performance evaluation of roundabouts for traffic delay and crash reductions in oxford
DESCRIPTION
Performance Evaluation of Roundabouts for Traffic Delay and Crash Reductions in Oxford. Mississippi department of transportation State Study 213. Waheed Uddin, PhD., P.E. Professor and Director, CAIT Center for Advanced Infrastructure Technology Department of Civil Engineering - PowerPoint PPT PresentationTRANSCRIPT
Waheed Uddin, PhD., P.E.Professor and Director, CAIT
Center for Advanced Infrastructure Technology Department of Civil Engineering
The University of Mississippihttp://www.olemiss.edu/projects/cait/Index.html
Performance Evaluation of Roundabouts for Traffic Delay and
Crash Reductions in Oxford
M I S S I S S I P P I D E PA RT M E N T O F T R A N S P O RTAT I O N
S TAT E S T U D Y 2 1 3
2
Task 1 ─ Collect and Review Pre-roundabout Data Historical traffic and historical crash data – Provided by MDOT Prior studies –Traffic and Planning Studies (Completed by Neel-Schaffer on behalf of MDOT) Plans - (Provided by MDOT)
Task 2 ─ Collect and Analyze Post-roundabout Data Current available traffic and crash data – Provided by MDOT On-site traffic data collection – completed by engineering students Traffic analysis of current traffic data – completed by Graduate student
Task 3 ─ Conduct Road Users’ and Public Survey Anonymous on-site and telephone surveys
Task 4 ─ Submit and Present Interim Report Task 5 ─ Finalize Data Collection, Complete Analysis, and Evaluate Results Task 6 ─ Final Report
Project Overview
The overall goal of this study is to assess the performance of a double roundabout interchange at the South Lamer Boulevard Exit on Highway 6 with respect to traffic
flow, capacity, safety improvements, benefit/cost, and public opinion.
3
Highway 6 and South Lamar Avenue Interchange
Prior to the roundabout construction the interchange experienced extreme delay, was a safety concern, and was projected to exceed capacity limitation by 2016.
Planned roundabouts on South Lamar Blvd.
(courtesy of James Sullivan, MDOT)
Current roundabout on South Lamar Blvd.(Google Earth)
The signalized and stop controlled intersections were replaced with a double
roundabout interchange, a full roundabout on one side and a teardrop shape on the other.
0
500
1000
1500
2000
2500
7:00 8:00 9:00 10:00 11:00 12:00 1:00 2:00 3:00 4:00 5:00 6:00
Veh
icle
s p
er H
our
Hour
Total Vehicles per Hour for North and South Bound
Total VPH North Bound
Total VPH South Bound
Total VPH
AM PM
Traffic DataIntersection of Hwy 6
Ramps and South Lamar Avenue
Collected by The University of Mississippi Engineering Students
Dates of Collection: October 12 – 17, 2009
Collection time: 7:00 AM to 7:00 PM
Collection intervals: 15 minute
Vehicle Class Distribution: Motorcycle, Truck, Bus, Passenger Car
Delay and Speed Results Queuing Results
Traffic Analysis Resultsfrom microsimulation software
Environmental Impacts of Roundabouts Decrease in vehicular
emissions and fuel consumption by reducing idling time at intersection
Vehicles stopping at traffic signals and stop signs emit more CO2 when compared to vehicles at roundabouts as the delay and queuing are greater
When vehicles are idle in a queue they emit about 7 times as much CO as vehicles traveling at 10 mph. The emissions from a stopped vehicle are about 4.5 times greater than a vehicle moving at 5 mph [environmental impacts of modern roundabouts]
Air Pollutant Stop - Controlled Intersection Roundabout IntersectionVOC emissions (g/hr) 6,030 1,399CO emissions (g/hr) 89,535 20,779
NOx emissions (g/hr) 4,484 1,041PM10 emissions (g/hr) 439 101
Air Pollutant Emissions For Pre- and Post - Roundabout*
* Emission values based on traffic data and speeds from Microsimulation Software.
g/veh/miEmission Rates by Speed and LOS for Light-Duty Vehicles and Trucks
25 Contact Points 7 Contact Points
What Makes Roundabouts Safer?
Stop Controlled Intersection
Roundabout
• Less Contact Points• Lower Travel Speeds• Geometry
• Calmer Drive
0
2
4
6
8
10
12
2004 2005 2006 2007 2008
Num
ber
of C
rash
es
Year
Crash Data for the Highway 6 and South Lamar Intersection
5am - 5pm 5pm- 5am
AM and PM Crash DataCrash Reduction Pre- and Post- Roundabout
Crash data for Highway 6 and South Lamar Interchange
0
1
2
3
4
5
6
Pre-Roundabout Post-Roundabout
Ave
rage
Nu
mb
er o
f C
rash
es p
er 6
Mon
ths
Average Number of Crashes per Half a Year Pre- and Post- Roundabout
JH_Oxford_Crash_Data_SL.xls Jessica Headrick_9.11.09
1
Post- Roundabout
The t-test concludes that the installment of the roundabouts do have a significant effect on the number of crashes reduced.
Daytime crashes were significantly reduced in the first year of the roundabout opening to traffic.
Public Opinion Survey
Locations of collection: On-site at two convenience
stores adjacent to the roundabouts
Random telephone and e-mail surveys
Factors: Age
Familiarity
Favorability
Results showed overwhelming approval of the roundabouts and support construction of more roundabouts.
Respondents commented…to install improved signage including flashing lights and additional pavement markings, especially at the south roundabout.
10
Performance Analysis of Roundabouts
Since the replacement of the signal controlled interchange with the roundabout interchange:
Driver delay has reduced by 24%. Driver idling time has reduced by 77%. Driver fuel wastage has reduced by 56%. Travel time through the interchange has
increased by 67%, saving drivers approximately $806,018 annually*.
Crashes and crash related injuries have been significantly reduced savings an annual comprehensive cost of $86,008 U.S. dollars.
Drivers favor the roundabouts over the signalized intersections at this location.
*Annual total of all vehicles through the interchange.