Phase C-LRIP/IOT&E Exit Criteria Issues
Resolved or Addressed
Technical Reviews /Readiness Reviews,
Audits
InitiateFRP
Program ReviewPlanning Process
InitiateAcquisition CoordinationTeam (ACT) Planning
Conduct ACTMeetings
Plan and scheduleJROC, OIPT, DAB
as required
Begin Program Decision
Brief Updates Notify Participants
Updated ICD, CDD, CPD, AS, TEMP, CARD, Threat, APB, Beyond-LRIP Report
Approved
IOT & E PlansApproved
Logistics AssessmentCertification
Phase C – LRIP/IOT&E
Exit Criteria Met
Mature Designfor Testing
Complete and Submit
Program Decision Brief
START
TECH - EVALcomplete
Ready forOPEVAL
Coordinate withSECDEF
Coordinate withSECNAV
Coordinate withOPNAV
Coordinate withSYSCOM
Schedule FRP
Decision Meeting
IOT & E PlansComplete & Provided
Cost, SchedulePerformance
Trade OffAnalysis
FINISH
SEE FRPLONG-RANGE
PLANNING CHECKLIST
SEE FRPPLANNINGCHECKLIST
SEE FRPPRE-REVIEWCHECKLIST
SEE FRPREVIEW
CHECKLIST
LONG RANGEPLANNING PHASE
PLANNING PHASEPRE-REVIEW
PHASE
• ACQUISITION STRATEGY (prior to LRIP)• APB (Including CAIV-based objectives)•BEYOND-LRIP REPORT•CPD• PHASE C-FRP EXIT CRITERIA• THREAT ASSESSMENT • TEST PLANS (Especially for IOT & E)• TEMP• ENVIRONMENTAL CONSEQUENCES • CCA Requirements• ADEQUACY OF RESOURCES (Manpower and Funding)• ICE AND MANPOWER ESTIMATE (10USC2434)•ISP UPDATE• SEE DoDI 5000.2 ENCLOSURE (3) for additional requirements
At FRP, the MDAtypically emphasizes validation
of the following:
BEGINNING OFFULL- RATE PRODUCTION -Execute Full-Rate Production-Deploy System-Phase C –FRP Exit Criteria
30 DAYS(PRE-REVIEW PHASE)
LONG-RANGE(PLANNING PHASE)
~1 DAY(REVIEW PHASE)
EXIT CRITERIA FORPHASE C- LRIP/ IOT&E SATISFIED
BEGINNING OF
PHASE C - FRP
BEGINNING OF PHASE C
PHASE CThis phase focuses on
evaluating program status, risk, and readiness to enter
full-rate production/ procurement and
deployment, or to authorize deployment for IT programs
or software-intensive programs after completion of
IOT&E.
180 DAYS
DRAFT BRIEF AND ADM
30 DAYS
ENTRY CRITERIA FORPHASE C-LRIP/IOT&E SATISFIED
30 DAYS
6 MONTHS(PLANNING PHASE)
TIMELINE~ 1 or More YEARS
BETWEEN MILESTONE C and Full-Rate Production
PEO C4I and SPACEFULL-RATE PRODUCTION REVIEW TIMELINE
PHASESMS C FRP
ADM
PEO C4I and Space ACQUISITION PROGRAM STRUCTURE GUIDE
ENCLOSURE (17)Page T-1
VERSION 3.0FEB 2004
NOTE: Full-Rate Production is conducted to evaluate program status, risk, and readiness to enter Full-Rate Production. Refer to DoDI 5000.2, Para 3.8.4-3.8.5 and SECNAVINST 5000.2C, Para 2.5.4.8.2 for FRP requirements. The DAB timeline can be found on page T-2.
PROCESS
For ACAT ID and IAMsee page T2 for additional DAB TIMELINE requirements
BEGINNING OF MILESTONE FRP PLANNING PHASE
REVIEW FRP CHECKLIST & PEO MAJOR REVIEW CHECKLIST
CONDUCT ACT MEETING – Obtain consensus to proceed.
(Email minutes to ACT Participants)90-180 DAYS
DRAFT ACT CHARTER 90-180 DAYSREFINE AoA PLAN, AS,
ICD, TDS, CDD, TEMP, DEVELOP CPD, AND SUBMIT
BEYOND-LRIP REPORT90-180 DAYS
PREPARE EXIT CRITERIA FOR PHASE C-FRPAND ANY ANTICIPATED ISSUES WITH RESPECT
TO SYSTEMS ACQUISITION ACTIVITIES90 DAYS
90 DAYS
CONFIRM AVAILABILITY OF PRINCIPLESFor proposed briefing date
SCHEDULE PRE-BRIEF AND BRIEFVIA ACQUISITION WEBSITE AND PEO
FRONT OFFICE CALENDAR30 DAYS
REVIEW FRP PRE-REVIEW CHECKLIST
ENSURE SYSTEMS ACQUISITION ACTIVITIES HAVE BEEN INITIATED 30 DAYS
SEND PRE-BRIEF TO ACT MEMBERS FOR REVIEW 20 DAYS
CONDUCT THE FRP PRE-BRIEF(Closed Session) 7 DAYS
SEND FINAL BRIEF AND ADM TO ACT FOR REVIEW 5 DAYS
SUBMIT MAJOR PROGRAM REVIEWREADINESS SHEET TO PEO
2 DAYS
Draft ADM(Ready for System Demo
/ DT & E initiation /Entry/Exit Criteria Met)
FRPDecision
BriefWith PEO
FRPDecision
BriefWith MDA
PEO ApproveExit Criteria
ACATIII and IV
MDA ApproveExit Criteria
ACATI and II