Page 1: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

PHASE I ESA

Environmental Site Assessment

Page 2: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

PURPOSE•PRODVIDE PROFESSIONAL

OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

Page 3: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

DETAILED SCOPE-OF SERVICE

•Conduct regulatory database search

•Review geological maps•Research subject property

history•Conduct interviews•Contact local regulatory

agencies

Page 4: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

SIGNIFICANT ASSUMPTION

•NONE

Page 5: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

LIMITATIONS AND EXCEPTIONS

•NOT CONSIDERED PART OF THE SUBJECT PROPERTY, AND WAS NOT ASSESSED NY URS.

Page 6: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

SPECIAL TERMS AND CONDITIONS

• NONE

Page 7: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

USER RELIANCE

•PREPARED FOR USE SOLELY BY COHC

Page 8: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

LOCATION AND LEGAL DESCRIPTION

•302 EAST 14TH STREET

Page 9: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

SUBJECT PROPERTY AND VCINIRY

CHARACTERISTICS•VACANT AT THE TIME•ADJACENT PROPERITES •INCLUDED RESIDENTIAL AND COMMERCIAL PROPERTIES

•SIDEWALKS, NOT FENCED PEDESTRIAN TRAFFIC

Page 10: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

PHYSICAL SETTINGS

•UNDERLAIN BY THE URBAN LAND- MARKHAM ASHKUM COMPLEX

Page 11: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

DESCRIPTIONS OF STRUCTURES, ROADS,

AND OTHER IMPROVEMENTS

•VACANTAND GRASSES WITH EXCEPTIONS OF PAVED SIDEWALKS NORTH, EAST AND WEST

•ALLEY RAN TGEOUGH E.14TH STREET TO S. ADJACENT UNNAMED ALLEY

Page 12: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

CURRENT ADJOINING PROPERTY USES

• N- BORDED TO THE N BY EAST 14TH ST AND AN APARTMENT BUILDING 285 EASTR 14TH AV

• E- BOARDED EAST BY ARNOLD ST FOLLOWED BY A COMMERCIAL BUILDING 350 E. 14TH ST

• S- BOARDED TO S. BY UNNAMED ALLEY FOLOWED BY VACANT LAND

• W- BOARDED W. BY MT. SINUIAPOSTOLLIC CHURCH AT 284 E. 14TH STREET

Page 13: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

TITLE RECORDS• URS NOT PROVIDED WITH THE

TITLE INSURANCE REPORTS FOR THE SUBJECT PROPERTY

Page 14: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

ENVIRONMENTAL LIENTAL LIENS USE

LIMITATIONS• NONE

Page 15: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

SPECIALIZED KNOWLEDGE

• NONE

Page 16: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

OWNER, SITE MANAGER, AND OCCUPANT INFORMATION

• OWNED BY COHC

Page 17: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

REASON FOR CONDUCTING PHASE I ESA

•COCH INDICATED THIS PHASE IESA WAS REQUESTED IN CONNECTION WITH POTENTIAL FUTURE DEVELOPMENT OF THE SUBJECT PROPERTY

Page 18: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

OTHER INFORMATION

• PROPERTY ABANDONED AFTER 1990 AND HAD POTENTIAL FOR DUMPING OF HAZARDOUS MATERIALS. URS DIDN’T OBSERVE EVIDENCE OF IMPROPER STORAGE OR DISPOSAL OF HAZARDOUS MATERIALS DURING VISIT IT IS NOT CONSIDERED A (REC) TO THE SUBJECT PROPERTY

Page 19: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

STANDARD ENVIRONMENTAL

RECORDS• HOBART CORPORATION AT

EAST 14th STREET AND ARONLOD STREET LOCATED NORTHEAST ADJACENT TO SUBJECT PROPERTY. IDENTIFIELD IN RCRA SMALL QUENTITY GENERATOR SQG DATABASE WITH NO VIOLATIONS REPORTED

Page 20: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

ADDITIONAL ENVIRONMENTAL

RECORDS• COCH-REQUEST NO RECOREDS

RELATING TO UST’S URS- REQUESTED TO REVIEW BUILDING PERMITS NO RESPONSE IEPA, BOL-NO INFORMATION IN THE BOLS RECOREDS FOR SUBJECT PROPERTY

Page 21: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

HISTORICAL USE•A BANK AND A SALOON

WERE LOCATED 304 EAST 14TH ST PROPERTY USES INCLUDED RESIDENTIAL AND COMMERCIAL OCCUPANTS

Page 22: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

AERIAL PHOTOGRAPHS

• COCH- REQUESTED NO RECORDS RELATING TO UST’S

• URS-REQUESTED TO REVIEW BUILDING PERMITS/NO RESPONSE

• ILLINOIS OSFM-URS SUBMITTED A FOIA REQUESTED/NO RESPONSE

• IERA, BOL

Page 23: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

TOPOGRAPHIC MAPS

• IMPROVED WITH THREE RECTANGULAR SHAPED STRUCTURES. ROAD DEPLICED WEST OF PARCEL B. SMALL SQUARE STRUCTURE LOCATED NORTH WEST OF PARCEL B. SEVERAL SMALL SQUARE STRUCTURE AND ONE LARGE RECTANGULAR STRUCTURE WERE DEPICTED SOUTHEAST AND SOUTHWEST OF PARCEL B RESPECTIVELY

Page 24: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

SANBORN FIRE INSURANCE MAPS• VACANT WITH EXCEPION OF A

STORE/DWELLING AND ASSOCIATED SHED AT 298 EAST 14TH AVE. BOARDERED NORH BY EAST 14TH ST FOLLOWED BY FARTHER NORTH BY VACANT PROPERTY. BOARDERED EAST BY 5TH AVE FOLLOWED BY PARCEL C

Page 25: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

CITY DIRECTORIES• INFORMATON INCLUDED A REVIEW

OF HISTORICAL CITY DIRECTORIES FROM 1991-2006 DUE TO LIMITATIONS OF EDR SEARCH PROCESS THE CITY DIRECTORY WAS ONLY CONDUCTED FOR 284 EAST 14TH STREET

Page 26: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

METHODOLOGY AND LIMITING CONDITIONS

• URA CONDUCTED THE SITE RECONNAISSANCE BY VISUALLY OBSERVING THE SUBJECT PROPERTY THE PROPERTIES SURROUNDING THE SUBJECT PROPERTY WERE OBSERVED BY WALKING OR BY DRIVING FROM ADJACENT PUBLIC THOROUGHFARES

Page 27: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

INTERIOR AND EXTERIOR OBSERVATIONS

•VACANT AND GRASSED LIMITED SNOW COVERED PORTIONS SIDEWALKS,MOUNDS OF GARBAGE

Page 28: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

HAZARDOUS SUBSTANCES AND PETROLEUM

PRODUCTS•NONE

Page 29: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

UNDERGROUND/ABOVEGROUND STORAGE TANKS

•NO EVIDENCE FOUND

Page 30: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

PCB-CONTAINING AND YDRAULIC EQUIPMENT

• FIVE POLE-MOUNTED TRANFORMERS WERE OBSERVERED A THE SUBJECT PROPERTY

• TWO OF THE POLE-MOUNTED TRANSFORMERS WERE LOCATED ON HE WESTERN PORTION OF PARCEL C

• THREE OF THE POLE-MOUNTED TRANSFORMERS WERE LOCATED AT THE PROPERTY BETWEEN PARCEL D

• TWO OF THE TREE POLE-MOUNTED TRANSFORMERS WERE LOCATED ON THE SOUTHEAST PORTION OF PARCEL D AND A SINGLE POLE-MOUNTED TRANSFORMER WAS LOCATED ON THE SOUTHWEST PORTION ON PARCEL D

Page 31: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

SOLID AND HAZARDOUS

WASTES• CURRENTLY VACANT, NO SOLID WASTE. SCATTERED DEBRIS WAS OBSERVED

Page 32: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

DRAINS ANS SUMPS

• NO DRAINS OR SUMPS

Page 33: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

WASTE WATER•NO PROCESS OR SANITARY

WASTE WATER GENERATED ON THE SITE.

Page 34: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

UTILITIES•PROPERTY VACENT NO

UTILITIES

Page 35: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

WELLS•NONE

Page 36: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

PITS,POUDS,LAGOONS

•NONE

Page 37: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

OTHER PHYSICAL EVIDENCE OF

CONTAMINATION•NONE

Page 38: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

CONCLUSIONS• URS IDENTIFIED NO SIGNIFICANT

DATS GAPS IN REASONABLE ASCERTAINABLE INFORMATION REVIEWED AND DESCRIBED IN THIS REPORT REGUARDING THE SUBJECT PROPERTY WITH THE EXCEPION THAT RESPONSES TO URS’ FOIA REQUESTS HAVE NOT BEEN RECEIVED

• NO HREC’S OR OTHER ENVIRONMENTAL ISSUES WERE IDENTIFIED

Page 39: PHASE I ESA Environmental Site Assessment. PURPOSE PRODVIDE PROFESSIONAL OPINION ON THE POTENTIAL FOR CURRENT PRESEMCE PF (REC’S) AT THE SUBJECT PROPERTY

ENVIRONMENTAL PROFESSIONALS INVOLVED

•STACY McCANCE PROJECT ENVIRONMENTAL SCIENTIST

•SARAH RUBEN PROJECT GEOLOGIST