    Project Summary

    - Project: PH No.15 Oxygen Plant Cryogenic Tank

    - Client: POSCO

    - Location: Pohang, Korea

    - Capacity: 10,000 ton x 1 tank (Nitrogen Liquid)

    910 ton x 1 tank (Oxygen Liquid)

    200 ton x 1 tank (Argon Liquid)

    80 ton x 2 tank (Oxygen, Nitrogen Liquid)

    - Scope: EPC Turnkey

    - Period: 2007 ~ 2010

    Project Summary

    - Project: GW No.15 Oxygen Plant Cryogenic Tank

    - Client: POSCO

    - Location: Gwangyang, Korea

    - Capacity: 7,000 ton x 1 tank (Oxygen Liquid)

    2,000 ton x 1 tank (Nitrogen Liquid)

    300 ton x 1 tank (Argon Liquid)

    - Scope: EPC Turnkey

    - Period: 2008 ~ 2010

    PH No.15 Oxygen Plant GW No.15 Oxygen Plant

  • 1

    Project Summary

    - Project: PH No.16 Oxygen Plant Cryogenic Tank

    - Client: POSCO

    - Location: Pohang, Korea

    - Capacity

    100,000Nm3/h (Oxygen Gas)

    100,000Nm3/h (Nitrogen Gas)

    4,000 ton x 1 tank (Oxygen Liquid)

    6,000 ton x 1 tank (Nitrogen Liquid)

    80 ton x 1 tank (HP Oxygen Liquid)

    100 ton x 1 tank (HP Nitrogen Liquid)

    - Scope: EPC Turnkey

    - Period: 2011. 6 ~ 2013. 12 (30 months)

    PH No.16 Oxygen Plant

  • 2

    Project Summary

    - Project: GW No.16 Oxygen Plant Cryogenic Tank

    - Client: POSCO

    - Location: Gwangyang, Korea

    - Capacity

    100,000Nm3/h (Oxygen Gas)

    100,000Nm3/h (Nitrogen Gas)

    7,000 ton x 1 tank (Oxygen Liquid)

    1,000 ton x 1 tank (Nitrogen Liquid)

    2,000 ton x 1 tank (Argon Liquid)

    - Scope: EPC Turnkey

    - Period: 2011. 6 ~ 2013. 12 (30 months)

    GW No.16 Oxygen Plant

  • 3

    Project Client/Location Period Capacity Scope

    Pohang #15 Oxygen Plant POSCO, Korea 2007 ~ 2010 3,429 ton/day EPC

    Gwangyang #15 Oxygen Plant POSCO, Korea 2007 ~ 2010 3,429 ton/day EPC

    Pohang #14 Oxygen Plant POSCO, Korea 2004 ~ 2006 1,886 ton/day EPC

    Gwangyang #14 Oxygen Plant POSCO, Korea 2004 ~ 2008 1,886 ton/day EPC

    Pohang #13 Oxygen Plant POSCO, Korea 2004 ~ 2006 1,886 ton/day EPC

  • 4

    Project Client/Location Period Capacity Scope

    Gwangyang #13 Oxygen Plant POSCO, Korea 2003 ~ 2005 1,371 ton/day EPC

    Pohang #12 Oxygen Plant POSCO, Korea 2003 ~ 2005 1,029 ton/day EPC

    Gwangyang #12 Oxygen Plant POSCO, Korea 1997 ~ 2000 1,371 ton/day EPC

    Pohang #11 Oxygen Plant POSCO, Korea 1995 ~ 1997 860 ton/day EPC

    Gwangyang #11 Oxygen Plant POSCO, Korea 1997 ~ 2000 1,371 ton/day EPC

    Pohang #10 Oxygen Plant POSCO, Korea 1991 ~ 1993 860 ton/day P.C

    Gwangyang #10 Oxygen Plant POSCO, Korea 1994 ~ 1995 720 ton/day EPC

    Pohang #9 Oxygen Plant POSCO, Korea 1991 ~ 1993 860 ton/day P.C

    Gwangyang #9 Oxygen Plant POSCO, Korea 1990 ~ 1992 538 ton/day P.C

    Pohang #8 Oxygen Plant POSCO, Korea 1982 ~ 1984 686 ton/day P.C

  • 5

    Project Client/Location Period Capacity Scope

    Gwangyang #8 Oxygen Plant POSCO, Korea 1990 ~ 1992 538 ton/day P.C

    Pohang #7 Oxygen Plant POSCO, Korea 1979 ~ 1981 1,029 ton/day P.C

    Pohang #6 Oxygen Plant POSCO, Korea 1976 ~ 1978 860 ton/day P.C

    Pohang #5 Oxygen Plant POSCO, Korea 1976 ~ 1978 860 ton/day P.C

    Pohang #3 Oxygen Plant POSCO, Korea 1974 ~ 1976 343 ton/day P.C

    Pohang #2 Oxygen Plant POSCO, Korea 1972 ~ 1973 154 ton/day P.C

    Pohang #1 Oxygen Plant POSCO, Korea 1972 ~ 1973 154 ton/day P.C

    Pohang #3 Hydrogen Plant POSCO, Korea 1995 ~ 1996 700 Nm/hr EPC

    Gwangyang #5 Hydrogen Plant POSCO, Korea 2004 ~ 2006 350 Nm/hr EPC

    Pohang #4 Hydrogen Plant POSCO, Korea 2005 ~ 2006 1,200 Nm/hr EPC

  • 6

    Project Name Location Client Description(Capacity)Scope

    of Work Period

    Product Quality Improvement Project Bangkok, Thailand Bangchak Petroleum Public Co., Ltd.

    BRU: 2,500 BPSDRSU: 17,900 BPSDHPU: 40 MMSCDNSU: 7,200 BPSD

    EPC 2010- 2011

    UAE RUWAIS Refinery Expansion Project RUWAIS, UAE TAKREER / SKEC 400,000 BPSD DE, PS 2009-2014

    PRU/GDS Unit Ulsan, Korea SK Energy PRU 974 MTDGDS 30,000 BPSD DE, PS 2006-2008

    Selective Hydrogenation Unit Ulsan, Korea S-Oil Corp. 30,000 BPSD DE,PS.CS 2006-2007

    Kerosene Hydrotreating Unit Mailiao, Taiwan Formosa Petrochemical Corp. 42,000 BPSD DE,PS 2005-2007

    Gasoline Hydrotreating Unit Taiwan Formosa Petrochemical Corp.HDS 26,500 BPSDISO 11,100 BPSD DE 2003-2005

  • 7

    Project Name Location Client Description(Capacity)Scope

    of Work Period

    YEP-V Project Yeosu, Korea Kumho Polychem Co., Ltd. EPM/EPDM 60,000MTA EPC 2013-2015

    PTT Phenol Project Rayong, ThailandPTT Phenol Company

    LimitedPhenol 250,000 MTA,Acetone 123,000 MTA

    EPC 2013-2015

    KPA IV Project Yeosoo, Korea Kumho P&B ChemicalCumene 900,000 MTA,Phenol 300,000 MTA

    EPC 2013-2015

    Needle Coke Project Gwangyang PMC TechNeedle Coke 63,000 MTAPitch Coke 28,000 MTA

    EPC 2012-2014

    Aceto Plant Project Ulsan, KoreaTONGSHU Petrochemical

    CO., LtdAcetonitrile 11,000 MTA EPC 2012-2013

    SK Innovation V-Project Inchon, Korea SK E&C Co., Ltd.Para-Xylene1,341.2 KMTA

    Benzene 410 KMTAEPC 2012-2014

    MOC Process Improvement Project Rayong, ThailandMaptaphut Olefins

    Co., Ltd.

    Ethylene 800,000 MTA 1,000,000 MTA

    Propylene 400,000 MTA 480,000 MTA

    EPC 2012-2013

    Wire & Cable Compounding(WCC) Plant Jubail, Saudi ArabiaGulf Advanced Cable Insul

    ation Company(GACIC)XLPE 20,000 MTA

    SC 5,000 MTAEPC 2011-2013

    PG Tank Project Rayong, ThailandRayong Terminal Company

    Limited

    PT Tank 15,000 MT x1,5,000 MT X 2,

    PE Tank 3,700MT x 1EPC 2011-2012

    SBPA Project Gunsan, Korea Samyang Inochem 150,000 MTA EPC 2010- 2012

    PX 700 kTA Expansion Project Daesan, KoreaSamsung Total Petrochem.

    Co., Ltd.700,000 MTA DE, P 2010- 2012

  • 8

    Project Name Location Client Description(Capacity)Scope

    of Work Period

    GOC(TC) LAB Project China Great Orient Chemical Ltd. LAB 100,000 MTA BD 2010- 2010

    LDPE, PP-3 & PP-B Extension Project Daesan, KoreaSamsung Total Petrochem.

    Co., Ltd.

    LDPE : 115,000 155,000 MTA PP-3 : 320,000 400,000 MTAPP-B : 130,000 147,000 MT

    A

    DE, PS 2010- 2011

    TDI Extension Project Yeosu, Korea KPX Fine ChemicalTDI 100,000MTATo 150,000MTA

    EPC 2009-2012

    RTC Project Rayong, ThailandRayong Terminal Company

    LimitedPropylene Oxide Tank *3

    Spherical Propylene Tank *2EPC 2009-2011

    Wongjin Poly Silicon Plant Project Sangju, KoreaWoongjin Poly Silicon

    Co., Ltd.5,000 MTA EPC 2008-2010

    Silan Plant YoungJu, KoreaSodiff Advanced Materials

    Co., Ltd.EPC 2008-2009

    BPEX HDPE Project Rayong, ThailandBangkok Polyethylene Public Company Ltd.

    250,000 MTA EPC 2007-2010

    Isobutene Plant Ulsan, Korea Songwon Industry Co., Ltd. 30,000 MTPA EPC 2007-2009

    MDI 142,000 MTPA Plant Extension Project Yeosu, KoreaKumho Mitsui Chemical In

    c.142,000 MTPA EPC 2007-2009

    BPA(lll) Plant Project Yeosu, Korea Kumho P&B Chemical 355,000 TPA DE,P 2007-2008

    Bio Diesel Plant(II) Sabah, Malaysia Global Bio-Diesel Sdn Bhd 300,000 MTA DE,PS 2007-2008

    Isopropyl Alcohol Plant Yeosu, Korea Isu Chemical Co., Ltd 30,000 MTA DE,PS 2007

  • 9

    Project Name Location Client Description(Capacity)Scope

    of Work Period

    GDC Project Daesan, KoreaGreen Soft Chem(Mitsui K

    asei Process)25,740 MTA EPC 2007-2008

    Carbon Black Plant Altamira, MexicoMexico Carbon Manuf. S.A

    de C.V45,000 MTA EPC 2006-2008

    SM Revamping Project Daesan, KoreaLotte Daesan Petrochemic

    al Corp.420,000 MTPA DE, P 2006-2008

    Bio Diesel Plant Sabah, Malaysia Global Bio-Diesel Sdn Bhd 200,000 MTA DE,PS.CS 2006-2007

    Polyonsan Project Ulsan, Korea Rhodia Polyamide Co., Ltd. 36,000 TPA EPC 2006-2007

    Air Separation Plant Ulsan, Korea Korea Airtech IncLN2 : 30,000 MTALAr : 2,700 MTA

    LO2 : 57,000 MTAEPC 2006-2007

    PTA Plant Revamping Ulsan, Korea Taekwang Industry Co.Ltd.400,000 MTA to900,000 MTA

    DE,PS,CS 2006-2007

    Standby Stabilizer Unit Rayong, Thailand PTT Public Co., Ltd. 15,000 BPSD EPC 2005-2007

    Naphtha Cracking Center Extension Yeosu, KoreaYeochun NCC

    CO., Ltd.

    Ethylene 510,000 to 875,000 MTA

    BD 170,000 to 220,000 MTADE,PS,CS 2005-2007

    Butandiol Plant Mailiao, Taiwan Nanya Plastics Corp. 80,000 MTA DE,PS 2005-2006

    Air Separation Plant Giheung, Korea BOC Gases Korea IncLN2 55,000 MTALAr 15,000 MTALO2 3,000 MTA

    DE, C 2005-2006

  • 10

    Project Name Location Client Description(Capacity)Scope

    of Work Period

    GLS Pattern Embossing Project Ulsan, Korea DuPont (Korea) EPC 2005-2006

    PTA Plant Debottlenecking Ulsan, Korea Hyosung Corp.350,000 MTA To

    410,000 MTADE 2005-2006

    CSC Ammonia Still Project Kaohsiung, Taiwan China Steel Corp. DE,PS 2005-2006

    G-ABS SM Stripper Ulsan, Korea Cheil Industry Inc 205 kg/h DE,P 2005-2006

    SRU#4/ARU#5/SWS#3 Unit Mailiao, TaiwanFormosa Petrochemical Co

    rp.800 MTPD DE 2004-2006

    SM3 Plant Mailiao, TaiwanFormosa Petrochemical Co

    rp.600,000 MTA DE 2004-2006

    Silan Plant Yeongju, KoreaSodiff Advanced Materials

    Co., Ltd.300 MTA EPC 2004-2005

    Linear Alkyl Benzene Plant Revamping Merak, IndonesiaPT. Unggul Indah Cahaya

    Tbk 180,000 MTA EPC 2004-2005

    Carbon Black Plant Extension Rayong, ThailandBridgestone Carbon Black

    (Thailand) Co., Ltd.18,200 MTA EPC 2004-2005

    Modacryl Resin Plant Ulsan, Korea Bibaco Co. Ltd. 2,500 MTA DE,PS 2004-2005

    Flexible Copper Clading Laminate Plant Gumi, Korea SD Flex Co., Ltd. 100,000 m2/min DE, PS, C 2004-2005

  • 11

    Project Name Location