Depth (m ) Depth (m ) Depth (m ) TVDSS Formation TVDSS TVDSS 500 1000 1500 Seabed 1,838 36" 1,910 2000 M iocene/Oligocene Unconform ity 2,166 2500 Base Tertiary 2,652 22" 2,600 Top Cam panian Shale 2,747 Base Cam panian Shale 2,951 13⅜"2,940 3000 Top Turonian (UpperTarget) 3,044 Base Turonian 3,163 9⅝" 3,330 Top Albian 3,343 LowerTarget- Top Sand (Hor1) 3,391 3500 Horizon 4 3,465 Top LowerEarlyAlbian 3,616 4000 Top Low estSand (Orange) 4,046 LowerTarget- Base Sand 4,100 TD 4,200 7"Liner Successcase There are 2 Targets 1) Turonian 2) Albian. I have shown some sands to highlight Albian Abandonment 1) Plug #1 to the TOL would give the necessary compliance. (Could say 800ft of cement The Two reservoir cannot be isolated individually from each other because of a short transition zone/formation. Turonian Abandonment Plan is to use the unverified TOC. For planning purposes. I am taking the base of the campanian shale and counting 350m (~1,000ft) which gives the required TOC to be ~2,600m (2,951-350 = 2,601m). P3 P2 P1 Bridge Plug Depth (m ) Plug length Plug length (ft) Bridge Plug 3380 Plug #1 3380 -3280 100m 328.1 Plug #2 3280 -2930 350m 1148.35 Plug #3 2930 -2600 330m 1082.73 The requirement is for long term abandon the well fit for re-entry should they wish to come back in a success case Barrier 1 for Turoninan Barrier 2 for Turonian Disadvantage of this option: In case of re-entry ABC will require to drill a lot of cement to be able to use it. 7” liner top packer possibly damaged. OPTION 1

Upload: jovyan25

Post on 10-Sep-2015

219 views

Category:

Documents


2 download

DESCRIPTION

PNA

TRANSCRIPT

PowerPoint Presentation

There are 2 Targets TuronianAlbian.I have shown some sands to highlightAlbian Abandonment1) Plug #1 to the TOL would give the necessary compliance. (Could say 800ft of cementThe Two reservoir cannot be isolated individually from each other because of a short transition zone/formation.Turonian AbandonmentPlan is to use the unverified TOC.

For planning purposes.I am taking the base of the campanian shale and counting 350m (~1,000ft) which gives the required TOC to be ~2,600m(2,951-350 = 2,601m).

P3P2P1Bridge Plug

The requirement is for long term abandon the well fit for re-entry should they wish to come back in a success caseBarrier 1 for TuroninanBarrier 2 for TuronianDisadvantage of this option:In case of re-entry ABC will require to drill a lot of cement to be able to use it.7 liner top packer possibly damaged.OPTION 1

Abandonment AssumptionsNot enough separation (>100ft) between the two zones (Turonian and Albian) hence treated as one continuous reservoir.

Procedure:-RIH with cement stinger and B/Plug setting tool.Set and tag and test B/plug @ 2,951m @ Base Campanian Shale.POOH above B/plug and place 800ft /250m combination Plug A. this conforms to two barrier standards.Displace well to inhibited seawater and POOH.RIH with debri cap install and test.POOH, recover riser.Seabed survey and De-mob.Shallow water plug placement set plugs above any aquifer that is not connected to seabed Suggested by Randy.We do not have a continuous sheet of cement across the top. Because we do not cut and pull. So the end objective of isolation of any aquifer cannot be achieved.

Advantage of this OptionShould ABC need to re-enter the well they have to drill only one 800ft cement plug.No possible damage to liner top packer.