Permitting and Design Permitting and Design Guidelines Working with Guidelines Working with
RegulatorsRegulators
Melissa Mormilo, P.E., LEED APMelissa Mormilo, P.E., LEED AP
DOWL EngineersDOWL Engineers
Regulatory AgenciesRegulatory Agencies
Municipality of AnchorageMunicipality of Anchorage City or BoroughCity or Borough Anchorage Water and Anchorage Water and
Wastewater UtilityWastewater Utility Alaska Department of Alaska Department of
Environmental ConservationEnvironmental Conservation U. S. Fish and WildlifeU. S. Fish and Wildlife Environmental Protection AgencyEnvironmental Protection Agency State of Alaska Department of State of Alaska Department of
Transportation and Public Transportation and Public FacilitiesFacilities
U.S. Army Corp of EngineersU.S. Army Corp of Engineers
What Needs to be What Needs to be Permitted?Permitted?
Grading Grading DrainageDrainage Water serviceWater service Sewer serviceSewer service Driveways Driveways Wetland/WaterwaysWetland/Waterways FloodplainFloodplain Coastal ZoneCoastal Zone
GradingGrading
Who is permit authority?Who is permit authority? MOA, City or BoroughMOA, City or Borough
What is required?What is required? Permit ApplicationPermit Application Signed Grading PlanSigned Grading Plan
How long does it take?How long does it take? 6 to 8 weeks to obtain permit6 to 8 weeks to obtain permit
DrainageDrainage
Who is permit authority?Who is permit authority? MOA (Within MOA)MOA (Within MOA) ADEC (Outside MOA)ADEC (Outside MOA)
What is required?What is required? MOAMOA
SWPPP (Project 1 acre or more)SWPPP (Project 1 acre or more) Erosion and Sediment Control PlanErosion and Sediment Control Plan
ADECADEC SWPPPSWPPP Pre- and Post- Drainage PlanPre- and Post- Drainage Plan
How long does it take?How long does it take? 6 to 8 weeks to obtain permit6 to 8 weeks to obtain permit
Water ServiceWater Service Who is permit authority?Who is permit authority?
AWWU (Within MOA)AWWU (Within MOA) ADEC (Outside MOA)ADEC (Outside MOA)
What is required?What is required? AWWUAWWU
Permit ApplicationPermit Application FeeFee Signed Plan and Profile DrawingsSigned Plan and Profile Drawings
ADECADEC Permit ApplicationPermit Application FeeFee Signed Plan and Profile DrawingsSigned Plan and Profile Drawings
How long does it take?How long does it take? AWWU – 4 to 6 weeksAWWU – 4 to 6 weeks ADEC – 6 to 8 weeksADEC – 6 to 8 weeks
Sewer ServiceSewer Service Who is permit authority?Who is permit authority?
AWWU (Within MOA)AWWU (Within MOA) ADEC (Outside MOA)ADEC (Outside MOA)
What is required?What is required? AWWUAWWU
Permit ApplicationPermit Application FeeFee Signed Plan and Profile DrawingsSigned Plan and Profile Drawings
ADECADEC Permit ApplicationPermit Application FeeFee Signed Plan and Profile DrawingsSigned Plan and Profile Drawings
How long does it take?How long does it take? AWWU – 4 to 6 weeksAWWU – 4 to 6 weeks ADEC – 6 to 8 weeksADEC – 6 to 8 weeks
DrivewaysDriveways Who is permit authority?Who is permit authority?
MOAMOA ADOT&PFADOT&PF
If intersecting ADOT&PF ROWIf intersecting ADOT&PF ROW City or BoroughCity or Borough
What is required?What is required? Permit ApplicationPermit Application FeeFee Drawings showing driveway designDrawings showing driveway design TIA (if required)TIA (if required)
How long does it take?How long does it take? 8 weeks to 12 weeks8 weeks to 12 weeks
Wetlands/WaterwaysWetlands/Waterways Who is permit authority?Who is permit authority?
MOAMOA Type C WetlandsType C Wetlands
U.S. Army Corp of EngineersU.S. Army Corp of Engineers U.S. Fish and WildlifeU.S. Fish and Wildlife
What is required?What is required? Permit ApplicationPermit Application FeeFee Drawings showing the wetlands or work Drawings showing the wetlands or work
below ordinary high water mark impactsbelow ordinary high water mark impacts Calculations Calculations
Amount of Fill in WetlandsAmount of Fill in Wetlands Acres of DisturbanceAcres of Disturbance
How long does it take?How long does it take? 8 weeks to 1 year8 weeks to 1 year
FloodplainFloodplain Who is permit authority?Who is permit authority?
MOAMOA Within MOAWithin MOA
City or BoroughCity or Borough What is required?What is required?
Permit ApplicationPermit Application FeeFee Drawings showing the floodplain Drawings showing the floodplain
impactsimpacts Calculations Calculations
Drainage CalculationsDrainage Calculations
How long does it take?How long does it take? 8 weeks to 1 year8 weeks to 1 year
Coastal ZoneCoastal Zone
Who is permit authority?Who is permit authority? ADNRADNR
What is required?What is required? Application/questionnaireApplication/questionnaire Cover letterCover letter
How long does it take?How long does it take? 30 to 60 days 30 to 60 days
Miscellaneous PermitsMiscellaneous Permits
ADOT&PFADOT&PF Utility PermitsUtility Permits Approach Road ReviewApproach Road Review Other Agency ReviewOther Agency Review
U.S. Fish and Wildlife Permit U.S. Fish and Wildlife Permit Fish HabitatFish Habitat
Other things to Other things to ConsiderConsider
VarianceVariance P&ZC and UDC hearingsP&ZC and UDC hearings PlattingPlatting Letters of non-objectionLetters of non-objection Access and Parking Access and Parking
AgreementsAgreements Other Agreements Other Agreements
(drainage, no-build)(drainage, no-build)If you anticipate what is needed for these
items, you won’t be scrambling when the contractor
is screaming for a permit!
Permit ProcessPermit Process
Submit Required Submit Required DocumentationDocumentation
Wait for CommentsWait for Comments Address CommentsAddress Comments Resubmit Drawings (if Resubmit Drawings (if
required)required)
Addressing CommentsAddressing Comments
How?How? In personIn person By letterBy letter Via email Via email
(with (with caution)caution)
Remember: You need the permit # no matter how you address comments!
Check for MOA review comments on-line!http://pas.ci.anchorage.ak.us/pas/permitrepo
rts.cfm
Be Proactive! Don’t wait for architect or contractor to give you the
comments to address!
Resubmitting DrawingsResubmitting Drawings
Bring sets of revised drawings Bring sets of revised drawings and (re)submittal formand (re)submittal form Check with Agency regarding Check with Agency regarding
how many copies how many copies Meet with reviewerMeet with reviewer Change drawings out Change drawings out
(if applicable)(if applicable)
Make sure old drawings are superseded and Make sure old drawings are superseded and new drawings are stamped with permit # new drawings are stamped with permit #
and date!and date!
DocumentationDocumentation
What should you keep copies What should you keep copies of?of? Entire submittal packageEntire submittal package Review comments generated by Review comments generated by
AgencyAgency Response to review comments Response to review comments
(with documentation)(with documentation) Sign-offs by reviewersSign-offs by reviewers Drawings, emails, phone Drawings, emails, phone
conversations regarding conversations regarding comments, resolution and signoffcomments, resolution and signoff
Copies of revised drawings and Copies of revised drawings and specsspecs
DocumentationDocumentation
Send it to project fileSend it to project file Send copies to the client, Send copies to the client,
design team contractor design team contractor for their use for their use (cc appropriately)(cc appropriately)
Remember to distribute revised drawings and specs!
Keep in MindKeep in Mind
Timelines for required Timelines for required permits, sign-offs, etc.permits, sign-offs, etc.
How permits/sign-offs How permits/sign-offs relate to one anotherrelate to one another
Lead time for signatures Lead time for signatures and feesand fees
Design GuidelinesDesign Guidelines MOAMOA
Title 21Title 21 MOA Design Criteria ManualMOA Design Criteria Manual Special ProvisionsSpecial Provisions HandoutsHandouts Wetlands and Floodplain MappingWetlands and Floodplain Mapping
AWWU AWWU Design and Construction Practices Design and Construction Practices
ManualManual City or BoroughCity or Borough
Design GuidelinesDesign Guidelines Special ProvisionsSpecial Provisions Floodplain MappingFloodplain Mapping
Design GuidelinesDesign Guidelines EPAEPA
NPDESNPDES On-Site Wastewater Treatment On-Site Wastewater Treatment
Systems ManualSystems Manual ADECADEC
Drinking Water RegulationsDrinking Water Regulations Wastewater RegulationsWastewater Regulations Storm water RegulationsStorm water Regulations
ADOT&PFADOT&PF Special ProvisionsSpecial Provisions Pre-Construction ManualPre-Construction Manual