Piers 24 & 25 Sediment Remediation Project Tacoma, Washington or… Adventures in Underpier Capping Adventures in Underpier Capping Rick Moore, Hart Crowser WEDA Pacific Chapter Conference November 5, 2009

Upload: marci

Post on 22-Jan-2016

27 views

Category:

Documents


0 download

DESCRIPTION

Piers 24 & 25 Sediment Remediation Project Tacoma, Washington or… Adventures in Underpier Capping. Rick Moore, Hart Crowser WEDA Pacific Chapter Conference November 5, 2009. Acknowledgments. Port of Tacoma US EPA US Army Corps of Engineers Washington State Department of Ecology - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Piers 24 & 25 Sediment Remediation Project

Tacoma, Washington

or… Adventures in Underpier CappingAdventures in Underpier Capping

Rick Moore, Hart Crowser

WEDA Pacific Chapter ConferenceNovember 5, 2009

Page 2: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Acknowledgments• Port of Tacoma• US EPA• US Army Corps of Engineers• Washington State

Department of Ecology• Bergerson Construction• Berger/ABAM

Page 3: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Presentation Overview

Project Setting and Background

Commencement Bay CERCLA ActionsHow Did We Get Here? When Will We Be Done?

Remediation ElementsWhy Do These Projects Always Happen in the Winter?

Lessons LearnedThe Good, the Challenged, and the Long-Term.

Page 4: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping
Page 5: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Historical Tideflat Filling

Page 6: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Commencement Bay Nearshore/ Tideflats Superfund SiteModified From Port of Tacoma Photo Slide

Sitcum

Hylebos

Thea Foss

Middle

St. Paul

Piers 24 & 25 Project

Site

Page 7: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

CERCLA Background• Commencement Bay/Nearshore

Tideflats Superfund Site– Work Began Mid-1980s– 1989 EPA Record of Decision– 20+ Year Cycle to Complete Remediation

• Piers 24 & 25– Part of Mouth of Hylebos Remedial Action – One of the Last CB/NT Remediation Efforts

Page 8: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Site Vicinity and Project Area2006 Aerial

Photo

Source: City of Tacoma

Hylebos Waterway

Blair Waterway

Piers 24 and 25 Project Site

Page 9: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Site Contaminants

• PAH, Metals, and PCB Contamination from Historical Shipyard Waste Disposal

• A Convenient Place to Dump Waste

• A Difficult Place to Clean Up

Page 10: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

1940s Shipyard

Piers 24 & 25 Project Site

Page 11: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

1946 Aerial Photo

Page 12: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Piers 24 & 25 Project Timeline• 1998 to 2000 Remedial Design

• EPA AOC 2002 and CD 2005

• 2000 to 2007 Revise/Finalize Design

• 10/07 and 2/08 Complete Construction

Page 13: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Remediation Elements• Embankment Capping on 2V:1H Slopes

• Hot Spot Dredging for As Contamination

• Debris Pile Removal

• Hot Spot PCB Removal

Page 14: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

A Difficult Place to Work

• Limited Access

• Forest of Pilings

• Steep, Slippery Rock Slopes

Page 15: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping
Page 16: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Barge-Mounted Placement of Capping Materials

Page 17: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Pier-Mounted Placement of Capping Materials

Page 18: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Sand Cap and Armor Rock Placement

Page 19: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Sand Cap and Armor Rock Placement

Page 20: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Toe Berm Riprap Placement

Page 21: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Sand Cap and Armor Rock

Page 22: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Lead Line Survey Control

Page 23: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Project Area - Post-Capping

Page 24: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Shotcrete Application

Page 25: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Photo Courtesy of the Port of Tacoma

Page 26: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Shotcrete Application

Page 27: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Piers 24 & 25 Project Area

Page 28: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Debris Pile Removal

Page 29: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

PCB Hot Spot Removal

Page 30: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

PCB Hot Spot Removal

Page 31: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Lessons Learned – The Good• Construction Methods Successful for

Steep Slope Capping

– Sand Cap 400 to 700 CY/Shift

– Crushed Armor Rock 400 to 600 CY/Shift

– Shotcrete 6 to 10 CY/Shift

• Total Construction Cost $4.6M – Within 1% of Engineering Estimate Excluding

Change Orders

Page 32: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

The Challenged• PCB Hot Spot and Deeper Debris

Excavation Were Unexpected and Costly

– Difficult Setting to Obtain Good Sampling Data

• 50% Toe Berm Riprap Quantity Over-Run

– Difficult to Estimate Riprap Repose Angle and Settling

Page 33: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

And The Long Term…• Piers 24 & 25 Cap Performing as Intended

• Remediation Complete:– Sitcum, Milwaukee, St. Paul, Thea Foss/Wheeler Osgood

Waterways, and ASARCO

• Remediation Pending: OXY/Area 5106

• CB/NT In Post-Construction Monitoring – Portions of the Blair and St. Paul Waterways

Delisted/Deleted from NPL

Page 34: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Thanks to WEDARick MooreHart [email protected]

m(206) 826-4521

Bill Evans Port of [email protected](253) 593-4563

Page 35: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

5106 and “OXY” In-Water Areas

Page 36: Piers 24 & 25 Sediment Remediation Project  Tacoma, Washington or… Adventures in Underpier Capping

Commencement Bay Waterways