Peer Review Objectives. Wayne Reiersen Field Period Assembly Peer Review October 11-12, 2006. NCSX has just started FPA on Station 1. Preparations for other stations are planned or in process. Does our technical approach to field period assembly appear feasible? - PowerPoint PPT PresentationTRANSCRIPT
Peer Review Objectives
Wayne ReiersenField Period Assembly Peer Review
October 11-12, 2006
NCSX has just started FPA on Station 1
VVSAs (3 ) fabr ic ate dat M ajo r To o l
M o dular c o i ls (1 8 )fabr ic ate d at P P P L
TF c o ils (1 8 )fabr ic ate d at E TI
Ins tal l c o o lant tube s ,he ate r s t r ips , and
f lux lo o ps
STATIO N 1
As s e m ble into 3 -c o ilm o dule s
As s e m ble two 3 -c o ilm o dule s o ve r VVSA
As s e m ble into 3 -c o ilTF m o dule s
Ins tal l two TF 3 -c o i l m o dule sand add po r t e xte ns io ns toc o m ple te the f ie ld pe r io d
As s e m ble thre e f ie ldpe r io ds to c o m ple te
s te l larato r c o re
STATIO N 2 STATIO N 3
STATIO N 4 STATIO N 5
NC
SX M
fg F
acili
tyN
CSX
Tes
t Cel
l
Preparations for other stationsare planned or in process
Station 1 2 3 4 5
BrooksDimensional Control Plan
√ Oct06 Jan07 Feb07 Apr07
ColeAssembly Spec and Drawings
√
Dec06
Mar07
Feb07
May07
Jun07
Apr07
May07
Jul07
Apr07
Brown Tooling Design √ Oct06 Jan07 Feb07 Apr07
Assembly Sequence Plan
√ Oct06 Jan07 Feb07 Apr07
DudekTooling Fabrication and Installation
√ Mar07 May07 Jun07 Aug07
ViolaAssembly Procedure
√
ACC Review √
Start Assembly √ Jun07 Aug07 Nov07 Sept07
Peer review objective - solicit expert advice on critical issues
• Does our technical approach to field period assembly appear feasible?
• Are metrology provisions and tooling design suitable?• Are dimensional control requirements realizable?• Are time and resource allocations reasonable?• What are the most significant risks? • What might we do differently?
Committee Members
• Torsten Braeuer, Lutz Wegener, Fred Hurd (W7-X)• David Anderson, Simon Anderson (HSX-UW)• Steve Knowlton (CTH-Auburn U)• Ken Chipley, Tom McManamy (SNS-ORNL)• Erik Perry (chair), Jim Chrzanowski, Geoff Gettelfinger
(PPPL)
Agenda
October 11 9:00 Reiersen Review objectives 9:10 Brooks Dimensional control requirements for the mod coils and
TF coils 9:30 Cole Design overview and assembly features10:30 Brown FPA assembly sequence, tooling, measurements, and
adjustmentsNoon ADJOURN
October 12 9:00 Viola Cost and schedule, staffing, metrology utilization10:00 Perry Coordinate collection of comments from
reviewersNoon ADJOURN