2-tower timeline
2 weeks ago• 3/28 - Installed Grid w/ stand into cleanroom• 3/31 - Completed Tower-A Single Bay TestsLast week• 4/4 - Installed FMA in Grid Bay 0• 4/5 - Installed FM104 in Grid Bay 0• 4/7 - Completed Tower-B Single Bay Tests• 4/8 - Installed FMB in Grid Bay 4• 4/8 - Installed FM105 in Grid Bay 4This week• 4/12 - 2-tower pre-test review
4/13/05 L.Wai I&T Photos 6
FMA crane operation
4/13/05 L.Wai I&T Photos 7
Bay 0 from back side of grid
4/13/05 L.Wai I&T Photos 8
FMA installation
4/13/05 L.Wai I&T Photos 9
FM104 installation
4/13/05 L.Wai I&T Photos 10
FMB crane operation (1)
4/13/05 L.Wai I&T Photos 11
FMB crane operation (2)
4/13/05 L.Wai I&T Photos 12
FMB crane operation (3)
4/13/05 L.Wai I&T Photos 13
Touch down!
4/13/05 L.Wai I&T Photos 14
FM105 Crane Op
4/13/05 L.Wai I&T Photos 15
Whew!
4/13/05 L.Wai I&T Photos 16
Photo Op!