PIC Magazine • December 2015

Conductor Installation Services Ltd. (CIS), an Acteon company that provides hammer services to install conductors and drive piles, an-nounced that it successfully completed its second subsea piling cam-paign for Technip in Norway. 

CIS used its remotely operated Subsea Piling System, which makes it possible to drive piles as large as 36 inches in diameter, in water depths to 300 metres. In August 2015, the piles were driven remotely to secure the subsea Boa Extension Manifold, which makes up an in-tegral part of the Alvheim development, approximately 225 kilometres west of Stavanger.  The development, which transports oil to the UK Scottish Area Gas Evacuation System, is designed to increase oil re-covery by enhancing current production rates via three new subsea well step-outs at East Kameleon, Kneler A and Boa.

SuBSEA PILInG InSTALLATIOn COMPLETED In SEvEn hOuRSOnce rigorous testing of all equipment was completed, the CIS

team mobilized with piling and pile-lifting equipment to the Alvheim field. Working from the Skandi Arctic dive support vessel in maxi-mum water depths of 130 metres, CIS successfully drove the four 30-inch manifold piles. 

 Although the seemingly impenetrable soil formation encountered at the Alvheim manifold site made the final five metres of each in-dividual driving operation more difficult than a previous operation carried out on nearby Bøyla field, the Subsea Piling System performed flawlessly. Each pile was successfully driven into the seabed to its respective target depth of 11.25 metres.  The subsea operation was successfully completed in seven hours in half of the time originally planned. All four piles were driven with a 90kJ hydraulic hammer in just 160 minutes.

RELIABLE TEChnOLOGy + PROACTIvE PERSOnnEL = WInnInG COMBInATIOn

For Technip, the Alvheim Boa campaign illustrated the effective-ness of the piling system, as well as the professionalism of CIS. 

“CIS delivered a well-maintained spread, and personnel who were very proactive during the run-up to the campaign and offshore,” says Mark Underhill, project manager for Technip Norge AS.  “Based on the performance on Boa, I would have no reservation in recommend-ing their services for future projects for Technip.”

“Our Subsea Piling System performed reliably, allowing us to drive the piles subsea very efficiently,” says Andy Penman, Group Manag-ing Director of CIS. “We have now completed two successful subsea piling campaigns for Technip in just 14 months: one on Alvheim and another on Bøyla field last year. Looking ahead, we hope to be in a position to drive more subsea piles for Technip as our relationship continues to develop.”

SuBSEA PILInG SySTEMThe subsea piling process is carried out by an experienced CIS en-

gineer from a control unit and monitoring system located onboard a nearby vessel. A hydraulic hammer, connected via an electronic um-bilical cable to the control system, is lowered into the water and placed

directly over the subsea pile. Once it is accurately positioned, the pile will be driven into the seabed by the hammer until it reaches its target depth. 

CIS, a member of Acteon’s Conductors, Risers and Flowlines group, provides conductor and pile installation services associated with con-struction projects carried out in the global oil and gas industry. These services are carried out both onshore and offshore to, for example, cre-ate foundations for new wells, platforms, bridges and jetties. 

The range of services provided by CIS supports the Acteon Group’s commitment to defining subsea services across a range of intercon-nected disciplines.

ABOuT COnDuCTOR InSTALLATIOn SERvICESConductor Installation Services Ltd (CIS), an Acteon Company, is

the only company that is solely dedicated to the process of installing conductors and piles. CIS takes responsibility for full project manage-ment for installing conductors anywhere in the world.  The company’s primary objective is to employ hammer services to install conductors and drive piles with the highest standard of structural integrity, reli-ably and safely. CIS also strives to reduce the cost of conductor and pile installation by developing more efficient work processes and using the latest state-of-the-art technology, including its remotely operated Subsea Piling System that the company developed to drive piles as large as 36-inches in diameter in water depths to 300 metres.

Since it was founded in Great Yarmouth, England in 2005, CIS has built an impressive track record of successful operations carried out in every major oil and gas-producing region.  In recognition of the fact that it had not incurred a single lost time incident (LTI) for 10 con-secutive years, CIS was awarded its second consecutive Gold Medal for Occupational Health and Safety in 2015 from the Royal Society for the Prevention of Accidents (RoSPA).  It is the highest award for safety in the United Kingdom.  Learn more at www.c-i-services.com.

ABOuT ACTEOnActeon companies provide mooring, foundation, riser, conductor,

flowline, and marine electronics products and services supported by strong engineering and project management capabilities.  Acteon’s companies are 2H Offshore, Aquatic, Claxton, Conductor Installa-tion Services (CIS), Core Grouting Services, Fluke Subsea, InterAct, InterMoor, J2 Subsea, Large Diameter Drilling (LDD), LM Handling, Menck, Mirage Machines, NCS Survey, Offshore Installation Ser-vices (OIS), Probe, Pulse Structural Monitoring, Seatronics, Subsea Riser Products (SRP) and TEAM Energy Resources.  Learn more at www.acteon.com.

ABOuT SuBSEA SERvICESSubsea services are defined as the provision of specialist equipment,

services and personnel that can operate from any fit-for-purpose vessel or platform. Acteon’s subsea service offering is unique and ad-dresses operational requirements that support oil and gas asset own-ers, construction and drilling companies, and vessel owners.

CIS drives subsea piles in 160 minutes on Alvheim development

Page 7: Piling Industry Canada Issue #2 2015

Your True Project PartnerSkyline Steel is a premier steel foundation supplier with an extensive network of manufacturing and stocking locations. Our wide range of products include H-piles, Pipe Piles, Steel Sheet Piles, Threaded Bar, Micropiles, Piling Accessories, and Structural Sections.

See how Skyline Steel can help with your next project. Visit skylinesteel.com or call. In Western Canada (BC, AB, SK, MB, YT, NT, and NU), call 1-780-460-8363; In Eastern Canada (ON, NB, NS, QC, PE, and NL.), call 1-866-461-6366.

© 2015 Skyline Steel, LLC. Skyline Steel is a wholly-owned subsidiary of Nucor Corporation, the largest producer of steel in the United States.

Ft. McMurray, ABEastern Alberta Transmission Line (EATL), AB

Oshawa, ON

Skyline_PIC_1115_f.indd 1 11/20/15 4:44 PM

Page 8: Piling Industry Canada Issue #2 2015

PilingIndustry News

8 PIC Magazine • December 2015

Equipment Corporation of America (ECA), a leading distributor of foundation construction equipment, received the BAUER Manu-facturing Service Partner Certification Award at the BAUER Parts and Service Initiative Meeting in Conroe, Texas. ECA is an exclusive BAUER distributor covering the eastern United States and eastern Canada.

This coveted award certifies that ECA meets all BAUER Manufac-turing standards, including stocking and supplying factory-autho-rized parts; employing factory-trained technicians; and complying with all health, safety and environmental mandates common to the United States and Canadian foundation drilling industry.

ECA earned the certification by successfully undergoing a rigid audit process at each of its six service facilities. The review included an inventory of tools and testing equipment; employee and customer technical training; service trucks; adequate maintenance and storage facilities; updated safety equipment; and compliance with oil and haz-ardous materials storage, handling, and disposal requirements.

“ECA is honoured to accept this coveted award from BAUER, one of the dominant global manufacturers of foundation construction equipment,” says Executive Vice-President Ben Dutton, whom ac-cepted the award from Walter Froehlich, BAUER’s Director of After

Market Parts and Service. “It is a testament to the diligence and profes-sionalism of the entire ECA team from our Parts and Service Depart-ment to the executive level.”

ABOuT EquIPMEnT CORPORATIOn Of AMERICAECA has been a leading supplier of foundation construction equip-

ment in the eastern United States and eastern Canada for nearly a century. They are exclusive distributors for BAUER Drills, Klemm Anchor and Micropile Drills, RTG Piling Rigs, Pileco Diesel Pile Hammers, HPSI Vibratory Pile Hammers, Word International Drill Attachments, Dawson Construction Products, and Grizzly Side Grip Vibros. ECA offers sales, rentals, service, and parts from nine facilities throughout the eastern U.S. and eastern Canadian provinces.

ECA earns coveted BAUER Service Award

As Canada’s largest Marine Construction, Land Foundations and Dredging contractor, FRPD is a recognized leader that employs state of the art methods and equipment. FRPD’s versatile fleet is ready to complete all scope and size Marine Construction, Environmental Remediation, Dredging and Land Foundation projects. Established in 1911 as Fraser River Pile Driving Company and incorporated in 2008 as Fraser River Pile & Dredge (GP) Inc., FRPD’s team of highly skilled professionals brings more than 100 years of experience and commitment to exceeding expectations.

1830 River Drive, New Westminster, B.C. V3M 2A8 Phone: 604-522-7971 (24/7)

www.frpd.com [email protected]

Fraser River Pile & Dredge (GP) Inc.

Page 9: Piling Industry Canada Issue #2 2015

Taking the

LEADin over 40 countriesaround the world

Canada’s most experienced and innovativedeep foundation contractor - Since 1897

600 Ferguson Ave. N. Hamilton, ON, Canada L8L 4Z9Tel: 905.528.7924 Fax: 1.905.528.6187 | Toll Free: 1.800.668.9432 (in Canada and USA)

www.berminghammer.com | www.berminghamfoundationsolutions.com

Lead SystemsImpact Hammers

Reverse Circulation DrillsCustom Foundation Equipment

Site SupportProject Planning

Contracting Services

Page 10: Piling Industry Canada Issue #2 2015

PilingIndustry News

10 PIC Magazine • December 2015

GRLWEAP – Wave Equation Analysis of Piles – is the most widely used software for the simulation of the pile driving process and for establishing the driving criterion. For each assumed pile capacity, it calculates the corresponding driving resistance (blow count) and stresses during driving. It also helps check the adequacy of pile driving equipment. GRLWEAP is also helpful for designing dynamic load tests on drilled foundations. The program is taught in advanced founda-tion engineering courses around the globe.

A key feature of GRLWEAP is its data-base of almost 1,000 pre-programmed pile driving hammers. Pile Dynamics recently performed a major update of the database, working closely with hammer manufacturers to incorporate the latest information on ef-ficiency and other important characteristics.

The latest database is part of GRLWEAP 2010-6, which includes other improvements to the software and help functions as well. The upgrade to version 2010-6 is compli-mentary for those with licenses of GRL-WEAP-2010 (either standard or Offshore Wave versions).

Pile Dynamics releases complimentary update of GRLWEAP program

Pile Drivers, Divers, Bridge, Dock and Wharf Builders Local Union 2404

#101 - 580 Ebury PlaceDelta, BC V3M 6M8www.Piledrivers2404.ca

604-526-2404Cell: 604-788-2902

1-800-LOC 2404

• ITA Designated Trades Training Provider• Trade Certified Pile Drivers / Bridgeworkers • NCCA Accredited Certified Riggers & Signalers • Red Seal Carpenters • CWB Certified Welders • CWB Certified Welder Test Centre • CSA Z275.4 Competent Surface Supplied Divers • AWS D3.6 Class “B” Underwater Welding Certification with CWB Stamp

A detailed description of the upgrade, and the maintenance upgrade itself, are avail-able on www.pile.com/grlweap. All users are encouraged to use the latest version of this software.

In addition to the GRLWEAP software program Pile Dynamics produces several

other quality assurance and quality control products for the deep foundations indus-try. The company is located in Cleveland, Ohio, and has commercial representatives in all continents. For more information visit www.pile.com/pdi.

Suite 300, 6 Roslyn RoadWinnipeg, Manitoba R3L 0G5

www.delcommunications.com

CREATIVE DESIGN

ADVERTISING SALES

TRADE PUBLICATIONS

QUALIFIED SALES & EDITORIAL TEAM

DEL Communications Inc.and you – the key to success!

We offer outstanding personal serviceand quality in the areas of:

Page 11: Piling Industry Canada Issue #2 2015

Authorized Distributor for the Following:

www.bayshoresystems.com

Call: 888.569.3745

More Drill Time.Less Down Time.

When you buy a LōDril®, TR Series, LAD Series or any other rig from Bay Shore Systems, you’ve made an investment that will keep paying you over and over again.

That's because Bay Shore rigs keep working over and over again. So, if you’re getting more downtime than drill time from your current equipment, it’s time to make a move to Bay Shore Systems.

• Solid Engineering• Common Source Parts• Rugged Construction• 95% Service Issues Resolved in Less Than 24 hours

PROUDLY MANUFACTURED IN THE U.S.A.

Page 12: Piling Industry Canada Issue #2 2015

PilingIndustry News

12 PIC Magazine • December 2015

A Liebherr piling rig was recently used for foundation works for the construction of future apartment buildings in the Danish capital of Copenhagen. Some 300 piles had to be installed by the LRH 100 belonging to the Danish construction company M.J. Er-iksson A/S.

In a major infrastructure project under the name “Frederiks Brygge” a waterfront area in the Southern docklands of Copen-hagen is currently redeveloped. On a total area of 120,000 square metres approximately 1,200 apartments are built together with re-tail and commercial space.

The Liebherr piling rig of the type LRH 100 was used for the installation of about 300 concrete piles with a diameter of 300 milli-metres and total lengths between eight and 13 metres.

Thanks to its unrivalled performance strength and it great flexibility the LRH 100 was able to complete this job within just 15 working days – a considerable time before schedule.

A major criterion on the jobsite was the sometimes narrow work space, offering just little leeway for the piling rig to move in any direction. Here, the innovative parallel kine-matics of the machine’s leader system with its great operational range proved to be an immense benefit for the customer. It allows radii of up to 8.75 metres and inclinations of maximum 18 degrees in all directions. Thanks to this feature the operator was able to change the position of the leader in all di-rections without moving the undercarriage.

“We are overall happy with the perfor-mance of the LRH 100. Its ability to install the piles in different angles and in any direc-tion as well as its long outreach massively contributed to the fast completion of the pil-ing works at the jobsite,” explains Kave Yaz-dani, engineer at M.J. Eriksson A/S.

Liebherr piling rig in major infrastructure project in Denmark

The LRH 100 is based on the proven LB 20 carrier machine of the Liebherr LB series of rotary drilling rigs. It is equipped with a powerful and emission-optimized 270 kW /362 hp Liebherr diesel engine and can be transported in one piece with the hammer mounted. The compact design of the carrier

machine with three metre transport width allows for quick and cost-effective trans-portation. The LRH 100 from Liebherr also offers a wide range of powerful equipment. This assures that the excellent performance of the basic machine is ideally converted into high productivity. l

Page 13: Piling Industry Canada Issue #2 2015

TORONTO: 519-623-6454OTTAWA: 613-241-5551

CALGARY: 403-248-4884www.hcmc.ca

“Innovation in Foundations”

HC Matcon Inc.122 Earl Thompson RoadAyr, Ontario N0B 1E0

Tel: (519) 623-6454Fax: (519) 623-6061

HCM Contactors Inc.# 9777 Enterprise Way SE Calgary, Alberta T3S 0A1

Tel: (403) 248-4884Fax: (403) 248-4897

TORONTO: 519-623-6454OTTAWA: 613-241-5551

CALGARY: 403-248-4884www.hcgroup.ca

“Innovation in Foundations”

Shotcrete Shoring CaissonsPiles and Lagging Helical PilesSlurry Walls MicropilesUnderpinning Rock AnchorsSoil Anchors Caisson WallsStructural Shotcrete

HC Matcon Inc.122 Earl Thompson RoadAyr, Ontario N0B 1E0

Tel: (519) 623-6454Fax: (519) 623-6061

HCM Contactors Inc.9777 Enterprise Way SECalgary, Alberta T3S 0A1

Tel: (403) 248-4884Fax: (403) 248-4897

Page 14: Piling Industry Canada Issue #2 2015

14 PIC Magazine • December 2015

The bright and eclectic landscape of down-town Miami is changing thanks to the ad-dition of a bold and innovative residential tower from world-renowned architect Zaha Hadid. The first of her architectural cel-ebrations in the Western Hemisphere, One Thousand Museum by Zaha Hadid Archi-tects will be a cutting-edge, contemporary, luxury residential tower that will rise more than 62 storeys high to encompass a total of 83 residences in 30,000 square feet.

Hadid’s signature curves are evident in the design, which uses fluidity throughout to combine the building’s exoskeleton with a recessed glass façade. The result is an ambi-tious and striking landmark tower that will rightfully earn its place on Miami’s rich ar-chitectural scene.

It is also one that has put the requisite pil-ings work to the test.

PLACEMEnT MATTERSThe complex design of One Thousand

Museum is one that calls for an extra deep foundation to provide the necessary struc-tural support for the towering structure that will rise above ground.

“This was an urban in-fill project in Mi-ami, one of the last sites available in the

downtown boulevard,” states Kevin Venger, developer for One Thousand Museum. “This is the missing piece to the luxury condos on that boulevard.”

Venger describes Hadid’s designs as using a “geometric curvature” to create buildings that “flow” from a structural standpoint.

“We’re rising 700 feet above the ground but to do that, we need to go 155 feet below the ground to put in the support piles,” explains Venger, who opted to use Miami-based HJ Foundations for the installation of augercast piles. “HJ Foundations has perfected the au-ger drill shaft. They installed 242 piles with 30-inch diameters in 85 working days. That’s unheard of and would have taken us twice the amount of time and double the cost if we were to have done it with traditional caisson piles.”

According to Frank Fonseca, president, HJ Foundation, a Keller Company, the com-pany’s “mega piles” (as he refers to them) are the result of 10 years of development in perfecting the craft. It’s one that carries over the efficiencies earned on smaller buildings to taller ones – one that Fonseca describes as having occurred over the course of several years.

Sky ViewDowntown Miami gets iconic new tower and breaks aworld piling record

By Melanie Franner

Page 15: Piling Industry Canada Issue #2 2015

O�ering a full range of piling products including sheetpile, H-pile, and pipe for sale or for rent anywhereacross North America from eight stocking locations.

Sheet piling - Hot Rolled, Cold Formed A572 Grade50 Standard. A690, A588, and other grades readilyavailable - all in your “as required” length.

Call us for support and service on your next project.

Providing Piling Product Solutions to the Heavy ConstructionIndustry for over 25 years

Providing Piling Product Solutions to the Heavy ConstructionIndustry for over 25 years

Providing Piling Product Solutions to the Heavy ConstructionIndustry for over 25 yearsO�ering a full range of piling products including sheetpile, H-pile, and pipe for sale or for rent anywhereacross North America from eight stocking locations.

Sheet piling - Hot Rolled, Cold Formed A572 Grade50 Standard. A690, A588, and other grades readilyavailable - all in your “as required” length.

www.rollformgroup.comRoll Form Group Suite 100 - 6701 Financial Drive, Mississauga, ON L5N 7J7 Tel: (905) 270-5300 Fax: (905) 593-3489 950 Industrial Road, Cambridge, ON N3H 4W1 Tel: (519) 650-2222 Fax: (519) 650-2223 26 Country Road 351, Iuka, MS, 38852 Tel: (662) 424-1460 Fax: (662) 424-0314Piling Products 945 Center Street, Green Cove Springs, FL, 32043 Tel: (904) 287-8000 Fax: (904) 529-7757

Page 16: Piling Industry Canada Issue #2 2015

16 PIC Magazine • December 2015

“Traditional caisson piles could have been used on this project but it would have been more expensive and time consuming to in-stall,” he says. “Because of our market share, we have used mega piles in hundreds of buildings in Miami over the years. We have perfected the design and implementation of augercast piles in high-rise towers like this one.”

HJ Foundations designs its own proprie-tary equipment and is able to meet the needs of different developers as a result.

“Our equipment is the biggest and most powerful in North America,” he says. “It is custom built to our specifications.”

The company is capable of installing piles as large as 42 inches in diameter and as deep as 170 feet, with load capacities as great as 1,800 tonnes per pile.

In the case of One Thousand Museum, HJ Foundations used 30-inch diametre au-gercast piles and went as deep as 160 feet on most of them. There were, however, a few ex-ceptions to the rule.

“We broke the world record by going 177 feet deep on this job with a few of the piles,” says Fonseca.

The soil conditions were typical of south Miami and posed no significant challenges for the experienced crew.

“The soil is intermittent layers of sand and limestone,” explains Fonseca. “We some-

times hit voids in the limestone formations but we just filled them in and kept going. In all, the project progressed pretty much as we thought it would, thanks to a lot of foresight and planning.”

Venger adds that every pile installed took about five truckloads of grout. “It required a lot of careful timing and sequencing,” he says. “But we never had to abandon a pile. At the worst, we had to go back and refill.”

According to Fonseca, the work below the ground at One Thousand Museum went relatively smoothly.

“We try to break down complex projects that developers create above the earth and make them uniform below the ground,” he explains. “Although the piles in this case were deeper than most, the rest of the job was fairly typical. Our work tends to go un-noticed because it does take place under-ground. Now that we’re done, the sexy part of building above ground can begin.”

fOunDATIOn fIRSTAnother significant element of One

Thousand Museum was the foundation pour required for the project.

“We used almost 10,000 yards of concrete for the foundation,” says Venger, who adds that it took about 1,000 truckloads of con-crete to complete the 24-hour pour. “We used seven different batch plans and had 170 trucks cycling at any given time. We had

25 off-duty police officers on hand to direct the traffic. We had five pumps per truck and had 10 trucks pumping continuously.”

Given all the activity that the foundation pour entailed, it surprisingly went well.

“Getting the piling work and the founda-tion in is a huge milestone for us,” concludes Venger. “Everything else is humanly con-trollable. We can pre-plan around anything that arises from this point forward, even it entails a hurricane. When it comes to the piling work, you’re up against the unknown. You never know what you’re going to find when you’re digging the hole. We had three wells put in for this project and pumped from two of them. We reached 1,000 gallons of water per minute from a well absorption point of view. We had the third back-up well ready but luckily, we didn’t have to use it. From this point forward, we’re off to the races.”

Construction work on the tower proper will begin in early 2016, with a completion date for One Thousand Museum expected in late 2017. When finished, One Thousand Museum will undoubtedly become a land-mark building – one that will transform the ambitious creative vision of Zaha Hadid into the stunning reality of luxury living – thanks to the expertise and experience of an industry ready and willing to rise to the challenge. l

As a premier steel foundation supplier now offering NZ sheets in addition to our extensive product line, Skyline Steel is the ideal partner for your next project.

Visit www.skylinesteel.com/nz or call 888.450.4330.

Section

Width

in

Height

in

Thickness

in

Pile

lb/ft

Wall Weight

lb/ft2

Section Modulus

in3/ft

Moment of Inertia

in4/ft

NZ 19 27.56 16.14 0.375 55 23.95 35.08 283.1

NZ 20 27.56 16.16 0.394 57 24.82 36.24 292.8

NZ 21 27.56 16.20 0.433 61 26.56 38.69 313.4

NZ 26 27.56 17.32 0.500 71 30.92 48.50 419.9

© 2015 Skyline Steel, LLC. Skyline Steel is a wholly-owned subsidiary of Nucor Corporation, the largest producer of steel in the United States.

Skyline_PIC_NZ_1115_f.indd 1 11/23/15 5:21 PM

Page 17: Piling Industry Canada Issue #2 2015

As a premier steel foundation supplier now offering NZ sheets in addition to our extensive product line, Skyline Steel is the ideal partner for your next project.

Visit www.skylinesteel.com/nz or call 888.450.4330.

Section

Width

in

Height

in

Thickness

in

Pile

lb/ft

Wall Weight

lb/ft2

Section Modulus

in3/ft

Moment of Inertia

in4/ft

NZ 19 27.56 16.14 0.375 55 23.95 35.08 283.1

NZ 20 27.56 16.16 0.394 57 24.82 36.24 292.8

NZ 21 27.56 16.20 0.433 61 26.56 38.69 313.4

NZ 26 27.56 17.32 0.500 71 30.92 48.50 419.9

© 2015 Skyline Steel, LLC. Skyline Steel is a wholly-owned subsidiary of Nucor Corporation, the largest producer of steel in the United States.

Skyline_PIC_NZ_1115_f.indd 1 11/23/15 5:21 PM

Page 18: Piling Industry Canada Issue #2 2015

18 PIC Magazine • December 2015

The new Children’s Hospital of Saskatchewan (CHS) is currently un-der construction in Saskatoon. When operational in 2019, it will be the first of its kind in the province – a five-floor, 176-bed facility that will offer specialized medical services for children, teenagers, preg-nant women, and mothers. It will also include a pediatric and adult emergency department for both the CHS and the existing Royal University Hospital (RUH), which is located adjacent to the CHS.

“Many of the specialized services that are going to be offered by the CHS are currently dispersed throughout the region and at differ-ent locations within existing facilities,” explains Craig Ayers, Chil-dren’s Hospital of Saskatchewan project director, Saskatoon Health Region. “In some instances, patients currently need to relocate within a department or between facilities. This new facility will al-low specialized services to be co-located under one roof. It is a very significant and complex project.”

SITE SITuATIOnConstruction of the new CHS is made all the more complex be-

cause it is being built on the site of the existing RUH. As such, there was extensive site preparation work involved. This began in 2011, and included the creation of a new entrance to the RUH, expansion of a portion of the parkade and demolition of an area of the parkade in the area of construction of the new facility.

“This is a complex project in that it is being integrated into an

existing, live site,” notes Tom Bain, senior project manager, Graham Construction, the general contractor on the project. “The new hos-pital is located between the existing Royal University Hospital and the parkade. This means we have both operational restrictions and access restrictions.”

Not only does the “live” site translate into tight building condi-tions, it also gives rise to other concerns.

“One of the main challenges is logistics,” says Bain. “We have a very limited area – what we call a ‘gap site’ to bring in materials and resources. We’re working in a live hospital environment and have to deal with just-in-time sequencing of materials delivery. We also have to manage the comings and goings of the general public, the physi-cians and other staff. It’s a tough logistical situation.”

PLAnnED PILInGThe first phase of construction on the CHS involved 240 cast-in-

place (CIP) concrete piles. The company charged with the work was Deep Foundations Contractors Inc. They began the job at the end of September 2014, and finished in February 2015.

“We worked through the winter but didn’t miss any time due to bad weather,” says David Bradshaw, regional manager, Western Can-ada, Deep Foundations Contractors Inc. “It just took a bit longer to warm up the equipment when working in minus 25 or minus 30-de-gree temperatures.”

Performance PilingNew Children’s Hospital of Saskatchewan puts piling to the testBy Melanie Franner

Page 19: Piling Industry Canada Issue #2 2015

19Piling Industry Canada • December 2015

Despite the extra time required to ready the equipment, Deep Foundations Contractors finished the first phase of piling work slightly ahead of schedule. That’s not to say it was an easy job.

“It was quite a complex project,” explains Bradshaw. “The ground conditions varied tremendously across the site. We had to constantly adjust the pile depths that were required.”

According to Bradshaw, the geotechnical information provided prior to the start of the project was limited because of the existing RUH parking structure that was located on the same site where the pilings were to be installed. The preliminary test holes were done primarily along the periphery of the site. Additional geotechnical testing was completed once the parking structure was demolished.

“We had anticipated a range of depth of between 15 to 20 metres,” says Bradshaw. “We ended up with a range of between 15 and 33 metres.”

Fortunately, the company had additional capacity on site to deal with the extra depths required.

“We did have to make some modifications to the way we handled the reinforcing cages,” adds Bradshaw. “We constructed a cage han-dling cradle to deal with the long cages safely. Additional reinforcing was required as well.”

The majority of the piles required a “bell” to be constructed at the base, which typically tripled the diametre of the base, in order to increase the bearing area and therefore, the pile capacity.

“The pile design was based on a combination of shaft friction and end bearing to develop pile capacity,” adds Bradshaw. “A greater shaft length was required when we encountered a layer of less-consistent material than assumed in the pile design, which meant piles had to be drilled deeper. It was essentially ‘real-time design.’”

RESTRICTED ACCESSAnother significant aspect of the piling work was the limited ac-

cess that the crew had to the site.“It was a real challenge,” says Bradshaw. “We were hemmed in on

three sides with the access limited to a long, single-lane driveway. Contractual conditions restricted the times of day when construc-tion traffic was allowed to access the site. It took a lot of good site planning to manage this constraint. The adjacent university did not want our supply trucks and equipment traveling through the univer-sity grounds during times of peak pedestrian and vehicular traffic as a safety precaution.”

Although the restricted access from the “gap” site had the team of 10 people sometimes working into the evening, it didn’t involve night work. And, it didn’t delay the schedule.

But the more complex scenario is yet to come.“Phase two will involve about 60 piles,” explains Bradshaw, who

adds a new ramp has to be constructed in order to close the existing ramp into the parking structure and maintain continuous access into the parking-structure grounds, as well as allowing for construction of the main hospital building. “Phase two will be very congested. I would estimate that about three quarters of the existing site will be eliminated due to other construction activities. Plus, there will be the added traffic from the trades that will come with the building of the

new hospital. It’s going to be very tight – no doubt about it.”Bradshaw estimates this part of the piling work will begin at the

end of February 2016, and run for a couple of months at least.“It would have been a lot easier for us to do the two phases at the

same time,” concludes Bradshaw. “But given the fact that the new hospital is being constructed on the existing site of a hospital that needs to remain operational, it just turned out that we had to do it in two phases. The first phase was tight. But the second will be tighter still.” l

[email protected]+1 216-831-6131 www.pile.com/champ

The new Cross-Hole AnalyzerCHAMP-XV

Your best CSL choice.

Looks smart, performs smarter.

Cross Hole Sonic Logging per ASTM D6760

Page 20: Piling Industry Canada Issue #2 2015

20 PIC Magazine • December 2015

The 10 storey height of the Home Insurance Building in Chicago, the world’s first skyscraper built in 1884-1885, pales in comparison to today’s modern mammoth high-rises, but it was a ground-breaking construction that would quickly be repeated and improved upon. Nowadays, high-rises are widespread with major cities depending on them to house the world’s growing population on earth’s limited land. But all those towering structures come with a price; one which the environment is paying. From greenhouse gas emissions to waste disposal, construction is high on the list of industries impacting the environment – in the top 10 according to a U.S. Environmental Pro-tection Agency report.

While the need for construction will likely never waver, the need for a more environmentally-friendly industry moving forward is essential. Enter wood construction. While wood is far from a new building material, the ability to create high-rise buildings out of lum-ber is still fairly innovative, but one that can help change the con-struction industry for the betterment of the environment.

“Wood is a renewable resource, offers flexibility in use, and is a more sustainable building material than concrete or steel in that it sequesters carbon, while the production of concrete and steel re-leases significant amounts of carbon. Also, a prefabricated wood structure is quick to erect and will result in a cleaner job site and a reduction of construction-related noise,” says John Metras, interim associate vice-president of resources and operations and managing director of infrastructure development for the University of British Columbia (UBC).

“The emergence of engineered wood products and advances in connectors has made it feasible to utilize wood-based products and systems as structural elements for wood buildings higher than the traditional four to six storey heights allowed by building code,” con-tinues Metras. “The use of engineered wood materials as a primary structural component in buildings of all types, and high-rise build-ings in particular, is currently a strong focus of design and research communities, forest industries and governments seeking to promote

Tall TimbersThe University of British Columbia is set to build Canada’s tallest wooden building

By Lea Currie

Page 21: Piling Industry Canada Issue #2 2015

800.348.1890 HMC-US.COM

Most advanced auto-steering

system

Drives pile up to 50'

Operates from excavator’s

auxiliary system

Ability to drive

round pile

More than 500 units

currently in the fi eld

3,000 vibrations

per minute

SSG

Most advanced auto-steering

Operates from vibrations

per minute

START WITH A

GREAT FOUNDATION THE INDUSTRY’S MOST ELITE SIDE GRIP FOR 17 YEARS

Page 22: Piling Industry Canada Issue #2 2015

22 PIC Magazine • December 2015

sustainability, innovation and economic development.”Laying the foundation for this industry advancement, UBC an-

nounced it will be breaking ground on a new student residence made primarily of wood. Once erected, Brock Commons is set to be Canada’s tallest wooden building at 18 storeys, as well as one of the tallest in the world.

This pioneering facility will be created with Douglas Fir Glulam and Parallel Strand Lumber (PSL) columns and SPF (spruce-pine-fir) Cross Laminated Timber (CLT) panels. A total of four 64-milli-metre double-corrosion protected soil anchors with 1250kN tension capacity will be used on the south side of each core footing. As the wooden structure will be lighter than concrete, the seismic loads are smaller, which impacts the core footing sizes. The foundation, as well as the elevator and stairwell cores, will be constructed with concrete. The core foundations are designed as capacity protected foundations with soil anchors to prevent overturning where required.

Metras explains that the reason for use of mass timber as the pri-mary structural material stems from UBC’s desire to demonstrate the practical use of a sustainable, locally-relevant construction mate-rial in a high-rise building application.

“UBC has constructed a number of two to five-storey buildings over the past five years utilizing mass timber structures. This project represents the next step in the evolution of mass timber construc-tion,” says Bernhard Gafner of Fast + Epp, structural engineer of Brock Commons.

While provincial regulations only allow for wooden buildings of six storeys or less, the Government of British Columbia issued a site specific regulation to allow UBC to construct with mass timber be-yond the current building code limits.

The significant height of the wooden facility required that several structural design needs be addressed. Naturally when working with timber, shrinkage was considered. “Providing column-to-column detail relying on end grain to end grain load transfer only is cru-cial. By avoiding timber members loaded perpendicular to grain, the vertical shrinkage of the wood structure is almost eliminated,” says Gafner.

Another concern was the structural robustness and dispropor-tionate collapse. While this issue is of utmost importance in some international codes, the Canadian building codes are vague and general. Given the innovative structure, the design team used the Eurocode EN-1991 as well as the Practical Guide to Structural Robust-ness and Disproprotionate Collapse in Buildings as expert reference documentation.

Finally, the axial column shortening, present in all structures re-gardless of materials used, needed to be considered and quantified in order to be addressed by the Mechanical Electrical Plumbing (MEP) consultants to avoid potential long-term serviceability issues.

“UBC is comfortable moving forward with development of this unique building given the careful design process and rigorous design

review by the Provincial Building & Safety Standards Branch, in-cluding review by a panel of independent building experts, to ensure that the facility will be safe, functional and sustainable,” says Metras.

The student residence will also be the province’s first building to be specified to the new 2015 National Building Code of Canada (NBCC) for seismic design. This resulted in higher seismic loads compared to the 2012 British Columbia Building Code due to the increased spectral response accelerations (Sa), explains Gafner.

“The use of the 2015 NBCC did not directly address or change the design of the wood components of the building, but as a result of the higher seismic forces, the CLT diaphragm needed to be designed to withstand these increased seismic loads,” says Gafner.

The building’s safety measures will include enhanced fire protec-tions and backup systems, a building-monitoring system, and an upgraded building core.

LEARnInG OPPORTunITyWhile the Brock Commons student residence will primarily

function as living quarters for 400 students, once construction is completed in the summer of 2017, the building will also provide a unique learning opportunity. As part of the UBC Campus as a Living Laboratory initiative, students and faculty will research the design, construction, evaluation and monitoring of advanced mass tim-ber structural systems. As well, sensors will be incorporated in the structure to measure building vibrations, moisture levels and ver-tical settlement as researchers monitor the building’s performance long-term, states Metras.

B.C.’s forest industry is also using this as a learning opportunity. A primary objective of the project is to determine the economic fea-sibility of using mass timber in a high-rise application. A favourable construction could result in long-term positive growth for the in-dustry if wood demand increases.

As this is one of the first projects of its kind at this height, ad-ditional costs were incurred for design, design review and approval, as well as risk mitigation during construction. Despite these extras, the cost differential compared to a standard concrete building was only eight per cent, says Metras. Several external agencies (Natural Resources Canada, BC Ministry of Forests, Forest Innovation In-vestment and the Binational Softwood Lumber Council) provided funding to cover the additional costs of this innovative project so the university does not incur a premium to build the facility. As the use of mass timber structure systems in high-rise buildings becomes more commonplace, these cost differences are expected to decline substantially.

As the world’s population continues to stretch the earth’s limits and bigger and taller buildings help ensure land-strapped cities can con-tinue to house their residents, the wood-based high-rise will assist in reducing the negative impact on earth. UBC’s Brock Commons will be a strong root in the growth of the construction industry. l

Tall Timbers continued

Page 23: Piling Industry Canada Issue #2 2015
Page 24: Piling Industry Canada Issue #2 2015

24 PIC Magazine • December 2015

It’s been a long time coming. In fact, it’s taken more than 50 years for sonic drilling research to come full circle – back to one of its earliest uses as a pile driver. Now, however, the tech-nology is far superior and set to revolution-ize the piling industry with a just-patented method.

But, first, a little history on how we got here. Back in the 1960s, an early sonic pile driving rig enjoyed a small measure of suc-cess using two WWII army tank engines that generated a whooping 1,000 hp. but, despite much effort and a fair bit of money, by the 1980s, sonic pile driving research had fizzled out with little to show for 20 years of effort.

That’s about the time that Ray Roussy, a Canadian engineer, entered the picture. His work on sonic drilling had suddenly ended when his employer, Hawker Siddeley, a Brit-ish aerospace company, decided to abandon sonic research.

Roussy was convinced the technology was viable – not so much as a pile driver – but, instead, as a drilling rig that could offer faster speeds and the much-appreciated abil-ity to drill through mixed soils where other rigs would jam up. He decided to continue the research but on his own and with no fi-nancing. It was not an easy road but, with

perseverance, Roussy patented and success-fully commercialized modern sonic drilling technology as we know it today.

After 35 years of effort, Roussy’s award-winning patented technology is now used in almost all drilling applications and around the world on six continents. Drilling three to five times faster through mixed soils, using no drilling mud (so less mess to clean up) and able to provide continuous core samples, sonic drilling technology has been embraced by many industries including mining, geo-thermal, and environmental.

Now, in the coming months, a new twist on this technology will be introduced to the construction industry – a move that has been anticipated for nearly a year but was kept se-cret until patents could be filed.

“It’s been a time-consuming but exciting project to finally realize the piling installa-tion potential in sonic drilling technology,” says Roussy.

Although Roussy spent the better part of his life and career perfecting his sonic drill-ing technology, that didn’t stop him from reflecting on its earliest roots in pile driving.

“I always believed the sonic drill would, one day, find its original niche in building foundations,” says Roussy.

Roussy, who is president of the Sonic Drill Corporation (which manufactures his patented sonic drill rigs) and Sonic Drilling Ltd. (which owns a fleet of sonic rigs that are used for contracting purposes), first used the newly-patented pile-anchor method on his own offices for Sonic Drilling Ltd.

“One of the main advantages of using a sonic to install pile-anchors is that it can be done efficiently, with no pounding, in tight spaces and without impacting adjacent structures,” he says. “Plus, on larger piling installations, there’s no need for cranes or heavy equipment while smaller projects can be quickly and easily completed…lots of op-portunity to save on costs.”

Sonic pile-anchors also provide excep-tional earthquake protection by prevent-ing the building from shifting or separating from its foundation – a significant cause of damage and death in seismic shake-ups and building collapses.

Only sonic rigs produced by the Sonic Drill Corporation can use this new method which offers three patented options:1. Sonic rigs can install formed-in-place

composite piles (which are a combination of concrete and steel) and are topped with a pile end cap which the building rests upon (see option one photo).

Patented Sonic Pile-AnchorsSet to RevolutionizeBuilding FoundationsBy Nancy Argyle

Option one: sonic pile with end cap (building rests on).

Page 25: Piling Industry Canada Issue #2 2015

25Piling Industry Canada • December 2015

2. Sonic rigs can install an anchor top which the building does not rest on but is anchored to (see option two photo).

3. Sonic rigs can install a pile-anchor which allows the building to rest on it as well as be bolted and anchored to it (see option three). Sonic pile-anchors can be cus-tomized for high-loading capacity and can be installed quickly, given the faster speed of the sonic drill. Sonic Drilling Ltd. is now actively quot-

ing on pile anchoring projects as word has spread locally about the advantages of the new technique. And, like the adoption of sonic drilling technology in general, it won’t take long before this new application is in use around the world. l

Nancy Argyle is one of Canada’s most experienced disaster communicators. Based in Calgary, she is a university lecturer, former print reporter, and strategic communications consultant who writes on a variety of topics.

Option two: sonic anchor(building doesn’t rest on, but is anchored).

Option three: sonic pile-anchor (buildingrests on and is anchored at the same time).

HELLY HANSEN WORKWEAR

Scandinavian design is the cornerstone in all Helly Hansen gear. The optimal combination of purposeful design, protection and style. This is why professional fi shermen, trade workers and discerning outdoor enthusiasts choose Helly Hansen.HHWORKWEAR.COM

Page 26: Piling Industry Canada Issue #2 2015

Equipment Corporation of America (ECA) was founded in 1918 as a provider of construction, industrial and material handling equipment. Today, ECA focuses primarily on providing the latest technology available to service the Foundation Industry. Through an exclusive partnership with Bauer Machine Group, ECA is the only partner company in the world to offer authorized sales, rental and service solutions for Bauer equipment.

S E R V I C E S & T E C H N O L O G I E S

➭ New and Used Equipment Sales and Rentals➭ Large Diameter Drill Rigs➭ Earth Retention & Micropile Drills➭ Fixed and Telescopic Mast Mobile Piling Rigs➭ Pile Driving Equipment - Diesel - Hydraulic Impact - Free Hanging Vibratory Hammers - Excavator Mounted Vibratory Hammers - Excavator Mounted Side Grip Vibratory

Hammers - Soil Mixing and Slurry Wall Equipment

➭ Drilling Tools and Accessories - Rock Augers - Core Barrels - Digging Buckets➭ Overburden Drilling Systems➭ Sectional Casing Systems➭ Equipment Service and Rebuilding➭ Welding and Fabricating➭ Field Service Fleet➭ Replacement Drill Teeth➭ Parts and Accessories

WE ARE the CORNERSTONE of the FOUNDATION INDUSTRY.

Find out how we can build a foundation together. 1.800.760.0925 -or- www.ecanet.com

EQUIPMENT CORPORATION OF AMERICA

B U I L D I N G F O U N D A T I O N S S I N C E 1 9 1 8

➭ PITTSBURGH412.264.4480

➭ WISCONSIN262.345.5716

➭ PHILADELPHIA610.626.2200

➭ NY/NJ 732.888.5477

➭ WASHINGTON, D.C.301.599.1300

➭ GREENSBORO 336.854.1220

➭ TORONTO800.760.0925

➭ BOSTON 508.821.4450

➭ JACKSONVILLE 904.284.1779AUTHORIZED DEALER:

Page 27: Piling Industry Canada Issue #2 2015

Equipment Corporation of America (ECA) was founded in 1918 as a provider of construction, industrial and material handling equipment. Today, ECA focuses primarily on providing the latest technology available to service the Foundation Industry. Through an exclusive partnership with Bauer Machine Group, ECA is the only partner company in the world to offer authorized sales, rental and service solutions for Bauer equipment.

S E R V I C E S & T E C H N O L O G I E S

➭ New and Used Equipment Sales and Rentals➭ Large Diameter Drill Rigs➭ Earth Retention & Micropile Drills➭ Fixed and Telescopic Mast Mobile Piling Rigs➭ Pile Driving Equipment - Diesel - Hydraulic Impact - Free Hanging Vibratory Hammers - Excavator Mounted Vibratory Hammers - Excavator Mounted Side Grip Vibratory

Hammers - Soil Mixing and Slurry Wall Equipment

➭ Drilling Tools and Accessories - Rock Augers - Core Barrels - Digging Buckets➭ Overburden Drilling Systems➭ Sectional Casing Systems➭ Equipment Service and Rebuilding➭ Welding and Fabricating➭ Field Service Fleet➭ Replacement Drill Teeth➭ Parts and Accessories

WE ARE the CORNERSTONE of the FOUNDATION INDUSTRY.

Find out how we can build a foundation together. 1.800.760.0925 -or- www.ecanet.com

EQUIPMENT CORPORATION OF AMERICA

B U I L D I N G F O U N D A T I O N S S I N C E 1 9 1 8

➭ PITTSBURGH412.264.4480

➭ WISCONSIN262.345.5716

➭ PHILADELPHIA610.626.2200

➭ NY/NJ 732.888.5477

➭ WASHINGTON, D.C.301.599.1300

➭ GREENSBORO 336.854.1220

➭ TORONTO800.760.0925

➭ BOSTON 508.821.4450

➭ JACKSONVILLE 904.284.1779AUTHORIZED DEALER:

Page 28: Piling Industry Canada Issue #2 2015

28 PIC Magazine • December 2015

Three major cities in China – Hong Kong, Macau, and Zhuhai – will soon be connect-ed by a series of bridges, tunnels, link roads, and boundary crossing facilities, providing a new direct link between the east and west banks of the Pearl River Delta for passenger and freight land transportation. At the ex-pected cost of approximately US $10.6 bil-lion, the construction of the massive Hong Kong-Zhuhai-Macao Bridge project be-gan in December 2009 and its completion is planned for late 2016. However, it faces daunting challenges as they combat nature to build and stabilize an artificial island that is central to the project.

A major project component is the Hong Kong Boundary Crossing Facilities (HK-BCF) that will serve as a transportation hub and provide clearance facilities for goods and passengers using the bridge. The HK-BCF is located on a 150-hectare artificial island that was reclaimed from open wa-ters just northeast of the Hong Kong In-

ternational Airport. The landing points for the link roads and tunnels will utilize 20 hectares of the island. The remaining 130 hectares will be used for the HKBCF cargo, passenger, and vehicle inspection facilities; offices for the immigration, customs, and excise departments; road networks; and a public transport interchange and traffic con-trol surveillance system.

The artificial island’s sea wall was built using a new, non-dredge approach. Large 30-meter-diameter steel caissons were dropped into the sea a few meters apart and joined by a flexible steel wall. As the mud was dug out from the middle, each 450-tonne caisson drove itself down towards the hard strata. This new recla-mation technique was used instead of the con-ventional approach of dredging out the soft mud down to the bedrock and replacing it with marine sand.

Additional ground strengthening mea-sures were also needed to help stabilize the island’s soft marine mud before construct-

ing boundary crossing facilities and tunnel landing points. Trevi Hong Kong joined these stabilization efforts by installing jet grout columns in a key area of the island.

STABILIzInG WITh jET GROuTInGTrevi Hong Kong installed 450 jet grout

columns with diameters ranging from 1.2 metres to three metres to a depth up to 35 metres. The jet grouting was performed by drilling a hole to the required depth, fol-lowed by rotating and extracting the drill rod while simultaneously pumping high-pressure fluid through nozzles at the foot of the drill string. A combination of air and cement grout slurry was injected as the breaking-up and consolidation agents, using the TREVIJET T1/S bi-fluid system. Five Soilmec 7T-600J high pressure pumps with four-inch pistons were used to install the large-diameter grout columns and a sin-gle Soilmec 7T-505 pump was used for the small-diameter columns.

Six Soilmec PSM-20 hydraulic drilling

The HubTrevi Hong Kong works onthe Hong Kong Boundary Crossing Facilities

By Claudio Borgatti, operations manager at Trevi S.p.A., and Marco Chiarabelli, corporate sales manager for Soilmec North America

Page 29: Piling Industry Canada Issue #2 2015

29Piling Industry Canada • December 2015

rigs were deployed for this jet grouting con-struction. The drilling rigs were all equipped with a monitoring system that displayed on a built-in LCD screen and recorded on a dedicated memory disk the main drilling and jetting parameters, including depth, drilling rate, string revolution speed, drill-ing torque, grout pressure, grout and air flow rate, drilling and jetting time, column deviation, and x and y inclination.

The artificial island’s geological condi-tions challenged the stabilization efforts. The top ground layer of about 8.5 metres of sand fill is followed by approximately 18.5 metres of very soft marine mud. Trevi Hong Kong needed to penetrate through the soft sand fill and marine mud into at least one metre of the Alluvium material that rests below.

The Soilmec drilling rigs performed beautifully, helping Trevi Hong Kong main-tain an aggressive production schedule of at least eight jet grout columns per day.

Above: Constructing jet grout columns on an island had its unique challenges, including needing four barges to deliver cement from the factory in China to the jobsite.

Right: Trevi Hong Kong complete the jet grouting construction in only two months, thanks in part to the reliability of their six

Soilmec drilling rigs.

Page 30: Piling Industry Canada Issue #2 2015

30 PIC Magazine • December 2015

Soilmec PSM-20 rigs jet grouting on an artificial island just northeast of Hong Kong International Airport.

SuPPLyInG An ISLAnDTrevi Hong Kong performed the jet

grouting on a very tight schedule within 2.5

months. This translated into a demanding

schedule for supply delivery to the island,

given the required high rate of cement con-

sumption.

Trevi Hong Kong used four barges with a

capacity of 1,200 tonnes to transport cement

from a factory in China to the jobsite on the

island in order to prevent any interruption

or delay in cement supply. Two additional

barges were equipped with 14 horizontal si-

los, each with a capacity of up to 600 tonnes

of cement, and four grout mixing plants. Sea

water was used as the water source for drill-

ing and mixing the cement grout. Given this

setup, Trevi was able to produce up to 1,200

cubic meters of cement grout per day.

Trevi Hong Kong was awarded the sub-

contract for the jet grouting in the middle of

March 2015, and the work was successfully

completed ahead of schedule on June 15,

2015. Trevi’s speedy construction of the jet

grout columns was greatly appreciated by

their client, the main contractor. l

Trevi Hong Kong depended on Soilmec drilling rigs to install 450 jet grout columns, helping to stabilize an artificial island at the centre of the Hong Kong-Zhuhai-Macao Bridge project.

Parked alongside the island, two barges were equipped with 14 silos and four grout mixing plants to keep up with the high consumption rate of cement grout – 1,200 cubic metres per day.

AMERIC

AN P

ILEDRIVING EQUIPMENT

J&M

FOU

NDATION EQUIP MENT

AMERIC

AN P

ILEDRIVING EQUIPMENT

&M F

OU

NDATION EQUIPME

Page 31: Piling Industry Canada Issue #2 2015

AMERIC

AN P

ILEDRIVING EQUIPMENT

J&M

FOU

NDATION EQUIP MENT

AMERIC

AN P

ILEDRIVING EQUIPMENT

&M F

OU

NDATION EQUIPME

Page 32: Piling Industry Canada Issue #2 2015

32 PIC Magazine • December 2015

In the current world enamoured with hoodie-wearing CEOs, it’s refreshing to profile a successful business person who not only started his career without cell phones, computers, overnight de-livery, or email, but who also still wears a suit and tie to every meeting.

It’s been nearly 60 years since Davide Trevisani started his career in the foundation drilling industry. Trevisani’s compa-ny, originally named Pali Trevisani, enjoyed its early successes without the help of modern conveniences; it was all hard work, problem-solving, and know-how. He took great care in shaping what is now known as Trevi S.p.A., learning the business from the underground up, working hard to solve project issues and do the job better, growing in careful leaps to the successful, publicly-traded enterprise that it is today.

Trevisani is the recipient of several honours and awards in-cluding an honorary Doctorate in Civil Engineering from the University of Bologna, the Leonardo Prize for Italian Quality Achievements, and the Ernst & Young Entrepreneur of the Year award. His most recent honour came in October 2015, when Davide Trevisani was bestowed one of the Deep Foundation In-stitute’s highest awards: the DaVinci Legends Award, which hon-ours practitioners that have made significant contributions and advancements to the research, design, construction, manufactur-ing, and use of deep foundations.

An EnTREPREnEuR IS BORnTrevisani was born on January 8, 1937, in Cesena, Italy in the

Emilia Romagna region, which is known worldwide for its heri-tage of excellence in engineering. With the renowned technical program at the University of Bologna at its centre since late in the 11th century, the region is home to the headquarters for Ferrari, Ducati, Lamborghini, and Maserati, to name a few.

No Substitute forHard Work and DedicationDavide Trevisani takes homeDFI’s DaVinci Legends Award

With a $600 CAD loan from his family, Trevisani purchased his first wooden drilling tripod.

Davide Trevisani is the proud recipient of Deep Foundation

Institute’s DaVinci Legends Award (2015).

Page 33: Piling Industry Canada Issue #2 2015

33Piling Industry Canada • December 2015

In 1956, with a high school degree in surveying, he worked for a small construc-tion company. By 1957, Trevisani’s business acumen had already taken shape: he saw a need and made plans to start a company that served the field of special foundations. He purchased his first wooden drilling tri-pod with a $600 CAD loan from his family. Originally producing small diametre piles using water well equipment, Pali Trevisani grew within 10 years into a company rec-ognized in Italian and foreign markets as a leader in the foundation drilling industry.

In the decades that followed, Trevisani would work on some of the most presti-gious and complex underground construc-tion projects in the world, including the stabilization of the Tower of Pisa, build-ing 17 new stations for the Copenhagen Cityringen rail line, providing anchors for the righting of the Costa Concordia, and strengthening levees in New Orleans.

fAMILy LEGACy TAkES ShAPE AnD SOILMEC IS ESTABLIShED

In 1969, together with his entrepre-neurial brother Gianluigi, Trevisani es-tablished Soilmec, the renowned equip-ment engineering and manufacturing arm of the Trevi Group. Since the beginning, Soilmec has incorporated advances and improvements learned from Trevi’s on-site construction experience, bringing the most cutting edge technological upgrades to solve ever-evolving foundation drilling challenges. This consistent effort to pro-vide the best foundation equipment on the market has made Soilmec, with its long list of successful innovations, an international

By 1967, Pali Trevisani established itself in the Italian and foreign markets.

Fugro has the experience, equipment, technology and professionals necessary to provide a complete and integrated plan to reduce potentially catastrophic and expensive risks on deep foundation projects. Fugro Loadtest applies state-of-the-art bi-directional technology, the Osterberg Cell®, to produce the information needed for true foundation optimization.

• Geophysical evaluations• Advanced site exploration (CPT, DMT, rock coring)• Seismic studies/liquefaction analysis• Complex soil properties analysis• Foundation design calibration (O-Cell® load testing)• Standard deep foundation load testing and dynamic analysis• Performance verification (RIM-Cell® proof loading) • Construction risk management (SoniCaliper™ shaft

excavation inspection)• GIS data management

managing deep foundation risk

888 241 [email protected]

www.fugro.comwww.loadtest.com

Page 34: Piling Industry Canada Issue #2 2015

34 PIC Magazine • December 2015

Soilmec’s R-12 is developed as one of the first, self-erecting, hydraulic operated,

compact drill rigs for bored piles.

Soilmec S.p.A. manufacturing plant is established (1969).

leader in the fields of ground and civil engineering.In 1981, Soilmec manufactured the R-12, which was one of the

first self-erecting, crawler-mounted, hydraulic rigs for bored piles. The R-12 also adopted a trapezoidal system for vertical approaches to the drilling point, saving many crawler movements and thereby increasing efficiency on job sites. By 1990, Soilmec sold its first rig on North American soil to the Hub Foundation Company.

Soilmec’s most recent decade of innovation has produced an ex-ceptional line of cranes and crane attachments that offer specific solutions for submerged foundation work, improved lift, and re-duced weight for cost-effective transport. Adding to its repertoire of cutting-edge technology, Soilmec unveiled its computer-based Drill-ing Mate System (DMS) in 2005, which allows operators to monitor the overall operation of the machine and “see underground” with drilling data including depth inclination, rotary speeds and crowd pressure.

Over the years, Soilmec has grown from being a small equipment manufacturer on 35 acres to a 150-acre global leader in the fields of geotechnical engineering and special foundations. Under the direc-tion of Davide’s son Simone, Soilmec is known for its unmatched experience and noteworthy accomplishments such as the develop-ment of its branch, Drillmec, specializing in oil, gas, and deep water

drilling equipment both onshore and off. Soilmec also recently ac-quired two well-established foundation drilling companies: PSM to augment its micro piling and tunnelling line, and American-based Watson which offers a wide range of customizable drill rigs.

ThE BEST IS yET TO COMEThe Trevi Group impact goes beyond its engineered equipment,

36 direct branches and 7,500 employees. Davide Trevisani and his brothers, Gianluigi and Cesare, take great pride in their charitable organization, Social Value, which is aimed at supporting solidarity initiatives, mainly to address children’s issues at the local, national, and international level. Some of their projects include donating a complete system for groundwater exploration in Central Africa to combat drought, ongoing commitments to the Nuestra Senora del Valle orphanage in Argentina, and building a nutrition centre in Cite Soleil in Haiti.

START uPS TAkE nOTE – ThIS IS hOW IT’S DOnEA career like Davide Trevisani’s is not only worthy of the many

awards it has earned, but it also deserves to be a model for entre-preneurs everywhere for its thoughtful growth, innovative contribu-tions, consistent dedication to solving industry needs, and superior service to the communities it serves.

The strength of Trevi S.p.A., Soilmec and all of the companies within the Trevi Group is the direct product of building on experi-ence. From Trevisani’s first days of drilling in his early 20s he con-stantly looked ahead to what was next, what could be done better, and how he could perform the best possible work. Nearly 60 years later, Trevisani continues to serve the foundation and drilling indus-tries with the same hard work and dedication he offered from the very start. l

Page 35: Piling Industry Canada Issue #2 2015
Page 36: Piling Industry Canada Issue #2 2015

36 PIC Magazine • December 2015

Whether Load and Resistance Factor Design (LRFD) or Allowable Stress Design (ASD) is used to design driven pile foundations in the U.S. could seem to depend on the project owner. In the case of public transportation jobs, the former is used almost exclusively, just as the latter is almost always used for private jobs. In reality, it depends of course on the design code. The bridge design code published by the American Association of State Highway and Transportation Officials (AASHTO) has used LRFD for some time, while the International Building Code (IBC), which has been generally adopted as the basis for the applicable building code throughout the U.S., still uses ASD.

In Canada, the situation is different since both the Bridge Code and the National Building Code are based on LRFD. As a result ASD, or “Working Stress Design” as this method is generally referred to in Canada, is seldom used these days.

In Europe, the Eurocode 7, the European standard for the design of geotechnical structures, also prescribes a factored design methodol-ogy, albeit not the same as the LRFD approach used in the U.S.

From this it could be concluded that the IBC is out of step, and it is

likely to remain that way for some time. As part of the GeoCoalition, the DFI Codes and Standards Committee is currently reviewing the 2015 version of the IBC, and developing a set of proposed changes to be incorporated in the 2018 version of this code. However, there is no indication that a transition to LRFD is going to be part of the proposed changes, which means that more than likely ASD will continue to be used in the U.S. for foundations on non-transportation jobs for at least another six years (since the IBC is updated every three years). How-ever, this continued use of ASD should not be used as a justification to exclude LRFD from the geotechnical courses at universities and col-leges in the U.S. While many institutions have not yet incorporated LRFD in their geotechnical courses, factored design will eventually be the method that is applied on all projects, and geotechnical design practitioners should be ready to do so. l

Reprinted with permission from the Deep Foundations Institute. Originally published in the May/June issue of Deep Foundations magazine.

LRFD versus ASD for Driven PilesThe code drives the methodologyBy Gerald Verbeek, Allnamics Pile Testing Experts BV

factored design will eventually be the method that is applied on all projects,and geotechnical design practitioners should be ready.

Page 37: Piling Industry Canada Issue #2 2015

3801-53 Avenue Lacombe, AB T4L 2L6

[email protected]

Sales | Service Parts

Mobile Fleet of Technicians

Rentals | Leasing

Largest Distributor Of Genuine Junttan Parts

Page 38: Piling Industry Canada Issue #2 2015

38 PIC Magazine • December 2015

Much has been written about value engineering, constructability and collaboration in the early stages of a project. At Keller Canada, we live it.

“We are looking for ways to save our clients’ money, not spend it,” says Shaun Arnault, regional manager for Keller Foundations. “Our in-house engineers offer cost-effective design-build services for safe, high-quality, constructible solutions. The result? Keller of-fers the lowest installed cost and optimal value to our clients at the same time.”

Our mission, vision, and competitive advantage have always focused on value for money. As Keller holds expertise in all pil-ing, earth retention, and ground improvement techniques and technologies, we seek to optimize value by offering truly unbiased technical recommendations; made possible by evaluating all avail-able options and relying on proven load tests, experience and prior performance.

COLLABORATIOn AnD TRuST – BuILDInG On OuR STREnGThSConstruction owners need to carefully evaluate a contractor’s

record of proven results on similar projects to gain confidence with solutions they may not be familiar with.

“Open and honest communication early on helps establish trust, allowing our clients to identify opportunities to build on our past successes. Hiring Keller to collaborate with your construction, geo-

Design-BuildOptimizing value and foundations in the commercial, infrastructure, and industrial markets

Submitted by Keller Canada

Page 39: Piling Industry Canada Issue #2 2015

Keller thrives on challenges and excels where others struggle. Backed by the largest and most comprehensive independent ground engineering specialist in the world, and with over 30 years oflocal on-site experience, Keller Canada provides the largest variety of piling and geotechnical solutions in the country.

Engage us early to experience the true benefits of value engineering. Lower your total install cost today. Visit KellerCanada.com or call 780-960-6700 – Formerly North American Caisson Ltd.

Foundation Piling Excavation Support Ground Improvement

IMPOSSIBLE TIMELINES.COMPLEX SITE .DIFFICULT SOIL CONDITIONS.Count us in.

Page 40: Piling Industry Canada Issue #2 2015

40 PIC Magazine • December 2015

technical, civil and structural engineering teams in the pre-design

stages will be key to your project’s success,” says Stephen Olney, di-

rector of Business Development for Keller Canada.

Collaborative models that aim to maximize value engineering

often draw on contracting methods that may differ from the tradi-

tional “three bids and a buy” approach that can hamper innovation.

Although Keller is awarded the majority of our work through com-

petitive bidding, early collaboration, value engineering, risk/reward

sharing, and sole source/negotiated contracts are gaining in popular-

ity, and producing positive results.

PIOnEERInG AnD MASTERInG InnOvATIOnSPioneering new techniques and technologies requires mastering

their productive application and managing market acceptance. At Keller Canada, we work exceptionally hard on optimizing our ap-plications and execution techniques. This includes working closely with the geo-technical community, equipment manufacturers, and subcontractors on design modifications and execution methods to improve safety, quality and productivity.

Keller Canada has been leading foundation innovations in the Canadian marketplace for over 30 years. These innovations have enhanced our clients’ approach to their foundation challenges across all commercial, industrial and infrastructure projects.

“We introduced continuous flight auger (CFA) piling a decade ago, and our clients have been experiencing a substantial 20 to 40 per cent savings,” says Barry Evans, senior project manager.

Keller is also increasing applications for cased secant piling (CSP), drilled displacement steel piling (DDSP), earth/subsurface retention and cut-off wall technologies, as well as ground improve-ment technologies for soil mixing, subsurface grouting, slope sta-bilization, rigid inclusions and stone columns.

ThE kELLER GROuP – WORLD LEADERS AnD GETTInG STROnGERThe Keller Group bolstered client value once again with the

acquisition of North American Caisson Ltd, a division of North American Construction Group, in 2013. In addition to over 30 years of local on-site experience in nine regional offices across Canada, we are now part of a global establishment, present in 40 countries with over 10,000 employees.

The Keller Group’s reputation is built on engineering excellence and continual innovation. Leveraging our combined assets is key to our success. Keller Canada benefits directly from the group’s experience and innovations in equipment, techniques, access to the world’s most respected geo-technical professionals and recent strategic acquisitions. This, in turn, serves to improve value to our clients, down the street and throughout the world. “

We call this the best of being local and the best of being global; the best of being big and the best of being small,” says Bernie Rob-erts, president of Keller Canada. l

The PIPE MILL with FAST SERVICEProducing:24”-192” OD.312”-2.00” WallLengths up to 80 ft.Straight Seam - DSAW20 ft. Lengths in Stock

Shipping Nationwide and Canada

800-821-3475Fax: 815-964-0045

[email protected]

TMR A M M I N G Q U A L I T Y

ArntzenBC_AD_Blue_BG_06_11_09.indd 1 7/8/11 2:05:36 PM

Page 41: Piling Industry Canada Issue #2 2015

Authorized Distributor for the Following:

Do it Right theFirst Time!

OEPSwww.bayshoresystems.com

Call: 888.569.3745

OEPS BARRICADECONFIGURATIONS

*when properly installed

When it Comes to Excavation Safety, You May Not Get a Second Chance.Safety on your job site is a serious issue. A hasty, ad hoc solution could easily have tragic results. Why take the risk when it’s so easy to do it right with the new Open Excavation Protection System (OEPS). Contact Bay Shore Systems to get an OEPS system for your work site.

• Meets OSHA’s requirements*• Easy assembly and storage• Sturdy, high visibility powder coated tubular barriers• Split panel, steel mesh flooring available in limited configurations• Flooring quickly locks into place for over-the-hole inspection• Panels can be stacked flat for easy transport and storage• Lock-out latches provide additional security

Page 42: Piling Industry Canada Issue #2 2015

42 PIC Magazine • December 2015

Soil mixing is used as a shoring (trench and pit shoring) alternative to the conventional methods such as beam and wooden lagging or soldier piles, sheet piles, or jet grouting walls. It is also used to con-solidate contaminated materials.

Soil mixing is a vibration free, very low noise method of shoring and is ideal in granular soils where other classic methods are not ap-plicable due to vibration and noise emissions.

Soil mixing is also very economical when compared to other forms of shoring, given the right soil conditions. Cost factors in favour of soil mixing are the high-production rates, absence of ag-gregate such as sand or gravel in the grout mix, and the fact that no spoils are generated for removal.

It is also common practice to combine soil mixing with conven-tional shoring techniques. An example of this is the secant-pile-wall installation where the primary piles are mixed and the secondary piles are cast-in-situ concrete bored piles, or vice versa, whatever is required.

Utilizing advanced ground improvement techniques, American Drilling in Palo Alto, California recently rented an ABI Mobilram TM 18/22 B to construct shoring for the foundation of a five-storey high-rise. The project included a parking garage below grade, and an

ABI twin soil mixing system supplied by Hammer and Steel, Inc. was used to build a waterproof soil-cement wall for excavation support during its construction.

Soil mixing was specified as it is a faster and less expensive method relative to traditional beam and wooden lagging retention systems, in addition to vibration-free and low noise installation, which was required due to the close proximity of residents and the San Fran-cisco Zoo. To accomplish this, the rig was supplied with multiple-axis twin mix drill head. Attached to the drill head were twin mix-ing tools 30 inches in diameter complete with extension drill rods to drill to a depth of 26 feet.

During construction, the mixing tools overlapped with the previ-ous soil mix columns, referred to as primary piles and drilling the secondary piles, to create a continuous soil-cement wall. The prima-ry piles were reinforced with H-beams, which were 28 feet in length. Once the retaining wall was exposed after excavation, the contractor scraped along the wall to create a flat, smooth surface. This allowed water proofing without gunite, saving time and money.

In addition to the ABI Mobilram, a fully-automated Scheltzke MPS 510 grout plant with G&H monitoring system was used. The MPS 510 was able to provide the required volume of grout for the

Stir It UpABI rigs utilized in soil mixing

Submitted by Hammer and Steel, Inc.

utilizing advanced ground improvement techniques, American Drilling in Palo Alto, California recently rented anABI Mobilram TM 18/22 B to construct shoring for the foundation of a five-storey high-rise.

Page 43: Piling Industry Canada Issue #2 2015

43Piling Industry Canada • December 2015

job using a separate silo to feed cement. The monitoring system was able to record all soil mixing data, such as grout flow, grout volume, drill depth and drill head RPM. From there the opera-tor was able to observe all data in real time from the cab, which enabled him to alter tooling penetration speed as needed. In addition, he was able to adjust grout volumes directly with the grout plant via radio remote. No operator was needed for the grout plant, other than to start the unit and clean it at the end of the day.

By using the ABI twin mix rotary, superior mixing is accom-plished as the two drill heads rotate in opposite directions at higher RPMs. Mixing is so efficient that only one column is in-jected with grout, yet no difference is seen in the cement mixed columns when exposed. On this jobsite, with only four crew, they were able to drill an average of 30 pairs of holes per day, equivalent to 1,560 linear feet of columns. With a twin mix sys-tem production rates doubled relative to a single axis auger not only because of the use of two augers, but because the mixing process itself was dramatically improved. Coupled with the ad-ditional speed, this setup was the perfect solution for the job. l

LoadCells

Model 3000Electricial ResistanceLoad Cell

Model 4900Vibrating Wire

Load Cell

www.gkmconsultants.comwww.geokon.com

To get the most accurate and reliable pile test results, count on quality-built vibrating wire load cells from Geokon, Inc.The World Leader in Vibrating Wire Technology™

48 Spencer StLebanon, NH 03766USA

1 • 603 • 448 •1562 [email protected] www.geokon.com

1430 Hocquart StreetSuite 100St. Bruno, QC J3V 6E1Canada

1 • 450 • 441 • 5444 [email protected] www.gkmconsultants.com

GKM Consultants1430 Hocquart Street1 • 450 • 441 • 5444

INNOVATION AND QUALITY SINCE 1979

Page 44: Piling Industry Canada Issue #2 2015

44 PIC Magazine • December 2015

Telescopic boom crawler cranes continue to gain popularity and market acceptance as a mainstream crane type. Spandeck, Inc. first began North American production of the Mantis telescop-ic boom crawler crane product line in 1979; Tadano purchased Mantis in 2008, and today, the influence of Tadano is clearly evi-dent in the Mantis telescopic boom crawler crane. The Tadano Mantis cranes produced today incorporate the core competencies of the heavy-duty Mantis product along with the quality and tech-nology of Tadano. The key criteria behind the design concept of the Tadano Mantis cranes is they are designed from the ground up to be used in level or out of level lifting conditions, and that they can pick-and-carry the full load chart. The “purpose built” design of the Tadano Mantis crane also lends itself to be a very func-tional crane that can perform a variety of manufacturer approved foundation applications, including vibratory pile extraction, CFA drilling work, and an optional vertical-travel lead system for pile driving.

There are two schools of thought on telescopic boom crawler crane design. The first is the “purpose built” crane, where all of the design considerations include the different forces imparted by out of level and pick-and-carry lifting that influence a cranes struc-tural and stability operating and lifting performance. The sec-ond, a hybrid design concept, utilizes crane components - boom, upper rotating structure, slewing ring, etc. - taken from mobile cranes that were designed to work on outriggers in perfectly level conditions. Components designed for stationary, level operation, generally lack some of the load design criteria, both dynamic and static, because of their intended application. While these hybrid design cranes offer good “level” ground lifting charts, their lifting performance is often de-rated significantly as “out of level” opera-tion is encountered.

Many manufacturers of telescopic crawlers advertise out of lev-el lifting capabilities, often up to four degrees out of level. Operat-ing through 360 degree rotation at four degrees out of level im-pacts the crane structure and lifting performance by one or more of the following factors: Load radius is increased while operating “downhill”, load radius is decreased when operating “uphill”, and side loading is inherently introduced into the telescopic boom when the crane is in any other position than directly “uphill” or

A Level Playing Field? Not necessarily so for telescopic boom crawler crane design and lifting performance

By Ed Hisrich, Tadano Mantis Corporation

www.platinumgrover.com

Page 45: Piling Industry Canada Issue #2 2015

www.platinumgrover.com

Page 46: Piling Industry Canada Issue #2 2015

46 PIC Magazine • December 2015

“downhill”. The load chart for the telescopic boom crawler is often

segmented at various degrees out of level for lifting performance

de-rates. The purpose built new Tadano Mantis GTC-1200, 130

tonne capacity crane utilizes load charts that have three out of level

load chart ranges. These charts are 0-1.5 degree slope – which is the

“level ground” chart, up to 2.5 degree slope, and up to four degree

slope. Multiple manufacturers limit their “level ground” chart to

0.3 degree slope, before having two degree and four degree slope

charts for out of level operation. To put the 0.3 degree slope into

perspective and compare it to 1.5 degrees: 0.3 degrees equates to

1.3 inches change in elevation over 20 feet (which is the approxi-

mate width of a 110 to 130 tonne telescopic boom crawler crane)

while 1.5 degrees is of course five times as much or 6.5 inches. Un-

fortunately, most parking lots that provide adequate water drainage

have a slope greater than 0.3 degrees, so this type of “level” lift-

ing performance with a crawler crane is often challenging to attain

without extensive grading and levelling efforts. Thus the crane with

a 0.3 degree level chart is generally outside of the operating limits

of that chart in most real world job sites. Switching to a two degree

or four degree slope load chart, is not all that competitive either,

as the capacities of the cranes drops significantly; as much as 20 to

30 per cent less than the purpose designed Tadano Mantis. Tadano

Mantis also provides load charts for operation with the standard

bi-fold jib erected: 220 feet (67 metre tip height) at up to 1.5 de-

grees out of level. Most other telescopic boom crawlers limit jib

lifting load charts at 0.3 degrees out of level.

A true evaluation of a telescopic boom crawler crane perfor-

mance should go deeper than the brochure load charts. An un-

derstanding of the out of level lifting limitations (that may not be

specifically identified in the brochures) should be developed. Strict

limitations to the crane “level” ground load charts may be benefi-

cial for developing strong comparison load charts, but in reality

they are impractical. Providing perfectly level lifting surfaces on

job sites is both costly and time consuming and that diminishes

productivity and profitability. The key features that are driving the

growth in the market for telescopic boom crawler cranes are: the

ability for the crane to move quickly from truck to work, the abil-

ity for the crane to work out of level, the ability of the crane to

pick and carry its full load chart, and the ability for the crane to

move from location to location and make lifts with minimal setup

time and effort. The Tadano Mantis GTC-1200 provides these key

features through a purpose built design and the strongest out of

level load charts on the market. The idea that the earth isn’t flat has

been embraced for thousands of years - it is evident on many job

sites - but all cranes are not developed with this reality as a design

criterion. l

www.rstinstruments.com/Permeation-Grout-Monitor.htmlMORE INFO

MIG

0185

B

The Permeation Grout Monitor System is a low-cost & non-invasive method that provides operators and engineers a “near-real-time” display and recording of key grouting parameters to enhance the understanding of site conditions.

RST also offers technical assistance

and other instruments for monitoring deep

foundations and piling projects:

TELEPHONE: 604 540 1100TOLL FREE: 1 800 665 5599

GROUT MONITORPERMEATION

Load/Stress CellsSettlement SystemsRebar Strain MetersStrain GaugesInclinometer SystemsJack-out Pressure CellsCrack Meters & Extensometers

Tension Measuring GaugesPiezometersBorehole PackersDatalogging SystemsInclinometer CasingVibration andOverpressure Readouts

innovation ingeotechnicalinstrumentation

[email protected] | www.rstinstruments.com

Page 47: Piling Industry Canada Issue #2 2015

Features of Pengo's Foundation Tooling: Flight-wrapped hub for added drilling strength | Hard-faced fl ight edges for increased protection and less fi eld-repair | Strata Proprietary Drilling Grade Carbide Teeth - Made for the Drilling Industry and in the USA.

PENGO HAS MORE FOUNDATION

TOOLS IN THE FIELD!

Improved design features including flight wrapped

hubs and Strata Conical Teeth.

Double Row, Single Row and Spiral Rock Augers with

diameters up to 15'.

S-Pattern and Flat Bottom Dirt Augers with

diameters up to 8'.

Combo Drill Bucket with patented Cam Lever and

Plunger system.

Standard and Heavy-Duty Core Barrel options.

The ALL NEW OrangeXpress Configuring and Quoting

tool can configure and quote your specs in a matter

of minutes.

Turning Your Challenges into Solutions!

800.599.0211 www.pengoattachments.com

[email protected]

THE DRIVE YOU NEED TO GET THE JOB DONE!From 2,000 ft/lb to 300,000 ft/lb, Pengo has a complete line of hydraulic drives for drilling and anchor installation. From mini-skid steer to 150T Excavator, we offer confi gurations that range from one, two or variable speed drives dependent on drive size and application.

Pengo is now listing our Revolution Series Drives with both Theoretical and Actual Torque values. Please check out the specs listed on our website or download the new Revolution Catalog at www.pengoattachments.comCopyright 2014. Pengo is a division of International Equipment Solutions.

RV-300RV-200DT-15 DV-40

TURNING YOUR JOB AROUND!

• Dual Purpose Pin & Torque Monitor• Downward Force Omitted with Patent-Pending Technology• Records Installation Data: Time/Date, Angle, Depth, Job # and Pile #• Weather Resistant ip67 Display Housing• 4" or 8" Touch Screen Monitor• Built-In Inclinometer - Standard• 98" Accurate Torque Reading• Download Data from Display to USB Drive• Hard-Wired to Use Digital Signal• No Loss of Boom Height

Provides the Productivity and Accuracy You Deserve on the Job Site!

Page 48: Piling Industry Canada Issue #2 2015

48 PIC Magazine • December 2015

Boosting financial literacy is one of the most important things small businesses can do to improve their odds of long-term success. The single biggest reason that more small busi-nesses don’t succeed is that they lack the fi-nancial literacy skills needed to navigate ob-stacles. Evidence of this comes directly from small business owners themselves.

Intuit, provider of business, financial and tax management solutions for small and mid-sized businesses across Canada, asked 500 Canadian small business owners to take a 10 question financial literacy quiz. The quiz included basic questions, such as: “What is the role of the balance sheet? What is the definition of accruals? How can short-term cash-flow be improved?”

The results show there is a real need to

help Canadian small businesses with their financial literacy and knowledge:• Only two per cent scored great (nine to 10

correct answers)• 16 per cent had a good score (seven to

eight)• 39 per cent received a passing grade (five

to six)• 44 per cent failed (one to four)

The study also uncovered a likely root cause. Half of small businesses surveyed re-alized they needed to spend time on finan-cial management. However, very few of them sought professional help and resources.

“It is crucial for small business owners to have a close relationship with their accoun-tant and banker as they are professionals who understand all financial situations and

can foresee the evolution of an organization,” explains Nick Foisy, Ag/Business Service Team Manager from Manitoba-based Van-guard Credit Union. “Often business owners aren’t able to spend the time reviewing their current financial situation which can lead to unnecessary issues and setbacks. Establish-ing good communication can allow for full financial understanding and provide the ability to seek assistance and advice.”

Money management becomes even more important when cash is flowing into the business and to the owner. Although han-dling business accounting and taxes may be within the capabilities of most business owners, professional help is highly recom-mended. The complexity of business book-keeping increases with each client, employee,

Money 101Improving your financial literacy can improve your business

• BONE-UP ON THE BASICS (at the very least). Even if you have a professional helping you with your finances, you still need to under-stand them. Know how to read – and make use of – income state-ments and balance sheets, understand your inventories, and learn how to manage your cash flow and supply chain.

• EMBRACE TECHNOLOGY. Intuit’s most recent study on small busi-ness success found a sizeable majority (86 per cent) of Canadian entre-preneurs believe the contributing value technology adds to their busi-ness is worth the cost. By using mobile devices and tools like finan-cial management software, online banking, and secure cloud-based document storage, entrepreneurs can work effectively from anywhere, making life as a business owner easier, faster, and more enjoyable.

• DO THE MATH. Do you know how much money it takes to run your business? Determine the true costs of your products and services, including labour, transportation, rent, marketing, insurance, phone, Internet, utilities, taxes, and whatever else you require to function. That’s just the beginning. You need to learn how to effectively track

money in and out of your business, a first step of which would be set-ting invoicing periods.

• UNCOVER YOUR HIDDEN COSTS. Have you ever needed to ob-tain a permit? Or get a license? The expense of these things can start adding up, especially when you factor in the cost of legal services, your own salary, return on investor capital, and capital for future expansion. Don’t forget to add the cost of borrowing money and the interest and debt you may have already accrued. Then start thinking ahead: once you can put numbers to everything that takes money out of your busi-ness, you can plan how much you will need to grow going forward.

• ESTABLISH PRIORITIES. Making a profit is an obvious goal, but what else should you aim to accomplish? Do you want to see your product on every shelf or only in select boutique stores? Do you want to expand or franchise your services or keep your company small in order to provide customized experiences to those willing to pay for them? Identifying your priorities will help determine the future course of your business, and the correct costs for your products or services.

Other quick tips to improving your financial literacy as a business ownercourtesy of The Globe and Mail include:

Page 49: Piling Industry Canada Issue #2 2015

49Piling Industry Canada • December 2015

sale and inventory order therefore seeking professional direction can provide solutions and encouragement for success.

“Not understanding finances can limit the growth potential of the business and its’ future. The business could become unsuc-cessful before it has a real opportunity. Both the business and the owner could lose funds

through poorly managed financial decisions, improper budgeting due to not understand-ing the business’s cash flow, and allocat-ing funds to the wrong expenses,” explains Foisy. “There’s a greater potential of lacking the ability to plan for unexpected situations, poor years, future expenses and growth. This also opens up for paying more for account-

ing and bookkeeping as these services would need to be outsourced.”

Noisy suggests business owners utilize local and online colleges that offer basic ac-counting and management courses that pro-vide a good starting point for better financial understanding. l

Index to Advertisers

Money management becomes even more important when cashis flowing into the business and to the owner.

American Piledriving Equipment ..........................31

Arntzen Corporation ..............................................40

Bay Shore Systems, Inc. ...................................11, 41

Bermingham foundation Solutions ........................9

Canadian Pile Driving Equipment Inc. ...................37

Dominion Pipe & Piling ........................................ IfC

Equipment Corporation of America .................26, 27

fraser River Pile & Dredge (GP) Inc. .........................8

Geokon, Incorporated ............................................43

hammer & Steel, Inc. .......................................... OBC

hCM Contractors, Inc. ............................................13

helly hansen Canada .............................................25

hercules Machinery Corporation ...........................21

Independence Tube Corporation .............................3

junttan Oy .............................................................23

keller Canada .........................................................39

Liebherr Canada Ltd...............................................35

Loadtest .................................................................33

northstar Inc. ...........................................................5

Pengo Corporation .................................................47

Pile Dynamics, Inc. .................................................19

Pile Drivers Local union 2404 ................................10

Platinum Grover International Inc. ........................45

Roll form Group .....................................................15

RST Instruments Ltd. .............................................46

Selix Equipment Inc. .............................................IBC

Skyline Steel ......................................................7, 17

Soilmec north America ....................................OfC, 4

Waterloo Barrier Inc. ..............................................29

Westco Drilling & Piles Ltd. ....................................49

Drilling & Piles Ltd.

Fort Macleod, Alberta

Ph: (403) 553-4084 | Fax: (403) [email protected]

www.westcodrilling.ca

Page 50: Piling Industry Canada Issue #2 2015

50 PIC Magazine • December 2015PIC Magazine • Spring/Summer 201054

2013 Directory

Free Directory LISTINGPiling Industry Canada

PICmagazine

To be listed in the 2013 Directory / Magazine Piling Industry Canada,please complete this form and fax back to DEL Communications Inc.

before November 9, 2012.

Toll Free Fax: 1.866.711.5282

Company Name: _______________________________________________________________________________

Mailing Address: _______________________________________________________________________________

_____________________________________________________________________________________________

Phone: ____________________________________Toll Free:____________________________________________

Fax: ______________________________________Toll Free:____________________________________________

Email: ________________________________________________________________________________________

Web: _________________________________________________________________________________________

Contact: ______________________________________________________________________________________

Please select one:

❏ Pile Contractor ❏ Consultant ❏ Engineer ❏ Supplier ❏ Manufacturer

❏ Other: _____________________________________________________________________________________

Published by:DEL Communications Inc.

Suite 300, 6 Roslyn Road, Winnipeg, Manitoba, Canada R3L 0G5Toll Free: 1.866.838.3029

Michelle [email protected]

Toll Free Fax: 1.866.711.5282

PIC_Spr2010_DJ:Northof60_20082.qxd 6/8/2010 1:56 PM Page 54

To be listed in the 2015 Piling Industry Canada Directory,please complete this form and fax back to DEL Communications Inc.

before November 7, 2014.

Suite 300, 6 Roslyn Road, Winnipeg, Manitoba, Canada R3L 0G5Toll Free: 1.866.838.3029

Michelle [email protected]

directory

To be listed in the next PILING INDUSTRY CANADA DIRECTORY,please complete this form and fax back to DEL Communications Inc. before November 7.

Suite 300, 6 Roslyn Road, Winnipeg, Manitoba, Canada R3L 0G5Toll Free: 1.866.704.0369

Jennifer [email protected]

ONE COMPANY LISTING PERFORM.If you have more than one company you want listed, please complete a form for each company.

To be listed in the next PILING INDUSTRY CANADA DIRECTORY,please complete this form and fax back to DEL Communications Inc. before November 7.

Suite 300, 6 Roslyn Road, Winnipeg, Manitoba, Canada R3L 0G5Toll Free: 1.866.838.3029

Michelle [email protected]

ONE COMPANY LISTING PERFORM.If you have more than one company you want listed, please complete a form for each company.

To be listed in the next PILING INDUSTRY CANADA DIRECTORY,

please complete this form and fax back to DeL Communications Inc. before November 7, 2016.

Page 51: Piling Industry Canada Issue #2 2015

Whatever your drilling needs may be... We have the answer!

1-888-990-0905 www.selix.ca

A-4080 Belgreen DriveOttawa, Ontario

K1G 3N2

WE ARE THE NEW DEALER OF THE

ICE VIBROS IN

ONTARIO, QUEBEC AND THE MARITIMES!

NOW AVAILABLE FOR SALE OR RENT

NOW AVAILABLE FOR SALE OR RENT

Page 52: Piling Industry Canada Issue #2 2015

DRILL WITH 70 FT CASING & 80 FT OF RODS WITH JUST ONE OPERATOR

SAVE ON LABOR, INCREASE SAFETY, DECREASE INSURANCE LIABILITIES & TOOLING COSTS

SAME RELIABLE REMOTE CONTROL, AS ALL OTHER MODELS, ALLOWS GREAT VISIBILITY

SALES • RENTALS • SERVICE • PARTS Missouri

800.325.PILE (7453) California

877.224.3356 Florida

904.284.6800 Kansas

913.768.1505Minnesota

952.469.6060New Jersey

973.512.2940Texas

936.257.8790

www.hammersteel.com | 800-325-PILE (7453)

MC 22A COMACCHIO DRILL RIGS