permits issued 1/1/21 to 12/31/21

24
Permits Issued 1/1/21 to 12/31/21 Schedule Permit issued Number Applicant Town Description LUA 2 2021-01-04 2020-0232 Reinemann, Charles Removal of a single pier dock supported by a continuous crib structure and construction of a pile driven U-shaped dock. Fort Ann MI 3 2021-01-06 2020-0209 Tanski, Mark & Mary Proposed variance from the shoreline setback to add 189.5 square foot to a pre-existing single-family dwelling and an additional 6 feet in height within 50 feet of the shoreline setback. Fine MI 1 2021-01-06 2020-0219 Berube, Jesse A two-lot subdivision. Putnam RM 5 2021-01-11 1996-0136D New Cingular Wireless P Amendment request to replace 3 antennas and 3 RRUs, and to add 3 new RRUs, plus associated tower-mounted equipment. Johnsburg RM 2 2021-01-11 2020-0136 Tupper Lake Crossroads, Construction of a three-story, 44-room hotel including a restaurant, lounge and meeting space. The hotel will have a footprint of approximately 9,800 square feet and an overall height of approximately 60 feet. Site development includes on-site parking for 38 cars with access from Park Street and Lake Street, stormwater management controls, landscaping, greenspace and snow storage areas. Additional parking will be provided off- site as necessary through an agreement with the Village of Tupper Lake for use of existing municipal parking located at 17 Demars Boulevard. Tupper Lake HA 1 2021-01-11 2020-0137 Gagnier, David and Whitn Construction of a single-family dwelling and a garage on Resource Management lands, to be served by a new on-site wastewater treatment system and on-site water supply. Willsboro RM 1 2021-01-11 2020-0243 Olcott, Gary Two-lot subdivision involving three parcels to re-configure lot lines and create two lots. No land use or development is proposed. Ticonderoga RU 1 2021-01-11 2020-0260 Vondell, Mark & Patricia Construction of a second mobile home serviced by municipal water and on-site wastewater treatment system. Jay LI 6 2021-01-13 2012-0128-1 New York RSA2 Cellular GP2005G-3R for co-location of antennas and equpment on an existing Agency-authorized 180-foot-tall lattice tower. No change to antenna centerline or tower height is proposed. Moriah RU 5 2021-01-13 2020-0140A Kucerak, Milan and Debor Changing the description for Lot 2. Fine RM Wednesday, January 5, 2022 Page 1 of 24

Upload: others

Post on 04-Jul-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Permits Issued 1/1/21 to 12/31/21

Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-01-04 2020-0232 Reinemann, Charles Removal of a single pier dock supported by a continuous crib structure and construction of a pile driven U-shaped dock.

Fort Ann MI

32021-01-06 2020-0209 Tanski, Mark & Mary Proposed variance from the shoreline setback to add 189.5 square foot to a pre-existing single-family dwelling and an additional 6 feet in height within 50 feet of the shoreline setback.

Fine MI

12021-01-06 2020-0219 Berube, Jesse A two-lot subdivision.Putnam RM

52021-01-11 1996-0136D New Cingular Wireless P Amendment request to replace 3 antennas and 3 RRUs, and to add 3 new RRUs, plus associated tower-mounted equipment.

Johnsburg RM

22021-01-11 2020-0136 Tupper Lake Crossroads, Construction of a three-story, 44-room hotel including a restaurant, lounge and meeting space. The hotel will have a footprint of approximately 9,800 square feet and an overall height of approximately 60 feet. Site development includes on-site parking for 38 cars with access from Park Street and Lake Street, stormwater management controls, landscaping, greenspace and snow storage areas. Additional parking will be provided off-site as necessary through an agreement with the Village of Tupper Lake for use of existing municipal parking located at 17 Demars Boulevard.

Tupper Lake HA

12021-01-11 2020-0137 Gagnier, David and Whitn Construction of a single-family dwelling and a garage on Resource Management lands, to be served by a new on-site wastewater treatment system and on-site water supply.

Willsboro RM

12021-01-11 2020-0243 Olcott, Gary Two-lot subdivision involving three parcels to re-configure lot lines and create two lots. No land use or development is proposed.

Ticonderoga RU

12021-01-11 2020-0260 Vondell, Mark & Patricia Construction of a second mobile home serviced by municipal water and on-site wastewater treatment system.

Jay LI

62021-01-13 2012-0128-1 New York RSA2 Cellular GP2005G-3R for co-location of antennas and equpment on an existing Agency-authorized 180-foot-tall lattice tower. No change to antenna centerline or tower height is proposed.

Moriah RU

52021-01-13 2020-0140A Kucerak, Milan and Debor Changing the description for Lot 2.Fine RM

Wednesday, January 5, 2022 Page 1 of 24

Page 2: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

12021-01-13 2020-0261 Davis, James S. and Eliza Proposed two lot subdivision creating a 1.5±-acre buildable lot and a 102.7±-acre buildable lot.

Black Brook RU

52021-01-14 2003-0211C Dwyer, Daniel; Page, Lydi Amend permit to allow vegetative cutting for filtered views.North Elba LI

52021-01-20 2012-0064B Miller II, Gary A greater than 25% expansion of life of mine of an existing permitted commercial sand and gravel extraction.

AuSable LI

22021-01-25 2020-0117 TowAway, LLC Operation of a commercial use vehicle impound lot. The proposal is to store a maximum of 12 impounded vehicles on the property for up to three days at a time, utilizing existing infrastructure including access, parking areas, fencing and an office space. The use will operate year-round on an as-needed basis and one new sign will be installed at the entrance to the impound lot.

Lake George RU

12021-01-25 2020-0187 Huskins, Margaret Two-lot subdivision creating an 11.6-acre vacant lot and a 20.4-acre lot improved by existing development.

Webb RM

62021-01-25 2021-0008 National Grid GP2019G-1 for the replacement of an existing 25-foot-high utility pole located in wetlands with a pole measuring 38.5 feet high.

Crown Point RM

62021-01-26 2020-0268 Warren County GP2002G-3AAR for replacement of the existing temporary bridge comprised of two metal pipes with one three sided concrete culvert.

Johnsburg RM

62021-01-27 2010-0186B New York RSA2 Cellular GP2005G-3R for replacement and addition of telecommunication antenans and equipment greater than 40 feet in height at the Olympic Ski Jumping Complex on the K-120 Jump.

North Elba HA

22021-01-27 2019-0047 Faber, James Construction of a raised, post-supported boardwalk and dock structure approximately 4 feet wide and 413.5 feet long.

Horicon MI

52021-01-27 2020-0168A Stretton, Ernie and Sara A request to remove condition 10 (color condition) of 2020-0168.North Elba RU

12021-01-27 2020-0229 Maurer, Judith & Masters Two-lot subdivision and access culvert replacement.Horicon RU

52021-02-05 2003-0161B Boudrieau, Emma Proposed new commercial use conversion of an existing building.Indian Lake LI

52021-02-05 2006-0209E Southshore East, LLC; So Permit amendment request involving a merger of previously authorized Lots 5 and 7, a boundary line adjustment between Lots 5 and 6, and changes to the authorized structure square footage limitations on Lots 5, 6, 7, 10 and 11.

Webb MI

Wednesday, January 5, 2022 Page 2 of 24

Page 3: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-02-05 2020-0252 NYSDOT Installation of step pools, refuge pools, and baffles in Alder Brook, downstream from the existing culvert and within the NYSDOT right-of-way on NYS Route 3.

Franklin RM

52021-02-10 1992-0010B Village of Saranac Lake Amend P1992-0010A to allow construction of a new 80 foot diameter clarifier, a new building and rehabilitation of piping on the project site.

St. Armand RM

22021-02-10 2020-0087 New York RSA2 Cellular Installation of an 80-foot-tall self-supporting monopole telecommunications tower to support Verizon Wireless antennas at a centerline mounting height of 76-feet above ground level (A.G.L.). Also proposed is an equipment platform and emergency generator at the tower’s base. The tower site will be accessed by an existing gravel access road. The proposed tower is located within ¼ mile of the main branch of the AuSable River, a designated Recreational River.

Chesterfield RU

22021-02-10 2021-0011 Hamilton County Highway GP2002G-3AAR for removal and replacement of the exisitng Old Piseco Road culvert over the Oxbow Lake outlet with an 18-foot precast concrete span on steel sheeting and cast in-place concrete backwalls.

Arietta RO

22021-02-12 2019-0207 New York RSA 2 Cellular Installation of a 120-foot-tall self-supporting monopole tower, concealed as a 125-foot-tall simulated tree, to support cellular antennas at the 116-foot centerline height. An equipment cabinet and generator are also proposed at the tower’s base. An access drive 387± feet in length will be constructed to reach the tower location.

Inlet HA

22021-02-12 2020-0091 Scheefer, Robert A four-lot subdivision of the project site involving wetlands to create Lot 1, a 7.07 acre building lot, Lot 2, a 4.47 acre building lot, Lot 3, a 24.71 acre building lot and Lot 4, a 15.82 acre vacant lot to be merged with Tax Map Parcel 32.3-5-18. Lots 1, 2, and 3 will each be improved by one new single-family dwelling with individual on-site wastewater treatment systems and individual water supplies.

North Elba LI

22021-02-12 2020-0163 Regan Development - Re The construction of a four-story, sixty-unit residential housing building consisting of 40 one-bedroom units and 20 two-bedroom units. The building will have a footprint of approximately 19,000 square feet and an overall height of approximately 60 feet. Site development includes parking for up to 90 vehicles, one new access driveway, stormwater management controls and landscaping.

North Elba HA

62021-02-12 2021-0018 Essex County DPW GP2002G-3AAR, submitted for the proposed replacement of an existing bridge along Tracy Road (County Route 6) that crosses New Pond Brook.

North Hudson WF

22021-02-22 2020-0264 Huyck, Brian & Russell Construction of a 64 foot by 216 foot (13,824 square foot) commercial boat storage building.

Harrietstown LI

62021-02-22 2021-0009 NY RSA 2 Cellular Partne GP2005G-3R for removal of existing equipment and installation of three (3) 700/850/PCS panel antennas, three (3) 700/850/AWS panel antennas, three (3) 700/850 RRH units, three (3) AWS/PCS RRH units, two (2) 6-circuit OVP units, one (1) hybrid cable and six (6) coax jumpers.

Tupper Lake RM

Wednesday, January 5, 2022 Page 3 of 24

Page 4: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

12021-02-22 2021-0023 McKeige, Cornelia Construction of a second single-family dwelling on Lot 1C which was authorized by Agency Permit 2020-0045. Tax Parcel 44.2-1-2 is included for the purposes of density transfer only.

Keene RU

62021-02-22 2021-0031 NYSEG GP2019G-1 for the replacement of two existing utility poles with poles measuring 43 feet in height.

Wilmington HA

12021-02-24 2020-0211 Putnam, T. Jeffrey & Laur A two-lot subdivision of 43.87-acres (Parcel 15) to create a vacant 9.74-acre lot (Lot 2) and a vacant 34.53-acre lot (Lot 1). Lot 1 will be merged with an adjoining parcel (Parcel 14) containing existing development. Also, a two-lot subdivision of 58.06-acres (Parcel 16) to create a vacant 0.4-acre lot that will be merged with proposed Lot 2 and a 57.66-acre lot with existing development being retained. A single family dwelling with on-site wastewater treatment system and on-site water is proposed for Lot 2.

Newcomb RU

22021-03-01 2019-0031 Jeckel, Ronald & Janis The action involves a four-lot subdivision of 535.09± acres of land to create one 31.81±-acre lot that is improved by a single-family dwelling constructed in 1988; and three vacant lots including a 6.78±-acre lot, a 249±-acre lot, and a 257±-acre lot each to be improved by a single-family dwelling.

Fort Ann RU

42021-03-01 2020-0275 Campbell, Robert and Joa Replacement of a below ground fuel tank with an above ground fuel tank on lands administered by the Hudson River Black River Regulating District.

Edinburg SA

22021-03-01 2020-0283 AT&T Mobility/New Cingul The addition of a 20-foot extension and new antenna arrays to an existing permitted telecommunications tower consistent with Federal Communications Commission rules and regulations implementing Section 6409.

Chesterfield RM

22021-03-03 2020-0056 Scrimshaw Ventures Hom Dredging below the mean high water mark of Lake George to allow boat access to existing docks.

Village of Lake HA

22021-03-03 2020-0263 NYSDOT Installation of cut-off walls and stone aprons at the outlet and inlet of an existing culvert on Route 22.

Putnam RM

12021-03-03 2020-0280 Gulak, Barron and Vonne Two-lot subdivision creating Lot 1, a 26.3-acre lot improved by an existing single-family dwelling with related development and Lot 2, a 3.3-acre vacant lot to be improved by a mobile home with related development.

Hope RM

22021-03-10 2020-0279 National Grid Installation of a 47.5 foot utility pole within the existing utility right-of-way.Horicon RU

12021-03-10 2021-0010 Provost, Matthew Two-lot subdivision creating a vacant lot parcel to be merged with an adjoining parcel.Saranac LI

62021-03-10 2021-0041 National Grid Replacement of an existing 38.5-foot-tall utility pole with a pole measuring 43 feet tall.Lake Luzerne LI

Wednesday, January 5, 2022 Page 4 of 24

Page 5: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

52021-03-15 2011-0015A Daut, David & Elizabeth Amend Condition 8 of P2011-15 to remove existing garage and replace with a new 576 square foot garage in a new location.

Fine MI

52021-03-15 2012-0038A Ellis, Jay & Suzanne Amend permit to allow for the construction of a 14-foot-tall, 30 foot by 40 foot pole barn on Lot 2 of a previously-authorized five-lot subdivision.

Mayfield RU

12021-03-15 2021-0001 Duell, Kristy Construction of a second dwelling serviced by on-site well and on-site wastewater treatment system.

Black Brook MI

12021-03-15 2021-0013 Pulsifer, James P. and Co Construction of a single-family dwelling on a lot that contains existing residential and commercial development.

Lewis RM

52021-03-17 2000-0141A St. Regis Property Owner' The reconfiguration and modification of an existing boat wash station.Harrietstown RM

52021-03-17 2003-0073E Locke, Colleen & Kelly Requesting an amendment to construct a pool outside of the limits of clearing authorized by P2003-73.

North Elba LI

22021-03-17 2018-0123 New York Land and Lake Subdivision of 1,169± acres into 34 lots, yielding 32 building lots, 1 developed lot, and 1 common lot. Thirty new single-family dwellings will be in the Rural Use land use area and two new single-family dwellings will be in the Resource Management land use area. The project sponsor proposes to extinguish all remaining principal building rights, 12 in Resource Management and 22 in Rural Use, for a total of 34. The project site includes the entirety of Woodward Lake, a 100±-acre impounded lake. Eighteen lots, plus the common lot, will have shoreline on Woodward Lake. Access will be provided from Collins Gifford Valley Road and a new 2,000-foot-long road.

A Property Owner’s Association will own the new road, Woodward Lake and its dam, a common area at the north end of the lake, and wetlands at the south end of the lake (189± acres in total). Individual lot owners will install and maintain the water supply, wastewater treatment, and stormwater management on each residential lot. The applicant proposes to limit each residential lot to one principal building and one accessory structure with no further subdivisions, and require any commercial timber harvesting outside the building envelope/limits of clearing to be done under the supervision of a professional forester.

Multiple Towns RU

32021-03-22 2020-0239 Faerber, Frederick G. & J Variance to construct an on-site wastewater treatment system within 100 feet of an intermittent stream to serve a new single-family dwelling.

Village of Spec LI

22021-03-22 2021-0021 Arico, Brian and Renee Three-lot subdivision creating a 58.77-acre lot with existing development, an 8.24-acre lot to be improved by a future single-family dwelling, and a 6.54-acre lot to be improved by a future single-family dwelling.

Webb LI

52021-03-24 2014-0180B New Cingular Wireless P Amendment Request to remove three panel antennas, replace six panel antennas, install one new surge arrestor, three new Remote Radio Units (RRUs), two new power cables, one new fiber cable and associated infrastructure.

Lake Luzerne RM

Wednesday, January 5, 2022 Page 5 of 24

Page 6: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-03-24 2020-0129 Cellco Partnership d/b/a V Installation of a 100-foot-tall monopole telecommunications tower to support cellular antennas at the 96-foot centerline height, with associated equipment. Also, construction of a 573-foot-long access drive to the tower site.

Corinth RU

12021-03-24 2021-0030 Morgan, Mary Louise & B A two-lot subdivision creating two parcels to be merged with adjoining parcels.Elizabethtown LI

12021-03-29 2019-0161 Houck, Roger & Melanie A two-lot subdivision and merger with no new land use and development.Horicon MI

22021-03-29 2020-0112 New Cingular Wireless P Installation of a 78-foot-tall monopole tower to be concealed as an 83-foot-tall simulated tree. The tower will support cellular antennas at the 69-foot centerline height with associated equipment. Also, construction of a 215-foot-long access drive.

Indian Lake MI

12021-03-29 2020-0272 McPhillips Properties LLC Two-lot subdivision of 909 acres to create a 181.97-acre lot and a 728-acre lot.Chester RU

22021-03-29 2020-0278 National Grid Installation of 14 new utility poles on an existing transmission line along NYS Route 3. Six poles will be 47.5 feet in height and eight poles will be 38.5 feet in height.

St. Armand RU

22021-03-29 2021-0032 F&W Forestry Services, I Timber harvest of 415 acres, separated by small buffers in areas of overstocked, poor quality American beech and northern hardwood stands with poor regeneration. The property is subject to a New York State Working Forest Conservation Easement and is certified to both the Forest Stewardship Council (FSC) and Sustainable Forestry Initiative (SFI) certification standards.

Newcomb RU

62021-03-31 2021-0045 Upper Saranac Foundatio GP2015G-2 for the removal of invasive species. Replaces P2020-53.Santa Clara WF

12021-04-05 2020-0123 The Nature Conservancy, Proposed subdivision of a 150-acre parcel, resulting in the creation of a 96-acre lot and a 54-acre lot to be deed-restricted against any new and use or development.

Newcomb MI

32021-04-05 2020-0265 Glauser, Mark and Gina The expansion of an existing single-family dwelling by 677 square feet in footprint and 2 feet in height within the shoreline setback area for the construction of a 936-square-foot attached garage and second story loft area on the non-shoreline side of the dwelling.

Parishville RM

62021-04-05 2021-0014 New Cingular Wireless P GP2010G-1 for installation of a new 80-foot-tall monopole telecommunications tower approximately 320 feet from an existing Agency-authorized monopole tower (i.e., a horizontal co-location). Six panel antennas and other smaller antennas and equipment are proposed to be installed on the new tower, with an equipment platform and emergency generator at the tower’s base. An existing access drive will be extended for 526 feet to the new tower site.

North Hudson LI

Wednesday, January 5, 2022 Page 6 of 24

Page 7: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-04-05 2021-0026 AT&T Mobility Corporation The addition of a 20-foot extension and new antenna arrays to an existing permitted telecommunications tower consistent with Federal Communications Commission rules and regulations implementing Section 6409 of the Spectrum Act.

Chesterfield RU

62021-04-05 2021-0061 St. Lawrence County Dep GP2002G-3AAR, submitted for the replacement of culverts involving wetlands.Fine MI

62021-04-05 2021-0062 St. Lawrence County Dep GP2002G-3AAR, submitted for the replacement of 10 culverts involving wetlands.Piercefield MI

62021-04-06 2020-0027A Herkimer County GP2002G-3AAR, revised proposal submitted for the replacement of a bridge on South Shore Road involving wetlands.

Wells MI

62021-04-12 2008-0296A T-Mobile Northeast LLC GP2005G-3R to replace antennas and add new antennas and related equipment.Schroon HA

22021-04-12 2021-0024 Essex County DPW The action involves the construction of a salt storage structure at the existing Essex County Department of Public Works facility on US Route 9 to enclose the existing salt storage area and provide stormwater management. The new structure will be approximately 11,500 square feet in footprint and 51 feet in height and be accessed from the existing driveways on the project site. No new outdoor lighting, land clearing or change in operations is proposed.

Lewis LI

22021-04-14 2020-0216 Upstone Materials, Inc. Commercial sand and gravel extraction having a Life of Mine area of 15.2± acres, a projected Life of Mine period of 10 years, and containing a total of approximately 120,000 cubic yards of material, being an expansion of a previously authorized 4.8-acre Life of Mine. Extraction operations are proposed intermittently from April to October, Monday through Friday, 8am - 5pm. An average of 22 and a maximum of 30 loaded truck trips/day is expected. No blasting or crushing is proposed.

Lewis LI

62021-04-14 2020-0222 AT&T Mobility Corporation GP2010G-1 for the horizontal co-location of a new telecommunications tower. The proposed tower will contain six new panel antennas and associated infrastructure. Access to the site will be along an existing access road.

Day LI

52021-04-19 2019-0039C ORDA Proposal to make changes to the the stormwater management plan as previously authorized by Project 2019-0039.

North Elba HA

22021-04-19 2020-0253 Moriah Central School Dis Proposal to construct outdoor athletic facilities, expand the existing bus garage, and construct new vestibules at Moriah Central School District’s High School Campus.

Moriah LI

Wednesday, January 5, 2022 Page 7 of 24

Page 8: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-04-19 2020-0266 Barile Family, LLC Re-development of the former W. Alton Jones Cell Science Center property to construct a total of 355 residential units as follows: 265 apartments within 22 new buildings 60-70 feet tall, 76 condominium units located within the existing structure and 14 additional condominium units located within a new building. The development will be served by municipal sewer and water infrastructure and also includes a clubhouse, greenhouse, pool, recreation facilities, maintenance building, pedestrian and vehicle access and on-site parking.

North Elba HA

22021-04-19 2020-0277 Woodcock, Gordon - Pivo The action involves the installation of a 5 megawatt solar energy generating facility located on 43 acres previously authorized as a commerce park.

Ticonderoga MI

12021-04-19 2021-0059 King, Rick and Julie Two-lot subdivision involving wetlands.Tupper Lake LI

12021-04-21 2021-0067 Flinchum, Terry and Cath Two-lot subdivision of the project site to create a 6.8-acre parcel to contain the existing leased lot and telecommunication tower use.

Lewis RU

62021-04-21 2021-0071 National Grid GP2019G-1 for replacement of an existing utility pole measurung 29.5 feet in height with a pole measuring 38.5 feet in height in a new location and involving wetlands.

Stony Creek RU

22021-04-26 2020-0082 Walton, William B./Doerin The action involves a request to expand the existing parking area, change the hours of operation to hold events with music, and undertake additional tree cutting to install elements of a high ropes course at an existing tourist attraction previously authorized by Agency Permit 2017-0076.

North Elba RM

12021-04-26 2020-0257 Crispin, Lee and Patricia Three-lot subdivision and mergers for the purpose of boundary line adjustments. No new land use or development is proposed and no new building lots will be created.

Broadalbin MI

62021-04-26 2021-0065 NYSDEC GP2005G-1R for the placement of bog bridging on the shoreline of Polliwog and Horseshoe Ponds where the trail reaches the water.

Santa Clara WF

62021-04-26 2021-0081 SLIC Network Solutions GP2019G-1 for replacement of existing utility poles with poles measuring greater than 40 feet in height.

Lewis LI

52021-04-28 1999-0096A LeClair, Michael & Collee Subdivision of a 57.6-acre project site to create a 1.75-acre lot containing an existing single-family dwelling and a 55.41-acre lot containing accessory use structures.

Chesterfield RM

62021-05-03 2009-0095F New Cingular Wireless P GP2005G-3R for the swapping of (6) antennas, removing (3) antennas, swapping (6) RRUS (remote radio units), adding (3) RRUS, adding (3) TMAs, adding (1) surge arrestor, adding (2) DC power cables and adding (1) fiber cable at the existing height of 192'. AT&T will also be performing cabinet work within its existing equipment room and current lease area.

Indian Lake RU

Wednesday, January 5, 2022 Page 8 of 24

Page 9: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

52021-05-07 2019-0165A NYSDOT GP2002G-3AAR to amend Permit 2019-0165, authorizing a culvert replacement involving wetlands on NYS Route 9N.

Hague WF

62021-05-07 2020-0037 NYSDEC GP2002G-3AAR for a culvert replacement involving wetlands.Clifton RM

62021-05-07 2020-0040 NYSDEC GP2002G-3AAR for snowmobile trail Involving wetlands.Clare RM

62021-05-07 2021-0077 Town of Clare GP2002G-3AAR, submitted for the proposed replacement and expansion of two existing culverts.

Clare RM

52021-05-10 2003-0163E Town of Keene Amendment request from the Town of Keene for a temporary (one-year) expansion of the previously authorized Marcy Field parking area from 75 to 110 vehicles. The existing and expanded area will serve a hiker/passenger shuttle bus service. The proposed expansion is located within 1/4 mile of the East Branch of the AuSable River, a designated Recreational River.

Keene RU

52021-05-10 2016-0192A Huber Resources Corp. Amend Condition 13 of Permit 2016-0192 to extend the term of a commercial mineral extraction for another four years.

Dannemora RM

52021-05-10 2018-0136A Corasanti, David Proposed change to the building location of Lot 6 previously authorized by Permit 2018-0136.

Inlet HA

12021-05-10 2019-0040 Colligan, James S. Collig Two-lot subdivision of a 2.89-acre parcel creating a 1.56-acre parcel improved by existing development and a 1.33-acre parcel to be improved by a new single-family dwelling.

Long Lake HA

12021-05-10 2020-0276 Zweigenhaft, Burt Construction of a new single-family dwelling within one-eighth mile of forest preserve land classified as wilderness.

North Elba RU

62021-05-10 2021-0098 National Grid GP2019G-1 for replacement of an existing 38.5-foot tall utility pole with a pole measuring 47.5 feet tall.

Lake George HA

22021-05-12 2019-0127 Jacoby, Mark & Vereecke The greater than 25% expansion of an existing campground through the addition of 28 campsites, a swimming pool and barn.

Ticonderoga LI

22021-05-12 2021-0056 Besignano, Paul - War Ca Change in use of an existing commercial building from a meat processing facility to a commercial use distillery. No expansion of building or other new land use and development is proposed. Modifications will be primarily to the interior of building. Wastewater will utilize the municipal system.

Ticonderoga MI

62021-05-17 2008-0297A T-Mobile Northeast, LLC GP2005G-3R to co-locate telecommunications antennas and equipment on the 120 meter ski jump support columns.

North Elba HA

Wednesday, January 5, 2022 Page 9 of 24

Page 10: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

52021-05-17 2019-0171A Ashlaw, Tyler Construction of a single-family dwelling served by a new on-site wastewater treatment system and individual well water supply.

Saranac RU

22021-05-17 2020-0145 JP Gross Properties, LLC Six-lot subdivision of 52± acres involving wetlands and the construction of a single-family dwelling on each lot.

Queensbury RU

22021-05-17 2020-0148 Reo, Brandon A three-lot subdivision to create two, 5±-acre lots and a 27±-acre lot. A new single-family dwelling will be constructed on each 5±-acre lot and the 27±-acre lot will contain existing development.

Thurman RU

32021-05-17 2020-0221 Jones, Jerry and Barbara Requesting a variance for the expansion of a pre-existing single-family dwelling located within the shoreline setback of Lower Chateguay Lake.

Bellmont MI

22021-05-17 2021-0033 789 Tarbell Hill, LLC c/o R Development of a 5MW solar power generating facility on 25 acres of leased land within two separate fenced areas totaling 18 acres. Access is proposed from Tarbell Hill Road and Dugway Road with the proposed point of interconnection infrastructure with existing utilities to be located adjacent to Tarbell Hill Road.

Moriah LI

12021-05-24 2021-0044 Malone, Stephen A two-lot subdivision of a 44.93-acre parcel creating a 2.93-acre parcel improved by an existing single-family and a 42-acre parcel improved by an accessory structure cabin.

Lyonsdale RU

52021-06-01 2009-0152A Clifton-Fine Health Care Construction of a 8,600 square foot addition to the Clifton-Fine Hospital.Fine LI

52021-06-01 2020-0187A Huskins, Margaret Two-lot subdivsion creating an 10.3 acre vacant lot and a 17.6-acre lot improved by existing development.

Webb RM

12021-06-01 2020-0237 Coyne, Chris Two-lot subdivision involving wetlands and the construction of a single-family dwelling.Chester RU

12021-06-01 2021-0007 Tuttle, Barton and Carrie Construction of a single-family dwelling and a boardwalk through wetlands.Clifton RM

62021-06-01 2021-0111 National Grid GP2019G-1 for the replacement of three existing utility poles involving wetlands within the National Grid right-of-way.

Mayfield RU

12021-06-07 2020-0228 Black, Michael A two-lot subdivision creating a vacant 270-acre buildable lot and a vacant 220-acre buildable lot.

Franklin RU

42021-06-10 2021-0090 NYS Olympic Regional D Construction of a new office building for ORDA employees, with 3 floors and 29,000 square feet (an approximately 9,620 square-foot footprint), located on the site of the former Lake Placid Hospital. Also, related site improvements such as parking area construction, utility installation, landscaping, and stormwater management. The building will connect to municipal water and sewer.

North Elba HA

Wednesday, January 5, 2022 Page 10 of 24

Page 11: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-06-14 2021-0006 Petrosino, Michael and C Construction of a boardwalk through wetlands, for access to the shoreline of Lake Placid. The boardwalk will be constructed in two sections: one 180 feet long by 4 feet wide and another 26 feet long by 3 feet wide.

North Elba MI

22021-06-14 2021-0089 The Lyme Timber Co Timber harvest of 408 acres on Lyme Timber’s 9,643 acre Corinth Tract, consisting of two discrete treatment areas: a 149.07 acre clearcut with reserves harvest to establish a vigorous young stand; and a 255.23 acre shelterwood removal with reserves harvest to release a well-established understory. The property is subject to a New York State Working Forest Conservation Easement and is certified to both the Forest Stewardship Council (FSC) and Sustainable Forestry Initiative (SFI) certification standards.

Corinth RU

52021-06-14 2021-0124 Reale Construction Co., I Amendment to renew permit term.Ticonderoga RU

22021-06-16 2020-0217 The Conservation Fund The project is a four-lot subdivision of an 8804±-acre parcel, creating: Lot 1, a 427±-acre lot improved by a seasonal use cabin; Lot 2, a 965±-acre lot proposed to be conveyed to the State of New York; Lot 3, a 5±-acre lot to be conveyed to an adjoining landowner as a non-building lot; and Lot 4, a 7407±-acre lot. No new land use or development is proposed.

Multiple Towns RM

32021-06-16 2021-0070 Heilsberg, George & Ther Replace an existing 11 foot tall, 26 foot wide, 884 square foot, two-bedroom single-family dwelling located entirely within the 100 foot shoreline setback with a 19.25 foot tall, 25.33 foot wide, 1380 square foot, two-bedroom single-family dwelling located entirely within the 100 foot shoreline setback.

Hope RM

22021-06-16 2021-0073 Windover Corporation Two, 4.5-foot overwinter drawdowns of Windover Pond for purposes of sediment compaction and management of nuisance native vegetation. The first drawdown is proposed to occur between 2021 and 2023, while the second drawdown is proposed to occur three to six years after the first drawdown. The drawdowns are proposed to be undertaken as previously permitted by the Agency under Permits 99-263 and 99-263A.

Johnsburg UW

62021-06-17 2021-0103 Town of Ohio GP2002G-3AAR, submitted for the proposed replacement of two storm-damaged bridges crossing Jones Creek on Atwood Lake Road.

Ohio RU

52021-06-18 1987-0074E Leinwand, Paul and Cicar Amend conditions 6 and 7 of APA Permit 87-74 to change authorized on-site wastewater treatment system design and location.

Santa Clara LI

62021-06-18 2021-0136 National Grid GP2019G-1 for replacement of an existing 38.5-foot tall utility pole with a pole measuring 43 feet tall.

Ohio RU

32021-06-23 2021-0039 Saroodis, Sheila and Willi Replacement of the pre-existing one-story single-family dwelling (partially in setback) with a new two-story single-family dwelling, with no increase in footprint and an 8 foot height increase.

Greig MI

Wednesday, January 5, 2022 Page 11 of 24

Page 12: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

12021-06-23 2021-0093 Carlson, Richard and Den Construction of a single-family dwelling and attached garage in a Recreational River Area.Jay LI

52021-06-28 2009-0297A Jojoel Realty Corp. Proposed construction of a single-family dwelling and conversion of the pre-existing single-family dwelling into a guest cottage.

Schroon LI

22021-06-28 2020-0090 Johnson, Gregory The establishment of a campground consisting of ten tent sites, restrooms, and two storage containers. Kayaks, paddleboards, and bikes will be available for use by campers.

AuSable RM

22021-06-28 2021-0037 Gabree, Michael Addition of a boatlift to an existing dock system involving wetlands.Crown Point RM

22021-06-28 2021-0040 Allott, Jeff, and Woolf, Aar Proposal to establish a campground with 4 sites, including 4 cabins under 300 square feet each. These sites will be serviced by a new bathhouse and pavilion.

Lewis RM

12021-06-30 2021-0091 Rhoades, James A two-lot subdivision creating a 158.07-acre parcel with an existing storage building, and a 147.96-acre vacant parcel.

Harrietstown RM

52021-07-02 2010-0207B New York RSA2 Cellular GP2005G-3R for antenna changes on existing water tank.Village of Tuppe HA

82021-07-02 2017-0164R Silverstein, Mary Margaret Renew prior permit for a two-lot subdivision creating "Lot 1," a 24.14 acre lot with an existing single-family dwelling and "Lot 2," a 23.15 acre building lot with existing development.

North Elba RU

22021-07-02 2019-0111 Heroux, Michael An 11-lot subdivision of 233.7± acres, creating two lots with existing development (a 3.2-acre lot with a single-family dwelling and an 79.7-acre lot with a commercial use, “Heroux Construction”) and nine vacant building lots (seven lots with 6.1 to 9.5 acres, one lot with 31.7 acres, and one lot with 65.7 acres). Also, after-the-fact authorization of a twelfth, 2.76-acre lot with an existing single-family dwelling. Portions of the property are within 1/8 mile of the Ha-De-Ron-Dah Wilderness or within 1/4 mile of the Middle Branch Moose River and/or contain wetlands.

Webb LI

22021-07-02 2020-0227 AT&T Mobility Corporation Construction of a new 99-foot-tall monopole telecommunications tower, concealed as a 104-foot-tall simulated tree, to support cellular antennas at the 90-foot height. An equipment platform and generator are also proposed at the tower’s base. The tower is located approximately 250 feet from an existing Agency authorized tower and will involve extension of an existing access road by approximately 275 feet.

Wells RU

62021-07-02 2021-0131 New York RSA 2 Cellular GP2005G-3R application for co-location on a previously authorized telecommunications tower at a mounting height of 78 feet above ground level.

Long Lake HA

62021-07-09 2006-0239B Verizon Wireless GP2005G-3R for replacement and addition of antennas and equipment to an existing tower.

Mayfield HA

Wednesday, January 5, 2022 Page 12 of 24

Page 13: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-07-14 2021-0048 Montag, Brandon and And Construction of a commercial self-storage facility adjacent to Route 186. The proposed facility will be accessed via Airport Road and consist of forty, 8 foot by 20 foot shipping containers that will be utilized as storage units, and one 30 foot by 150 foot pole barn for vehicle storage.

Harrietstown RU

62021-07-14 2021-0156 Lake Placid Village Electri GP2019G-1 Replace existing 35' 6" utility pole with 44' 3" utility pole.North Elba HA

12021-07-19 2021-0004 Helms, Thomas Two-lot subdivision of 5.63± acres to create a vacant 0.65±-acre lot that will be merged with an adjoining parcel and a 4.98±-acre lot to be retained.

Long Lake MI

22021-07-19 2021-0054 Homestead Development Construction of six, two-bedroom, single-family dwellings and four multiple-family dwellings containing four, two-bedroom units each. The development will be located on a 3.09-acre lot, include a single access from Wesvalley Road, on-site parking for 33 vehicles and be served by municipal sewer, water and electrical infrastructure.

North Elba HA

22021-07-19 2021-0066 Parkview Development Construction of an approximately 3,000 square foot building, 47 feet in height, containing a commercial space and six residential units; as well as construction of a four-story, 17,100 square foot residential building containing 63 residential units with an overall height of 56 feet. The project includes on-site parking with vehicle and pedestrian access to Broadway and Depot Street. The development will be served by municipal water and sewage infrastructure.

Harrietstown HA

62021-07-20 2021-0157 NYSDEC GP2005G-1R for replacement of existing bridge, cribbing, and bog bridging involving wetlands and crossing Beaver Brook in the Pigeon Lake Wilderness Area.

Long Lake SA

22021-07-21 2021-0042 Renuart, Don and Jill Three-lot subdivision of the 328±-acre project site to create a 9.6±-acre lot, a 7.21±-acre lot, and a 312±-acre lot. One new single-family dwelling each will be constructed on the 9.6±-acre lot and the 7.21±-acre lot.

Franklin LI

12021-07-21 2021-0051 Arnold, Robert L. & Mary A two-lot subdivision of the project site to create the following lots comprised of Moderate Intensity Use and Low Intensity Use lands:Lot 1, which is improved by an existing single-family dwelling; and Lot 2, a vacant lot to be improved by a new single-family dwelling.

Willsboro MI

62021-07-27 2021-0152 Landvest GP2002G-3AAR for minor impacts to wetlands related to installation of a culvert to replace failing bridge on logging road.

Hopkinton RM

52021-07-28 2019-0189A Camp Pine Cove, LLC Amendment to use coffer dam for additional dredging.Tupper Lake LI

12021-07-28 2021-0137 Newcombe, Barry Construct a single-family dwelling on a previously-authorized lot.Saranac LI

Wednesday, January 5, 2022 Page 13 of 24

Page 14: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-08-04 2021-0085 Herrington, Patricia - Excu A three-lot subdivision of a 307±-acre project site to create a 38±-acre lot, a 29.47±-acre lot and a 240±-acre lot. One cabin will be constructed on the 29.47±-acre lot.

Hopkinton RU

22021-08-04 2021-0114 NYSDEC Application of the pesticide Prenfish Toxicant™ (Active Ingredient: 5% Rotenone) to remove non-native golden shiners from Long Pond, a lake in the Debar Wild Forest. The lake will be stocked to establish a native brook trout (Salvelinus fontinalis) population upon natural degradation of the toxicant. This will be the second reclamation of Long Pond, with a previous reclamation undertaken in 1965. The project complies with the Guidelines for Fisheries Management in Wilderness, Primitive, and Canoe Areas (Adopted by the Adirondack Park Agency on April 26, 1990 and Amended on July 10, 1992).

Waverly UW

62021-08-04 2021-0163 NYSDOT GP2002G-3AAR for the replacement of a 4 foot diameter corrugated metal pipe with embedded 6.5 foot diameter HDPE pipe, installing cutoff wall at inlet, embankment protection at inlet.

Crown Point RM

52021-08-04 2021-0173 Robjent, Larry Construction a 1,500 square foot single-family dwelling to be served by an on-site wastewater treatment system and an individual well water supply.

Keene RU

12021-08-10 2021-0121 Lyndaker, Michael and Sa A two-lot subdivision of tax parcel 202-3-3.1 and a two-lot subdivision of tax parcel 202-3-4.2 to separate the lands containing shoreline on the Oswegatchie River north of NYS Route 3 from the remaining lands south of NYS Route 3.

Fine RM

52021-08-11 2005-0127C Nolan, Richard Amend P2005-0127 to allow for the construction of a staircase to access the shoreline.Wilmington MI

22021-08-11 2020-0033 Craigardan, Inc. Establishment of a Group Camp consisting of a residence building, main building, studio and kiln. These structures will be serviced by an on-site well and on-site wastewater treatment system.

Elizabethtown RU

22021-08-11 2020-0061 Patterson, Craig The action involves a three-lot subdivision of a 24.22±-acre parcel resulting in the creation of two 8±-acre lots to be improved by new single-family dwellings, and a 8.2±-acre lot improved by an existing single-family dwelling.

Saranac RU

12021-08-11 2020-0115 Fowler, Beth & Frank Two-lot subdivision creating a parcel with an existing single-family dwelling and a vacant parcel to be merged with an adjoining parcel with an existing single-family dwelling.

Crown Point LI

12021-08-11 2020-0259 Martin, Daniel Construction of a single-family dwelling on Resource Management lands and within 300 feet of NYS Route 86.

Harrietstown RM

12021-08-11 2021-0017 Strong, Marilyn A two-lot subdivision of the 28.5-acre project site, resulting in: a 23.6-acre lot improved by an existing single-family dwelling; and a 4.9-acre vacant building lot for the construction of one single-family dwelling with individual well water supply and on-site wastewater treatment system.

Willsboro RM

Wednesday, January 5, 2022 Page 14 of 24

Page 15: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-08-11 2021-0076 Lutzy, Amanda The proposed project is a new commercial use involving operation of a veterinary clinic in an existing structure (formerly the Redford Diner). The project site is located within 1/4 mile of the Saranac River, a designated Recreational River.

Saranac LI

12021-08-11 2021-0118 Munro, Timothy and Maur Construction of a single-family dwelling.Schroon RM

12021-08-11 2021-0142 Trudeau, Tanner Construction of a single-family dwelling in Resource Management.Harrietstown RM

22021-08-13 2021-0132 Schoeninger, Taylor and Installation of a dock through wetlands to access Lake George.Ticonderoga HA

62021-08-13 2021-0177 National Grid GP 2019G-1 for the replacement of two existing 34 foot high utility poles located in wetlands with poles measuring 38.5 feet high.

Webb SA

52021-08-18 2012-0118B Ketchell, Robert & Debora Proposed amendment to move the septic location as authorized in P2012-0118.Black Brook LI

62021-08-18 2020-0038 NYSDEC GP2002G-3AAR for road rehabilitation Involving wetlands.Colton RM

62021-08-18 2021-0176 NYSDOT GP2002G-3AAR for minor impacts to wetlands related to temporary placement of access pad to get to streambank along Stoner Lake Outlet.

Caroga LI

12021-08-18 2021-0178 Hill, Jesse A two-lot subdivision of 38-acres (Parcel 11.1) to create an 8.591-acre lot and a 29.4-acre lot. The 8.591-acre lot will be merged with Parcel 6.3, and the 29.4-acre lot will be merged with Parcel 7.

Broadalbin LI

12021-08-18 2021-0179 HAPEC, Inc - Marvin, Ang Replacement of a pre-existing mobile home in a new location within a recreational river area.

Keene LI

12021-08-23 2021-0060 Bisso, Mark Construction of a single-family dwelling on a Low Intensity portion of a lot improved by a single-family dwelling.

North Hudson RM

62021-08-25 2021-0025 AT&T Mobility Corporation GP2010G-1 Horizontal co-location of an 85' tall telecommunications tower adjacent to the existing Town of Essex water storage tank.

Essex RM

52021-09-01 2016-0151B Cellco Partnership d/b/a V GP2005G-3R for the removal of nine panel antennas, one OVP unit and three RRHs. Installation of one new 5G antenna, three PCS antennas, three AWS antennas, two OVP units, three RRHs and associated infrastructure.

Warrensburg RU

52021-09-01 2018-0215A St. Pierre, Timothy & Ther Amendment request to construct the single-family dwelling in a different location.Peru LI

Wednesday, January 5, 2022 Page 15 of 24

Page 16: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

12021-09-01 2020-0282 Whaley, Michael and Rox Construction of a single-family dwelling on a shoreline lot in Resource Management Land Use Area.

Greig RM

12021-09-01 2021-0038 Hammond, Duane Proposed subdivision of a 7-acre parcel, resulting in the creation of a 1-acre lot improved by an existing single-family dwelling, and a 6-acre lot that will be improved by a proposed single-family dwelling.

Schroon RU

12021-09-01 2021-0105 Olcott, Jody & Thomas/Gi The two-lot subdivision of the lands comprised of Parcel 10.110, Parcel 10.110/1 and Parcel 19.100 to create a 0.5±-acre lot improved by a dwelling, a 98±-acre lot improved by accessory structures, and the merger of the 98±-acre lot with the lands comprised of Parcel 10.210 and Parcel 10.230.

Moriah RU

12021-09-01 2021-0109 Esper, Cheryl Two-lot subdivision of the 153.7±-acre property comprised of Parcel 16.100 and Parcel 17 to create a vacant 139±-acre and a vacant 15±-acre lot, and the merger of the 15±-acre lot with Parcel 19 and Parcel 20.

Jay RU

12021-09-01 2021-0120 Rivet, Leo Proposed two-lot subdivision of a 189.43-acre parcel, resulting in the creation of a vacant 92.12-acre lot, and a vacant 97.31-acre lot.

Ellenburg RU

62021-09-01 2021-0174 National Grid GP2019G-1 for the replacement of 117 existing utility poles with new utility poles measuring more than 40 feet in height.

Inlet SA

52021-09-07 2014-0138B Cellco Partnership d/b/a V GP2005G-3R to remove three existing antennas and install three new RRH/antenna units and associated infrastructure.

Putnam LI

52021-09-07 2020-0154A EIP Communications I, LL GP2005G-3R to remove 4 existing panel antennas, install three new panel antennas, three RRHs, two OVPs, one hybrid cable, two co-ax cables and related infrastructure improvements.

Webb RM

22021-09-07 2021-0106 Cranley, John Proposed re-configuration of two existing lots to create four new lots: a 0.51±-acre lot with an existing single-family dwelling; a 0.50±-acre lot with an existing single-family dwelling; a vacant 0 .5±-acre lot; and a vacant 1.47±-acre lot. Potential building sites for single-family dwellings have been identified on the two vacant lots.

North Elba HA

52021-09-08 2015-0022A NY RSA 2 d/b/a Verizon GP2005G-3R involving the removal of 12 existing panel antennas, installation of 12 new panel antennas, two new OVP units, one hybrid cable and related infrastructure.

Lewis LI

62021-09-09 2021-0168 NYSEG GP2019G-1 for the installation of 24 new utility poles less than 40 feet in height. Three of the new utility poles involve wetlands.

Newcomb LI

62021-09-09 2021-0170 NYSDEC GP2005G-1R for minor impacts to wetlands related to Pine Lake Trail improvements. Trailhead 18T 485511 4841322

Greig WF

62021-09-09 2021-0190 NYSDEC GP2005G-1R for a culvert replacement on Palmer Pond Road.Chester WF

Wednesday, January 5, 2022 Page 16 of 24

Page 17: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

62021-09-13 2021-0154 AT&T Mobility Corporation GP2005G-3R for co-location of a new 8-foot tall telecommunications antenna array at a centerline mounting height of 97 feet AGL. The existing monopine tower will be extended approximately 10 feet to accommodate the new equipment and crown branching.

Queensbury RU

62021-09-13 2021-0182 National Grid GP2019G-1 for the replacement of existing utility poles at various heights with utility poles measuring 43 feet tall.

Lake Pleasant HA

52021-09-15 2000-0287A Kilbourne, Edward and Wi Construct a single-family dwelling in a different location.Schroon RU

12021-09-15 2020-0225 Kralik, Jozef & Forsyth, M Construction of a single-family dwelling with associated development within a recreational river area.

North Hudson LI

52021-09-17 2003-0134B Jubin, Arthur Amendment for the transfer of a principal building right.North Elba RM

62021-09-17 2021-0158 New Cingular Wireless P GP2005G-3R for installation of antennas and equipment at a centerline heights of 290 feet and 335 feet on an existing 400-foot guyed tower.

Saranac RM

52021-09-20 1996-0076Y NYCO Minerals, LLC Amendment to authorize a one-time increase in the number of truckloads of aggregate from 46 to 80 from the time of permit issuance to October 31, 2021.

Lewis IU

12021-09-20 2021-0094 Paley, Willam and Ramje Proposal for a new single-family dwelling located within 1/8th of a mile of the Sentinel Range Wilderness area and within 150 feet of NYS Route 73.

Keene RU

12021-09-20 2021-0155 Caner, Judith M, c/o Cano Two-lot subdivision to adjust the boundary lines orginially authorized by Permit 2015-0009 to create a 120-acre lot with existing development and a 20-acre lot with a buildable location identified in Permit 2015-0009.

Keene RM

52021-09-20 2021-0157A NYSDEC Request to amend General Permit 2005G-1R Section C General Condition 1 to extend project completion timeline.

Long Lake SA

22021-09-22 2021-0064 Mountains Edge LG LLC Review of six lots (lots 4, 5, 6, 7, 8 & 9) of a sixteen-lot subdivision, due to the involvement of jurisdictional wetlands. The lots range in size from 0.67± acres to 1.06± acres and are to each be developed with a single-family dwelling served by municipal sewer and individual water supply. No on-site wastewater treatment systems are proposed.

Lake George HA

12021-09-22 2021-0078 St. Clair, Marcia and Edw Proposal for a two-lot subdivision of a 63±-acre parcel, resulting in the creation of a 55±-acre lot, and an 8±-acre lot that will be merged with an adjoining parcel.

Johnstown RU

12021-09-22 2021-0129 Bartlett, Myron Douglas a Two-lot subdivision involving wetlands of the 80-acre project site to create a 2.5- acre lot to be improved by a single-family dwelling and a 77.5- acre lot.

Webb MI

Wednesday, January 5, 2022 Page 17 of 24

Page 18: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

52021-09-27 1991-0047R Warnecke, Mark & Drum Boundary line adjustment conveying part of tax map parcel 155.4-1-18.100 to tax map parcel 155.4-1-18.200.

Minerva RU

52021-09-27 1996-0136E New Cingular Wireless P Amendment request to extend the existing 60-foot-tall tower to a height of 70 feet and add antenna(s) to the tower. Eligible facilities request.

Johnsburg RM

12021-09-27 2021-0165 Maine, Louis and Sandra Construction of a single-family dwelling with drilled well and on-site wastewater treatment system.

Hopkinton RU

52021-09-29 2005-0108B Miller, Gary E II Request to amend 2005-0108 to construct a single-family dwelling in a different location.Black Brook RM

52021-10-04 1985-0302E Melucci, Charles K. & The Construction of one shared access to Lot 9 and Lot 10 that is noncompliant with Agency Permit 1985-0302.

Piercefield LI

52021-10-06 1987-0224R Tsarenkov, Maksim and C Proposal to amend P1987-0224R to allow for an extension to the originally authorized driveway, and construction a single-family dwelling in a location other than authorized in the original permit.

Johnsburg RU

22021-10-06 2021-0115 Litterer, Paul J. & Katheri Construction of a dock involving wetlands to access Efner Lake on Parcel 31 and authorization of the creation of Parcel 32.11 by subdivision after-the-fact.

Corinth LI

62021-10-07 2021-0211 Gerhardt, Susan & Mikuly GP2002G-3AAR for proposed replacement of culvert under existing driveway involving wetlands.

Chester RU

52021-10-13 2017-0097A Etchberger, John F. & Em Amendment request to construct a single-family dwelling in a different location.North Elba LI

12021-10-13 2021-0086 Lawliss, Mark Construction of a single-family dwelling in a Recreational River area.Bellmont RU

22021-10-19 2020-0157 ELP Ticonderoga Solar, L Installation of a 20 MW solar facility to be sited on approximately 100 acres of a 255-acre property. The proposal includes installation of approximately 46,000 Hanwha 585-watt (or equivalent) solar photovoltaic (PV) panels. The solar panels will be attached to a single-axis tracker racking system and secured into the ground by driven posts (maximum structure height of 10 feet). The entire solar array will be enclosed by a 7-foot-tall wire mesh fence. The DC power produced by the solar panels will be converted to AC utility grade power using central inverters, located on equipment pads throughout the array. The project also involves a new connection to National Grid’s Ticonderoga-Republic #2 115kV line located 1,450± feet east of the solar array, construction of a transformer station near NY State Route 9N between the array and that 115kV line, and installation of an underground AC line through wetlands to connect the solar array to the transformer station. The project is expected to operate for at least 20 years and to produce approximately 38,500 MWh of solar energy the first year.

Ticonderoga MI

Wednesday, January 5, 2022 Page 18 of 24

Page 19: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-10-19 2021-0087 Bolton Landing Storage, L The project involves a greater than 25% expansion of a commercial use storage facility which was previously authorized by Agency Permit 2001-22. Two new storage structures are proposed, one measuring 30’ x 100’ and one measuring 20’ x 100’. The new storage units will be served by an existing access drive and existing infrastructure.

Bolton LI

12021-10-19 2021-0101 Ball, Kevin & Erin Proposal to construct a single-family dwelling within the Black River Scenic River Area.Ohio LI

22021-10-25 2020-0070 Lashinsky, Barry and Jac Subdivision of 73± acres to create four vacant lots of 10.2± acres, 10.1± acres, 9.9± acres, and 42.8± acres, and construction of one single-family dwelling, driveway, and on-site wastewater treatment system on each lot.

Jay LI

12021-10-25 2020-0155 Terence Finnan Trust 5/2 A two-lot subdivision to create a 4.7± acre lot improved by an existing dwelling and an 11.2± acre vacant lot to be improved by a new dwelling.

Keene RU

12021-10-25 2021-0043 Schenone, Eric Construction of a single-family dwelling within the Hudson River Recreational River Area.Chester RM

52021-10-27 2016-0165A Bird, Richard Create a four acre vacant lot from TMP 44-1-26.111 to be merged with TMP 44-1-26.114. No newland use or development is proposed.

Long Lake RU

12021-10-27 2021-0074 Bain, Daniel & Hanauer, K Two-lot subdivision creating a non-shoreline lot less than 320,000 square feet in size in Rural Use for the construction of one new single-family dwelling.

Jay RU

52021-10-27 2021-0164 Hinds, Christopher Proposed construction of a single-family dwelling.AuSable RU

12021-10-27 2021-0185 Annis, John Two-lot subdivision in a Recreational River area and within an eighth mile of a Wilderness area and the construction of a single-family dwelling on each lot.

St. Armand RU

62021-10-27 2021-0239 Town of Chester GP2001G-1E to remove beaver dam material from under a 10 foot wide concrete box culvert opening.

Chester HA

92021-10-27 2021-0252 Town of Franklin Emergency Authorization for replacement of a culvert and shoulder/slope stabilization following undermining.

Franklin WF

62021-11-01 2021-0241 NYSDOT GP2002G-3AAR for a proposed culvert improvement beneath a section of I-87 which is surrounded by Wild Forest lands with temporary and permanent impacts to wetlands.

North Hudson WF

52021-11-04 1988-0431C Smith, Donald Construction of a single family dwelling and installation of an on-site wastewater treatment system. The existing garage apartment structure will be converted to a guest cottage use.

Keene RU

Wednesday, January 5, 2022 Page 19 of 24

Page 20: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

52021-11-04 2009-0009A T-Mobile Northeast LLC GP2005G-3R for: replacement of 3 antenna mounts and 3 antennas, installation of 3 new antennas, replacement of 3 TMAs, installation of 3 RRHs, removal of 6 coax cables, installation of 2 hybrid cables, installation of a 100 amp breaker, installation of a 48 kW diesel generator and associated underground conduits.

Village of Saran HA

52021-11-04 2014-0022C Upstone Materials INC; N Amendment to Condition 22 of Permit 2014-0022B to extend the permit term through 2027.St. Armand RM

22021-11-04 2020-0032 Taylor, Greg Removal of six existing docks, extension of three existing docks, and installation of one new dock involving wetlands on Friends Lake.

Chester MI

12021-11-04 2021-0083 Branch, Samantha and R Construction of a single-family dwelling and individual water supply well within the Cedar River Recreational River Area.

Indian Lake LI

12021-11-04 2021-0117 Vaillancourt, Pierre and M Construction of a single-family dwelling.Dannemora RU

12021-11-04 2021-0220 Porter, Richard A. & Lola Two-lot subdivision involving wetlands and construction of a single-family dwelling and on-site wastewater treatment system.

Keene HA

12021-11-04 2021-0229 Upstate Vistas LLC - Kos A two-lot subdivision of 1,309± acres involving wetlands to create a vacant 940±-acre lot and a 360±-acre lot containing an existing hunting and fishing cabin.

Multiple Towns RM

62021-11-04 2021-0250 NYSDOT GP2002G-3AAR for proposed replacement of a cross-culvert drainage pipe along NYS Rte 73.

Keene WI

62021-11-04 2021-0253 National Grid GP2019G-1 for the replacement of an existing 29.5-foot tall utility pole located in wetlands with a pole measuring 34 feet tall.

Brighton RM

62021-11-04 2021-0258 NYSDEC GP2005G-1R for replacement of culverts on Big Otter Lake Road in the Independence River Wild Forest

Greig WF

12021-11-08 2021-0169 Goodrow, Kirk Two-lot subdivision involving wetlands creating a 45.61-acre lot and a 21.88-acre lot.Parishville RU

12021-11-08 2021-0210 O'Leary, Dan & Nicole Two-lot subdivision involving wetlands of a 24.6±-acre project site to create a 5.12±-acre parcel (Parcel A) to be improved by an accessory garage and a 19.48±-acre parcel (Parcel B).

Clifton MI

52021-11-10 2009-0085A Wooster, Anthony Construction of a single-family dwelling.Mayfield RM

Wednesday, January 5, 2022 Page 20 of 24

Page 21: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

22021-11-15 2021-0143 Essex County IDA/Moriah Subdivision of a 38.04±-acre parcel adjoining the existing Moriah Business Park into four lots, to expand the business park. Development of one of the new lots with eight 14,000-square-foot warehouse storage structures to support an existing business on an adjoining lot. Offer two of the new lots for sale for commercial or industrial uses. The fourth lot contains wetlands, will not be developed, and will be merged with an adjoining 15.87±-acre lot.

Moriah MI

12021-11-15 2021-0235 Cole, Thomas J A two-lot subdivision to convey 3.42 acres from Parcel 31.1-11 to Parcel 31.1-12 in a Low Intensity land use area in the Hudson River Recreational River Area.

Johnsburg LI

62021-11-15 2021-0270 National Grid GP2019G-1 for the replacement of two existing utility poles in wetlands with new poles measuring 38.5 feet in height, and replacment of one existing utility pole measuring 38.5 feet in height, with a new pole measuring 43 feet in height.

Chester RU

12021-11-16 2019-0203 LaGoy, Ed Two lot subdivision of Low Intensity Use lands resulting in the creation of a 4.49± acre lot improved by a single-family dwelling and a vacant 20.86± acre lot.

Bolton LI

12021-11-16 2021-0146 Tahawus Club Two-lot subdivision of tax parcel 110-3-3.100 resulting in a 3.77-acre building lot for the construction of one single-family dwelling and installation of an on-site wastewater treatment system and individual potable water supply well.

Newcomb RU

22021-11-16 2021-0234 Pastore Rental Equipment Establishment of a commercial use involving equipment rentals and repairs.Fort Ann MI

62021-11-16 2021-0242 NYSDOT GP2002G-3AAR for proposed culvert improvement beneath NY-10 with temporary impacts to wetlands at culvert outlet.

Arietta LI

62021-11-16 2021-0243 NYSDOT GP2002G-3AAR for proposed culvert improvement beneath NY-10 with temporary impacts to wetlands at culvert outlet.

Arietta WF

12021-11-16 2021-0255 Vollers, Tom A proposed two-lot subdivision of Parcel 2.111 involving wetlands creating a 10.98±-acre lot to be merged with the adjoining Parcel 20. No new land use and development is proposed.

Lake Pleasant LI

52021-11-17 2000-0081C Town of Crown Point Upgrades to the existing water system per NYSDOH, involving upgrades to the well control building and wells located off Pearl Street and bulk water storage tank off Middle Road.

Crown Point LI

22021-11-17 2005-0039B Brennan, Tom and Briann The action involves the construction of an elevated, 4-foot-wide and 15-foot-long dock on posts located within wetlands.

Bleecker LI

22021-11-17 2021-0149 Antonucci, Frank & Berna Proposed three-lot subdivision creating a 56.5-acre lot with existing development, a 10.8-acre lot for the construction of a single-family dwelling, and a 10.7-acre lot for the construction of a single-family dwelling.

Multiple Towns RU

Wednesday, January 5, 2022 Page 21 of 24

Page 22: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

12021-11-17 2021-0219 Holstein, Kurt A two-lot subdivision of Parcel 1 involving wetlands to create a 217.17±-acre lot containing existing development and a vacant 1.33±-acre lot that will be merged with Parcel 20.2.

Arietta LI

12021-11-18 2021-0203 Ballen, Ira & Cornelia Proposed two-lot subdivision and construction of a new single-family dwelling with associated development. Subdivision involves wetlands and state land CEA.

Multiple Towns RU

12021-11-18 2021-0265 McKinney, Michael A. & D Two-lot subdivision to convey 11.3 acres from tax map parcel 236.-1-3 to be merged with tax map parcel 236.-1-6. No development is proposed.

Warrensburg LI

62021-11-22 2006-0287D T-Mobile Northeast, LLC GP2005G-3R for the removal of three existing panel antennas, installation of three new panel antennas, removal of six TTAs, installation of six RRUs, removal of one co-ax cable and installation od one HCS cable with related infrastructure.

Lake George RU

22021-11-22 2007-0320R3 Ruffolo, Saverio Third renewal of Permit 2007-0320 which authorized two lots involving wetlands in an eight lot subdivision.

Bolton RU

22021-11-22 2021-0119 Village of Speculator Reconstruction of a 49-foot tall fire tower, originally located on Makomis Mountain, in the Village of Speculator's park as a public use for education and outdoor recreation. The project is funded by NYSDEC through an Adirondack Communities Smart Growth Grant.

Village of Spec HA

22021-11-22 2021-0150 Word of Life Fellowship, I Three projects are currently proposed at an existing group camp on a 52.6-acre island on Schroon Lake: construction of a recreational pavilion (to replace an old ball court "air dome" structure), renovation of an existing camper cabin to create a new public restroom, and construction of two new camper cabins where there is no existing structure.

Schroon LI

62021-11-22 2021-0233 DISH Wireless, LLC GP2005G-3R involving horizontal co-location on a previously authorized monopine telecommunications tower. The proposed array will be mounted at a centeriline mounting height of 111 feet above ground level and will contain three panel antennas (one per sector), and a 5 foot by 7 foot equipment platform with related infrastructure.

Queensbury MI

12021-11-22 2021-0267 Quinn, Lisa & Green, Ray Two-lot subdivision involving wetlands to convey 29 acres from Parcel 106.-2-32.11 to be merged with Parcel 106.-2-25.

Broadalbin LI

52021-11-30 2014-0031A Ernst, Samantha and Dou Amendment to allow for construction of a single-family dwelling and accessory structures in a different location than was previously authorized.

Broadalbin RU

52021-11-30 2020-0091A Scheefer, Robert The action involves an amendment to Agency Permit 2020-0091 to allow the merger of previously authorized Lots 3 and 4 and removing condition 7 which required Lot 4 be merged with an adacent parcel.

North Elba LI

22021-11-30 2020-0197 JTR Lake George, LLC Proposed dredging wetlands located below the mean-high water mark of Lake George to restore a beach and swimming area.

Bolton MI

22021-11-30 2021-0161 McGahay, Alison The proposal involves the addition of 140 square feet of new dock area to an existing 120 square foot dock.

Wilmington MI

Wednesday, January 5, 2022 Page 22 of 24

Page 23: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

62021-11-30 2021-0272 Herkimer County Highway GP2002G-3AAR for proposed culvert replacement beneath Big Moose Rd. with temporary impacts to wetlands from placement of coffer dam.

Webb MI

52021-12-01 1998-0140B Bionique Testing Lab, Inc. Proposed expansion to temporarily accommodate extra staff using a 64x24 modular office trailerwith self-contained septic and two 8x10 office trailers, increasing staff from 35 to 50.

Harrietstown IU

52021-12-02 2020-0229A Maurer Family Irrevocable Two-lot subdivision and access culvert replacement.Horicon RU

22021-12-06 2021-0175 Vedder, Todd A two-lot subdivision of tax parcel 126.020-1-4 to create a shoreline access lot for the seasonal installation of a four-foot-wide, eighty-foot-long dock involving wetlands. The dock will be raised a minimum of 18-inches above the surface of the wetlands and the shoreline access lot will be merged with tax parcel 126.020-1-1.100.

Arietta LI

52021-12-07 2014-0125A Jarvis, Amanda & Brent Two-lot subdivision of Tax Map Parcel 216.-1-20.51 to create a vacant 2.6-acre lot that will be merged with an adjoining parcel identified as TMP 216.-1-20.52.

Saranac RU

22021-12-07 2021-0047 Amell, Randy Three-lot subdivision involving wetlands to create a 18.94±-acre lot improved by an existing commercial use garage, a 10.82±-acre lot and a 34.94±-acre lot.

Tupper Lake HA

52021-12-09 2013-0270B Deyo, Todd Proposed expansion of mining limits and relocation of current stock pile area within the previously approved Life of Mine area.

AuSable LI

12021-12-09 2021-0222 Clarke, Scott Construction of a single-family dwelling as conditioned by Permit 81-193.Harrietstown LI

12021-12-09 2021-0226 Borstein, Elena A subdivision of 25 acres into two lots. Lot 1A will be 14 acres in size and is developed by a pre-existing single-family dwelling. Lot 1B will be 11 acres in size, is vacant and will be developed by a single-family dwelling to be served by an individual well water supply and on-site wastewater treatment system. Both lots have frontage on NYS Route 9N and shoreline on the Boquet River, a designated Recreational River in this area.

Elizabethtown RU

22021-12-13 2020-0111 New Cingular Wireless P Installation of a 130-foot-tall monopole tower to be concealed as a 135-foot-tall simulated tree. The tower will support cellular antennas at the 126-foot centerline height with associated equipment. Access to the tower will be along a 591-foot-long extension of an existing driveway.

Lake Luzerne RU

32021-12-13 2021-0166 Krause, Dorothy B. Variance request for expansion of an existing single-family dwelling on Star Lake, increasing the footprint of the dwelling by 176 square feet and being 32.6 feet from Star Lake at its closest point.

Fine LI

12021-12-13 2021-0221 VanValkenburg, Joseph Two-lot subdivision creating a 31.561-acre lot and a 2.284-acre lot, both to be improved by single-family dwellings with related development.

Forestport HA

Wednesday, January 5, 2022 Page 23 of 24

Page 24: Permits Issued 1/1/21 to 12/31/21

SchedulePermit issued Number Applicant Town DescriptionLUA

12021-12-13 2021-0238 Barney, Paul A. Proposed construction of a single-family dwelling on a sub-standard-sized lot in a Moderate Intensity Use land use area.

Schroon MI

52021-12-14 2008-0214A T-Mobile Northeast LLC GP2005G-3R for the removal of three (3) antennas, three (3) Bias-Ts, three (3) antenna mounts, and four (4)coax cables; installation of three (3) new antenna mounts; installation of six (6) new antennas; installation of three (3) RRHs; installation of one (1) hybrid cable; and relocation of three (3) TMAs.

Chester RM

62021-12-17 2021-0162 Warren County DPW GP2002G-3AAR for minor impacts to wetlands related to the re-construction of Olmstead Road.

Chester LI

12021-12-23 2021-0140 Adirondack Mt Land, LLC Two-lot subdivision of the Resource Management portion of Parcel 4 to create Lot 1 and Lot 2; the construction of two single family dwellings on Lot 1 and Lot 2; and the after-the-fact authorization of the Rural Use portion of Parcel 4.

Stony Creek RU

22021-12-29 2021-0202 Tirrito, Louis A five-lot subdivision to create a 63-acre lot and four building lots as follows: 5.8 acres, 5.9 acres, 6.1 acres and 15 acres. The four building lots will each be developed by one single family dwelling with on-site wastewater treatment system and individual well water supply. No development is currently proposed for the 63-acre lot.

Ohio RU

22021-12-29 2021-0237 Adirondack Public Observ Development on the site of the Adirondack Public Observatory, including installation of a one-way crusher run driveway extension, stone dust sidewalk, and additional parking area with connection to North Little Wolf Road; construction of the Astro Science Center (14,100± SF) and Research Telescope Building (759± SF); and tree planting on the site and on the Town of Tupper Lake property across the road.

Tupper Lake MI

22021-12-29 2021-0251 Dual Development LLC Replacement of an existing 73-unit hotel building with a new hotel building that is 53 feet in overall height and contains 185 guest rooms.

North Elba HA

12021-12-29 2021-0283 Burns, Chad Two-lot subdivision involving wetlands.Ohio RU

Wednesday, January 5, 2022 Page 24 of 24