MAT Program Project FlowPhase 1 - Pre-Construction
Programmed/Allocated to MetroMetro Lead
Programmed/Allocated to LocalLocal Lead
MOU or Cooperative Agreement Funding Agreement
Authorize funds/contracting with selected projects
Board Action
Procure
Complete Phase 1 WorkResulting in scope, budget, and roles for Phase 2
Release LOIBoard Action
Cycle 1 MAT ProgramProjects Selected
Initial ConsultationDetermine Phase 1 Lead
Contact: Jacob Lieb(213) 922-4132
[email protected]://metro.net/matprogram
![Page 2: Phase 1 - Pre-Constructionmedia.metro.net/about_us/committees/images/mat-project-dev-flow-… · MAT Program Project Flow Phase 1 - Pre-Construction Programmed/Allocated to Metro](https://reader035.vdocuments.site/reader035/viewer/2022080722/5f7b80e2cfdc820d703442dd/html5/thumbnails/2.jpg)
MAT Program Project FlowPhase 2 - Final Design and Construction
Final Design and Construction Programmed
Programmed/Allocated to MetroMetro Lead
Programmed/Allocated to LocalLocal Lead
MOU or Cooperative Agreement Funding Agreement
Procure
Design and Build the Project
Contact: Jacob Lieb(213) 922-4132
[email protected]://metro.net/matprogram