phase i | 300,000 sf available now design & connect€¦ · morning breakfast service offering...

25
www.AssemblyAtNorthFirst.com DESIGN & CONNECT PHASE I | 300,000 SF AVAILABLE NOW “REHAB/RENOVATION PROJECT” 2019 AWARD WINNER

Upload: others

Post on 11-Nov-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

www.AssemblyAtNorthFirst.com

DESIGN & CONNECT

PHASE I | 300,000 SF AVAILABLE NOW

“REHAB/RENOVATION PROJECT”

2019 AWARD WINNER

Page 2: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

MIS

SIO

N ST

ATEM

ENT a. A gathering together of people

b. The putting together of machinery

(as-sem-bly, /e’semble/)

Offer a state of the art work environment that encourages maximum worker productivity.

Assembly is a 27-acre low density, sustainable campus, which combines walkable access to offsite retail, hotel and residential amenities; state of the art office and R&D workspaces; and The Grove, a one-acre amenity-rich environment designed to maximize workforce productivity.

Assembly is responsive to the needs of today’s technology tenants. It offers flexible and programmed spaces designed to foster collaboration for groups of different sizes and disciplines, through delivery of extraordinary buildings, private porches and well landscaped and merchandised outdoor spaces.

Assembly acknowledges that its tenants’ campus needs will change over time and is designed to satisfy this need, indoors and in common areas.

Mission Statement:

REHAB/RENOVATION PROJECT 2019 WINNER

Page 3: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

TABL

E O

F CO

NTEN

TS

PROJECT OVERVIEW

THE LOCATION

PHASE II

THE SPACE

THE GROVE

DESIGN & CONNECT

Page 4: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

Leading edge design by Gensler, offering large floor plates, abundant natural light, high ceilings, LEED Gold Core & Shell

With 90k SF to 1.3MM SF+, Assembly will accommodate your growth needs

Distinctive, signature lobbies and Main Street to feature your corporate identity

One acre of flexibly programmed amenity space is the backbone of the campus

3,000 SF+ of Indoor/Outdoor fitness center with locker room facilities

Several outdoor eating and gathering areas featuring BBQ grills, pizza ovens and fire pit

Immediate pedestrian friendly access to premium shopping, dining, living to attract and retain the best workforce

Proximate to the entire Silicon Valley via immediate 237 East / West access

1,000 lineal feet of frontage, directly on North First Street creates high visibility for your corporate identityPR

OJE

CT

OVE

RVIE

W

THE SPACE THE GROVE THE LOCATION

Page 5: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

3960 3930

3950

394090

4000

115,174 SF

81,998 SF

46,285 SF

60,720 SF

98,674 SF

86,243 SF

PHASE I

PHASE II

27 Acres | 3 Architecturally distinct buildings | 1 Full acre of amenity space | Main Street

PRO

JEC

T O

VERV

IEW

10

FITNESS CENTERMAIN LOBBYLOADINGCONNECTOR EV STATION

8

2

10 10

4

4

4

O�ce Space

Porch

Circulation PathSupport

3950 N. 1st St46,285 sf1 story

4000 N. 1st St 109,048 sf2 story

3970 N. 1st St

102,463 sf1 story

3960 N. 1st St

3930 N. 1st St84,240 sf1 story

3940 N. 1st St60,720 sf1 story

90 HQ Dr81,998 sf2 story

North 1st Street

Head

quar

ters

Dr

Rose Orchard Way

T

T

T

T

S

S

S

S

Loading

ExistingAmenity

ExistingAmenity

BackDoor

BackDoor

MainLobby

MainLobby

Amenity

Amenity

Amen

ity

Porch

Porc

h

Porch

Porch

LoadingLoading

MainLobby

Loading

N

Phase 2

Phase 1

Option A: Repositioning - Plan Diagram

09.28.2016

Page 6: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

FLOOR PLATES50,000 to 100,000 SF floor plates in single and two-story configurations foster collaboration and increase workforce interaction

HEIGHT & LIGHTAbundant natural light achieved via new full height glass and ceiling heights ranging from 18’ to 22’

CORPORATE IDENTITYAll buildings offer distinctive, prominent lobbies and multiple signage opportunities to feature your corporate identityTH

E SP

AC

E

Page 7: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

CONNECT

THE

SPA

CE

Page 8: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

EXCHANGE

THE

SPA

CE

Page 9: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

DESIGN

THE

SPA

CE

Page 10: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

SHAPE

THE

SPA

CE

Page 11: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

THE

GRO

VE

Concierge-style attention for your workforce means dining options from morning to evening, laundry pick up, bike storage, car wash, and car fuelingMorning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to orderAfternoon beverage service and fresh, healthy snacks to keep the team focused and nearbyHost your next company event at The Grove by reserving selected areas/cooking stations and letting us handle your party or meeting setup/breakdown

POTENTIAL ON-SITE SERVICES:

THE GROVE is a one acre contiguous, car free area that extends 500’ in length (greater than

the size of a football field) and sets the standard today for “Work Lifestyle” in the Silicon Valley.

Distinct zones for the individual seeking quiet outdoor workspace, group breakout areas under trees, fire pits for collaborationA comprehensive kitchen and trellis-covered patio (seating for 80)Stay productive anywhere at The Grove with complimentary high speed WiFi

OUTDOORS:

2,200 SF Indoor Fitness Center fully equipped with the latest cardio machines, weights and training equipment650 SF Outdoor Fitness/Yoga deckNew men’s and women’s locker rooms, shower facilities and towel service

ON-SITE FITNESS:

Page 12: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

Invesco Meeting 02.03.2017

Assembly - Amenity Area Enlargement

0 40 80'

1" = 40' at full size (11 x 17")

A

A

B

B

F

F

M

N

M

D

D

D

K

H

H

N

C

C

J

J

G

E

E

L

LEGENDThe Gallery : Under counter refrigerators, grills in island, storage, picnic tables, overhead shade structure and market lighting

The Lounge : Concrete �re pit in crushed stone paving

The Garden : Adirondack chairs in small rooms on crushed stone paving

The Stage : Wood deck with casual Seating

Fitness Porch (15' x 50')

The Grill : BBQ, large umbrellas, tables, and chairs on crushed stone paving (20' x 30')

Assembly Walk

"O�-The-Grid" Food Truck Plaza

Assembly Plaza

Pizza ovens and casual seating on crushed stone paving (30' x 60')

EVA Access (26' width)

3960 Amenity Space Porch

Pedestrian walk to retail center (10' wide)

4000

3930

3970

3960

THE GALLERYUnder counter refrigerators, grills in island, storage, picnic tables, overhead shade structure and market lighting

THE LOUNGEConcrete fire pit in crushed stone paving

FITNESS CENTERDECK

THE GRILLBBQ, large umbrellas, tables, and chairs on crushed stone paving

3960 AMENITY SPACE PORCH

THE GARDENAdirondack chairs in small rooms on crushed stone paving

THE STAGEWood deck with casual seating

“OFF-THE-GRID” FOOD TRUCK PLAZA

ASSEMBLY PLAZA

PEDESTRIAN WALK Retail center next door

THE

GRO

VE

a day in the life of THE GROVE

7:00am 11:30am:• Yoga Classes open• Coffee, Smoothies and Continental

Breakfast at the GALLERY11:30am 1:30pm:

• Lunch at the OFF-THE-GRID FOOD TRUCK PLAZA or Catered at the GALLERY and Patio or at the GRILL Pizza Oven

5:00pm 7:00pm:• Private events at the GALLERY or the STAGE

6:00am:

Fitness Center is 2,200 SF | Yoga Deck is 650 SF

• FITNESS CENTER and Yoga Deck open

Page 13: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

THE

GRO

VE

DESIGNMeet or relax in a unique environment with elements of luxury residential and resort properties integrated into a office setting to create a tranquil ambiance throughout the campus

FEATURESWide range of amenities include fire pits, BBQ grills, wood stage, fitness area, lawns, food truck plaza, electric car charging

WORKSeveral areas are designed for group meetings or just relaxation space, to keep workers engaged with each other and close to work

Page 14: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

REJUVENATE

THE

GRO

VE

Page 15: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

SHOPPING & DINING

Immediate pedestrian friendly access to shopping, dining & living keeps your work force close

THE

LOC

ATIO

N

VISTAMONTAÑA

PARK

237

O�ce Space

PorchCirculation Path

Support

3950 N. 1st St

46,285 sf

1 story

4000 N. 1st St

109,048 sf

2 story

3970 N. 1st St102,463 sf

1 story

3960 N. 1st St

3930 N. 1st St

84,240 sf

1 story

3940 N. 1st St

60,720 sf

1 story

90 HQ Dr

81,998 sf

2 story

North 1st Street

Headqua

rters

Dr

Rose Orchard Way

T

T

T

T

S

SS

S

Loading

Existing

Amenity

Existing

Amenity

BackDoor

BackDoor

Main

Lobby

Main

Lobby

Amenity

Amenity

Amenity

Porch

Porch

Porch

Porch

Loading

Loading

Main

Lobby

Loading

N

Phase 2

Phase 1

Option A: Repositioning - Plan Diagram

09.28.2016

Page 16: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

McC

arth

y B

lvd

.

Gre

at

Am

eric

a P

kwy.

87

237

880

101

680

BARTMilpitas Station

VTA Light RailMontague Station

VTA Light RailChampion Station

VTA Light RailBaypointe StationAmtrak/Ace

Great America Station

CaltrainLawrence Station

Caltrain/Amtrak/AceSanta Clara Station

VTA Light RailTasman Station

SAN JOSE

LEVI’SSTADIUM

Central Expy.

Scott Blvd.

Tasman Dr.

N. First St .

Montague Expy.

N.

Mat

hi l

da

Ave

.

Lafayette St.

Sa

n T

om

as

Exp

y.

Law

ren

ce E

xpy.

Zanker Rd

.GREAT

AMERICA

GREATMALL

INTERNATIONAL AIRPORT

Excellent access to all local and regional transportation options

THE

LOC

ATIO

N

O�ce Space

PorchCirculation Path

Support

3950 N. 1st St

46,285 sf

1 story

4000 N. 1st St

109,048 sf

2 story

3970 N. 1st St102,463 sf

1 story

3960 N. 1st St

3930 N. 1st St

84,240 sf

1 story

3940 N. 1st St

60,720 sf

1 story

90 HQ Dr

81,998 sf

2 story

North 1st Street

Headqua

rters

Dr

Rose Orchard Way

T

T

T

T

S

SS

S

Loading

Existing

Amenity

Existing

Amenity

BackDoor

BackDoor

Main

Lobby

Main

Lobby

Amenity

Amenity

Amenity

Porch

Porch

Porch

Porch

Loading

Loading

Main

Lobby

Loading

N

Phase 2

Phase 1

Option A: Repositioning - Plan Diagram

09.28.2016

Page 17: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

880

237

Domain Apartments 444 Units

1

North Park Apartment Village 2,700 Units

6

Brandon Park Apartments 1,579 Units

7

Enso Apartments 183 Units

3 121 Tasman Apartments 240 Units

Aire Apartments 293 Units

4

Verona Apartments 438 Units

The Verdant/Latitude Apartments 704 Units

Epic Apartments 769 Units

5

8 10

11Tasman Apartments

554 Units

2

Crescent Village Apartments1,750 Units

9

10,000 class A housing units within 2.5 miles

THE

LOC

ATIO

N

N. First St.

Zanker Rd.

Montague Expy.

Tasman Dr.

Project/Development Dwelling Units

1. Domain Apartments 444

2. Tasman Apartments 554

3. Enso Apartments 183

4. 121 Tasman Apartments 240

5. The Verdant / Latitude Apartments 704

6. North Park Apartment Village 2,700

7. Brandon Park Apartments 1,579

8. Aire Apartments 293

9. Crescent Village Apartments 1,750

10. Verona Apartments 438

11. Epic Apartments 769

Total: 9,654

O�ce Space

PorchCirculation Path

Support

3950 N. 1st St

46,285 sf

1 story

4000 N. 1st St

109,048 sf

2 story

3970 N. 1st St102,463 sf

1 story

3960 N. 1st St

3930 N. 1st St

84,240 sf

1 story

3940 N. 1st St

60,720 sf

1 story

90 HQ Dr

81,998 sf

2 story

North 1st Street

Headqua

rters

Dr

Rose Orchard Way

T

T

T

T

S

SS

S

Loading

Existing

Amenity

Existing

Amenity

BackDoor

BackDoor

Main

Lobby

Main

Lobby

Amenity

Amenity

Amenity

Porch

Porch

Porch

Porch

Loading

Loading

Main

Lobby

Loading

N

Phase 2

Phase 1

Option A: Repositioning - Plan Diagram

09.28.2016

Page 18: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

PHA

SE I

I

PHASE II OPTION 1 | RENOVATION

Fully renovate 3 existing buildings in architectural style consistent with Phase I40,000 to 60,000 SF floor plates in single and two story buildingsClear heights:

- 90 Headquarters: 12’ 9”- 16’- 3940 & 3950 North First: 15’ - 17’ 6”

Abundant power with 21 KV service to projectGrade and dock-high loading

Page 19: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

393039604000

O�ce Space

Porch

Circulation PathSupport

3950 N. 1st St46,285 sf1 story

4000 N. 1st St 109,048 sf2 story

3970 N. 1st St

102,463 sf1 story

3960 N. 1st St

3930 N. 1st St84,240 sf1 story

3940 N. 1st St60,720 sf1 story

90 HQ Dr81,998 sf2 story

North 1st Street

Head

quar

ters

Dr

Rose Orchard Way

T

T

T

T

S

S

S

S

Loading

ExistingAmenity

ExistingAmenity

BackDoor

BackDoor

MainLobby

MainLobby

Amenity

Amenity

Amen

ity

Porch

Porc

h

Porch

Porch

LoadingLoading

MainLobby

Loading

N

Phase 2

Phase 1

Option A: Repositioning - Plan Diagram

09.28.2016

PHASE II

3950

3940

90

115,174 SF 98,674 SF 86,243 SF

PHA

SE I

I

81,998 SF2 Stories

1 Story1 Story

46,285 SF60,720 SF

OFFICE SPACE FITNESS CENTER

Op

tion

1 | R

enov

atio

n

THE GROVE

PHASE I

Page 20: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

Demolish 3 existing buildings and develop 552,000 SF in 2 new state-of-the-art buildings with structured parkingFloor plate sizes of 32,000 - 65,000 SF

Scenario 1

PHA

SE I

I

Scenario 2Demolish existing 3 buildings and develop up to 920,000 SF in 1 new state-of-the-art building with structured parkingFloor plate sizes of 84,000 - 165,500 SF

PHASE II OPTION 2 | GROUND-UP DEVELOPMENT

Page 21: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

39303960

115,174 SF 98,674 SF 86,243 SF

4000

PHASE II

PHASE I

O�ce Space

Porch

Circulation PathSupport

3950 N. 1st St46,285 sf1 story

4000 N. 1st St 109,048 sf2 story

3970 N. 1st St

102,463 sf1 story

3960 N. 1st St

3930 N. 1st St84,240 sf1 story

3940 N. 1st St60,720 sf1 story

90 HQ Dr81,998 sf2 story

North 1st Street

Head

quar

ters

Dr

Rose Orchard Way

T

T

T

T

S

S

S

S

Loading

ExistingAmenity

ExistingAmenity

BackDoor

BackDoor

MainLobby

MainLobby

Amenity

Amenity

Amen

ity

Porch

Porc

h

Porch

Porch

LoadingLoading

MainLobby

Loading

N

Phase 2

Phase 1

Option A: Repositioning - Plan Diagram

09.28.2016390,000 SF 6 STORIES±65,000 SF FLOOR PLATES

162,000 SF 5 STORIES±32,400 SF FLOOR PLATES

AMEN

ITY

4 FLOORS + ROOF LEVEL 1,670 CARS TOTAL

PARKING GARAGEPORCHGREEN SPACE

PHA

SE I

IO

ptio

n 2

| Gro

und-

Up D

evelo

pmen

t | S

cena

rio 1

THE GROVE

OFFICE SPACE FITNESS CENTER

Page 22: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

PARKING GARAGE

PHA

SE I

IO

ptio

n 2

| Gro

und-

Up D

evelo

pmen

t | S

cena

rio 1

OFFICE SPACE

Page 23: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

39303960

115,174 SF 98,674 SF 86,243 SF

4000

PHASE II

PHASE I

O�ce Space

Porch

Circulation PathSupport

3950 N. 1st St46,285 sf1 story

4000 N. 1st St 109,048 sf2 story

3970 N. 1st St

102,463 sf1 story

3960 N. 1st St

3930 N. 1st St84,240 sf1 story

3940 N. 1st St60,720 sf1 story

90 HQ Dr81,998 sf2 story

North 1st Street

Head

quar

ters

Dr

Rose Orchard Way

T

T

T

T

S

S

S

S

Loading

ExistingAmenity

ExistingAmenity

BackDoor

BackDoor

MainLobby

MainLobby

Amenity

Amenity

Amen

ity

Porch

Porc

h

Porch

Porch

LoadingLoading

MainLobby

Loading

N

Phase 2

Phase 1

Option A: Repositioning - Plan Diagram

09.28.2016

AMEN

ITY

919,000 SF 9 STORIESFLOOR 1 & 2: ±165,500 SF FLOOR PLATES FLOOR 3 TO 9: ±84,000 SF FLOOR PLATES

9 FLOORS + ROOF LEVEL 3,340 CARS TOTAL

PHA

SE I

IO

ptio

n 2

| Gro

und-

Up D

evelo

pmen

t | S

cena

rio 2

PARKING GARAGEGREEN SPACE

THE GROVE

OFFICE SPACE FITNESS CENTER

Page 24: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

PHA

SE I

IO

ptio

n 2

| Gro

und-

Up D

evelo

pmen

t | S

cena

rio 2

PARKING GARAGEOFFICE SPACE

Page 25: PHASE I | 300,000 SF AVAILABLE NOW DESIGN & CONNECT€¦ · Morning breakfast service offering freshly pressed juices, roasted coffee and herbal teas all made to order Afternoon beverage

Connect& Tour with us

Michael Rosendin, SIOR, CCIM

Executive Vice President

+1 408 282 [email protected].# 08912356

Craig Fordyce, SIOR, CCIM

Executive Vice President

+1 408 282 [email protected].# 00872812

Shane Minnis, LEED AP

Vice President

+1 408 282 [email protected].# 01708656

www.AssemblyAtNorthFirst.com