phulbari project - coaltrans asia bali 5 june 2006 v2 · ` assigned to asia energy 1998 ... jamuna...
TRANSCRIPT
The Phulbari Coal Project The Phulbari Coal Project -- BangladeshBangladesh
Presentation to Coaltrans Asia Conference Presentation to Coaltrans Asia Conference
Bali, 5 June 2006Bali, 5 June 2006
Listed on the London Stock Exchange (AIM) Market – AEN.L
Coal in West …Gas in East
Jamalganj
Dighipara
Khalaspir
Barapukuria
Madhyapara(hard Rock)
PHULBARI
Bangladesh Resource Potential – The Big Picture……
Asia Energy operates under Contract with the Government of BanglAsia Energy operates under Contract with the Government of Bangladesh adesh Original Contract with BHPOriginal Contract with BHP……signed 1994signed 1994Assigned to Asia Energy 1998Assigned to Asia Energy 1998…… exploration and resource evaluation ensuedexploration and resource evaluation ensuedAsia Energy PLC listed on London AIM Asia Energy PLC listed on London AIM …….April 2004.April 2004April April ‘‘04 04 Mining Lease grant triggered Feasibility Study requirementMining Lease grant triggered Feasibility Study requirement24 months to complete and submit a24 months to complete and submit a ““Feasibility Study & Scheme of DevelopmentFeasibility Study & Scheme of Development””(SoD)(SoD)
Submitted SoD to Government 2 Oct 2005Submitted SoD to Government 2 Oct 2005Now in Approval phaseNow in Approval phase
BiodiversityBiodiversity
Mine DesignMine Design
Drilling & Coal TestingDrilling & Coal TestingCoal Transport & InfrastructureCoal Transport & Infrastructure
Power generationPower generation
Environmental MonitoringEnvironmental Monitoring
ConsultationConsultationWater StudiesWater Studies
World Class International and Bangladesh Team involved in ProjecWorld Class International and Bangladesh Team involved in Project t Feasibility StudiesFeasibility Studies
CEGISCEGIS -- Centre for Environmental Centre for Environmental & & Geographic Information Services Geographic Information Services AC Nielsen Bangladesh Pty Ltd (AC Nielsen) AC Nielsen Bangladesh Pty Ltd (AC Nielsen) Nature Conservation Management (NACOM)Nature Conservation Management (NACOM)IUCN The World Conservation Union (IUCN)IUCN The World Conservation Union (IUCN)Bangladesh Atomic Energy CommissionBangladesh Atomic Energy CommissionFalgu Sandhani for drilling support and adviceFalgu Sandhani for drilling support and adviceBangladesh University of Engineering and TechnologyBangladesh University of Engineering and TechnologyInstitute of Water Modelling (IWM)Institute of Water Modelling (IWM)Bangladesh Centre for Advanced StudiesBangladesh Centre for Advanced StudiesProfessor Dr Muhammad Qumrul HassaanProfessor Dr Muhammad Qumrul HassaanDepartment of Geological Sciences, Jahangirnagar Uni BangladeshDepartment of Geological Sciences, Jahangirnagar Uni BangladeshBarlow Jonker Pty LtdBarlow Jonker Pty LtdAME Consulting Pty LtdAME Consulting Pty LtdCoffey Geosciences Ltd (Coffey)Coffey Geosciences Ltd (Coffey)
20052005 20062006 20072007--20112011
Ramp Up 2007Ramp Up 2007 --
Project DevelopmentProject Development20062006--20072007
Feasibility StudyFeasibility StudyQ2Q2--Q3 2005Q3 2005
20052005 20062006
Ramp Up 2008Ramp Up 2008-- 20120133Initial Initial EnvironmentalEnvironmentalExaminationExamination
Q1Q1 20052005
Project DevelopmentProject Development200620062006--200720082008
Feasibility StudyFeasibility Study- Q3 2005Q3 2005
Project Timeline Project Timeline –– Feasibility and DevelopmentFeasibility and Development
APPROVALSAPPROVALSQ2 2006Q2 2006
Resource Resource StatementStatement
QQ22 20020044
SCHEME of SCHEME of DEVELOPMENT DEVELOPMENT
to Govtto Govt
OB MININGOB MINING 2002007 7 COAL 2008COAL 2008
Land AcquisitionLand Acquisition
LAPLAP
20082008 ++20204040
Phulbari Power ProjectPhulbari Power Project
ENVIRONMENTALCLEARANCE
In Situ Coal Resources In Situ Coal Resources –– JORC Standards CompliantJORC Standards Compliant
1919
1919
Base SeamBase Seam
5725723939389389125125TotalTotal
404028281212InferredInferred
24424439391241246262IndicatedIndicated
2882882372375151MeasuredMeasured
TotalTotalLower Lower SeamSeam
Main SeamMain SeamUpper Upper SeamSeam
Notes:
1. Results based on Geological Model submitted in July 2005
2. Table compiled from data contained in the Phulbari Coal Project ‘In Situ Resource Statement‘ issued by GHD to Asia Energy, August 2005.
Mining at Phulbari Mining at Phulbari ……
Open Cast Truck and Shovel operationCoal measures at 165 – 270 metresThick seams (main seam 22 metres)Dewatering with down hole pumpsMinimal Blasting requiredOverburden contains saleable
construction materials
Open Pit Open Pit --MidMid--Life DetailLife Detail
Overburden StrippingOverburden Stripping
HaulageHaulageRehabilitationRehabilitation
Coal ProductionCoal Production
20072007200820082009200920102010201520152020202020252025203020302035203520432043
2015
2020
2025
2030
2035
2045
2010
Progressive Land RehabilitationProgressive Land Rehabilitation
Mining Stage Mining Stage Plans Plans
Phulbari Environmental and Social Impact ManagementPhulbari Environmental and Social Impact Management
EIAEIA completed to highest completed to highest international standardsinternational standards……....
Covers all critical environmental Covers all critical environmental management tasksmanagement tasks
Comprehensive monitoring programs Comprehensive monitoring programs for water quality, noise and air qualityfor water quality, noise and air quality
Asia EnergyAsia Energy’’s commitment to sustainable s commitment to sustainable developmentdevelopment……..
Phulbari is a pioneering project with a plus 30 year life Phulbari is a pioneering project with a plus 30 year life No one will be disadvantaged by the ProjectNo one will be disadvantaged by the ProjectNo one will be relocated without proper compensation & livelihooNo one will be relocated without proper compensation & livelihood d restoration assistancerestoration assistancePeople will enjoy improved amenities:People will enjoy improved amenities:
SanitationSanitationmore reliable / abundant water supply:more reliable / abundant water supply:
TownTownVillageVillageIrrigationIrrigation
Environmental and Social impact management programs, in line witEnvironmental and Social impact management programs, in line with h the highest international standards, will be in placethe highest international standards, will be in placeBiodiversity will be conservedBiodiversity will be conserved
Phulbari can pursue a diversified marketing strategy, based onPhulbari can pursue a diversified marketing strategy, based on…………
Cost CompetitivenessCost CompetitivenessPhulbari is comfortably in the Lowest FOB Cost Quartile for the Phulbari is comfortably in the Lowest FOB Cost Quartile for the international international seaborne coal trade and will be profitable in all foreseeable maseaborne coal trade and will be profitable in all foreseeable market conditionsrket conditions
High quality, marketable coal High quality, marketable coal Export products are readily useable in all major marketsExport products are readily useable in all major marketsDomestic products are tailored to growing power and industry neeDomestic products are tailored to growing power and industry needsds
Reliable Coal deliveryReliable Coal deliveryA robust delivery chain and transport system is a key component A robust delivery chain and transport system is a key component of the of the Phulbari ProjectPhulbari Project
Location Location C&F advantage to South Asian markets, especially eastern India C&F advantage to South Asian markets, especially eastern India Competitive in other Asian markets and to the eastern MediterranCompetitive in other Asian markets and to the eastern Mediterranean in ean in Panamax vesselsPanamax vessels
Coal ProductsCoal Products
Coal preparation plant will produce three products using dense mCoal preparation plant will produce three products using dense medium edium cyclones and spiralscyclones and spirals
Total product recovery from ROM coal will be exceptionally high Total product recovery from ROM coal will be exceptionally high (94%) (94%) due to the clean and consistent due to the clean and consistent ‘‘in situin situ’’ quality and thick seams quality and thick seams
Product mixProduct mix60% Export Thermal 60% Export Thermal ~ 9.0 Mtpa~ 9.0 Mtpa
20% Export Metallurgical20% Export Metallurgical ~ 3.0 Mtpa~ 3.0 Mtpa
20% Domestic Thermal20% Domestic Thermal ~ 3.0 Mtpa~ 3.0 Mtpa–– Higher Ash (19% Higher Ash (19% -- 33%) 33%) –– Otherwise similar to Export ThermalOtherwise similar to Export Thermal
Coal Sales Profile 2008 Coal Sales Profile 2008 –– 20382038
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
Low Ash Met Coal Export Thermal Coal Domestic Thermal Coal
‘000 Tonnes per year
Phulbari Low Ash Metallurgical Coal Phulbari Low Ash Metallurgical Coal –– Quality ComparisonQuality Comparison
High as PossibleHigh as Possible
High if Vitrinite lowHigh if Vitrinite low
>0.70>0.70
>3>3>40>40
>0.06>0.06>0.1>0.1
>6800>6800<1.0<1.0
<4.0<4.0
<11.0<11.0
<36.0<36.0
>50.0>50.0
<12.0<12.0
Market Market PreferencePreference
553.53.5Coking Properties Coking Properties -- CSNCSN52524545HGIHGI
6868
44
0.720.72
5454
99
0.820.82
Petrographic PropertiesPetrographic Properties
Macerals Macerals –– Vitrinite (% mineral free)Vitrinite (% mineral free)
-- Liptinite (% mineral free)Liptinite (% mineral free)
Rv, max (%)Rv, max (%)
0.0150.0150.0350.035Phosphorus (%)Phosphorus (%)0.020.020.020.02Chlorine (%)Chlorine (%)7200720074207420Specific Energy, Gross Kcal/kgSpecific Energy, Gross Kcal/kg0.550.550.750.75Sulphur (%)Sulphur (%)
2.52.5
9.59.5
33.833.8
54.254.2
2.82.8
6.86.8
33.733.7
56.756.7
Proximate AnalysisProximate Analysis
Moisture (%)Moisture (%)
Ash (%)Ash (%)
Volatiles (%)Volatiles (%)
Fixed Carbon (%)Fixed Carbon (%)
9.09.010.010.0Total Moisture (% as received)Total Moisture (% as received)
Hunter Valley SSCCHunter Valley SSCCPhulbari LAMCPhulbari LAMCTypical Specification** Typical Specification** (Air Dried, unless stated)(Air Dried, unless stated)
Phulbari Export Thermal Coal Phulbari Export Thermal Coal –– Quality ComparisonQuality Comparison
>1500>1500>1600>1600>1200>1200Ash Fusion Temp Ash Fusion Temp -- Initial Def (Initial Def (ººC)C)
LowLowLowLowLow as PossibleLow as PossibleAsh slagging and fouling Ash slagging and fouling propensitypropensity
6800680069306930>6300>6300Specific Energy, Gross Kcal/kgSpecific Energy, Gross Kcal/kg
43430.800.80
2.42.4
12.012.0
31.431.4
54.254.2
8.58.5
Phulbari ETCPhulbari ETC
>40>40<1.0<1.0
<5.0<5.0
<16.0<16.0
<38.0<38.0
>45.0>45.0
<15.0<15.0
Market PreferenceMarket Preference
(Bituminous Coal)(Bituminous Coal)
5050HGIHGI0.550.55Sulphur (%)Sulphur (%)
2.52.5
13.513.5
33.533.5
50.550.5
Proximate AnalysisProximate Analysis
Moisture (%)Moisture (%)
Ash (%)Ash (%)
Volatiles (%)Volatiles (%)
Fixed Carbon (%)Fixed Carbon (%)
9.09.0Total Moisture (% as received)Total Moisture (% as received)
Hunter Valley ETCHunter Valley ETCTypical Specification** Typical Specification** (Air Dried, unless stated)(Air Dried, unless stated)
**Provisional
Target MarketsTarget MarketsExports 12 MtpaExports 12 Mtpa
4 Mtpa by rail to eastern India 4 Mtpa by rail to eastern India –– via the existing crossvia the existing cross--border rail connectionsborder rail connections8 Mtpa by Bulk Carriers to seaborne markets, including south and8 Mtpa by Bulk Carriers to seaborne markets, including south and west coast India, viawest coast India, via
–– Dedicated rail transport on the existing network to KhulnaDedicated rail transport on the existing network to Khulna–– Stockpiling and barge loading at KhulnaStockpiling and barge loading at Khulna–– Bulk carrier Loading Platform at Akram Point Bulk carrier Loading Platform at Akram Point –– Transhipment through the existing shipping channel to open seaTranshipment through the existing shipping channel to open sea
Domestic Sales 3 MtpaDomestic Sales 3 MtpaPower stations, via direct delivery from mine mouthPower stations, via direct delivery from mine mouthBrickworks and other local industry, via existing rail networkBrickworks and other local industry, via existing rail network
–– Current local industry consumption of >2 Mtpa is met by high sulCurrent local industry consumption of >2 Mtpa is met by high sulphur (up to 4%) coal from phur (up to 4%) coal from IndiaIndia
Phulbari
Ishurdi
Darshana
Khulna
Mongla
Akram point
Jamuna Bridge
Hardinge Bridge
Dhaka
Gazipur
Chandpur
Chittagong
IndiaIndia
Handymax Handymax 4040--45kt45ktPanamax Panamax 5555--70kt70kt
CoalDelivery
Coal Delivery Coal Delivery –– Existing Rail InfrastructureExisting Rail Infrastructure
Dual Gauge Track Phulbari – Ishurdi Junction
Coal Delivery Coal Delivery –– Barge Loading and ShipmentBarge Loading and Shipment
Typical 8,000 tonne Self Propelled Barge loading and transhipment
Coal Delivery Coal Delivery -- Bangladesh Inland Waterways (Barge Route)Bangladesh Inland Waterways (Barge Route)
Handy Size vessel at Mongla on Pussur River Mongla Kleenheat LPG Berth
Phulbari provides unparalleled opportunities for Bangladesh portPhulbari provides unparalleled opportunities for Bangladesh port and rail authorities to and rail authorities to improve infrastructure and revitalize the countryimprove infrastructure and revitalize the country’’s western transport corridors western transport corridorPhulbari will quadruple Bangladesh rail freight and transform MoPhulbari will quadruple Bangladesh rail freight and transform Monglangla-- Khulna into the Khulna into the countrycountry’’s largest export volume port s largest export volume port
Sea Port to MarketSea Port to Market……
BangladeshShiploading Platform, to be anchored in sheltered deep water (>18.0 meters) at Akram Point
Existing shipping channel to open sea to be dredgedto Panamax capability
Shipping Distance Comparison* Shipping Distance Comparison* –– PhulbariPhulbari‘‘s Competitive Positions Competitive Position
(1,473)(1,473)
1,5451,545
1,4481,448
4,4664,466
3,1833,183
6,2016,201
3,0183,018
Pearl RiverPearl River(South China)(South China)
2020
1,4011,401
3,1283,128
4,5094,509
3,2523,252
4,6334,633
1,3811,381
Port KelangPort Kelang(Malaysia)(Malaysia)
2,2522,2522,7432,743Tanjung BaraTanjung Bara
Kalimantan Kalimantan IndonesiaIndonesia
4714715,4515,451Diff to Akram PointDiff to Akram Point
3,1503,1504,2544,254Diff to Akram PointDiff to Akram Point
(1,780)(1,780)2,4982,498Diff to Akram PointDiff to Akram Point
4,5034,5035,6965,696NewcastleNewcastleNSW AustraliaNSW Australia
7,1827,1824,4994,499Richards BayRichards BaySouth AfricaSouth Africa
4,0324,032245245Akram PointAkram PointBangladeshBangladesh
Gwangyang Gwangyang (Korea)(Korea)
ParadipParadip(Orissa, East (Orissa, East
India)India)Load Port Load Port
*Nautical Miles Shipped Between Ports*Nautical Miles Shipped Between Ports
Phulbari Power ProjectPhulbari Power Project……
500 MW mine500 MW mine--mouth proposal mouth proposal submitted to GoBsubmitted to GoBKey DriversKey Drivers
Ready coal market 1.5MtpaReady coal market 1.5MtpaBangladesh is power hungry Bangladesh is power hungry and suffering critical and suffering critical shortagesshortagesGoB is developing a GoB is developing a ‘‘newnew’’Energy Policy, with coal as its Energy Policy, with coal as its centrepiececentrepiece
Expansion to 1000 MW likelyExpansion to 1000 MW likelyAttractive New Business:Attractive New Business:
IPO opportunityIPO opportunityPower plant
GoB
Project Company
(Bangladesh)
Asia Energy Equity
IA, PPA
EPC contractorEPC contract
ADB, IFC, EIB and commercial
banks
BPDB
DA
Debt finance
Power sales
Phulbari Coal
Project Coal supplyG
oB G
uara
ntee
Boiler Supplier
Turbine Supplier
BOP Supplier
O&M services provider
O & M contract
Project development
Development Partner
Power plant
GoB
Project Company
(Bangladesh)
Asia Energy Equity
IA, PPA
EPC contractorEPC contract
ADB, IFC, EIB and commercial
banks
BPDB
DA
Debt finance
Power sales
Phulbari Coal
Project Coal supplyG
oB G
uara
ntee
Boiler Supplier
Turbine Supplier
BOP Supplier
O&M services provider
O & M contract
Project development
Development Partner
BANGLADESH BANGLADESH
andand
ASIA ENERGYASIA ENERGY““Making natural resources work Making natural resources work for the people of Bangladeshfor the people of Bangladesh…”…”
Significant Economic and Social BenefitsSignificant Economic and Social BenefitsValue added to the Bangladesh Economy over life of mine (*)Value added to the Bangladesh Economy over life of mine (*)
$7 billion in royalty and tax payments $7 billion in royalty and tax payments $21.4 billion or 1% boost to Bangladesh GDP$21.4 billion or 1% boost to Bangladesh GDP
–– $7.8 billion direct$7.8 billion direct–– $13.7 billion through economic multipliers$13.7 billion through economic multipliers
$3 billion saving in foreign exchange through coal import substi$3 billion saving in foreign exchange through coal import substitutiontution
Employment and Training opportunitiesEmployment and Training opportunities2100 jobs during construction, 1200 during operations2100 jobs during construction, 1200 during operationsStrong reliance on training local recruitsStrong reliance on training local recruits8 to 10 new jobs for every project employee8 to 10 new jobs for every project employee
Social infrastructure improvements including health, education aSocial infrastructure improvements including health, education and housingnd housingClean, potable water supply from mine dewatering in an area annuClean, potable water supply from mine dewatering in an area annually impacted ally impacted by droughtby droughtVital construction materials for the building and transport induVital construction materials for the building and transport industrystryNew commercial opportunities for the western part of Bangladesh New commercial opportunities for the western part of Bangladesh as a result of as a result of rail and port upgradingrail and port upgradingGrowth in energy supplyGrowth in energy supply
Coal fired electricity from Phulbari will reduce countryCoal fired electricity from Phulbari will reduce country’’s over dependence on gas and s over dependence on gas and meet 10% of countrymeet 10% of country’’s energy needs by 2015s energy needs by 2015
(*) (*) GHD Study resultsGHD Study results
Financing Phulbari Financing Phulbari –– A Structured ApproachA Structured Approach
$50 million share capital raising on 30 November 2005, through J$50 million share capital raising on 30 November 2005, through J P P Morgan CazenoveMorgan Cazenove
Funds to be used for initial equipment purchases (dewatering borFunds to be used for initial equipment purchases (dewatering bores, first es, first overburden fleet), deposits to secure future mine equipment ordeoverburden fleet), deposits to secure future mine equipment orders, initial land rs, initial land acquisition and recruitmentacquisition and recruitment
Project Financing Process underway, with Barclays Capital as advProject Financing Process underway, with Barclays Capital as advisers isers Anticipated Total Funding requirement of approx US$1.0 Billion*Anticipated Total Funding requirement of approx US$1.0 Billion*Banking Banking ““Project Information MemorandumProject Information Memorandum”” in preparationin preparationIndependent Engineering Reviews have been completedIndependent Engineering Reviews have been completed–– Mining and Infrastructure (SRK)Mining and Infrastructure (SRK)–– Environmental and social Impacts (URS)Environmental and social Impacts (URS)Go to market Q2 2006Go to market Q2 2006
*(excluding financing costs)*(excluding financing costs)
The Phulbari Coal ProjectThe Phulbari Coal Project…….... An exciting new development for the global coal industry……..
A sustainable social and economic investment for the people of Bangladesh…….
A successful venture for the shareholders of Asia Energy