Page 1: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

Peco Facet Sewage Water Treatment Plant

Page 2: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

2

Project: ……………………………………………………...Imisli Olympic Sport Complex

Contractor: …………………………………………………………………...“AZIMPORT” LLC

Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH

Date of order: ………………………………………………………………………….April 2011

Facet model: …………………………………………………………………………..STP-16HB

Max. design flow rate: …………………………………………………………….40 m³/day

Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE)

Commissioning date: …………………………………………………………….24.12.2011

Peco Facet Sewage Water Treatment Plant

Project Information

Page 3: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

3

Peco Facet Sewage Water Treatment Plant

Imisli town Republic of Azerbaijan

300 kilometers from capital Baku

Page 4: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

4

Olympic Sport Complex Imisli,

Republic of Azerbaijan

Peco Facet Sewage Water Treatment Plant

Panorama view

Facet

STP unit

Page 5: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

5

Peco Facet Sewage Water Treatment Plant

Waste Waters formed in toilets, showers and/or kitchen flows to the Sewage Water Treatment Plant installed by

Facet

Facet

STP unit

Page 6: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

6

Peco Facet Sewage Water Treatment Plant

Sewage Water Treatment Plant STP16HB

Facet scope: Design, Engineering, Supply of Equipment, Supervision of Installation and Start-up

All civil works and sewer network system was made by AZIMPORT LLC (local

construction company) – www.azimport.az

Page 7: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

7

Peco Facet Sewage Water Treatment Plant

Construction period – July 2011

Azimport LLC - Local Civil company has built Pumper well, Inlet pit,

Aeration Chamber and House for the Control Room According to drawings provided by Facet

Sport Complex back view

Facet checks all constructions

Pumper well

Control roomAeration Chamber

Page 8: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

8

Peco Facet Sewage Water Treatment Plant

Installation works has been carried out by AZIMPORT LLC under supervision of Facet specialists

Installation of Settling and Disinfection Chamber by Crane

Installation period – October 2011

Page 9: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

9

Peco Facet Sewage Water Treatment Plant

Installation of Settling and Disinfection Chamber by Crane

Installation period – October 2011

Page 10: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

10

Peco Facet Sewage Water Treatment Plant

Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)

Installation period – October 2011

Page 11: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

11

Peco Facet Sewage Water Treatment Plant

Grinding Pumps (main and stand-by) and Screen Bar

into the Pumper Well

Installation period – October 2011

Page 12: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

12

Peco Facet Sewage Water Treatment Plant

Piping works, Aeration Diffusers, Outlet Pipe

Installation period – October 2011

Page 13: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

13

Peco Facet Sewage Water Treatment Plant

Installation of Bio-Film Media into the Aeration Chamber

Installation period – October 2011

General Piping Works

Page 14: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

14

Peco Facet Sewage Water Treatment Plant

Start Up and Commissioning – December 2011

Facet specialists has carried out the operation training course to the staff of Final Customer (Administration of

Sport Complex)

Page 15: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

15

Peco Facet Sewage Water Treatment Plant

General Plan

Page 16: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

16

Peco Facet Sewage Water Treatment Plant

Effluent Conditions

Ph……………………………………………………6-8

BOD5 ……………………………………………..<25 mg/l

COD …..……………………………………………<125 mg/l

TSS …………………………………………………<35 mg/l

O2 dissolved (aeration chamber) ……..6-10 mg/l

Temperature ………………………………….. Ambient

Aspect ………………………………………..…. Odorless and Transparent

Page 17: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

17

Peco Facet Sewage Water Treatment Plant

Opening Ceremony of the Imisli Olympic Sport Complex with participation of his

Excellency the President of the Republic of Azerbaijan Mr.

Ilham Aliyev

Page 18: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

18

Opening Ceremony - 2011

Peco Facet Sewage Water Treatment Plant

Page 19: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

19

Opening Ceremony - 2011

Peco Facet Sewage Water Treatment Plant

Page 20: Peco Facet Sewage Water Treatment Plant. 2 Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...AZIMPORT

20

Thank you for attention