peco facet sewage water treatment plant. 2 project:...
TRANSCRIPT
Peco Facet Sewage Water Treatment Plant
2
Project: ……………………………………………………...Imisli Olympic Sport Complex
Contractor: …………………………………………………………………...“AZIMPORT” LLC
Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH
Date of order: ………………………………………………………………………….April 2011
Facet model: …………………………………………………………………………..STP-16HB
Max. design flow rate: …………………………………………………………….40 m³/day
Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE)
Commissioning date: …………………………………………………………….24.12.2011
Peco Facet Sewage Water Treatment Plant
Project Information
3
Peco Facet Sewage Water Treatment Plant
Imisli town Republic of Azerbaijan
300 kilometers from capital Baku
4
Olympic Sport Complex Imisli,
Republic of Azerbaijan
Peco Facet Sewage Water Treatment Plant
Panorama view
Facet
STP unit
5
Peco Facet Sewage Water Treatment Plant
Waste Waters formed in toilets, showers and/or kitchen flows to the Sewage Water Treatment Plant installed by
Facet
Facet
STP unit
6
Peco Facet Sewage Water Treatment Plant
Sewage Water Treatment Plant STP16HB
Facet scope: Design, Engineering, Supply of Equipment, Supervision of Installation and Start-up
All civil works and sewer network system was made by AZIMPORT LLC (local
construction company) – www.azimport.az
7
Peco Facet Sewage Water Treatment Plant
Construction period – July 2011
Azimport LLC - Local Civil company has built Pumper well, Inlet pit,
Aeration Chamber and House for the Control Room According to drawings provided by Facet
Sport Complex back view
Facet checks all constructions
Pumper well
Control roomAeration Chamber
8
Peco Facet Sewage Water Treatment Plant
Installation works has been carried out by AZIMPORT LLC under supervision of Facet specialists
Installation of Settling and Disinfection Chamber by Crane
Installation period – October 2011
9
Peco Facet Sewage Water Treatment Plant
Installation of Settling and Disinfection Chamber by Crane
Installation period – October 2011
10
Peco Facet Sewage Water Treatment Plant
Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)
Installation period – October 2011
11
Peco Facet Sewage Water Treatment Plant
Grinding Pumps (main and stand-by) and Screen Bar
into the Pumper Well
Installation period – October 2011
12
Peco Facet Sewage Water Treatment Plant
Piping works, Aeration Diffusers, Outlet Pipe
Installation period – October 2011
13
Peco Facet Sewage Water Treatment Plant
Installation of Bio-Film Media into the Aeration Chamber
Installation period – October 2011
General Piping Works
14
Peco Facet Sewage Water Treatment Plant
Start Up and Commissioning – December 2011
Facet specialists has carried out the operation training course to the staff of Final Customer (Administration of
Sport Complex)
15
Peco Facet Sewage Water Treatment Plant
General Plan
16
Peco Facet Sewage Water Treatment Plant
Effluent Conditions
Ph……………………………………………………6-8
BOD5 ……………………………………………..<25 mg/l
COD …..……………………………………………<125 mg/l
TSS …………………………………………………<35 mg/l
O2 dissolved (aeration chamber) ……..6-10 mg/l
Temperature ………………………………….. Ambient
Aspect ………………………………………..…. Odorless and Transparent
17
Peco Facet Sewage Water Treatment Plant
Opening Ceremony of the Imisli Olympic Sport Complex with participation of his
Excellency the President of the Republic of Azerbaijan Mr.
Ilham Aliyev
18
Opening Ceremony - 2011
Peco Facet Sewage Water Treatment Plant
19
Opening Ceremony - 2011
Peco Facet Sewage Water Treatment Plant
20
Thank you for attention
Peco Facet Sewage Water Treatment Plant