  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    1/33

    Thames Tunnel

    Preliminary environmentalinformation report

    FiguresVolume 18: Heathwall Pumping Station siteassessment

    Regulations 2 and 10 of the Infrastructure Planning(Environmental Impact Assessment) Regulations 2009

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    2/33

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    3/33

    !!!!

    !!

    !!

    WANDSWORTH

    CITY OF WESTMINSTER

    LAMBETHPO

    NTON

    ROAD

    NINEE

    LMSL

    ANE

    GROSVENORROAD

    CRINGLESTREET

    POSTO

    FFICEW

    AY

    PASCALSTREET

    CLAVERTONSTREET

    KIRTLIN

    GSTREET

    BATT

    ERSE

    APAR

    KROA

    D

    STGEORGE'SSQUARE

    BRAMLEYCRESCENT

    STGEORGE'SSQUARE

    NINE

    ELM

    SLANE

    GROSVENORROAD

    Vol 18 Figure 2.1.1for PEIR

    Heathwall PSSite Location Plan

    Title:

    Map Ref : ...................... ...... 1PL03-MG-00339Date : ............................ ...... 2011/10/10Projection : ............... ........... British National Grid

    0 25 50 75 100 12512.5

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued

    incomplete in any way.

    Area ofmain map

    The Point, 7thFloor,

    37NorthWharf Road,Paddington,LondonW21AF

    Thames Water Utilities

    Legend

    !! Photo LocationDraft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Looking northeast from within the pumping station site

    Looking south from the river towards Middle Wharfand the pumping station

    Looking west along the river

    Looking north towards the pumping station acrossNine Elms Lane

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    4/33

    LAMBETH

    WANDSWORTH

    CITY OF WESTMINSTER

    PONT

    ONROAD

    NINE

    ELMS

    LANE

    GROSVENORROAD

    CRINGLESTREET

    POSTO

    FFICEW

    AY

    PASCALSTREET

    CLAVERTONSTREET

    KIRTLIN

    GSTR

    EET

    BATT

    ERSE

    APAR

    KROA

    D

    STGEORGE'SSQUARE

    BRAMLEYCRESCENT

    STGEORGE'SSQUARE

    Vol 18 Figure 2.2.1for PEIR

    Heathwall Pumping StationEnvironment Setting

    Title:

    Map Ref : ........................ .... 1PL03-MG-00316Date : ............ .................. .... 2011/09/07Projection : ................ .......... British National Grid

    0 25 50 75 100 12512.5

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued

    incomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    Legend

    Draft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    Conservation Area

    Listed Building

    Tree Preservation Order

    Sites of Importance for NatureConservation (SINC)

    ! Metropolitan Importance

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    5/33

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    6/33

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    7/33

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    8/33

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    9/33

    !(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(

    !(

    Albert 4

    Nine Elms 7

    Chelsea 3Chelsea 4

    Chelsea 5

    Nine Elms 6

    Nine Elms 4Nine Elms 3

    Nine Elms 5

    Nine Elms 2

    Nine Elms 1

    Albert 5Albert 3

    Albert 2

    Albert 1

    W3

    LB5

    Vol 18 Figure 4.4.1for PEIR

    Heathwall Pumping StationAir Quality and Odour -

    Air Quality Monitoring Locations

    Title:

    Map Ref : ........................ .... 1PL03-AQ-10082Date : ............ .................. .... 2011/09/30Projection : ................ .......... British National Grid

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be

    Acquired or Used

    !(Existing Local Authority

    Continuous Monitors

    !(Existing Local AuthorityDiffusion Tubes

    !(New Diffusion Tubes(Project)

    0 90 180 270 36045

    Metres

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    10/33

    Churchill

    1t o

    24

    1

    Chy

    Gardens

    Mud

    5.3m

    S h

    e r a

    t o n

    H o u s e

    T u n n

    e l

    MP

    rin P ts

    Post

    Chy

    t Depot

    th Lambeth)

    4.8m

    Drake House

    P O N T O N R

    O A D

    StGeorge'sWharf

    Jetty

    Shingl

    DFn

    Grosvenor Pier

    GrenvilleHo use

    12

    108

    5.1m

    Mud

    1to76

    Warehouse

    MeanH

    ighWa

    ter

    PrescotWharf

    Raleigh House

    POSTOF

    FICEWAY

    Tank

    MeanH

    ighWat

    er

    Crane

    ElmQu

    ay

    Middle Wharf

    NINEE

    LMSL

    ANE

    L

    Dinorvic Wharf

    GROSVE

    NORROA

    D

    22to

    50

    56

    4

    2

    FrobisherHouse

    136

    Pumping

    El SubSta

    Hopper

    SM

    3.3m

    SomersetWha

    Mud

    Westminster Boating Base

    Garage

    132

    102

    54

    El Sub

    123

    RiverTh

    ames

    4.8m

    Sh i n l

    MP

    Dolphin

    135

    52

    Dolphin

    Station

    6

    137

    SM

    Statue

    Tennis Court

    ULC

    4.8m

    Pimlico Gardens& Shrubbery

    Bourne alle a

    MP

    4.9m

    (PH)

    Navigation Light

    4

    Mud

    (fixed red)

    WB

    (fixed red)

    FB

    GARDENS ROAD

    Capstan

    HowardHo

    use

    Mud

    Capstans

    4.4m

    1 t o 9 7

    Dolphin

    Posts

    (fixed red)

    16

    1to19

    CringleDock

    1

    to42

    Dolphin

    Bollard

    1

    to42

    1 t o 7 0

    Navigation Light

    Navigation Light

    Dolphin

    Jetty

    King

    Bollard

    5.1m

    Shingle

    Mooring Posts

    Dolphin

    1

    Playground

    1 t o 9 7

    Navigation Light

    1to36

    Crane

    (fixed red)

    GROSVENOR ROAD

    FB

    Warehouse

    RefuseTran sfer

    1to62

    FB

    CHURCHILL

    Travelling

    Bollard

    92

    MaitlandHo

    useTyrre

    llHouse

    Shingle

    Station

    5.2m

    NelsonH

    ouse

    MP

    Mean High Water

    Churchill GardensHaw

    kinsHou

    se

    MPs

    88

    ChurchillGardens

    FB

    1 t o 9

    Darwin

    6 6

    TCB

    Depot

    House

    5.0m

    Post

    Pla y ground

    KeatsHouse

    109

    Navigation Light

    Post

    Tideway Industrial Est

    ate

    7

    W i l k

    i n s H

    o u s e

    MP

    11

    MPs

    Playground

    t o

    Shingle

    KIRTLING STREET

    Mooring Posts

    130

    Sorti

    ngOffi

    ce

    Posts

    Shingle

    R i p l e

    y H o u s e

    Moyle

    80

    Shelley

    House

    (fixed red)

    TCB

    RiverThames

    Whitley

    House

    1

    Bollards

    William IV

    3 3

    Posts

    129

    LB

    5.3m

    WB

    2d

    Hall

    Jetty

    7 6

    MP

    Hungerf

    ordHouse

    110a

    MP

    Dolphin

    (PH)

    House

    3.6m

    The

    94

    Pla y g

    round

    105

    MillP

    ondB

    ridge

    5.7m

    Posts

    Balmoral Castle

    1to36

    2a

    Works

    88

    Jetty

    5.3m

    RiverLodge

    A n s o n H o u s e

    Mean High Water

    Post

    CringleWharf

    1a

    Cn

    TelfordTerrace

    Jetty

    Mud

    1f

    Tank

    Viaduct

    Depot

    SM

    Sorting Office

    MP 2

    SM

    Warehouse

    42

    46

    PONT

    ONROAD

    Depot

    8

    WB

    CRINGLESTREET

    NINE ELMS

    K I R T L I N

    G S

    T R E E T

    4.1mEl SubSta PumpingStation

    Depot

    Depot

    3.5m

    4.2m(ThamesWater Board)

    3.9m

    3a 3b

    33

    Works

    5

    ElSubSta

    9

    10

    BrooksCourt

    TCBs

    4.2m

    3.7m

    El SubSta

    4

    1

    4.4m

    138

    t041

    4t02022to28

    1to14

    M ean

    H i g

    hW a

    ter

    MH& MLW

    Shelter

    Conveyor

    Tank

    87

    Cycle HireStation

    HireStation

    Cycle

    BoroC

    onst,

    GLAsl

    yCons

    t&LB

    Bdy

    CCLW

    CCLW

    Und

    WardB

    dy

    Boro Const, GL Asly Const &LB Bdy

    CR

    !

    !

    !

    !

    !

    !!

    !

    !

    !

    !

    !

    #*#*

    ")Q

    !( !(

    Kirtling Street

    Kirtling Street

    Heathwall Pumping Station

    529672,177700

    529552,177813

    529381,177791

    529145,177846

    529052,177784

    529052,177652

    Trawl2

    Trawl1

    SE1

    SE2

    AL2AL1

    SW1

    SW2

    CS17XCS16X

    Vol 17 Figure 5.4.1for PEIR

    Heathwall PS and Kirtling StAquatic Ecology

    Sampling Locations

    Title:

    Map Ref : ......................... ... 1PL03-AE-20025Date : .............................. .... 2011/10/03Projection : ................ .......... British National Grid

    0 40 80 12020

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,Paddington, London W2 1AF

    Thames Water Utilities

    Legend

    Draft Limit of Land to beAquired or Used

    !( CSO (Directly Controlled)

    Airlift

    ")Q Quadrat

    #* Sweep/Kick Sample

    ! Coordinates of Sampling Area

    Boat Fish Trawl

    ! ! Seine Netting

    Sampling Area for Fish andBenthic Invertebrates

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    11/33

    Jetty

    12

    Mud

    1to76

    Warehouse

    Prescot Wharf

    POSTOF

    FICEWA

    Y

    Tank

    Crane

    ElmQu

    ay

    Middle Wharf

    NINEE

    LMSL

    ANE22

    to50

    56

    4

    2

    Pumping

    Hopper

    SM

    3.3m

    Garage

    54

    52

    Station

    6

    SM

    ULC

    4

    Capstan

    Mooring Posts

    (fixed red)MPNavigation Light

    TidewayIndustrialEstate

    MP

    MPs

    Mooring Posts

    Sortin

    gOffic

    e

    2d

    3.6m

    MillP

    ondB

    ridge

    2a

    Jetty

    5.3m

    1a

    Mud

    1f

    SM

    SM

    3.5m

    3a 3b

    ElS

    ubSta

    TCBs

    Me a n Hig h Wa t e r

    MH& MLW

    87

    Und

    WANDSWORTH

    CITY OF WESTMINSTER

    Vol 18 Figure 6.4.1for PEIR

    Heathwall PSTerrestrial Ecology -

    Phase 1 Habitat Survey

    Title:

    Map Ref : ........................ .... 1PL03-TE-40005Date : ............................. ..... 2011/10/03Projection : .................. ........ British National Grid

    0 10 20 30 405

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    LegendDraft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    Built-up Areas - Buildings

    ECultivated/Disturbed Land- Ephemeral/Short Perennial

    Hard Standing

    Intertidal - Mud/Sand

    Running Water

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    12/33

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    13/33

    11

    3

    7

    2

    1

    10

    4

    6

    9

    5

    2

    8

    Vol 18 Figure 8.4.1for PEIR

    Heathwall Pumping StationLand Quality

    Contaminative Land Uses

    Title:

    0 20 40 60 8010

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    ThePoint, 7th Floor,37 North Wharf Road,Paddington, London W2 1A F

    Thames Water Utilities

    Legend

    Draft Limit of Land to be Acquiredor Used

    Draft Limit of Land 250m Buffer

    Past & present potentialcontamination sources

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Map Ref : ....................... ..... 1PL03-LQ-30012Date : .......................... ........ 2011/10/07Projection : ............... ........... British National Grid

    Ref Item Inferred Date of

    Operation

    (a) Lime works and

    Dock

    Prior to 1875 to

    c1896

    (b) Sewage Pumping

    Station Including Dock

    c1916 to c1951

    (c) Existing Sewage

    Pumping Station

    c1951 to present

    2 M anor House Wharf

    and Other Various

    Wharves

    c1896 to c1975

    a) London Gas Works Pre c1875 c1976b) Sorting Office and

    Warehouses

    c1976-onwards

    4 Rai lway Prior to c1875 to

    c1975

    (a) Unspecified

    Industrial/Commercial

    Buildings

    c1896-c1916

    (b) Paint and Colour

    Works

    1916-1952

    (c) Various Works and

    Depots

    1952- present

    (a) Unspecified

    Industrial/Commercial

    Buildings

    1896-1916

    (b) Paint and Colour

    Works

    c1916-c1952

    (c) Various Works and

    Depots

    c1952-present

    (a) Various Wharves

    Including ImperialWharf and Jam

    Prior to c1875 to

    c1975

    (b) North Thames Gas

    Board Offices

    c1975-c1987

    (c) Nine Elms/Tideway

    Industrial Estate and

    Depot

    c1987- present

    8 Dock - Including Lock

    and Brine Mill Pond

    Prior to 1875 to

    c1986

    9 Tanks A ssoc ia ted

    With Gas Works.

    c1966

    10 a) Brewery Prior to c1875 to

    c1976

    b) Warehousing c1976 to c1984

    11 Warehousing and

    Sorting Office

    c1984 to present

    5

    6

    7

    On site

    Off-site

    1

    3

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    14/33

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    15/33

    ")

    ")

    ")

    ")

    ")

    &:&:

    &: &:

    z z

    z z z

    z z z

    z z z

    z z z

    z z z z

    z z z z

    z z z z

    """

    _

    _

    _

    ____

    ?

    Vol 18 Figure 8.4.3for PEIR

    Heathwall Pumping StationLand Quality - Environmental

    Records and Waste Sites

    Title:

    Map Ref : ........................ .... 1PL03-LQ-30034Date : .......................... ........ 2011/10/07Projection : ............... ........... British National Grid

    0 20 40 60 8010

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    ThePoint, 7th Floor,37 North Wharf Road,Paddington, London W2 1A F

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or Used

    Draft Limit of Land 250m Buffer

    Waste

    ? Licensed Waste Management Facilities

    _ Past Potential Contaminated Industrial Uses

    " Registered Waste Transfer Sites

    z Historic Landfill Sites

    Hazards

    &: Pollution Incidents to Controlled Waters

    ") LA Pollution Prevention & Controls

    _ Past Potentially Contaminated Industrial Uses

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    16/33

    4.8m

    Drake House

    P O N T O N R O A D

    StGeorge'sWharf

    Jetty

    Shingle

    DFn

    Grosvenor Pier

    GrenvilleHou se

    South Bank

    12

    108

    V i u c t

    5.1m

    Mud

    1to76

    Ware house

    MeanHighWater

    PrescotWharf

    Raleigh House

    BusinessCentre

    POST

    OFFICE

    WAY

    Tank

    MeanH

    ighWat

    er

    Crane

    Sta

    28to30

    ElmQuay

    Rive

    rsideC

    ourt

    MiddleWharf

    NINEE

    LMSL

    ANE

    LB

    Dinorvic Wharf

    GROSVE

    NORR

    OAD

    22to

    50

    1

    to

    5

    56

    4

    2

    136

    Pumping

    El SubSta

    MP

    Hopper

    SM

    3.3m

    Pillar

    El

    20

    Depot

    SomersetWharf

    Mud

    21

    Slopingmasonry

    66 t o9 7

    Sub

    20

    Westminster Boating Base

    34to

    65

    25

    26

    Garage

    132

    54

    El SubSta

    RiverTh

    ames

    4.8m

    Shingle

    MP

    1t

    o

    33

    Dolphin

    135

    52

    Dolphin

    Station

    6

    137

    SM

    27

    Statue

    24

    Tennis Court

    22

    6 t o 9

    31to

    33

    ULC

    23

    Pimlico Gardens& Shrubbery

    10 to 19

    Bourne ValleyWharf

    MP

    Depot

    4.9m

    (PH)

    Navigation Light

    4

    (fixed red)

    WB

    FB

    GARDENS ROAD

    Capstan

    Mud

    Capstans

    4.4m

    1 t o 9 7

    Dolphin

    (fixed red)

    1to19

    CringleDock

    Bollard

    1 t o 7 0

    Navigation Light

    King

    Bollard

    5.1m

    Mooring Posts

    1 t o 9 7

    Navigation Light

    1to36

    Crane

    (fixed red)

    GROSVENORROAD

    Warehouse

    RefuseTran sfer

    FB

    CHURCHILL

    Travelling

    Bollard

    92

    MaitlandHo

    useTyrre

    llHouse

    Shingle

    Station

    5.2m

    Nelson

    House

    MP

    Mean High Water

    Churchill GardensHaw

    kinsHou

    se

    88

    FB

    1t o9

    Darwin

    TCB

    Depot

    5.0m

    Post

    Pla y g

    round

    KeatsHouse

    109

    Navigation Light

    Post

    Tideway Industr ial Estat

    e

    MP

    MPs

    Playground

    Shingle

    KIRTLING STREET

    MooringPosts

    130

    Sorting

    Offi

    ce

    Posts

    Shingle

    80

    Shelley

    House

    (fixed red)

    RiverThames

    Whitley

    House

    Bollards

    illiam IV

    129

    LB

    5.3m

    WB

    2d

    Hall

    Jetty

    7 6

    MP

    Hungerfo

    rdHouse

    110a

    Dolphin

    (PH)

    House

    3.6m

    The

    94

    Pla y g

    round

    105

    MillP

    ondB

    ridge

    Balmoral Castle

    1to36

    2a

    Works

    88

    Jetty

    5.3m

    RiverLodge

    Mean High Water

    CringleWharf

    1a

    Cn

    Mud

    1f

    1.9m

    29

    Tank

    41

    47

    PASCALSTREET

    49

    Viaduct

    31

    45

    Depot

    El

    ElSubSta

    SM

    38

    Sorting Office

    MP 2

    27

    SM

    21

    17StaSub

    Chy

    37

    15

    LTwrSB

    rWarehouse

    40

    26

    W

    Warehouse

    Depot

    23

    39

    43

    42

    LTwr

    13

    46

    LTwr

    PONT

    ONRO

    AD

    10

    25

    EAPARKROAD

    Depot

    8

    WB

    CRINGLESTREET

    NINE ELMS

    K I R T L I N

    G S

    T R E E T

    4.1mPumpingStation

    Depot

    Depot

    TCBs

    3.5m

    4.2m(ThamesWater Board)

    3.9m

    3a 3b

    TCB

    33

    Works

    5

    ElSubSta

    9

    10

    BrooksCourt

    TCBs

    4.2m

    3.7m

    El SubSta

    TCBs New Covent

    4

    1

    4.4m

    t

    1to14

    M eanH

    ighW

    ate

    r

    MH& MLW

    Shelter

    Conveyor

    Tank

    87

    46

    a

    Cycle HireStation

    BoroC

    onst,

    GLAslyC

    onst&

    LBBdy

    CCLW

    CCLW

    CCLW

    Und

    WardB

    dy

    Boro Const, GL Asly Const &LB Bdy

    CR

    CF

    Und

    Und

    CW

    FW

    Elm Quay

    Icon Apartments

    River Lodge

    Houseboats

    WANDSWORTH

    CITY OF WESTMINSTER

    LAMBETH

    Vol 18 Figure 9.4.1for PEIR

    Heathwall PSNoise and Vibration -Residential Receptors

    Title:

    Map Ref : ....................... ..... 1PL03-NV-40013Date : ............................. ..... 2011/09/30Projection : .................. ........ British National Grid

    0 25 50 75 10012.5

    Metres

    Mapping reproduced by permission of Ordnance Survey on

    behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    LegendDraft Limit of Land to

    be Acquired or Used

    Local Authority Boundary

    Residential Receptors

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    .

    e nHi

    hter

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    17/33

    !( !(

    PONTONROAD

    Jetty

    Shingle

    Grosvenor Pier

    South Bank

    12

    Mud

    1to7

    6

    Warehouse

    Mean

    HighW

    ater

    Prescot Wharf

    Business Centre

    POSTO

    FFICEW

    AY

    Tank

    Crane

    Sta

    28to30

    ElmQu

    ay

    River

    Middle Wharf

    NINEE

    LMSL

    ANE

    LB

    Dinorvic Wharf

    22to

    50

    1t

    o5

    56

    4

    2

    Pumping

    MP

    Hopper

    SM

    3.3m

    El

    20

    Mud

    21

    lin

    mnr

    Sub

    Westminster Boating Base

    34t

    25

    26

    Garage

    132

    54

    El Sub Sta

    RiverT

    hames

    MP

    1t

    o3

    3

    Dolphin

    52

    Dolphin

    Station

    6

    SM

    27

    24

    Tennis Court

    22

    6t

    o9

    31to

    33

    ULC

    23

    10 to 19

    Bourne Valley Wharf

    Navigation Light

    4

    ( f ixedred)

    Capstan

    Mud

    4.4m

    Dolphin

    Bollard

    Navigation Light

    5.1m

    MooringPo sts

    1

    (fixedred)

    GROSVENOR ROAD

    Warehouse

    FB

    ll

    Shingle

    5.2m

    MP

    Mean High Water

    88

    1 to 9

    TCB

    5.0m

    Post

    Navigation Light

    Post

    Tideway Industrial Estate

    MP

    MPs

    Playground

    KIRTLING STREET

    Mooring Posts

    130

    Sortin

    gOffi

    ce

    Shingle

    80

    ( f ixedred)

    River Thames

    ll r

    129

    5.3m

    2d

    MP

    Hung

    3.6m

    4

    ayg

    round

    MillP

    ondB

    ridge

    2a

    orks

    Jetty

    5.3m

    River Lodge

    Mean High Water

    Cringle Wharf

    1a

    Cn

    Mud

    1f

    .

    Tank

    SM

    Sorting Office

    SM

    SBrWarehouse

    40

    Warehouse

    42

    PONT

    ONRO

    AD

    Depot

    8

    WB

    CRINGLESTREET

    K I R T L I N

    G S

    T R E E T

    4.1m

    Depot

    Depot

    3.5m

    4.2m

    3a 3b

    33

    Works

    5

    ElSubSta

    9

    10

    Brooks Court

    TCBs

    4.2m

    3.7m

    El Sub Sta

    4

    1

    4.4m

    1to14

    M ea

    n H

    ig h W

    at e

    r

    MH & MLW

    or

    Tank

    87

    Cycle Hire Station

    Boro

    Const,G

    LAsly

    Const&

    LBBdy

    CCLW

    CCLW

    CCLW

    Und

    WardBd

    y

    Boro C onst,GL Asly Co nst & LB Bdy

    8

    7

    6

    5

    4

    3

    2

    1

    1

    1

    CS17XCS16X

    Vol 18 Figure 10.4.1for PEIR

    Heathwall PSSocio-Economic - Context Plan

    Title:

    Map Ref : ......................... ... 1PL03-SE-20013Date : .............................. .... 2011/10/04Projection : ................ .......... British National Grid

    0 20 40 60 80 10010

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,Paddington, London W2 1AF

    Thames Water Utilities

    Legend

    Draft Limit of Land to beAcquired or Used

    !( CSO (Directly Controlled)

    Site Context Features

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Site Context Features1. Thames Path2. Elm Quay Residential3. Tideway Wharf - Mixed Use

    Development (Under Construction)4. Nine Elms Pier and Residential Moorings5. Grassed Open Space6. U.S. Embassy Site - Planned

    Development7. Ballymore Site - Planned Mixed

    Use Development8. Royal Mail - Proposed Mixed Use

    Re-development

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    18/33

    CITY OF WESTMINSTER

    WANDSWORTH

    LAMBETH

    C20XS

    Vol 18 Figure 11.4.1for PEIR

    Heathwall PSTownscape and VisualDevelopment Pattern

    and Scale

    Title:

    Map Ref : ........................ .... 1PL03-TS-40024Date : ............. ................. .... 2011/10/04Projection : ................. ......... British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Legend

    Draft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    Building Heights

    (mts)

    0 - 20m

    20 - 40m

    40 - 60m

    60 - 80m

    80 - 100m

    >100m

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    19/33

    CITY OF WESTMINSTER

    WANDSWORTH

    LAMBETH

    Vol 18 Figure 11.4.2for PEIR

    Heathwall PSTownscape and Visual

    Pattern and Extentof Vegetation

    Title:

    Map Ref : ........................ .... 1PL03-TS-40056Date : ............. ................. .... 2011/10/05Projection : ................. ......... British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Legend

    Draft Limit of Land to

    be Acquired or Used

    Local Authority Boundary

    Known TreePreservation Orders

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    20/33

    St George'sSquare Gardens

    Millbank

    South River Bank

    CITY OF WESTMINSTER

    WANDSWORTH

    SOUTHWARK

    Warwick Square

    Vol 18 Figure 11.4.3for PEIR

    Heathwall PSTownscape and Visual

    Open SpaceDistribution and Type

    Title:

    Map Ref : ........................ .... 1PL03-TS-40147Date : ............................. ..... 2011/10/06Projection : .................. ........ British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    LegendDraft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    Metropolitan Open Land

    Designated Open Space

    (CoW)

    Public Open Space

    Private Open Space

    LUPUSSTR

    EET

    BELGRAVEROAD

    GROSV

    ENORR

    OAD

    CRINGLESTREET

    WANDSWO

    RTH

    ROAD

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    21/33

    WANDSWORTHLAMBETH

    CITY OF WESTMINSTER

    Vol 18 Figure 11.4.4for PEIR

    Heathwall PSTownscape and Visual

    Transport Network

    Title:

    Map Ref : ........................ .... 1PL03-TS-40090Date : ............................. ..... 2011/10/05Projection : .................. ........ British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued i n part or issuedincomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Legend

    Draft Limit of Land to

    be Acquired or Used

    Local Authority Boundary

    Rail

    Thames Path

    London Cycle Routes

    A Road

    LUPUSSTR

    EET

    BELGRAVEROAD

    GROSV

    ENORR

    OAD

    NINE

    ELM

    SLA

    NE

    CRINGLESTREET

    WANDSWO

    RTH

    ROAD

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    22/33

    Battersea Residential

    WestminsterResidential

    Millbank ConservationArea - Institutional

    River Thames - Nine Elms Reach

    River Thames -Vauxhall & Pimlico Reach

    Pimlico Residential

    Battersea Industrial

    Lambeth Residential

    St George's WharfResidential

    Nine Elms Lane Commercial

    Bessborough Residential

    Pimlico Academy

    Rail Residentialwaterfront- West

    Albert EmbankmentCommercial

    Nine Elms LaneResidential

    WANDSWORTH

    LAMBETH

    CITY OF WESTMINSTER

    Vol 18 Figure 11.4.5for PEIR

    Heathwall PSTownscape and VisualTownscape Character

    Areas

    Title:

    Map Ref : ......................... ... 1PL03-TS-40163Date : ............................. ..... 2011/10/06Projection : .................. ........ British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey on

    behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,

    amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Legend

    Draft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    Townscape CharacterArea Boundary

    Conservation Areas

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    23/33

    ..

    .

    .

    .

    .

    .

    .

    .

    .

    .

    .

    .

    .

    .

    GROSVENOR ROAD

    TU

    RPENTINELANE

    PEABODYAVENUE

    SQUARE

    P O N T O N

    R O A D

    POSTOF

    FICEWA

    Y

    NINEE

    LMSL

    ANE

    GROSVE

    NORRO

    AD

    STGEORGE'S

    GARDEN

    SROAD

    NINE

    ELM

    SLA

    NE

    GROSVENOR ROAD

    CHURCHILL

    KIRTLING STREET

    CLAVERTONSTREET

    PASCALSTREET

    BRAMLEYCRESCENT

    PONT

    ONROA

    D

    BESSBOROUGHGARDENS

    STGEORGE'SSQUAREMEWS

    BALVAIR

    DP

    LACE

    LINDSAYSQUARE

    PONSONBYTERRACE

    GROSV

    ENOR

    ROAD

    CLAVERTONSTREET

    CHICHES

    TERSTR

    EET

    CRINGLESTREET

    KIRTLIN

    GS

    TREET

    NINE

    ELM

    SLA

    NE

    SAVONASTR

    EET

    THESSA

    LYROAD

    WANDS

    WORTH

    ROAD

    PAXTONTERRACE

    R A N E L A G H R O A D

    J O H N S O N ' S P L A C E

    CITY OF WESTMINSTER

    WANDSWORTH

    LAMBETH

    1.7

    1.10

    2.2

    1.8

    3.1

    1.6

    1.5

    2.4

    2.3

    2.1

    1.4

    1.3

    1.2

    1.1

    1.9

    2.5

    3.2

    Vol 18 Figure 11.4.6for PEIR

    Heathwall PSTownscape and VisualViewpoint Locations

    Title:

    Map Ref :...............................1PL03-TS-40117Date : ............. ............. ........ 2011/10/06Projection : ............ ............. . British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright an d database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,

    which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    Legend

    Draft Limit of Land tobe Acquired or Used

    Local Authority Boundary

    . Viewpoints

    Zone of TheoreticalVisibility

    Verifiable PhotomontageLocations

    ThePoint, 7th Floor,37 NorthWharf Road,

    Paddington,LondonW2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Viewpoint Locations:1.X - Residential receptors

    2.X - Recreational receptors

    3.X - Transport receptors

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    24/33

    kk

    kk

    Heathwall Pumping Station

    A3035

    A3035

    Nine Elms Lane

    Cemex Battersea Plant

    WANDSWORTH

    LAMBETH

    CITY OF WESTMINSTER

    LAMBETH

    Title:

    Map Ref : ........................ .... 1PL03-TT-50156Date : .......................... ........ 2011/10/05Projection : ............... ........... British National Grid

    0 30 60 90 12015

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued

    incomplete in any way.

    Area ofmain map

    ThePoint, 7th Floor,37 North Wharf Road,Paddington, London W2 1A F

    Thames Water Utilities

    Legendkk Site Access

    Construction Traffic Routes

    Primary Route

    Transport for London Road Network

    London Cycle Routes

    Thames Path

    Draft Limit of Land to be Acquired or Used

    Local Authority Boundary

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Volume 18 Figure 12.2.1for PEIR

    Heathwall Pumping StationTransport - Construction

    Traffic Routes

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    25/33

    #*

    Heathwall Pumping Station A3035

    A3035

    Heathwall Pumping Station

    156,344

    Nine Elms Lane

    WANDSWORTH

    LAMBETH

    CITY OF WESTMINSTER

    Title:

    Map Ref : ........................ .... 1PL03-TT-50134Date : .......................... ........ 2011/10/05Projection : ............... ........... British National Grid

    0 30 60 90 12015

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued

    incomplete in any way.

    Area ofmain map

    ThePoint, 7th Floor,37 North Wharf Road,Paddington, London W2 1A F

    Thames Water Utilities

    Legend

    #* Pumping StationBus Stop

    Bus Route

    Transport for London Road Network

    London Cycle Routes

    Thames Path

    Draft Limit of Land to be Acquired or Used

    Local Authority Boundary

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    Volume 18 Figure 12.4.1for PEIR

    Heathwall Pumping StationTransport - Local Site Plan

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    26/33

    !2.3

    Vol 18 Figure 15.4.1for PEIR

    Heathwall PSFlood Risk

    EA Flood Zones

    Title:

    Map Ref : ........................ .... 1PL03-FL-20015Date : ............. ................. .... 2011/09/30Projection : .................. ........ British National Grid

    0 50 100 150 20025

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.

    Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued

    incomplete in any way.

    Area ofmain map

    The Point, 7th Floor,

    37 North Wharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    Note: Water Level Node - Thames TidalJoint Probability Extreme Water Levels 2008

    LegendDraft Limit of Land to be Acquired or Used

    Thames Tidal Defences

    ! Water Level Node

    EA Flood Zone 3

    EA Flood Zone 2

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    27/33

    !H

    !H

    !H

    !H!H

    !H

    !H

    !H!H

    !H

    !H

    !H

    !H

    !H

    !H!H !H

    !H

    !H!H

    !H!H

    !H!H!H

    !H

    !H

    !H

    !H

    !H

    !H

    !H

    !H!H

    !H

    !H

    !H

    !H

    !H

    !. !.

    !.

    !.

    !.

    !.

    !. !.!.!.!.

    !.

    Heathwall Pumping Station

    LAMBETH

    WANDSWORTH

    CITY OF WESTMINSTER

    KENSINGTON & CHELSEA

    SR1092SR1091

    SR1089SR1087

    SR1083

    SR1078

    SR1073SR1072

    SR1070

    SA1084

    SA1077

    SA1075

    PR1090

    PR1088

    PR1085

    PR1081

    PR1074

    SR1087A

    SR1072A

    SA1074A

    PR1088A

    SR2085

    SR2084

    SR2069

    SR2068

    SR2067

    SR2066 SR2065

    SR2062

    SR2061

    SR2060

    SR2059

    SR2058

    SR2057

    SR2056

    SA2064

    SA2063

    Title:

    Map Ref : ......................... ... 1PL03-WR-20018Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

    LegendDraft Limit of Land to be Acquired or Used

    Thames Tunnel - Abbey Mills Route

    Main Tunnel

    Connection Tunnel

    Local Authority Boundary (OS)

    River Thames

    LTT 2009 GI Drilled Boreholes

    !H Land

    !H Marine

    LTT 2011 GI Proposed Boreholes

    !. Land

    !. Water

    Superficial Geology

    Alluvium

    Kempton Park Gravel Member

    Langley Silt Member

    Taplow Gravel Formation

    Vol 18 Figure E.1for PEIR

    Heathwall PSGroundwater

    Superficial Geology

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    28/33

    !. !.

    !.

    !.

    !.

    !.

    !. !.!.!.!.

    !.

    !.

    !.

    !.

    !.!.

    !.

    !.

    !.!.

    !.

    !.

    !.

    !.

    !.

    !.!. !.

    !.

    !.!.

    !.!.

    !.!.!.

    !.

    !.

    !.

    !.

    !.

    !.

    !.

    !.!.

    !.

    !.

    !.

    !.

    !.

    Heathwall Pumping Station

    LAMBETH

    WANDSWORTH

    CITY OF WESTMINSTER

    KENSINGTON & CHELSEA

    SR1092SR1091

    SR1089

    SR1087

    SR1086SR1083

    SR1078

    SR1073SR1072

    SR1070

    SA1084SA1082

    SA1077

    SA1075

    PR1090

    PR1088

    PR1081

    PR1074

    SR1087A

    SA1074A

    PR1088A

    SR2085

    SR2084

    SR2069

    SR2068

    SR2067

    SR2066 SR2065

    SR2062

    SR2061

    SR2060

    SR2059

    SR2058

    SR2057

    SR2056

    SA2064

    SA2063

    70

    Title:

    Map Ref : ......................... ... 1PL03-WR-20084Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    Legend

    Draft Limit of Land to be Acquired or Used

    Thames Tunnel - Abbey Mills Route

    Main Tunnel

    Connection Tunnel

    Local Authority Boundary (OS)

    River Thames

    LTT 2009 GI Drilled Boreholes

    !. Land

    !. Marine

    LTT 2011 GI Proposed Boreholes

    !. Land

    !. Water

    EA Chalk Piezometric Level(mATD) - January 2008

    Solid Geology

    London Clay Formation

    Vol 18 Figure E.2for PEIR

    Heathwall PSGroundwater - Solid Geology

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    29/33

    A

    AAA

    A

    A

    D

    D

    Heathwall Pumping Station

    TQ27-262

    TQ27-284A

    TQ27-284BU

    LAMBETH

    WANDSWORTH

    CITY OF WESTMINSTER

    KENSINGTON & CHELSEAPGWU1414

    PGWU2139

    70

    TQ37-17C

    TQ27-334

    Title:

    Map Ref : ......................... ... 1PL03-WR-20040Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or Used

    Thames Tunnel - Abbey Mills Route

    Main Tunnel

    Local Authority Boundary (OS)

    River Thames

    D EA Water Quality Monitoring Locations

    EA Groundwater Level Monitoring Locations

    A Historical Data Available

    A Data Not Available

    A Recent Data AvailableEA Chalk Piezometric Level(mATD) - January 2008

    Superficial Geology

    Alluvium

    Kempton Park Gravel Member

    Langley Silt Member

    Taplow Gravel Formation

    Vol 18 Figure E.3for PEIR

    Heathwall PSGroundwater

    EA Monitoring LocationsThis is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.

    The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    30/33

    :

    ::

    :

    :

    :

    :

    :

    :

    Heathwall Pumping Station

    LAMBETH

    WANDSWORTH

    CITY OF WESTMINSTER

    KENSINGTON & CHELSEA

    70

    8

    134

    129

    74

    70

    41

    250

    162

    42

    Title:

    Map Ref : ......................... ... 1PL03-WR-20041Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued

    incomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or Used

    Thames Tunnel - Abbey Mills Route

    Main Tunnel

    Connection Tunnel

    Local Authority Boundary (OS)

    River Thames

    GSHP Scheme: Unknown: Chalk

    EA Chalk Piezometric Level(mATD) - January 2008

    Superficial Geology

    Alluvium

    Kempton Park Gravel Member

    Langley Silt Member

    Taplow Gravel Formation

    Vol 18 Figure E.6for PEIR

    Heathwall PSGroundwater - GSHP

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    31/33

    Heathwall Pumping Station

    LAMBETH

    WANDSWORTH

    CITY OF WESTMINSTER

    KENSINGTON & CHELSEA

    70

    Title:

    Map Ref : ......................... ... 1PL03-WR-20019Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid

    0 100 200 300 40050

    Metres

    Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.

    All rights reserved.Ordnance Survey Licence number 100019345

    CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued

    incomplete in any way.

    Area ofmain map

    The Point,7thFloor,

    37NorthWharf Road,

    Paddington, London W2 1AF

    Thames Water Utilities

    LegendDraft Limit of Land to be Acquired or Used

    Thames Tunnel - Abbey Mills Route

    Main Tunnel

    Connection Tunnel

    Local Authority Boundary (OS)

    River Thames

    EA Chalk Piezometric Level(mATD) - January 2008

    Source Protection Zones

    Zone I (Inner Protection Zone)

    Zone II (Outer Protection Zone)

    Superficial Geology

    Alluvium

    Kempton Park Gravel Member

    Langley Silt Member

    Taplow Gravel Formation

    Vol 18 Figure E.7for PEIR

    Heathwall PSGroundwater - SPZ

    This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    32/33

    110-RG-ENV-PWH10-000112

  • 8/3/2019 PEIR_Vol 18 Figures Heathwall Pumping Station

    33/33

    Phase two consultation (Autumn 2011)

    For further information see our website:www.thamestunnelconsultation.co.uk

    or call us on 0800 0721 086