PETREVEN is a Drilling Contractor(established in 1998 in Venezuela).The Company, being part of the TREVI Group, has a solid backgroundin drilling rig engineering and management.
The main objective of PETREVEN is to provide drilling services in those areas where the use of our technology and expertise will be able to create increase of drilling performance, cost reduction, high safety standards and environmental protection.
Our strategy is to develop a project, creating together with the Client a dedicated working team, able to design a “fit for purpose“ drilling rig to enhance productivity and additional value to the field operations
ITALYPetreven
VenezuelaH200
PETRORITUPANOH301
PETRODELTA
PETREVEN WORLWIDE LOCATIONS
Saudi ArabiaH301 – H600 – H601
PETRODELTA (PDVSA)
2 RIG HH220 SERIES3 RIG HH102 SERIES
ColombiaG102
PETROBRAS
PeruH107 – H109PETROBRAS
ArgentinaH103 – H104 PETROBRASH105 – H108REPSOL-YPF
H106CHEVRON IN OPERATION RIG UP IN PROGRESS
RIG FLEET
RIG FLEET HH102 HH220 HH300 HH600
Max Hook Load Capacity 220,000 lbs 440,000 lbs 600,000 lbs 1200,000 lbs
Drilling Depth 5500 ft 12000 ft 17000 ft 23000 ft
Mud Pumps 2x1000 HP 3x1000 HP 2x1600 HP 3x1600 HP
Top Drive Max Torque 26000 lbs/ft 26000 lbs/ft 32000 l bs/ft 50000 lbs/ft
Clearance for BOP Stack 17.06 ft 17.70 ft 22.00 ft 30.0 0 ft
RIG FLEET
PETREVEN achieved successful results in the Latin America, in term of drilling performance and safety standards, working for Major oil company.These results have allowed the constant increase o f our rig fleet and the awarding of new important contracts
24
8 9
13
18
2004 2005 2006 20072008 2009
2
VenezuelaOperators: Petrobras, Lasmo-ENI, PDVSAActivity 1999-2009Oilfields: Lobo-Leona, Orocual, Concepcion, Kaki, Oritupano,Rigs: HH200 – H301
PETREVEN VENEZUELA
Venezuela 2002 -2009
Operational Days 1665
Drilled wells 109
Depth average (ft) 7941,06
Total feet drilled (ft) 865576
Actual time average (days) 19.62
Construction rate (ft/day) 519,79
Moving Average (days) 3,10
Down Time (%) 4,19
Venezuela 2002 -2009
PerùOperator: PetrobrasActivity 2006-2009Oilfield: TalaraRigs: H107 – H109
PETREVEN PERU
Perù 2006 -2009
Operational Days 1.538
Drilled wells 209
Depth average (ft) 3.880
Total feet drilled (ft) 810.944
Actual time average (days) 7,25
Construction rate (ft/day) 543,21
Moving Average (days) 0,77
Down Time (%) 2,90
Perù 2006 -2009
ColombiaOperator: Petrobras, Hocol, Petromar, Ecopetrol, PetromineralesActivity 2002-2009Oilfields: Guando, Mango, Rio Ceibas San Francisco, Antares, Lomalarga, Campo DinaRig: G102
PETREVEN COLOMBIA
Colombia 2002 -2009
Operational Days 2.363
Drilled wells 178
Depth average (ft) 3.664
Total feet drilled (ft) 652.128
Actual time average (days) 10,60
Construction rate (ft/day) 925,94
Moving Average (days) 1,92
Down Time (%) 0,72
Colombia 2002 -2009
ArgentinaOperators: Petrobras, Repsol-YPF, ChevronActivity 2005-2009Oilfields: Medanito, Senal Picada, Puesto Hernandez , El Trapial, Las HerasRigs: H103, H104, H105, H106, H108
PETREVEN ARGENTINA
Argentina 2005 -2009
Operational Days 5.248
Drilled wells 615
Depth average (ft) 3.925
Total feet drilled (ft) 2.414.165
Actual time average (days) 8,39
Construction rate (ft/day) 477,83
Moving Average (days) 0,92
Down Time (%) 2,94
Argentina 2005 -2009
PETREVEN CORPORATE STATISTICS 2002-2009
Operational Days 10.814
Drilled wells 1111
Depth average (ft) 4.853
Total feet drilled (ft) 4.742.813
Actual time average (days) 9,73
Construction rate (ft/day) 438,57
Moving Average (days) 2
Down Time (%) 2,68
PETREVEN ARGENTINA R.O.P. RECORD
OPERATOR
WELL
CHEVRON
ET-899
December 2007RIG H106
WELL
OILFIELD
ET-899
EL TRAPIAL
HOURS
FT DRILLED
DEPTH
24.5
4235
4642
R.O.P. 174 FT/HR
Time (day)
OPERATOR
WELL
PETROBRAS
PH-2031
November 2007
PETREVEN ARGENTINA DRILLING RECORD
RIG H103
0,00
500,00
1000,00
1500,00
2000,00
2500,00
3000,00
3500,00
4000,00
0,00 0,50 1,00 1,50 2,00 2,50 3,00 3,50 4,00
Dep
th (
ft)
Program
Petreven
OILFIELD PUESTO HERNANDEZ
25
3166
3638
HOURS
FT DRILLED
DEPTH
DRILLING AVERAGE 1303 FT/DAY
ROP PLANNED 102 FT/HR
ROP REAL 125 FT/HR
TOTAL HOURS SAVED 20.64
OPERATOR
WELL
PETROBRAS
ORM-174
May 2002
PETREVEN VENEZUELA DRILLING RECORD
RIG H200
0
1000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time (day)
Program
Petreven
OILFIELD ORITUPANO-LEONA
9521 FTPLANNED DEPTH
PLANNED DAYS 24
REAL DEPTH 9430 FT
REAL DAYS 13.64
2000
3000
4000
5000
6000
7000
8000
9000
10000
Dep
th (
ft)
Petreven
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time (day)
Program
OPERATOR
WELL
PETROBRAS
MAN-112H
October 2006
PETREVEN COLOMBIA DRILLING RECORD
RIG G102
500
1000
1500
2000
2500
3000
3500
4000
4500
Dep
th (
ft)
Program
Petreven
WELL
OILFIELD
MAN-112H
MANGO
4066 FTPLANNED DEPTH
PLANNED DAYS 24
REAL DEPTH 4256 FT
REAL DAYS 13.8
IMSIMS
MANAGEMENTCOMMITMENTS
HSEQ POLITICS
RESPONSABILITYIN OPERATIONS
PROCEDURES& NORMATIVES
CONTINUATIVEEVALUATION
GOALSOBJECTIVES
INCENTIVEPROGRAMS
PETREVEN works following strict politics to fulfill Client’s expectation and at the same time to ensure the best QHSE standard to his Personnel and for the Environment close to which perform his operations…
INSPECTIONSAUDITORIES
TRAINING
ANOMALIES INVESTIGATIONS
HSEQSUPPORT
…to do this PETREVEN works with an “Integrated Management System” that allows a continuous controls and reaction when needed.
Corporative 2002-2008Accidents type vs. working area
3
7
6
12
30
40
50
QHSE STATISTICS
1
710
1
2
2
6
92
3
3
1
1
21
1
2
0
10
20
With lost time Restricted Work Medical treatment Firs t Aid
Substructure
Pipe rack
Rig Floor
Well site
Maintenance
Tanks
Pumps
Corporative 2002-2008Accidents type vs. Operation type
8
8
30
35
40
45
Various
Rig cleanig
Rig maintenance
Rig down
Rig up
Running casing
Drilling
QHSE STATISTICS
1
9
1
14
1
1
2
2
8
3
1
3
21
1
2
2
0
5
10
15
20
25
With lost time Restricted Work Medical treatment First Aid
Awarding received in 2004 -2005 and 2006 as best dr illing contractor for the technical excellence, always complying with all safety and en vironmental protection criteria
Safety & Quality
Argentina
Colombia
Perú
Venezuela
Corporativo
HSEQ STATISTICSGLOBAL FREQUENCY INDEX (TRCF)
ACUM ULATED (12 m onths )
0,0
2,0
4,0
6,0
8,0
10,0
12,0
14,0
Jun 08
Jul 08
Ago08
Sep08
Oct08
Nov08
Dic 08
Ene 09
Feb09
Mar09
Abr09
May0908 08 08 08 08 08 08 09 09 09 09 09
LOST TIME FREQUENCY INDEX (LTIF)ACCUMULATED (12 m onths)
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
Jun 08
Jul 08
Ago08
Sep08
Oct08
Nov08
Dic 08
Ene 09
Feb09
Mar09
Abr09
May09
Safety & QualityLeader in Performances and Safety
2004
LTIR PETREVEN
LTIR IADC
In the six years up to June 2009, PETREVEN Colombia reported zero Lost Time Incident (LTI)
2008. PETREVEN, has been chosen among all companies operating in the field in Colombia to be awarded with the Prize by the Safety Columbi an Council
20042005
20062007
2008
0
0,1
0,2
0,3
0,4
0,5
0,6
0,7
LTIR IADC
Thanks for the interest in our technologyThanks for the interest in our technology !!