PENNDOT PROJECT INFORMATION

Brady’s Run Road

Slope Stability ProjectSR 4012, Section B10

Brighton Township, Beaver County

Page 2: PENNDOT PROJECT INFORMATION · 2018. 5. 29. · Dan Bliss, P. E. - Project Manager at 412.429.4943 or dbliss@pa.gov John Jordan- Assistant Geotechnical Project Manager TJ. yler Merce

PROJECT TEAM

Design Division

Direct questions to:

Dan Bliss, P. E. - Project Manager at 412.429.4943 or [email protected]

John Jordan- Assistant Geotechnical Project Manager

J. Tyler Mercer, P. E. - Assistant District Environmental Manager

Press Office

Steve Cowan - District Press Officer

Please complete survey at end of presentation

Page 3: PENNDOT PROJECT INFORMATION · 2018. 5. 29. · Dan Bliss, P. E. - Project Manager at 412.429.4943 or dbliss@pa.gov John Jordan- Assistant Geotechnical Project Manager TJ. yler Merce

PURPOSE OF PRESENTATION & PROJECT INTRODUCTION

SR 4012, Section B10 (Brady’s Run Road) Slope Stability Project

The purpose of this presentation is to introduce the project to the public and gather feedback

The purpose of the project is to reestablish Brady’s Run Road between Achortown Road and South Drive in Brighton Township, Beaver County

Landslide repairs on right lane headed eastbound

Roadway and guide rail work

Page 5: PENNDOT PROJECT INFORMATION · 2018. 5. 29. · Dan Bliss, P. E. - Project Manager at 412.429.4943 or dbliss@pa.gov John Jordan- Assistant Geotechnical Project Manager TJ. yler Merce

PROPOSED PROJECT IMPROVEMENTS

Reconstruct the embankment with a 13-foot tall Geosynthetic Reinforced Soil (GRS) slope on top of a 1.5:1 rock slope.

Landslide repair includes reconstruction of the lane and shoulder on the embankment side of the road with milling and resurfacing of the lane and shoulder on the cut slope side. The reconstruction length is approximately 500 feet.

Construction is expected to take place in Spring of 2019.

Right-of-way required from Bradys Run Park

0.4961 acres of permanent ROW.

0.1175 acres of Temporary Construction Easement

Page 6: PENNDOT PROJECT INFORMATION · 2018. 5. 29. · Dan Bliss, P. E. - Project Manager at 412.429.4943 or dbliss@pa.gov John Jordan- Assistant Geotechnical Project Manager TJ. yler Merce

RIGHT-OF-WAY

Required Right-of-Way

Temporary ConstructionEasement

Page 7: PENNDOT PROJECT INFORMATION · 2018. 5. 29. · Dan Bliss, P. E. - Project Manager at 412.429.4943 or dbliss@pa.gov John Jordan- Assistant Geotechnical Project Manager TJ. yler Merce

RIGHT-OF-WAY

Required Right-of-Way

Temporary ConstructionEasement

Page 8: PENNDOT PROJECT INFORMATION · 2018. 5. 29. · Dan Bliss, P. E. - Project Manager at 412.429.4943 or dbliss@pa.gov John Jordan- Assistant Geotechnical Project Manager TJ. yler Merce

PROPOSED DETOUR

When coming from Constitution Boulevard traveling Southbound

Continue past Brady’s Run Road

Right onto Wildwood Drive

Right onto Dutch Ridge Road

Continue onto Park Road

Detour Length: approximately 5.5 miles (12 minutes)

Wildwood Dr.

Constitution Blvd.

Dutch Ridge Rd.

Park Rd.

Project Location

Page 9: PENNDOT PROJECT INFORMATION · 2018. 5. 29. · Dan Bliss, P. E. - Project Manager at 412.429.4943 or dbliss@pa.gov John Jordan- Assistant Geotechnical Project Manager TJ. yler Merce

PROPOSED DETOUR

When coming from Brady’s Run Road traveling Eastbound

Right onto Park Road

Continue onto Dutch Ridge Road

Left onto Wildwood Drive

Left onto Constitution Boulevard

When coming from Constitution Boulevard traveling Northbound

Left onto Wildwood Drive

Right onto Dutch Ridge Road

Continue onto Park Road

Page 10: PENNDOT PROJECT INFORMATION · 2018. 5. 29. · Dan Bliss, P. E. - Project Manager at 412.429.4943 or dbliss@pa.gov John Jordan- Assistant Geotechnical Project Manager TJ. yler Merce

NATIONAL ENVIRONMENTAL POLICY ACT (NEPA)

The transportation decision making process includes feedback from the public. In addition, public outreach is part of the NEPA (National Environmental Policy Act) process:

NEPA requires agencies to integrate environmental values into their decision-making processes by considering the environmental impacts of their proposed actions and reasonable alternatives to those actions

NEPA also includes public involvement activities and gathering feedback from the public

Image courtesy of MDOT

Page 11: PENNDOT PROJECT INFORMATION · 2018. 5. 29. · Dan Bliss, P. E. - Project Manager at 412.429.4943 or dbliss@pa.gov John Jordan- Assistant Geotechnical Project Manager TJ. yler Merce

PROJECT SURVEY

https://www.surveymonkey.com/r/XFDX5B8