pcsa.co. mi… · assumptions on the final project cost, future rates from henry county, and final...

3

Upload: others

Post on 09-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: pcsa.co. MI… · assumptions on the final project cost, future rates from Henry County, and final loan rates, Mr. Adcock proposed a $2 per month increase on water rates for the next
Page 2: pcsa.co. MI… · assumptions on the final project cost, future rates from Henry County, and final loan rates, Mr. Adcock proposed a $2 per month increase on water rates for the next
Page 3: pcsa.co. MI… · assumptions on the final project cost, future rates from Henry County, and final loan rates, Mr. Adcock proposed a $2 per month increase on water rates for the next