![Page 1: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/1.jpg)
PILC OPERATING EXPERIENCES & PRACTICES
STAN HEYER PECO ENERGY CO.
APRIL 30, 2003
![Page 2: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/2.jpg)
Wooden Duct
![Page 3: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/3.jpg)
Secondary Tap of “Edison Tube” Conductor
![Page 4: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/4.jpg)
OXFORD 63FROM MH #
TO MH# LENGTH CONDUCTOR SUPPLIER
INSTALL DATE
90743 7918 22 3x115 SUC 10/1/007918 6995 40 3x115 SUC 10/1/006995 90742 84 3x115 SUC 12--9990742 32870 52 3x115 SUC 12--9932870 7919 54 3x115 SUC 12--997919 32871 89 3x115 SUC 12--9932871 7920 132 3x115 SUC 12--997920 5387 35 3x115 SUC 10/1/005387 32872 88 3x115 SUC 10/1/0032872 7921 106 3x115 10/1/007921 89593 40 3-1x250 Roeb. 8/1/5089593 7921 40 3-1x250 Roeb. 8/1/507921 32878 93 3x115 10/1/0032878 7922 124 3x115 ASW 10/1/007922 7923 79 3x250 Okon. 06/06/297923 5390 200 3x250 ASW 12/01/04
![Page 5: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/5.jpg)
OXFORD 63FROM MH #
TO MH# LENGTH CONDUCTOR SUPPLIER
INSTALL DATE
90743 7918 22 3x115 SUC 10/1/007918 6995 40 3x115 SUC 10/1/006995 90742 84 3x115 SUC 12--9990742 32870 52 3x115 SUC 12--9932870 7919 54 3x115 SUC 12--997919 32871 89 3x115 SUC 12--9932871 7920 132 3x115 SUC 12--997920 5387 35 3x115 SUC 10/1/005387 32872 88 3x115 SUC 10/1/0032872 7921 106 3x115 10/1/007921 89593 40 3-1x250 Roeb. 8/1/5089593 7921 40 3-1x250 Roeb. 8/1/507921 32878 93 3x115 10/1/0032878 7922 124 3x115 ASW 10/1/007922 7923 79 3x250 Okon. 06/06/297923 5390 200 3x250 ASW 12/01/04
![Page 6: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/6.jpg)
Affect of Overloads on PILC Cable Performance
• 12 year study of 3 conductor sector cable performance (1930-1941)
• 13 kV belted cable design• 6 generating station tie lines included in
study• 22 miles of cable in study
![Page 7: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/7.jpg)
Conductor Temperatures
• AEIC Normal Operating Conductor Temperature - of 80oC (calculated to be 77oC)
• Overload Conductor Temperature –calculated to be 109oC
![Page 8: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/8.jpg)
13 kV 3-Conductor Belted Cable Overload Test Data
Test Group
Entire System
6 Years Operation at AEIC Rating 18.1 6
2 Years Overload of Test Group 67.8 9
4 Years Operation at AEIC Rating Subsequent to Overload 43.8 7.3
Failures per 100 miles of cable per year
![Page 9: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/9.jpg)
Causes of Failure Data During Two Years of Overload
Test Group
Entire System
Lead Sheath Cracks 52 3.4Insulation Breakdown 4.5 0.6Electrolysis & Corrosion 4.5 3.6Miscellaneous 6.8 1.4
Total 67.8 9.0
Failures per 100 miles of cable per year
![Page 10: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/10.jpg)
Causes of Failure During Four Years Subsequent to Overload
Test Group
Entire System
Lead Sheath Cracks 31.7 2.4Insulation Breakdown 5.4 0.7Electrolysis & Corrosion 4.5 2.5Miscellaneous 2.2 1.7
Total 43.8 7.3
Failures per 100 miles of cable per year
![Page 11: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/11.jpg)
Major PILC Design Change
• Increasing failure rates due to longitudinal movement of 3 conductor cable.
• Added a 500 kcmil single conductor triplexed cable in 1946.
• Triplexed cable reduced longitudinal cable movement during load cycling between 1/5 and 1/12 from 3 conductor cables.
![Page 12: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/12.jpg)
3-Conductor versus 1-Conductor Triplexed Cable Failure Rates
• Industry Average - 9.5• PECO 3- Conductor Cable - 8.6• PECO Triplexed Cable - 6.2
Failures per 100 miles of cable per year
Industry Average Data from Joint EEI-AEIC Cable Operating Report 1960-63
![Page 13: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/13.jpg)
Single Phase Splice
![Page 14: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/14.jpg)
3 Phase Splice
![Page 15: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/15.jpg)
Close Up 3 Phase Splice
![Page 16: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/16.jpg)
Completed Insulated 3 Phase Splice
![Page 17: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/17.jpg)
Four Way Splice
![Page 18: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/18.jpg)
Single Phase Live End Seal
![Page 19: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/19.jpg)
3 Phase Test Cap
![Page 20: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/20.jpg)
Seven Way Splice
![Page 21: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/21.jpg)
Close up of 7 Way Splice
![Page 22: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/22.jpg)
PRODUCTS NEEDED TO TRANSITION FROM PILC TO
EXTRUDED CABLES• REPLACEMENT FOR SECTOR CABLE• REPLACEMENT FOR 1 PHASE CABLE• TRIFURCATING TRANSITION SPLICE• TRANSITION SPLICE FOR SINGLE
PHASE• WYE SPLICE
![Page 23: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/23.jpg)
LIMITATIONS OF THE NEW EXTRUDED CABLE SYSTEM
• SPLICES ARE LARGER• TAPS CANNOT BE MADE IN TRANSITON
MANHOLES DUE TO MH SIZE LIMITATIONS
• REPAIRS SOMETIMES REQUIRE PULLING AN EXTRA STRETCH OF CABLE DUE TO INADEQUATE SPACE TO SLIDE TUBES FOR COLD OR HEAT SHRINK PRODUCTS
![Page 24: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/24.jpg)
BENEFITS OF EXTRUDED CABLE SYSTEM OVER PILC
• LESS SKILL REQUIRED FOR INSTALLATION
• CABLE IS LESS EXPENSIVE• FASTER INSTALLATION OF SPLICES
![Page 25: PILC OPERATING EXPERIENCES & PRACTICES7921 89593 40 3-1x250 Roeb. 8/1/50 89593 7921 40 3-1x250 Roeb. 8/1/50 ... 7923 5390 200 3x250 ASW 12/01/04. Affect of Overloads on PILC Cable](https://reader034.vdocuments.site/reader034/viewer/2022051814/603977c06fa8cf4d3115fc3e/html5/thumbnails/25.jpg)
TRANSITION MILESTONES
• FIRST EPR FLAT STRAP INSTALLATION AUGUST 2000
• JANUARY TO DECEMBER 2001 – LESS THAN 500 FEET OF PILC CABLE INSTALLED ( REDUCED FROM AN ANNUAL USAGE OF 12000 FEET )
• JANUARY 2002 ELIMINATED ALL USE OF PILC CABLE