photograph location type of visual receptor · type of visual receptor regional road distance from...
TRANSCRIPT
-
Camera Level: 23.8m AODGrid Reference: E 87934; N 333354Date / Time of photograph: 17 October 2003 / 12:10 pmCamera / Lens: Hassleblad / 50mm
View from R314 at Bellagelly South, looking west.
Post Construction
ANGLE OF VISION SCALE40˚ 40˚ 50˚ 57˚50˚57˚
Red line shows the scale and extent of the proposed terminal which will not be visible.
VIEW 5 Sheet 1 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
Viewpoint Number
5
Photograph Location
Viewpoint from R314
Type of Visual Receptor
Regional road
Distance from Centre of Terminal (approx.)
1,500 m (1.5 km)
Significance of Impact
Direction of View / Description
No impact
View looking west from public highway, showing extensive evergreen
(Rhododendron) roadside vegetation, which provides effective low level screen to
road users. Low level screen reinforced by intermittent lines of high level coniferous
trees. The screening is such that there will be no view of the proposed development
from this section of road.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33
-
Camera Level: 23.8m AODGrid Reference: E 87934; N 333354Date / Time of photograph: 17 October 2003 / 12:10 pmCamera / Lens: Hassleblad / 50mm
View from R314 at Bellagelly South, looking west.
VIEW 5 Sheet 2 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
As existing
Terminal overlaid, but not cropped
Post construction
2X zoom, post construction
ANGLE OF VISION SCALE (does not apply to 2X zoom below)40˚ 40˚ 50˚ 57˚50˚57˚
Red line shows the scale and extent of the proposed terminal which will not be visible.
Red line shows the scale and extent of the proposed terminal which will not be visible.
Viewpoint Number
5
Photograph Location
Viewpoint from R314
Type of Visual Receptor
Regional road
Distance from Centre of Terminal (approx.)
1,500 m (1.5 km)
Significance of Impact
Direction of View / Description
No impact
View looking west from public highway, showing extensive evergreen
(Rhododendron) roadside vegetation, which provides effective low level screen to
road users. Low level screen reinforced by intermittent lines of high level coniferous
trees. The screening is such that there will be no view of the proposed development
from this section of road.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33
-
Camera Level: 19.4m AODGrid Reference: E 88665; N 333589Date / Time of photograph: 17 October 2003 / 12:15 pmCamera / Lens: Hassleblad / 50mm
View from R314, just west of Glenamoy, looking west.
Post Construction
ANGLE OF VISION SCALE40˚ 40˚ 50˚ 57˚50˚57˚
VIEW 5A Sheet 1 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
Viewpoint Number
5A
Photograph Location
Viewpoint from R314
Type of Visual Receptor
Regional road
Distance from Centre of Terminal (approx.)
2,300 m (2.3 km)
Significance of Impact
Direction of View / Description
Slight neutral impact
View looking west from public highway. The screening is such that only the upper
section of the flare stack will be visible above the existing tree line.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33
-
Camera Level: 19.4m AODGrid Reference: E 88665; N 333589Date / Time of photograph: 17 October 2003 / 12:15 pmCamera / Lens: Hassleblad / 50mm
View from R314, just west of Glenamoy, looking west.
VIEW 5A Sheet 2 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
As existing
Terminal overlaid, but not cropped
Post construction
2X zoom, post construction
ANGLE OF VISION SCALE (does not apply to 2X zoom below)40˚ 40˚ 50˚ 57˚50˚57˚
Viewpoint Number
5A
Photograph Location
Viewpoint from R314
Type of Visual Receptor
Regional road
Distance from Centre of Terminal (approx.)
2,300 m (2.3 km)
Significance of Impact
Direction of View / Description
Slight neutral impact
View looking west from public highway. The screening is such that only the upper
section of the flare stack will be visible above the existing tree line.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33
-
Camera Level: 13.1m AODGrid Reference: E 89353; N 334129Date / Time of photograph: 17 October 2003 / 11:55 amCamera / Lens: Hassleblad / 50mm
View from Ross Port road near Glenamoy, looking south west.
Post Construction
ANGLE OF VISION SCALE40˚ 40˚ 50˚ 57˚50˚57˚
VIEW 6 Sheet 1 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
Viewpoint Number
6
Photograph Location
Viewpoint from public road at junction with property driveway
Type of Visual Receptor
Road
Distance from Centre of Terminal (approx.)
3,080 m (3.08 km)
Significance of Impact
Direction of View / Description
Negligible neutral impact
View looking south west across open land and coniferous plantations from middle
distance. The terminal development is essentially screened and contained by
coniferous plantations, with only the tops of the flare stack and methanol still
appearing contiguous with or slightly above the existing tree line, a tree line which
will continue to grow and provide increasing screening.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33
-
Camera Level: 13.1m AODGrid Reference: E 89353; N 334129Date / Time of photograph: 17 October 2003 / 11:55 amCamera / Lens: Hassleblad / 50mm
View from Ross Port road near Glenamoy, looking south west.
VIEW 6 Sheet 2 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
As existing
Terminal overlaid, but not cropped
Post construction
2X zoom, post construction
ANGLE OF VISION SCALE (does not apply to 2X zoom below)40˚ 40˚ 50˚ 57˚50˚57˚
Viewpoint Number
6
Photograph Location
Viewpoint from public road at junction with property driveway.
Type of Visual Receptor
Road
Distance from Centre of Terminal (approx.)
3,080 m (3.08 km)
Significance of Impact
Direction of View / Description
Negligible neutral impact
View looking south west across open land and coniferous plantations from middle
distance. The terminal development is essentially screened and contained by
coniferous plantations, with only the tops of the flare stack and methanol still
appearing contiguous with or slightly above the existing tree line, a tree line which
will continue to grow and provide increasing screening.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33
-
Camera Level: 21.8m AODGrid Reference: E 86333; N 332490Date / Time of photograph: 29 August 2002 / 3:40 pmCamera / Lens: Hassleblad / 50mm
View from residential property at Bellanaboy Bridge(Mr. P. Healy), looking north.
Post Construction
ANGLE OF VISION SCALE40˚ 40˚ 50˚ 57˚50˚57˚
Red line shows the scale and extent of the proposed terminal which will not be visible.
VIEW 7 Sheet 1 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
Viewpoint Number
7
Photograph Location
Viewpoint from rear garden of closest residential property to the terminal site
Type of Visual Receptor
Residential property
Distance from Centre of Terminal (approx.)
570 m (0.57 km)
Significance of Impact
Direction of View / Description
No / Negligible impact
View looking north north east from rear garden of property. Views of the terminal will
not be possible due to the proximity of the house to the tall coniferous trees just
across the road.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33
-
Camera Level: 21.8m AODGrid Reference: E 86333; N 332490Date / Time of photograph: 29 August 2002 / 3:40 pmCamera / Lens: Hassleblad / 50mm
View from residential property at Bellanaboy Bridge(Mr. P. Healy), looking north.
VIEW 7 Sheet 2 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
As existing
Terminal overlaid, but not cropped
Post construction
2X zoom, post construction
ANGLE OF VISION SCALE (does not apply to 2X zoom below)40˚ 40˚ 50˚ 57˚50˚57˚
Red line shows the scale and extent of the proposed terminal which will not be visible.
Red line shows the scale and extent of the proposed terminal which will not be visible.
Viewpoint Number
7
Photograph Location
Viewpoint from rear garden of closest residential property to the terminal site
Type of Visual Receptor
Residential property
Distance from Centre of Terminal (approx.)
570 m (0.57 km)
Significance of Impact
Direction of View / Description
No / Negligible impact
View looking north north east from rear garden of property. Views of the terminal will
not be possible due to the proximity of the house to the tall coniferous trees just
across the road.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33
-
Camera Level: 18.0m AODGrid Reference: E 86211; N 332408Date / Time of photograph: 29 August 2002 / 3:55 pmCamera / Lens: Hassleblad / 50mm
View from residential property at Bellanaboy Bridge(Mr. P. Healy), looking north east.
Post Construction
ANGLE OF VISION SCALE40˚ 40˚ 50˚ 57˚50˚57˚
VIEW 7A Sheet 1 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
Viewpoint Number
7A
Photograph Location
Viewpoint from rear garden of residential property adjacent to the terminal site
Type of Visual Receptor
Residential property
Distance from Centre of Terminal (approx.)
650 m (0.65 km)
Significance of Impact
Direction of View / Description
Negligible impact
View looking north east from the western-most part of the garden of this property
which is close to south west corner of the terminal site. The top of the flare stack will
be visible just above the existing coniferous trees.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33
-
Camera Level: 18.0m AODGrid Reference: E 86211; N 332408Date / Time of photograph: 29 August 2002 / 3:55 pmCamera / Lens: Hassleblad / 50mm
View from residential property at Bellanaboy Bridge(Mr. P. Healy), looking north east.
VIEW 7A Sheet 2 of 2BELLANABOY BRIDGE TERMINALENVIRONMENTAL IMPACT STATEMENTSHELL E&P IRELAND LIMITED
As existing
Terminal overlaid, but not cropped
Post construction
2X zoom, post construction
ANGLE OF VISION SCALE (does not apply to 2X zoom below)40˚ 40˚ 50˚ 57˚50˚57˚
Viewpoint Number
7A
Photograph Location
Viewpoint from rear garden of residential property adjacent to the terminal site
Type of Visual Receptor
Residential property
Distance from Centre of Terminal (approx.)
650 m (0.65 km)
Significance of Impact
Direction of View / Description
Negligible impact
View looking north east from the western-most part of the garden of this property
which is close to south west corner of the terminal site. The top of the flare stack will
be visible just above the existing coniferous trees.
Fo
r ins
pecti
on pu
rpos
es on
ly.
Cons
ent o
f cop
yrigh
t own
er req
uired
for a
ny ot
her u
se.
EPA Export 25-02-2014:23:36:33