PerformanceManagementSelf-Assessment
1/24
Q1Choosethebestresponsethatrepresentsthestageof
developmentforyourprogram:-Always/AlmostAlways=You
explicitlydothisactivityorhavethiscapacityinplace.-Sometimes=Youexplicitlydothisorhavethecapacity,buthaveawaytogo.-Never/AlmostNever=Youdothisbarelyornotatall.Whatoccursis
nottheresultofanyexplicitstrategy.
Answered:10 Skipped:0
0% 20% 40% 60% 80% 100%
1.Astatedcommitmentexistsfro...
2.Performanceismanaged...
3.Managersaretrained
tomanage...
4.Managersareheld
accountabl...
5.Thereareincentives
for...
6.Aprocessormechanism
existsto...
7.Aprocessormechanism
existsto...
8.Aprocessormechanism
existsto...
9.Leadersnurtureanorganizati...
10.QIispracticed
widelyand...
11.Personnelandfinancialresources...
Never/AlmostNever
Sometimes Always/AlmostAlways
PerformanceManagementSelf-Assessment
2/24
1.Astatedcommitmentexistsfromhigh-levelleadershipforaperformancemanagementsystem
0%0
30%3
70%7
10
2.Performanceismanagedforatleastsomepriorityareasthatarecriticaltotheorganization’smissionandfunction
0%0
30%3
70%7
10
3.Managersaretrainedtomanageperformance
30%3
60%6
10%1
10
4.Managersareheldaccountablefordeveloping,maintaining,andimprovingtheperformancemanagementsystem
50%5
40%4
10%1
10
5.Thereareincentivesforperformanceimprovement
77.78%7
22.22%2
0%0
9
6.Aprocessormechanismexiststoalignthevariouscomponentsoftheperformancemanagementsystem(i.e.,performancestandards,measures,reports,andimprovementprocessesfocusonthesamethings)
33.33%3
55.56%5
11.11%1
9
7.Aprocessormechanismexiststoaligntheorganization’sperformancemanagementsystemwithyourstrategicplan
44.44%4
55.56%5
0%0
9
8.Aprocessormechanismexiststoalignyourperformanceprioritieswithyourbudget
66.67%6
22.22%2
11.11%1
9
9.Leadersnurtureanorganizationalculturefocusedonperformanceimprovement
11.11%1
66.67%6
22.22%2
9
10.QIispracticedwidelyandregularlyinthedepartment
11.11%1
77.78%7
11.11%1
9
11.Personnelandfinancialresourcesareassignedtoperformancemanagementfunctions
22.22%2
77.78%7
0%0
9
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
3/24
Q212.Performanceisactivelymanagedinthefollowingareas
(CHECKALLTHATAPPLY)Answered:9 Skipped:1
0% 20% 40% 60% 80% 100%
A.HealthStatus(e.g.,diabetes...
B.PublicHealth
Capacity...
C.HumanResource
Developmen...
D.DataandInformationSystems...
E.CustomerFocusandSatisfacti...
decisionsorsystem
changes)
F.FinancialSystems(e.g.,...
G.ManagementPractices(e.g.,...
H.ServiceDelivery
(e.g.,cli...
Never/AlmostNever
Sometimes Always/AlmostAlways
A.HealthStatus(e.g.,diabetesrates)
22.22%2
44.44%4
33.33%3
9
B.PublicHealthCapacity(e.g.,communitiesservedbyahealthdepartmentorprogram)
22.22%2
66.67%6
11.11%1
9
C.HumanResourceDevelopment(e.g.,workforcetrainingincorecompetencies)
11.11%1
77.78%7
11.11%1
9
D.DataandInformationSystems(e.g.,injuryreportlagtime,participationinintranetreportsystem)
22.22%2
55.56%5
22.22%2
9
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
4/24
E.CustomerFocusandSatisfaction(e.g.,useofcustomer/stakeholderfeedbacktomakeprogram
11.11%1
55.56%5
33.33%3
9
decisionsorsystemchanges)
0%0
100%1
0%0
1
F.FinancialSystems(e.g.,frequencyoffinancialreports,reportsthatcategorizeexpensesbystrategicpriorities)
11.11%1
22.22%2
66.67%6
9
G.ManagementPractices(e.g.,communicationofvisiontoemployees,projectscompletedontime)
11.11%1
77.78%7
11.11%1
9
H.ServiceDelivery(e.g.,clinicno-showrates)
11.11%1
44.44%4
44.44%4
9
PerformanceManagementSelf-Assessment
5/24
Q313.Regardingtheareaslistedabove:
Answered:9 Skipped:1
0% 20% 40% 60% 80% 100%
Thereisateam
responsibl...
Never/AlmostNever
Sometimes Always/AlmostAlways
Thereisateamresponsibleforintegratingperformancemanagementeffortsacrossalltheareas
44.44%4
33.33%3
22.22%2
9
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
6/24
Q4Choosetheresponsethatisclosesttoyourprogram'sstageof
development:Answered:9 Skipped:1
PerformanceManagementSelf-Assessment
7/24
0% 20% 40% 60% 80% 100%
1.Performancestandards...
2.Specificperformancetargetsar...
3.Managersandemployees
areheld...
4.Therearedefined
processes...
4A.Nationalperformancestandards,...
4B.Theorganization
uses...
4C.Scientific
guidelines...
4D.Theorganization
sets...
4E.Theorganization’sstandard...
5.Theorganization'sperforma...
5A.Individual
performanc...
5B.Theorganization
relates...
6.Standardsandtargetsareregula...
7.Theorganizationcoordinate...
8.Trainingisavailabletohelpst...
9.Personnelandfinancialresources...
Never/AlmostNever
Sometimes Always/AlmostAlways
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
8/24
1.Performancestandardsareusedandrelevanttotheorganization’sactivities
11.11%1
55.56%5
33.33%3
9
2.Specificperformancetargetsaresettobeachievedinacertaintimeperiod
11.11%1
66.67%6
22.22%2
9
3.Managersandemployeesareheldaccountableformeetingstandardsandtargets
22.22%2
66.67%6
11.11%1
9
4.Therearedefinedprocessesandmethodsforchoosingperformancestandards,indicators,ortargets.
33.33%3
55.56%5
11.11%1
9
4A.Nationalperformancestandards,indicators,andtargetsareusedwhenpossible(e.g.,NationalPublicHealthPerformanceStandards,LeadingHealthIndicators,HealthyPeople2020)
0%0
77.78%7
22.22%2
9
4B.Theorganizationusesbenchmarksagainstsimilarorganizations
55.56%5
44.44%4
0%0
9
4C.Scientificguidelinesareused
0%0
88.89%8
11.11%1
9
4D.Theorganizationsetspriorities
11.11%1
55.56%5
33.33%3
9
4E.Theorganization’sstandardscoveramixofcapacities,processes,andoutcomes
11.11%1
55.56%5
33.33%3
9
5.Theorganization'sperformancestandards,indicators,andtargetsarecommunicatedthroughouttheorganizationanditsstakeholdersorpartners
22.22%2
77.78%7
0%0
9
5A.Individualperformanceexpectationsareregularlycommunicated
11.11%1
55.56%5
33.33%3
9
5B.Theorganizationrelatesperformancestandardstorecognizedpublichealthgoalsandframeworks,(e.g.,EssentialPublicHealthServices)
33.33%3
66.67%6
0%0
9
PerformanceManagementSelf-Assessment
9/24
6.Standardsandtargetsareregularlytestedtoassuretheyareunderstood
44.44%4
55.56%5
0%0
9
7.Theorganizationcoordinatesregularlysomultipleprograms,divisions,ororganizationsusethesameperformancestandardsandtargets(e.g.,samechildhealthstandardisusedacrossprogramsandagencies)
33.33%3
66.67%6
0%0
9
8.Trainingisavailabletohelpstaffuseperformancestandards
77.78%7
22.22%2
0%0
9
9.Personnelandfinancialresourcesareassignedtomakesureeffortsareguidedbyrelevantperformancestandardsandtargets
44.44%4
44.44%4
11.11%1
9
Notes:(1)
PerformanceManagementSelf-Assessment
10/24
Q5Choosetheresponsethatisclosesttoyourprogram'sstageof
development:Answered:9 Skipped:1
0% 20% 40% 60% 80% 100%
1.Theorganizationusesspeci...
1A.Everymeasurehasa
clear...
1B.Eachquantitative
measureha...
1C.Interraterreliabilit...
2.Measuresareselected
in...
3.Therearedefined
methodsan...
3A.Existingsourcesofdataareu...
3B.Standardizedmeasures...
3C.Measurescoveramix
of...
4.Dataarecollectedfor
themeasures
5.Trainingisavailabletohelpst...
6.Personnelandfinancialresources...
Never/AlmostNever
Sometimes Always/AlmostAlways
1.Theorganizationusesspecificmeasuresforallormostoftheestablishedperformancestandardsandtargets
11.11%1
44.44%4
44.44%4
9
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
11/24
1A.Everymeasurehasacleardefinition
22.22%2
44.44%4
33.33%3
9
1B.Eachquantitativemeasurehasaclearunitofmeasuredefined
22.22%2
22.22%2
55.56%5
9
1C.Interraterreliabilityhasbeenestablishedforqualitativemeasures
55.56%5
44.44%4
0%0
9
2.Measuresareselectedincoordinationwithotherprograms,divisions,ororganizationstoavoidduplicationofdatacollection
44.44%4
55.56%5
0%0
9
3.Therearedefinedmethodsandcriteriaforselectingperformancemeasures
22.22%2
66.67%6
11.11%1
9
3A.Existingsourcesofdataareusedwheneverpossible
0%0
11.11%1
88.89%8
9
3B.Standardizedmeasures(e.g.,nationalprogramorhealthindicators)areusedwheneverpossible
0%0
44.44%4
55.56%5
9
3C.Measurescoveramixofcapacities,processes,andoutcomes
0%0
55.56%5
44.44%4
9
4.Dataarecollectedforthemeasures
0%0
33.33%3
66.67%6
9
5.Trainingisavailabletohelpstaffmeasureperformance
55.56%5
33.33%3
11.11%1
9
6.Personnelandfinancialresourcesareassignedtocollectperformancemeasurementdata
11.11%1
66.67%6
22.22%2
9
Notes:(1)
PerformanceManagementSelf-Assessment
12/24
Q6Choosetheresponsethatisclosesttoyourprogram'sstageof
development:Answered:8 Skipped:2
0% 20% 40% 60% 80% 100%
1.Theorganizationdocuments...
2.Managersatalllevelsareheld...
2A.Thereisaclearplan
forthe...
2B.Reportingofprogressispartof...
3.Theorganization
hasa...
4.Trainingisavailabletohelpst...
5.Reportsaretestedso
people...
6.Personnelandfinancialresources...
Never/AlmostNever
Sometimes Always/AlmostAlways
1.Theorganizationdocumentsprogressrelatedtoperformancestandardsandtargets
12.50%1
62.50%5
25%2
8
2.Managersatalllevelsareheldaccountableforreportingperformance
12.50%1
12.50%1
75%6
8
2A.Thereisaclearplanforthereleaseofthesereports(i.e.,whoisresponsible,methods,howoften)
25%2
37.50%3
37.50%3
8
2B.Reportingofprogressispartoftheorganization’sstrategicplanningprocess
12.50%1
12.50%1
75%6
8
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
13/24
3.Theorganizationhasareportingsystemthatintegratesperformancedatafromprograms,agencies,divisions,ormanagementareas(e.g.,financialsystems,healthoutcomes,customerfocusandsatisfaction)
25%2
62.50%5
12.50%1
8
4.Trainingisavailabletohelpstaffeffectivelyanalyzeandreportperformancedata
62.50%5
25%2
12.50%1
8
5.Reportsaretestedsopeopleunderstandthemandcanusethemfordecision-making
50%4
37.50%3
12.50%1
8
6.Personnelandfinancialresourcesareassignedtoanalyzeperformancedataandreportprogress
12.50%1
62.50%5
25%2
8
Notes:(1)
PerformanceManagementSelf-Assessment
14/24
Q77.Performanceinformationisregularlymadeavailabletothe
following(CHECKALLTHATAPPLY)Answered:8 Skipped:2
0% 20% 40% 60% 80% 100%
A.Managersandleaders
B.Staff
C.Governanceboardsand
policymakers
D.Stakeholdersorpartners
E.Thepublic,
including...
Never/AlmostNever
Sometimes Always/AlmostAlways
A.Managersandleaders
12.50%1
12.50%1
75%6
8
B.Staff 12.50%1
87.50%7
0%0
8
C.Governanceboardsandpolicymakers
25%2
62.50%5
12.50%1
8
D.Stakeholdersorpartners
25%2
75%6
0%0
8
E.Thepublic,includingmedia
25%2
75%6
0%0
8
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
15/24
Q88.Adecisionhasbeenmadeonthefrequencyofanalysisand
reportingonperformanceprogressforthefollowingtypesofmeasures
(CHECKALLTHATAPPLY)Answered:8 Skipped:2
0% 20% 40% 60% 80% 100%
A.HealthStatus
B.PublicHealth
Capacity
C.HumanResource
Development
D.DataandInformation
Systems
E.CustomerFocusandSatisfaction
F.FinancialSystems
G.ManagementPractices
H.ServiceDelivery
Never/AlmostNever
Sometimes Always/AlmostAlways
A.HealthStatus 12.50%1
37.50%3
50%4
8
B.PublicHealthCapacity
62.50%5
37.50%3
0%0
8
C.HumanResourceDevelopment
12.50%1
75%6
12.50%1
8
D.DataandInformationSystems
37.50%3
50%4
12.50%1
8
E.CustomerFocusandSatisfaction
0%0
37.50%3
62.50%5
8
F.FinancialSystems 0%0
25%2
75%6
8
G.ManagementPractices
62.50%5
37.50%3
0%0
8
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
17/24
Q9Choosetheresponsethatisclosesttoyourprogram'sstageof
development:Answered:8 Skipped:2
0% 20% 40% 60% 80% 100%
1.Aprocessexiststo
improve...
1A.Thereisanentityorperson...
1B.Thereisaregular
timetable...
1C.Thestepsinthe
processar...
2.Managersandemployees
areevalua...
3.Performancereportsar...
4.Theorganization
hasthe...
4A.Processesexistto
manage...
4B.Managershavethe
authority...
4C.Staffhavethe
authority...
5.Theorganizationregularly...
6.Thereisaprocessor
mechanism...
7.QItrainingisavailable...
8.Personnelandfinancialresources...
Never/AlmostNever
Sometimes Always/AlmostAlways
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
18/24
1.Aprocessexiststoimprovequalityorperformance
12.50%1
62.50%5
25%2
8
1A.Thereisanentityorpersonresponsiblefordecisionmakingbasedonperformancereports(ex.,topmanagementteam,governingoradvisoryboard)
25%2
37.50%3
37.50%3
8
1B.ThereisaregulartimetableforyourQIprocess
25%2
62.50%5
12.50%1
8
1C.Thestepsintheprocessarecommunicated
37.50%3
62.50%5
0%0
8
2.Managersandemployeesareevaluatedfortheirperformanceimprovementefforts(ex.,performanceimprovementisintheirjobdescriptions)
12.50%1
75%6
12.50%1
8
3.Performancereportsareusedregularlyfordecision-making
12.50%1
75%6
12.50%1
8
4.Theorganizationhasthecapacitytotakeactiontoimproveperformancewhenneeded
0%0
62.50%5
37.50%3
8
4A.Processesexisttomanagechangesinpolicies,programs,orinfrastructure
25%2
62.50%5
12.50%1
8
4B.Managershavetheauthoritytomakecertainchangestoimproveperformance
12.50%1
25%2
62.50%5
8
4C.Staffhavetheauthoritytomakecertainchangestoimproveperformance
12.50%1
75%6
12.50%1
8
5.TheorganizationregularlydevelopsperformanceimprovementorQIplansthatspecifytimelines,actions,andresponsibleparties
25%2
75%6
0%0
8
6.ThereisaprocessormechanismtocoordinateQIeffortsamongprograms,divisions,ororganizationsthatsharethesameperformancetargets
25%2
75%6
0%0
8
7.QItrainingisavailabletomanagersandstaff
87.50%7
12.50%1
0%0
8
PerformanceManagementSelf-Assessment
19/24
8.Personnelandfinancialresourcesareallocatedtotheorganization’sQIprocess
12.50%1
50%4
37.50%3
8
Notes:(1)
PerformanceManagementSelf-Assessment
20/24
Q109.Performanceinformationisusedtodothefollowing(CHECKALL
THATAPPLY)Answered:8 Skipped:2
0% 20% 40% 60% 80% 100%
A.Determineareasfor
moreanaly...
B.Setpriorities
and...
C.Informpolicymakers
ofthe...
Never/AlmostNever
Sometimes Always/AlmostAlways
A.Determineareasformoreanalysisorevaluation
12.50%1
62.50%5
25%2
8
B.Setprioritiesandallocate/redirectresources
12.50%1
62.50%5
25%2
8
C.Informpolicymakersoftheobservedorpotentialimpactofdecisionsundertheirconsideration
37.50%3
62.50%5
0%0
8
Never/AlmostNever Sometimes Always/AlmostAlways
Total
PerformanceManagementSelf-Assessment
21/24
75% 6
50% 4
87.50% 7
87.50% 7
62.50% 5
50% 4
Q11WhichPublicHealthAccreditationBoard(PHAB)domainsdotheactivitiesofyourprogram(s)address?(CHECKALLTHATAPPLY)
Answered:8 Skipped:2
0% 20% 40% 60% 80% 100%
Domain1:Conductanddisseminat...
Domain2:Investigate
health...
Domain3:Informand
educateab...
Domain4:Engagewith
thecommun...
Domain5:Develop
publichea...
Domain6:Enforce
publichea...
Domain7:Promote
strategies...
Domain8:Maintaina
competent...
Domain9:Evaluateandcontinuous...
Domain10:Contributetoandapply...
Domain11:Maintain
administra...
Domain12:Maintain
capacityt...
Domain1:Conductanddisseminateassessmentsfocusedonpopulationhealthstatusandpublichealthissuesfacingthecommunity
Domain2:Investigatehealthproblemsandenvironmentalpublichealthhazardstoprotectthecommunity
Domain3:Informandeducateaboutpublichealthissuesandfunctions
Domain4:Engagewiththecommunitytoidentifyandaddresshealthproblems
Domain5:Developpublichealthpoliciesandplans
Domain6:Enforcepublichealthlaws
TotalRespondents:TotalRespondents:88
Other(pleasespecify)Other(pleasespecify)((00))
AnswerChoices Responses
PerformanceManagementSelf-Assessment
22/24
87.50% 7
87.50% 7
100% 8
87.50% 7
87.50% 7
50% 4
Domain7:Promotestrategiestoimproveaccesstohealthcareservices
Domain8:Maintainacompetentpublichealthworkforce
Domain9:Evaluateandcontinuouslyimprovehealthdepartmentprocesses,programs,andinterventions
Domain10:Contributetoandapplytheevidencebaseofpublichealth
Domain11:Maintainadministrativeandmanagementcapacity
Domain12:Maintaincapacitytoengagethepublichealthgoverningentity
TotalRespondents:TotalRespondents:88
Other(pleasespecify)Other(pleasespecify)((00))
PerformanceManagementSelf-Assessment
23/24
12.50% 1
12.50% 1
12.50% 1
12.50% 1
12.50% 1
12.50% 1
12.50% 1
12.50% 1
25% 2
12.50% 1
Q12Whatprogram(s)areyousubmittingthissurveyonbehalfof
(CHECKALLTHATAPPLY)?Answered:8 Skipped:2
0% 20% 40% 60% 80% 100%
Administration
BirthandDeath
Certificates
Epi/Preparedness
HealthPromotion
IDClinic&Research(clinical)
ImmunizationClinic
Pharmacy
PHIG
STD/HIVPrevention
andContro...
TBClinic
Administration
BirthandDeathCertificates
Epi/Preparedness
HealthPromotion
IDClinic&Research(clinical)
ImmunizationClinic
Pharmacy
PHIG
STD/HIVPreventionandControl(STDClinic,HIVPrevention&Outreach,PTC,LTC,andBehavioralSurveillance/Research)
TBClinic
TotalRespondents:TotalRespondents:88
Other(pleasespecify)Other(pleasespecify)((11))
AnswerChoices Responses
PerformanceManagementSelf-Assessment
24/24
37.50% 3
25% 2
62.50% 5
25% 2
50% 4
25% 2
12.50% 1
12.50% 1
Q13Whatstaffwereinvolvedwithcompletingthesurvey(CHECKALL
THATAPPLY)Answered:8 Skipped:2
0% 20% 40% 60% 80% 100%
Director/Associate
Director/A...
ProgramDirector
ProgramManager
ClinicalCoordinator
Clinic/Program
Administrator
ProgramCoordinator
ProgramSupervisor
ContractAdministrator
s
Director/AssociateDirector/AdministrativeDirector
ProgramDirector
ProgramManager
ClinicalCoordinator
Clinic/ProgramAdministrator
ProgramCoordinator
ProgramSupervisor
ContractAdministrators
TotalRespondents:TotalRespondents:88
Other(pleasespecify)Other(pleasespecify)((22))
AnswerChoices Responses