PENGURUSAN SUNGAI MAPAN
Dari Perspektif KejuruteraanPengangkutan Endapan dan
Keseimbangan Sungai
Profesor Aminuddin Ab Ghani
©©USM_USM_REDAC_2007REDAC_2007
PengenalanPengenalan
©©USM_USM_REDAC_2007REDAC_2007
Sistem Sungai Semula JadiSistem Sungai Semula Jadi
Zon Air Hulu Zon Pindah Zon PemendapanTiga Zon Sungai
©©USM_USM_REDAC_2007REDAC_2007
Koridor SungaiKoridor Sungai
©©USM_USM_REDAC_2007REDAC_2007
Zon Air HuluZon Air Hulu
Buaya Sangkut, Sungai Endau
2
©©USM_USM_REDAC_2007REDAC_2007
Zon Air HuluZon Air Hulu
Sungai Endau©©USM_USM_REDAC_2007REDAC_2007
Zon Air HuluZon Air Hulu
Taman Negara, Sungai Pahang
©©USM_USM_REDAC_2007REDAC_2007
Zon PindahZon Pindah
Sg Pahang, Temerloh©©USM_USM_REDAC_2007REDAC_2007
Zon PindahZon Pindah
Sungai Berliku
©©USM_USM_REDAC_2007REDAC_2007
Zon PindahZon Pindah
Sungai Perak, Kuala Kangsar©©USM_USM_REDAC_2007REDAC_2007
Zon PindahZon Pindah
Sungai Lurus
3
©©USM_USM_REDAC_2007REDAC_2007
Jajaran Sungai Semula jadi
Lurus
Berliku
©©USM_USM_REDAC_2007REDAC_2007
Pelbagai Bentuk Keratan Rentas Sungai Berliku Semula jadi
©©USM_USM_REDAC_2007REDAC_2007
Zon PemendapanZon Pemendapan
Muara Sg Pahang, Pekan©©USM_USM_REDAC_2007REDAC_2007
Zon PemendapanZon Pemendapan
Kuala Muda
©©USM_USM_REDAC_2007REDAC_2007
Zon PemendapanZon Pemendapan
Kuala Mersing©©USM_USM_REDAC_2007REDAC_2007
Zon PemendapanZon Pemendapan
Pulau Tioman
Sg Endau, Jeti Tg Gemok
4
©©USM_USM_REDAC_2007REDAC_2007
Zon PemendapanZon Pemendapan
Sg Bebar, Nenasi©©USM_USM_REDAC_2007REDAC_2007
Udang Galah: Sg Bebar, Nenasi
©©USM_USM_REDAC_2007REDAC_2007
Sungai Yang Masih Dalam Keadaan SemulajadiSungai Yang Masih Dalam Keadaan Semulajadi
Sungai Sedim, Kulim
Sungai Ulu Paip, Kulim
Sungai Kampar @ Kg Jahang,
Gopeng
Sungai Kulim, Kedah
©©USM_USM_REDAC_2007REDAC_2007
Nuki River (Kitakyushu City, Fukuoka Prefecture)
Before construction( October 1991 )
23 months after construction (July 1995)Sediment was deposited on which vegetation grew,
Creating a natural water space.
Contoh Pemulihan Sungai di Jepun Contoh Pemulihan Sungai di Jepun
Immediately after construction (August 1993)
©©USM_USM_REDAC_2007REDAC_2007
(a) Pembinaan Siap Pada 30 Januari 2003 (b) 4 Bulan Selepas Pembinaan
Aliran Rendah (22 Mei 2003)
Aliran Tinggi (19 Mei 2003)
Pembinaan Sungai Buatan Di Kampus Kejuruteraan USMPembinaan Sungai Buatan Di Kampus Kejuruteraan USM
©©USM_USM_REDAC_2007REDAC_2007
Semasa Banjir
Selepas Banjir
Banjir 1993 Banjir 1993 –– Sungai KerohSungai Keroh
5
©©USM_USM_REDAC_2007REDAC_2007
Hakisan TebingHakisan Tebing
©©USM_USM_REDAC_2007REDAC_2007
Hakisan TebingHakisan Tebing
©©USM_USM_REDAC_2007REDAC_2007
Hulu Hilir
Pemendapan Dalam Sungai Pemendapan Dalam Sungai ––Sungai KerayongSungai Kerayong
©©USM_USM_REDAC_2007REDAC_2007
Di hulu Jambatan Manjoi (21-12-1997)Banjir 1997Banjir 1997
©©USM_USM_REDAC_2007REDAC_2007
Saluran Utama
Dataran Banjir
Hakisan di Saluran Utama dan Hakisan di Saluran Utama dan Dataran Banjir 1997 Dataran Banjir 1997 –– Sungai PariSungai Pari
©©USM_USM_REDAC_2007REDAC_2007
Keratan R entas @ 1 2 /1 1 /9 7
3 5 .0
3 5 .5
3 6 .0
3 6 .5
3 7 .0
3 7 .5
3 8 .0
3 8 .5
3 9 .0
-1 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3Le ba r [m ]
Ara
s [m
]
BLW L0 .2 Y o0 .6 Y o0 .8 Y o
Keratan Rentas @ 19/11/97
35.0
35.5
36.0
36.5
37.0
37.5
38.0
38.5
39.0
-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23Lebar [m]
Ara
s [m
]
BLWL0.2Yo0.6Yo0.8Yo
Keratan Rentas @ 29/11/97
35
35.5
36
36.5
37
37.5
38
38.5
39
-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23Lebar [m]
Ara
s [m
]
BLWL0.2Yo0.6Yo0.8Yo
Keratan Rentas @ 03/12/97
35
35.5
36
36.5
37
37.5
38
38.5
39
-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23Lebar [m]
Ara
s [m
]
BLWL0.2Yo0.6Yo0.8Yo
Keratan Rentas Di Jambatan Manjoi
35
35.5
36
36.5
37
37.5
38
38.5
39
-2 3 8 13 18 23Jarak [m]
Ara
s [m
]
BL12Nov
WL12Nov
BL19Nov
WL19Nov
BL29Nov
WL29Nov
BL3Des
WL3Des
Hakisan dan Pemendapan Dalam Hakisan dan Pemendapan Dalam Saluran SungaiSaluran Sungai
6
©©USM_USM_REDAC_2007REDAC_2007
100
105
110
115
120
125
130
135
140
3600 4100 4600 5100 5600 6100 6600 7100
Distance, meter
Ele
vatio
n, fe
et
Calibrated WL 1997 Flood Soffit Silibin Soffit Manjoi Design Bed BL graf
Permodelan Sungai Menggunakan Permodelan Sungai Menggunakan FLUVIALFLUVIAL--12 Banjir 12 Banjir 19971997, Sg Pari, Sg Pari
©©USM_USM_REDAC_2007REDAC_2007
Kerja Pembinaan Semula Sungai Pari Kerja Pembinaan Semula Sungai Pari Selepas Banjir November 1997Selepas Banjir November 1997
©©USM_USM_REDAC_2007REDAC_2007
Kawalan Hakisan Tebing
©©USM_USM_REDAC_2007REDAC_2007
Kawalan Hakisan Tebing
©©USM_USM_REDAC_2007REDAC_2007
Keseimbangan SungaiKeseimbangan Sungai
©©USM_USM_REDAC_2007REDAC_2007
Konsep Asas Konsep Asas Pengangkutan Pengangkutan
EndapanEndapan
7
©©USM_USM_REDAC_2007REDAC_2007
BAHAN DASAR
BEBAN ENDAPAN
DASAR
BEBAN TERAMPAI
BEBAN HASIL HAKIS
JUMLAH BEBAN BAHAN DASAR
JUMLAHAN BEBAN
Ragam Pengangkutan Ragam Pengangkutan EndapanEndapan
©©USM_USM_REDAC_2007REDAC_2007
Ragam Pengangkutan Ragam Pengangkutan EndapanEndapan
©©USM_USM_REDAC_2007REDAC_2007
No Sediment Transport
Diagram ShieldsDiagram Shields(Featherstone & Nalluri 1993)(Featherstone & Nalluri 1993)
©©USM_USM_REDAC_2007REDAC_2007
Bentuk Bentuk DasarDasar
©©USM_USM_REDAC_2007REDAC_2007
Stesen SP7 Sg. Pari
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.10 1.00 10.00 100.00
Sampel 1 Sampel 2 Sampel 3 PurataSaiz Partikel (mm)
Pera
tusT
elus
(%)
d90
d65
d10
d35
d50
d60
Taburan Saiz Bahan DasarTaburan Saiz Bahan Dasar
©©USM_USM_REDAC_2007REDAC_2007
Halaju Kritikal Halaju Kritikal
8
©©USM_USM_REDAC_2007REDAC_2007
Pengangkutan Jumlahan Beban Bahan Dasar
0.04 < d50(mm) < 4.94
0.137 < d50(mm) < 1.71yo(m) < 1.0 m
0.19 < d50(mm) < 0.93
0.09 < d50(mm) < 2.78
0.785 < d50(mm) < 28.6
ψ < 10
3.17 < d50(mm) < 28.6
Ackers & White
Yang
Engelund & Hansen
Graf
Einstein
Einstein – Brown
Meyer-Peter-Muller
Shields
Persamaan
2.8
2.7
2.6
2.5
Rajah 2.29
2.4
2.3
1.56 < d50(mm) < 2.472.2Pengangkutan Beban Endapan Dasar
Julat DataRujukan PersamaanJenis Persamaan
Persamaan Pengangkutan Persamaan Pengangkutan Endapan SediadaEndapan Sediada
©©USM_USM_REDAC_2007REDAC_2007
Graf (1968)Graf (1968)
©©USM_USM_REDAC_2007REDAC_2007
Ackers Ackers –– White (1972)White (1972)
©©USM_USM_REDAC_2007REDAC_2007
©©USM_USM_REDAC_2007REDAC_2007
Yang Yang (1973)(1973)
©©USM_USM_REDAC_2007REDAC_2007
9
©©USM_USM_REDAC_2007REDAC_2007 ©©USM_USM_REDAC_2007REDAC_2007
Pengkalan Data Pengkalan Data Endapan SungaiEndapan Sungai
©©USM_USM_REDAC_2007REDAC_2007
Pencerapan DataPencerapan Data
©©USM_USM_REDAC_2007REDAC_2007
(a)(a) Kadar Aliran :Kadar Aliran :
• Pencerapan kadar aliran dilakukan untuk enam lokasi pencerapan bagi membangunkan lengkung kadar aliran.
• Tatacara pencerapan kadar aliran dibuat berdasarkan Prosedur Hidrologi No. 15 “River Discharge Measurement by Current Meter” (JPS, 1976).
Meter Arus Swoffer 2100 Meter Arus Model Neyrflux Type 80
Pencerapan DataPencerapan Data
©©USM_USM_REDAC_2007REDAC_2007
SungaiSungai Kulim, SerdangKulim, Serdang
©©USM_USM_REDAC_2007REDAC_2007
(b) (b) Bahan Dasar :Bahan Dasar :
• Bahan dasar dicerap dititik yang sama untuk pencerapan beban endapan dasar. Sebanyak tujuh sampel dicerap bagi setiap keratan rentas.
• Lengkung taburan endapan (S-Curve) hasil analisis ayakan diberikan dalam Volume III Draf Laporan Akhir.
Pensampel Kaut Bahan Dasar Van Veen
Data
Pencerapan DataPencerapan Data
10
©©USM_USM_REDAC_2007REDAC_2007
PURATA SAIZ BATU ADALAH 35.8mm
SungaiSungai Kulim, SerdangKulim, Serdang
©©USM_USM_REDAC_2007REDAC_2007
Sungai Muda,Sungai Muda, Kg. Sg DerhakaKg. Sg Derhaka
©©USM_USM_REDAC_2007REDAC_2007
(c) (c) Beban Endapan Dasar :Beban Endapan Dasar :
• Pensampel beban endapan dasar Helley-Smith yang mempunyai bukaan muncung 76 mm × 76 mm dan satu kurung sampel dengan mesh bersaiz 0.25 mm telah digunakan.
• Bagi setiap lokasi kajian, tujuh sampel dicerap pada jarak yang sama.
Aliran Rendah
Aliran Tinggi
Data
Pencerapan DataPencerapan Data
©©USM_USM_REDAC_2007REDAC_2007
Alat Helley-Smith diletakkan disetiap lokasi selama 10 minit
Sampel yang diperolehidimasukkan dalam bag plastik
dan dilabelkan
Sungai Kulim, SerdangSungai Kulim, Serdang
©©USM_USM_REDAC_2007REDAC_2007
Sungai Muda,Sungai Muda, Ladang VictoriaLadang Victoria
©©USM_USM_REDAC_2007REDAC_2007
(d) (d) Beban Endapan Terampai :Beban Endapan Terampai :
• Pensampel DH 48 atau DH 59 digunakan bagi mencerap data beban endapan terampai secara kaedah depth integrating (JPS, 1977).
• Sebanyak tiga sampel dicerap bagi setiap lokasi kajian.
• Nilai beban endapan terampai bagi keratan rentas dikira berdasarkan nilai purata sampel yang dicerap.
Aliran Rendah Aliran Tinggi
Data
Pencerapan DataPencerapan Data
11
©©USM_USM_REDAC_2007REDAC_2007
Sungai Muda,Sungai Muda, Ladang VictoriaLadang Victoria
©©USM_USM_REDAC_2007REDAC_2007
(d) (d) Cerun Saluran :Cerun Saluran :
• Cerun saluran di setiap keratan rentas adalah berdasarkan cerun permukaan air dicerap menggunakan “Electronic Digital Measurement” (EDM).
• Nilai purata digunakan bagi tujuan analisa data endapan sungai.
(f) (f) Suhu Aliran :Suhu Aliran :
• Suhu aliran diukur dengan menggunakan meter ketumpatan.
• Suhu 30 oC digunakan dalam analisa data endapan sungai.
“Electronic Digital Measurement”(EDM)
Meter Ketumpatan
Pencerapan DataPencerapan Data
©©USM_USM_REDAC_2007REDAC_2007
Ringkasan Data Bagi Sungai Pari @ ManjoiRingkasan Data Bagi Sungai Pari @ Manjoi
Perubahan Keratan Rentas Taburan Saiz Endapan Rintangan Aliran
PengkalanPengkalan DataData
©©USM_USM_REDAC_2007REDAC_2007
Pembangunan Pembangunan Persamaan Persamaan
Pengangkutan Pengangkutan Endapan SungaiEndapan Sungai
©©USM_USM_REDAC_2007REDAC_2007
(a)(a)Hubungan antara Hubungan antara kadar alirkadar alir dan dan jumlahanjumlahan beban beban endapanendapan
(b)(b)Hubungan parameter aliran dan parameter Hubungan parameter aliran dan parameter pengangkutanpengangkutan
(c)(c)Penilaian persamaan pengangkutan endapan yang Penilaian persamaan pengangkutan endapan yang lazim lazim digunakandigunakan
(d)(d)Permodelan Permodelan sungaisungai menggunakan menggunakan FluvialFluvial--1212..
Analisis DataAnalisis Data
©©USM_USM_REDAC_2007REDAC_2007
Hubungan antara Kadaralir Aliran dan Kadaralir Jumlahan Beban EnHubungan antara Kadaralir Aliran dan Kadaralir Jumlahan Beban Endapan (Tdapan (Tjj))
0.1
1
10
100
0.1 1 10 100Q (m 3 /s)
Sungai Pari @ Manjoi
Analisis VSo Vs Tj
Perbandingan Analisis
Analisis DataAnalisis Data
12
©©USM_USM_REDAC_2007REDAC_2007
Hubungan Parameter Aliran (Hubungan Parameter Aliran (ψψ) dan Parameter Pengangukutan () dan Parameter Pengangukutan (φφ))
0.001
0.01
0.1
1
10
100
1000
0.001 0.01 0.1 1 10 100Parameter Pengangkutan, φ
Para
met
er A
liran
, ψ
Sg Pari @ Tmn Merdeka Sg Pari @ Manjoi Sg Pari @ BuntongSg Kinta Sg Raia @ Kg Tanjung Sg Raia @ Bt GajahSg Kampar @ KM 34 Sg Kerayong Sg KulimSg Langat @ Kajang Sg Langat @ Dengkil Sg Lui @ Kg LuiSg Semenyih @ Kg Sg Rinching Persamaan Graf (1968) Persamaan Modified Graf (4.4)
φ=0.5(ψ)-2.52
φ=10.39(ψ)-2.52
Analisis DataAnalisis Data
©©USM_USM_REDAC_2007REDAC_2007
Parameter Pengangkutan EndapanParameter Pengangkutan Endapan
Rintangan Aliran
Bentuk Keratan Rentas
Saiz Endapan
Pengangkutan
Pergerakan
Parameter Tak BerdimensiJenis Parameter
s
o*
s50o
50s VS,VU,
)1S(gdV,
RSd)1S(
ω−−
=ψ
350s
vv
d)1S(g
VRC,C−
=φ
υω
ω⎟⎠⎞
⎜⎝⎛
υ−
= 50s
s
*503/1
2s
50grd,U,
Bd,)1S(gdD
o
2
yB,
AB
50
o
502
ss d
y,dR,
V)1S(gRS8 −
=λ
Analisis DataAnalisis Data
©©USM_USM_REDAC_2007REDAC_2007
Analisis RegresiAnalisis Regresi
φ
Cv
Tj
Pembolehubah Bersandar Pembolehubah Tak Bersandar
,dR,
yB,y,R,
U
50oo
*
υ
50
o50*
50os50 dy
,d
,U,dR,
yB,
)1s(gdV
υω
ω−
AB,
yB,
dR,
dy
,D,2
o5050
ogrψ
Analisis DataAnalisis Data
©©USM_USM_REDAC_2007REDAC_2007
0.01
0.10
1.00
10.00
100.00
1 10 100 1000 10000R/d50
T j
Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu Ga jahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim
0.01
0.10
1.00
10.00
100.00
1 10 100 1000B/y0
Tj
Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim
0.01
0.10
1.00
10.00
100.00
1 10 100 1000 10000y0/d50
T j
Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim
Tj Lawan R/d50
Tj Lawan B/yo
Tj Lawan yo/d50
Hubungkait Antara Tj Dengan Pembolehubah Tak Bersandar
Analisis DataAnalisis Data
©©USM_USM_REDAC_2007REDAC_2007
0.00001
0.0001
0.001
0.1 1.0 10.0U*/ω
Cv
Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim
0.00001
0.0001
0.001
1 10 100 1000B/y0
Cv
Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim
0.00001
0.0001
0.001
0.1 1.0 10.0 100.0V/(gd50(S-1)1/2
Cv
Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim
Cv Lawan R/d50
Cv Lawan V/gd50(S-1)1/2 Tj Lawan U*/ω
Hubungkait Antara Cv Dengan Pembolehubah Tak Bersandar
Analisis DataAnalisis Data
©©USM_USM_REDAC_2007REDAC_2007
0.001
0.01
0.1
1
10
0.1 1.0 10.0 100.0Ψ
Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim
0.001
0.01
0.1
1
10
1 10 100 1000 10000y0/d50
Φ
Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim
φ Lawan ψ
φ Lawan yo/d50
0.001
0.01
0.1
1
10
1 10 100 1000 10000R/d50
Sg. Pari @ Manjoi Sg. Pari @ Buntong Sg. Kinta @ IpohSg. Raia @ Kg. Tanjung Sg. Raia @ Batu Gajah Sg. Kampar @ KM 34Sg. Kerayong Sg. Kulim Sg. Pari @ Tmn Merdeka
φ Lawan R/d50
Hubungkait Antara ψ Dengan Pembolehubah Tak Bersandar
Analisis DataAnalisis Data
13
©©USM_USM_REDAC_2007REDAC_2007
⎟⎟
⎠
⎞
⎜⎜
⎝
⎛ −⎟⎟⎠
⎞⎜⎜⎝
⎛⎟⎟⎠
⎞⎜⎜⎝
⎛= −
VRdSg
dRVSC s
sv
350
390.1
50
293.0
04 )1(10*811.1
ω
Analisis DataAnalisis Data390.1
50
293.0o4
dRVS
10811.1 ⎟⎟⎠
⎞⎜⎜⎝
⎛⎟⎠⎞
⎜⎝⎛
ω×=φ −
Atau
©©USM_USM_REDAC_2007REDAC_2007
0.01
0.1
1
10
100
1000
0.1 1 10 100 1000
Q ( m3/s )
T j
( kg/
s )
Data Endapan Sungai Malaysia Persamaaan 4.14
⎟⎟
⎠
⎞
⎜⎜
⎝
⎛ −⎟⎟⎠
⎞⎜⎜⎝
⎛⎟⎟⎠
⎞⎜⎜⎝
⎛= −
VRdSg
dRVSC s
sv
350
390.1
50
293.0
04 )1(10*811.1
ω
Lengkung Kadar EndapanLengkung Kadar Endapan
©©USM_USM_REDAC_2007REDAC_2007
Permodelan Permodelan SungaiSungai
©©USM_USM_REDAC_2007REDAC_2007
mula
data input
t = t + Δt
penghalaan air
penghalaan endapan
penyesuaian geometri saluran
tempohmasa telah diliputi?tidak
ya
tamat
Carta Aliran FLUVIALCarta Aliran FLUVIAL--1212
©©USM_USM_REDAC_2007REDAC_2007
JajaranSungai Pari
Keratan Rentas
Sungai Pari
PermodelanPermodelan SungaiSungai
©©USM_USM_REDAC_2007REDAC_2007
Ch. 3020 ( 21 Oktober 2002) Jambatan Manjoi, Ch. 3380 ( 21 Oktober 2002)
Taman Merdeka, Ch. 2475 ( 21 Oktober 2002)Alor Limpah Batu, Ch. 1220 ( 25 Julai 2001)
PermodelanPermodelan SungaiSungai
14
©©USM_USM_REDAC_2007REDAC_2007
Jambatan Silibin, Ch. 4540 ( 21 Oktober 2002)
Tokong Buddha, Ch. 4160 ( 21 Oktober 2002)Ch. 3600 ( 21 Oktober 2002)
Kuala Sungai Pari ( 22 Julai 2001 )
PermodelanPermodelan SungaiSungai
©©USM_USM_REDAC_2007REDAC_2007
Data Profil Data Profil Paras AirParas Air
Data Profil Data Profil Paras AirParas Air
Perbezaan Paras Air Sungai Pari
34.00
35.00
36.00
37.00
38.00
39.00
2000 2500 3000 3500 4000 4500 5000Keratan Rentas, m
Para
s, m
P. Air 7/10/2002 (35.00 Cumecs) P. Air 8/10/2002 (34.70 Cumecs)P. Air 9/10/2002 (47.80 Cumecs) P. Air 10/10/2002 (14.15 Cumecs)P. Air 21/10/2002 (7.05 Cumecs)
Paras Air Cerapan Sungai PariParas Air Cerapan
PermodelanPermodelan SungaiSungai
©©USM_USM_REDAC_2007REDAC_2007
Data Data Aliran SungaiAliran Sungai
Puncak Hidrograf Tahun 2000 Sungai Pari
0
20
40
60
80
100
120
2390 2400 2410 2420 2430 2440 2450Masa, jam
Kada
ralir
, m3 /s
PermodelanPermodelan SungaiSungai
©©USM_USM_REDAC_2007REDAC_2007
Taburan Purata Saiz Endapan Bahan
Dasar Untuk Sungai Pari
0.00
10.00
20.00
30.0040.00
50.00
60.0070.00
80.00
90.00
100.00
0.01 0.10 1.00 10.00 100.00
Saiz Partikel, mm
Pera
tus
Telu
s, %
Cerapan Dasar Hil ir Cerapan Dasar Hulu
d50 = 2.50 mm
d50 = 1.80 mm
Data Data Bahan DasarBahan Dasar Data Bahan TebingData Bahan Tebing
Lengkung Kadar EndapanLengkung Kadar Endapan
0.00
0.05
0.10
0.15
0.20
0.25
0.00 10.00 20.00 30.00 40.00 50.00Masa (jam)
Out
put E
ndap
an, Q
s (m
3 /s)
PermodelanPermodelan SungaiSungai
©©USM_USM_REDAC_2007REDAC_2007
Penyelakuan FluvialPenyelakuan Fluvial--1212
PermodelanPermodelan SungaiSungaiPerbandingan Paras Dasar dan Air FL-14/12 Sungai Pari Pada
Puncak Hidrograf Tahun 2000
32.00
34.00
36.00
38.00
40.00
42.00
1000 1500 2000 2500 3000 3500 4000 4500 5000Keratan Rentas, m
Para
s, m
Paras Dasar Simulasi FL12 Paras Air Simulasi FL12 Paras Dasar Mula Paras Cerapan
©©USM_USM_REDAC_2007REDAC_2007
PermodelanPermodelan SungaiSungaiJambatan Manjoi, Sungai Pari
34.0035.00
36.0037.00
38.0039.00
40.00
0.00 10.00 20.00 30.00 40.00 50.00Jarak Dari Tebing Kiri, m
Para
s, m
P. Dasar Awal P. Dasar Simulasi FL-12
CH 4160, Sungai Pari
33.0034.0035.0036.0037.0038.0039.0040.00
0.00 10.00 20.00 30.00 40.00 50.00Jarak Dari Tebing Kiri, m
Para
s, m
Paras Dasar Awal Paras Dasar Simulasi FL-12
Ch. 3380
Ch. 4160
15
©©USM_USM_REDAC_2007REDAC_2007
Projek Tebatan Projek Tebatan Banjir Sg. Muda, Banjir Sg. Muda,
KedahKedah
©©USM_USM_REDAC_2007REDAC_2007
©©USM_USM_REDAC_2007REDAC_2007
Kawasan Banjir 1998Kawasan Banjir 1998
©©USM_USM_REDAC_2007REDAC_2007
Kawasan Banjir 2003Kawasan Banjir 2003
©©USM_USM_REDAC_2007REDAC_2007
Kawasan Banjir Kuala Ketil Kawasan Banjir Kuala Ketil Oktober 2003Oktober 2003
©©USM_USM_REDAC_2007REDAC_2007
Aliran Sungai Muda,Aliran Sungai Muda,Ladang VictoriaLadang Victoria
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
6 24 42 60 78 90 108 126 144 162 180
Masa (jam)
Kad
ar a
lir (m
3 /s)
50-year ARI (Q=1768 cumec)
100-year ARI (Q=2001 cumec)
Flood 2003 (Qmax=1340 cumec)
16
©©USM_USM_REDAC_2007REDAC_2007
-6
-4
-2
0
2
4
6
8
10
12
-200 -150 -100 -50 0 50Distance (m)
Ele
vatio
n (m
)
Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level
0
2
4
6
8
10
12
-200 -150 -100 -50 0 50Distance (m)
Ele
vatio
n (m
)
Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level
(a)Ch. 39.50 (M8-Ladang
Victoria Bridge)
(b) Ch 31.60 (Kuari Kg
Pantai Perai )
Perubahan Keratan RentasPerubahan Keratan Rentas
©©USM_USM_REDAC_2007REDAC_2007
CH 21.90
CH 23.00
-6
-4
-2
0
2
4
6
8
10
-400 -350 -300 -250 -200 -150 -100 -50 0 50 100Distance (m)
Ele
vatio
n (m
)
Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level
(d) Ch. 23.00 (Kg Lahar Tiang)
-8
-6
-4
-2
0
2
4
6
8
10
-200 -150 -100 -50 0 50Distance (m)
Ele
vatio
n (m
)
Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level
(e) Ch. 21.90 (M17-Kg Lahar Tiang)
©©USM_USM_REDAC_2007REDAC_2007
KG. BUMBUNG LIMA
PEKULA
KG. JAWA
KG. BUKITLALANG
Merdeka Bridge
PLUS Highway
-20
-15
-10
-5
0
5
10
-200 -150 -100 -50 0 50Distance (m)
Ele
vatio
n (m
)
Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level
CH 13.1 CH 15.4
-14
-12-10-8-6
-4-202
468
-200 -150 -100 -50 0 50Distance (m)
Ele
vatio
n (m
)
Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level
Ch. 13.10 (Bumbong Lima)Ch. 15.40 (Bumbong Lima)
©©USM_USM_REDAC_2007REDAC_2007
Pemetaan Risiko Pemetaan Risiko BanjirBanjir
©©USM_USM_REDAC_2007REDAC_2007
Mud
a B
arra
ge
Mer
deka
B
ridg
e
Exp
ress
way
Bri
dge
Rai
lway
Bri
dge B
ridg
e
Pipe
Bri
dge
Profil Banjir 2003, Sg. Muda Profil Banjir 2003, Sg. Muda (Q=1340m(Q=1340m33/s)/s)
©©USM_USM_REDAC_2007REDAC_2007
n = 0.03
Paras Air Paras Air MaksimumMaksimum di CH 41.2 di CH 41.2 (Ladang Victoria)(Ladang Victoria)
17
©©USM_USM_REDAC_2007REDAC_2007
n = 0.03
Paras Air Maksimum di Ch 25.2 Paras Air Maksimum di Ch 25.2 (Pinang(Pinang Tunggal)Tunggal)
©©USM_USM_REDAC_2007REDAC_2007
n = 0.03
Paras Air Maksimum di CH 14.0 Paras Air Maksimum di CH 14.0 (Bumbung(Bumbung Lima)Lima)
©©USM_USM_REDAC_2007REDAC_2007
Kawasan Ditenggelami Air bagi GunatanahSekarang (Q=220.0 m3/s)
Sungai PariSungai Pari
©©USM_USM_REDAC_2007REDAC_2007
Kawasan Ditenggelami Air bagi Gunatanah2020 (Q=343.0 m3/s)
Sungai PariSungai Pari
©©USM_USM_REDAC_2007REDAC_2007
Bekas Lombong Sebagai Kolam TahananBekas Lombong Sebagai Kolam Tahanan
©©USM_USM_REDAC_2007REDAC_2007
Keseimbangan SungaiKeseimbangan Sungai
18
©©USM_USM_REDAC_2007REDAC_2007
Zorkeflee Abu Hasan (MSc, 1998)
Evaluation of Scour and Deposition in Malaysian Rivers Undergoing Training Works: Case Studies of Pari and Kerayong Rivers
Nasehir Khan E. M Yahaya (MSc, 1999)
Development of Total Bed Material Transport Rating Curves for Rivers in Malaysia: Case Studies of Pari River and Kerayong River and Kulim River
Pelajar Pengajian SiswazahPelajar Pengajian Siswazah
©©USM_USM_REDAC_2007REDAC_2007
Noor Azman Ibrahim (MSc, 2002 )
Sediment Load Measurement In Malaysian Rivers –Case Studies of Pari, Kinta and Perak Rivers
Ahmad Darus (MSc, 2002)
Conservation and Restoration of Urban Rivers: Case Studies of Raia River and Pari River
Pelajar Pengajian SiswazahPelajar Pengajian Siswazah
©©USM_USM_REDAC_2007REDAC_2007
Sharifah Abdullah (MSc, 2002 )
Simulation of River Bed Changes Due To Sand Mining Operation At Muda River
Ahmad Bakri Abdul Ghaffar (MSc, 2003 )
Factors Affecting Values of Manning's Flow Resistance Coefficient
Pelajar Pengajian SiswazahPelajar Pengajian Siswazah
©©USM_USM_REDAC_2007REDAC_2007
Abd Jalil Hassan (MSc, 2005)
River and Floodplain Modelling for the Development of Flood Risk Map: A Case Study of Sg. Selangor
Chang Chun Kiat (MSc, 2006)
Sediment Transport in Sungai Kulim, Kedah
Pelajar Pengajian SiswazahPelajar Pengajian Siswazah
©©USM_USM_REDAC_2007REDAC_2007
Junaidah Ariffin (PhD, 2004)
Development of Sediment Transport Models for Selected Rivers in Malaysia Using Regression Analysis and Artificial Neural Network
Shanker Kumar a/l Sinnakaundan(PhD, 2003)
Sediment Transport Modeling and Flood Risk Mapping in Geographic Information System
Pelajar Pengajian SiswazahPelajar Pengajian Siswazah
©©USM_USM_REDAC_2007REDAC_2007
Rabie A A Hussein (Calon PhD)
Floodplain Inundation Modelling using an Integrated GIS with Radar and Optical Remote Sensing
Pelajar Pengajian SiswazahPelajar Pengajian Siswazah
19
©©USM_USM_REDAC_2007REDAC_2007
Flood Risk Mapping for Pari River Incorporating Sediment Transport (2003)Journal of Environmental Modelling & Software, Vol. 18, No. 2, pp. 119-130
Sediment Transport Equation Assessment for Selected Rivers in Malaysia (2005)International Journal of River Basin Management, IAHR, Vol. 3, No. 3, pp. 203-208
List of PublicationsList of Publications
Multiple Linear Regression Model for Total Bed Material Load Prediction (2006)Journal of Hydraulic Engineering, ASCE, Vol. 132, No. 5, pp. 521-528
©©USM_USM_REDAC_2007REDAC_2007
Revised Equations for Manning’s Coefficient for Sand-Bed Rivers (2007)International Journal of River Basin Management, IAHR, Vol. 5, No. 4, pp. 329-346
List of PublicationsList of Publications
Case Study: Flood Mitigation of the Muda River, Malaysia (In Press)Journal of Hydraulic Engineering, ASCE.
Sediment Transport Modeling for Kulim River - A Case Study (Under Review).Journal of Hydro-Environment Research, IAHR
©©USM_USM_REDAC_2007REDAC_2007
PenghargaanPenghargaan
©©USM_USM_REDAC_2007REDAC_2007
Naib CanselorUniversiti Sains Malaysia
Timbalan NaibCanselor USMPenyelidikan & Inovasi
©©USM_USM_REDAC_2007REDAC_2007
Hj Ab Ghani Mat
Hajjah Rahmah Ariffin
Pn Salbiah Abd Hamid
Hafizuddin Aminuddin
Farzana Aminuddin©©USM_USM_REDAC_2007REDAC_2007
Profesor Nor Azazi Zakaria
Prof. Madya Rozi Abdullah
Prof. Madya Lariyah Mohd Sidek
Prof. Madya Mohd Nordin Adlan
Prof. Madya Ahmad Shukri Yahaya
Dr Dini Ramya Hassan Basri
20
©©USM_USM_REDAC_2007REDAC_2007
Semua KakitanganPusat PengajianKejuruteraan Awam
Semua Kakitangan PusatPenyelidikan KejuruteraanSungai dan Saliran Bandar
©©USM_USM_REDAC_2007REDAC_2007
Jabatan Pengairan dan Saliran
Kementerian Sains, Teknologi & Inovasi
©©USM_USM_REDAC_2007REDAC_2007
SekianSekianTerima KasihTerima Kasih