performing online simulations_spd
TRANSCRIPT
-
8/14/2019 Performing Online Simulations_SPD
1/37
System Process DocumentPerforming Online Simulations
Department
Responsibility/Role
File Name 27637036.docRevision
Document Generation Date 15/01/2010 09:51:00
Date Modified 1/15/2010 09:51:00 AM
Last Changed by
Status
Performing Online Simulations
Trigger:
Concept
In this topic, you will perform online simulations.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/15/2010 09:51:00 AM Page 1
-
8/14/2019 Performing Online Simulations_SPD
2/37
System Process DocumentPerforming Online Simulations
Procedure
Step Action
1. Begin by navigating to the Online Planner Status page.
Click the Workbench link.
Page 2 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
3/37
System Process DocumentPerforming Online Simulations
Step Action
2. Use the Organizations page to select an instance:organization.
Last changed on: 1/15/2010 09:51:00 AM Page 3
-
8/14/2019 Performing Online Simulations_SPD
4/37
System Process DocumentPerforming Online Simulations
Step Action
3. Find organization TST:M1 TST:Seattle Manufacturing.
Click the vertical scrollbar.
Step Action
4. Click the TST:M1 TST:Seattle Manufacturing list item.
Page 4 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
5/37
System Process DocumentPerforming Online Simulations
Step Action
5. Click the OKbutton.
orPress [Alt+O].
Last changed on: 1/15/2010 09:51:00 AM Page 5
-
8/14/2019 Performing Online Simulations_SPD
6/37
System Process DocumentPerforming Online Simulations
Step Action
6. Click the Plans tab.
Step Action
7. Use the Navigator page, Plans tab to view and act on results from the
material/capacity plan.
Page 6 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
7/37
System Process DocumentPerforming Online Simulations
Step Action
8. Click the Plans tree item.
Last changed on: 1/15/2010 09:51:00 AM Page 7
-
8/14/2019 Performing Online Simulations_SPD
8/37
System Process DocumentPerforming Online Simulations
Step Action
9. Click the Const-Cp2 (Constrained Plan - Capacity) tree item.
Step Action
10. Click the Plan menu.
Page 8 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
9/37
System Process DocumentPerforming Online Simulations
Step Action
11. Click the Start Online Planner menu.
Last changed on: 1/15/2010 09:51:00 AM Page 9
-
8/14/2019 Performing Online Simulations_SPD
10/37
System Process DocumentPerforming Online Simulations
Step Action
12. Use the Note page to view the concurrent request ID of the online replan.
Step Action
13. Click the OKbutton.
orPress [Alt+O].
Page 10 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
11/37
System Process DocumentPerforming Online Simulations
Step Action
14. Click the OKbutton.
orPress [Alt+O].
Last changed on: 1/15/2010 09:51:00 AM Page 11
-
8/14/2019 Performing Online Simulations_SPD
12/37
System Process DocumentPerforming Online Simulations
Step Action
15. Use the Online Planner Status page to monitor the status of online planner
processing.
The page refreshes automatically.
Step Action
16. When Status becomes Ready for Planning, you can begin making changes for
online simulation.
Page 12 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
13/37
-
8/14/2019 Performing Online Simulations_SPD
14/37
System Process DocumentPerforming Online Simulations
Step Action
18. Return to Planner Workbench, Navigator page, Plans tab.
In this case, you will simulate adding a day of work to a resource.
Click the View By list.
Step Action
19. Click the Resources list item.
Page 14 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
15/37
System Process DocumentPerforming Online Simulations
Step Action
20. Click the Plans tree item.
Last changed on: 1/15/2010 09:51:00 AM Page 15
-
8/14/2019 Performing Online Simulations_SPD
16/37
System Process DocumentPerforming Online Simulations
Step Action
21. Click the Const-Cp2 (Constrained Plan - Capacity) tree item.
Step Action
22. Click the TST:M1 tree item.
Page 16 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
17/37
System Process DocumentPerforming Online Simulations
Step Action
23. Click the LABORtree item.
Last changed on: 1/15/2010 09:51:00 AM Page 17
-
8/14/2019 Performing Online Simulations_SPD
18/37
System Process DocumentPerforming Online Simulations
Step Action
24. Click the MOLDING (Plastic Injection Molding Department) tree item.
Step Action
25. Right-click the MOLDING (Plastic Injection Molding Department) tree item.
Page 18 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
19/37
System Process DocumentPerforming Online Simulations
Step Action
26. Click the Resources menu.
Last changed on: 1/15/2010 09:51:00 AM Page 19
-
8/14/2019 Performing Online Simulations_SPD
20/37
System Process DocumentPerforming Online Simulations
Step Action
27. Click the Resources menu.
Step Action
28. Use the Resources page to view resource information.
Page 20 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
21/37
System Process DocumentPerforming Online Simulations
Step Action
29. Click the Availability button.
orPress [Alt+A].
Last changed on: 1/15/2010 09:51:00 AM Page 21
-
8/14/2019 Performing Online Simulations_SPD
22/37
System Process DocumentPerforming Online Simulations
Step Action
30. Use the Resource Capacity page to view and create simulation changes for
resources.
Step Action
31. Click in the Update Mode field.
Page 22 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
23/37
System Process DocumentPerforming Online Simulations
Step Action
32. Click the Update Mode button.
Last changed on: 1/15/2010 09:51:00 AM Page 23
-
8/14/2019 Performing Online Simulations_SPD
24/37
System Process DocumentPerforming Online Simulations
Step Action
33. Use the Update Mode page to select values for field Update Mode.
Step Action
34. Click the Add Day list item.
Page 24 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
25/37
System Process DocumentPerforming Online Simulations
Step Action
35. Click the OKbutton.
orPress [Alt+O].
Step Action
36. Click the Start Date button.
Last changed on: 1/15/2010 09:51:00 AM Page 25
-
8/14/2019 Performing Online Simulations_SPD
26/37
-
8/14/2019 Performing Online Simulations_SPD
27/37
System Process DocumentPerforming Online Simulations
Step Action
38. Click the 6 button.
Step Action
39. Click the OKbutton.
Last changed on: 1/15/2010 09:51:00 AM Page 27
-
8/14/2019 Performing Online Simulations_SPD
28/37
-
8/14/2019 Performing Online Simulations_SPD
29/37
System Process DocumentPerforming Online Simulations
Step Action
41. Click the Shift button.
Step Action
42. Enter the desired information into the Capacity Units field. Enter "1".
Last changed on: 1/15/2010 09:51:00 AM Page 29
-
8/14/2019 Performing Online Simulations_SPD
30/37
System Process DocumentPerforming Online Simulations
Step Action
43. Click the Apply button.
orPress [Alt+A].
Page 30 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
31/37
System Process DocumentPerforming Online Simulations
Step Action
44. Click the Close page object.
Step Action
45. Click the Close page object.
Last changed on: 1/15/2010 09:51:00 AM Page 31
-
8/14/2019 Performing Online Simulations_SPD
32/37
System Process DocumentPerforming Online Simulations
Step Action
46. Click the Plan menu.
Page 32 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
33/37
System Process DocumentPerforming Online Simulations
Step Action
47. Click the Online Replan menu.
Step Action
48. The Online Planner Status page reappears.
The online planner begins replanning.
Last changed on: 1/15/2010 09:51:00 AM Page 33
-
8/14/2019 Performing Online Simulations_SPD
34/37
System Process DocumentPerforming Online Simulations
Step Action
49. When Status returns to Ready for Planning, the online planner has completed
replanning.
Page 34 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
35/37
System Process DocumentPerforming Online Simulations
Step Action
50. Click the Plan menu.
Step Action
51. Click the Stop Online Planner menu.
orPress [t].
Last changed on: 1/15/2010 09:51:00 AM Page 35
-
8/14/2019 Performing Online Simulations_SPD
36/37
System Process DocumentPerforming Online Simulations
Step Action
52. Click the OKbutton.
orPress [Alt+O].
Page 36 Last changed on: 1/15/2010 09:51:00 AM
-
8/14/2019 Performing Online Simulations_SPD
37/37
System Process DocumentPerforming Online Simulations
Step Action
53. The Status becomes Complete.
Step Action
54. You have successfully performed online simulations.
End of Procedure.