paybast co. ( pjs )paybastco.com/downloads/english rezome , - bahman 94.pdf · table of contents:...

65
PAYBAST CO. ( PJS ) PREQUALIFICATION DOCUMENT MAY 2015

Upload: others

Post on 25-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PAYBAST CO. ( PJS )

PREQUALIFICATION DOCUMENT

MAY 2015

Page 2: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

TABLE OF CONTENTS: PAGE

1 – GENERAL INFORMATION 1

2 – SERVICES AND FIELD OF ACTIVITIES 2

3 – ORGANIZATION CHART AND COMPANY STRUCTURE 3

3-1 – MEMBERS OF THE BOARD 3

3-2 – OTHER MANAGEMENT TEAM MEMBERS 3

3-3 – COMPANY KEY PERSONNEL 4

3-4 – ORGANIZATION CHART 5

3-5 – AWARDS 6

4 – EXPRIENCES : 8

4- 1 – MANAGERS EXPERINCES 9

4- 2 – COMPANYS REFRENCES 20

5 – QUALITY MANAGEMENT 22

6 – COPMANY RESOURCES : 24

6 – 1 – MANPOWER 25

6 – 2 – CONSTRUCTION EQUIPMENT AND MACHINERY 26

,

Page 3: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

1-GENERAL INFORAMTION :

COMPANY NAME : PAYBAST

TYPE OF CPMPANY : PRIVATE JOINT STOCK

DATE OF ESTABLISHMENT : 1991

REGIS. CODE AND PLACE. : 87716 – TEHRAN - IRAN

PAID CAPITAL : 1/000/000/000 IRANIAN RIALS

COMPANY ADDRESS : NO 22, 4TH FLOOR,

MANSOOR ALLEY,

MOTAHHARI ST., VALI ASR

AVE., TEHRAN, IRAN

PHONE NO. : ( +98) 88726729 – 32

FAX NO. : ( +98) 88726728

E – MAIL ADDRES : [email protected]

WEB SITE : WWW.PAYBASTCO.COM

1

Page 4: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

2- SERVICES AND FIELD OF ACTIVITIES :

SERVICES OFFERED BY PAYBAST :

●PROJECT EVALUATION.

●CONSTRUCTION DETAIL ENGINEERING

●PROCUREMENT SERVICES

●CONSTRUCTION AND PRECOMMISSIONING

●ASSISTANCE TO COMMISSIONING AND START - UP

FIELD OF ACTIVITES:

•OIL, GAS AND PETROCHEMICAL COMPLEXES

•PIPELINES, WATER AND SEWAGE TREATMENT PLANTS AND

NETWORKS

•STEEL AND CONCRETE INFRASTRUCTURES

•POWER PLANTS, FOOD INDUSTRIES AND INDUSTRIAL COMPLEXES

•RESIDENTIAL AND ADMIN. BUILDINGS.

2

Page 5: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

3 – ORGANOZATOIN CHART AND COMPANY STRUCTURE:

PAYBAST HAS BEEN ESTABLISHED BY A GROUP OF MANAGERS,

HAVING VALUABLE EXPERINCES IN INDUSTRIAL PROJECTS.

THE AIM OF THE COMPANY IS TO BUILT UP DYNAMIC ORGANIZATION

AND UPDATE KNOWLEDGE FOR PROVIDING SERVICES WITH HIGH

QUALITY IN PROJECTS.

“SATISFACTION OF THE CLIENT IS THE MAIN AIM OF COPMANY “

MEMBERS OF THE BOARD, MANAGEMENT AND KEY PERSONAL OF THE

COMPANY ARE AS FOLLOWS :

3 – 1 - MEMBERS OF THE BOARD

M . SANADZADEH : CHAIRMAN

E . ROSHAEIAN : VICE CHAIRMAN

GH. KARIMI : MANAGING DIRECTOR

F . ZAHEDI : TECHNICAL & ENG . MANAGER

3 – 2 – OTHER MANGEMENT TEAM MEMBERS :

M . KASIRZADEH :PROCUREMENT MANAGER

3

Page 6: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

Boa

rd O

f Dire

ctor

s

H.S

.E M

anag

erM

anag

ing

Dire

ctor

QA

/ Q

C M

anag

er

Pro

cure

men

t M

anag

erE

ngin

eerin

g M

anag

erP

roje

cts

Dire

ctor

Fin

anci

al A

nd

Adm

inis

trat

ion

Man

ager

Pro

ject

M

anag

ers

Adm

inis

trat

ion

War

ehou

seF

inan

cial

3-4

–C

om

pan

y O

rgan

izat

ion

Ch

art

5

Page 7: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

3–5– AWARDS :

6

Page 8: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

7/1

Page 9: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

7/2

Page 10: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

7/3

Page 11: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

4 – EXPRIENCES :

4-1- MANAGERS EXPERIENCES

4-2- COMPANYS REFRENCES

8

,

,

Page 12: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

4-1- MANAGER’S EXPERIENCES

9

Page 13: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PERIOD COMPANY

PAYBAST CO.

( SHARE HOLDER &MEMBER

OF THE BOARD )

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION SITE MANAGER

KOTAM GOSTAR CO.

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

39,000,000,000 RIALS.

KIMIA GHARB GOSTAR CO.

M.SANADZADEH, MECHANICAL ENGINEER ( B.S. FROM TEHRAN UNIVERSITY )

PROJECT

PROJECT

ERECTION OF EQUIPMENT & PIPING OF

C2 RECOVERY PLANT- PARS

PETROCHEMICAL COM. -ASSALUYEH

40,000,000,000 RIALS.

(SHARE HOLDER & MEMBER

OF THE BOARD )

4 - EXPERIENCES

4-1- MANAGERS EXPERINCES

POSITION

ERECTION OF MECHANICAL WORKS OF

GOLPAYEGAN PETROCHEMICAL

COMPANY (GBPC)

PROJECT

2005 - NOW

PROJECTS & POSITIONS

HEAD OF MECHANICAL DEPARTMENT

2002-2005

MECHANICAL , ELECTRICAL &

INSTRUMENT WORKS OF CITRIC ACID

FACTORY- KERMANSHAH

2002-2003

GBPC

SITE MANAGER

2004-2006

2003-2004

HAMPA(PPC)

10,000,000,000 RIALS

SITE MANAGER

,

10

Page 14: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PERIOD COMPANY

POSITION

PROJECT

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

PROJECT

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

16,000,000,000 RIALS.

PIPING & INSULATION OF HYDROGEN

UNIT -BANDAR ABBAS REFINERY

NIRO- VA - TAVAN CO.

ERECTION OF MECHANICAL , ELECTRICAL

& INSTRUMENT WORKS OF MONTAZER

GHAEM COMBINED CYCLE POWER PLANT

PROJECT

KOTAM GOSTAR CO.

PROJECT MANAGER

2000-2002

SITE MANAGER

1998-2000

1996-1998

N.I.E.O.C

M.SANADZADEH, MECHANICAL ENGINEER ( B.S. FROM TEHRAN UNIVERSITY )

PROJECTS & POSITIONS

MAPNA CO.

22,000,000,000 RIALS

1998-2002

SITE MANAGER

1996-1998

MAPNA CO.

28,000,000,000 RIALS.

ERECTION OF MECHANICAL , ELECTRICAL

& INSTRUMENT WORKS OF SHAHID

RAJAEI COMBINED CYCLE POWER PLANT

11

Page 15: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PERIOD COMPANY

POSITION

PROJECT

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

PROJECT

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

DURATION

CLIENT

POSITION

PROJECT

DURATION

CLIENT

AMOUNT

OF

CONTRACT

PROJECTS & POSITIONS

M.SANADZADEH, MECHANICAL ENGINEER ( B.S. FROM TEHRAN UNIVERSITY )

1994-1996 SAHAND AZAR .CO.

1990-1993

SITE MANAGER

1994-1996

WATER ORGANIZATION OF TEHRAN

3,000,000,000 RIALS.

SITE MANAGER

PROJECT1988-1990 IRAN NATIONAL STEEL GROUP

1990-1993 ATMOSPHERE CO.

1980-1988AHWAZ PLANING AND BUDGET

ORGANIZATION

EMERGENCY WATER PIPELINE OF

GHAZVIN

ERECTION OF MECHANICAL ,ELECTRICAL

& INSTRUMENT WORKS OF COOLING

SYSTEM OF SHAHID RAJAEI POWER

PLANT

MANAGER OF HYDRULIC & PENUMATIC

MAINTENANCE

PIPE MANUFACTURING FACTORY

TAVANIR CO.

35,000,000,000 RILAS.

8 YEARS

1988-1990

I.N.S.G

……………..

30,000,000,000 RIALS

LOCAL PROJECTS

MECHANIC ENGINEER

12

Page 16: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

DATE COMPANY

PAYBAST CO.

SHARE Holder & MEMBER OF

THE BOARD

POSITION

PROJECT

KOTAM GOSTAR CO. DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

PROJECT

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

PROJECT

DURATION

CLIENT

AMOUNT

OF

CONTRACT

15,000,000,000 RIALS.

4 - EXPERIENCES

4-1- MANAGERS EXPERINCES

PROJECTS & POSITIONS

E.ROSHAEIAN, CIVIL ENGINEER ( B.S. FROM SHIRAZ UNIVERSITY)

HEAD OF CIVIL DEPARTMENT

94,000,000,000 RIALS

2003-2005

BASTAB BANA CO.1999-2002

IRAN KHODRO SAZEH

10,000,000,000 RIALS

CONSTRUCTION OF INDUSTRIAL

FOUNDATIONS OF IRAN KHODRO

COMPANY-TEHRAN

PROJECT MANAGER

2001-2002

2005 - NOW POSITION

2003-2005

KIMIA GHARB GOSTAR CO.

PROJECT MANAGER

MAROON PETROCHEMICAL COMPLEX

,(MPC) CONSTRUCTION OF CONTROL

ROOM , SUBSTATION & WAREHOUSE

CONSTRUCTION OF CIVIL WORKS OF

CITRIC ACID FACTORY- KERMANSHAH

2002-2003

MPC

SITE MANAGER

,

13

Page 17: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

DATE COMPANY

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

40,000,000,000 RIALS.

CONSTRUCTION OF UTILITY BUILDINGS

OF BANDAR ABBAS REFINERY

TOTAL FINA ELF

1996-1999

10,000,000 USD

SIRRI A & E FIELD DEVELOPMENT

PROJECT

CONSTRUCTION MANAGER

TABRIZ PETROCHEMICAL CO.

25,000,000,000 RIALS.

MAHSHAHR ECONOMIC ZONE CO.

REINFORCING OF FOUNDATIONS OF

PETROL STATION AND ENTRANCE

SQUARE OF MAHSHAR SITE

SITE MANAGER

10,000,000,000 RIALS.

1999-2000

UNDER GROUND PIPING AND CIVIL

WORKS OF COOLING WATER , POWER

PLANT AND WASTE WATER PLANT

PROJECTS & POSITIONS

E.ROSHAEIAN, CIVIL ENGINEER ( B.S. FROM SHIRAZ UNIVERSITY)

1992-1993 SHANGARF CO.

PROJECT

1992-1993

N.I.E.O.C

SITE MANAGER

1993-1996

PROJECT

1999-2002

CONSTRUCTION MANAGER

1997-1999 JAHANPARS CO.

PROJECT

BASTAB BANA CO.

1993-1997 RADIRA CO.

PROJECT

14

Page 18: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

DATE COMPANY

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT

OF

CONTRACT

PROJECT

1985-1988 JASK COMPANY

CONSTRUCTION OF CIVIL WORKS AND

FOUNDATION OF 133 MB OIL STORAGE

TANKS -ESFAHAN REFINERY PLANT

CONSTRUCTION OF MAIN ROAD

BETWEEN "CHENAR SHAHIJAN" AND

"DOGONBADAN"

N.I.O.C

1985-1986

200,000,000 RIALS

400,000,000 RIALS

SITE MANAGER

PROJECT

PROJECTS & POSITIONS

E.ROSHAEIAN, CIVIL ENGINEER ( B.S. FROM SHIRAZ UNIVERSITY)

1990-1993

1,000,000,000 RIALS.

ARAK REFINERY

SITE MANAGER

CONSTRUCTION OF RESIDENTIAL CAMP

FOR "BELELI"COMPANY IN ARAK

REFINERY

1986-1988

ROAD MINISTRY

1990-1992 BELELI.CO.

PROJECT

SITE MANAGER

15

Page 19: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

DATE COMPANY

PAYBAST CO.

SHARE HOLDER &MEMBER

OFTHE BOARD

POSITION

DURATION

CLIENT

AMOUNT OF

CONTRACT

POSITION

DURATION

CLIENT

KOTAM GOSTAR CO.

AMOUNT OF

CONTRACT

( SHARE HOLDER & MEMBER

OF THE BOARD )POSITION

DURATION

CLIENT

AMOUNT OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT OF

CONTRACT

1999-2001

FALEGH SANAT CO.

37,000,000,000 RIALS (6.2 M USD)

4 - EXPERIENCES

4-1- MANAGERS EXPERINCES

PROJECTS & POSITIONS

1997-2005

2005 - NOW

PROJECT

G.B.P.C

GH.KARIMI, CIVIL ENGINEER ( M.S. FROM TEHRAN UNIVERSITY )

CONSTRUCTION OF STEEL STRUCTURE,

MECHANICAL & ELECTRICAL WORKS OF

AMIR KABIR CANE SUGAR FACTORY -

AHWAZ / IRAN

CONSTRUCTION OF MECHANICAL,

ELECTRICAL & INSTRUMENTATION WORKS

OF ARDABIL AVIATION FUEL FACILITIES /

IRAN

CONSTRUCTION OF MECHANICAL,

ELECTRICAL & INSTRUMENTATION WORKS

OF "GHAED BASIR" PETROCHEMICAL

COMPLEX GOLPAYGAN / IRAN

PROJECT

PROJECT

CONSTRUCTION OF CIVIL WORKS OF

CITRIC ACID FACTORY- KERMANSHAH / IRAN

G.B.P.C

2003-2005

134,000,000,000 RIALS (19.1 M USD)

POSITION

PROJECT

KIMIA GHARB GOSTAR CO.

2002-2003

39,000,000,000 RIALS (5.6 M USD)

MANAGING DIRECTOR (Please refer to

www.paybastco.com)

PROJECT MANAGER

PROJECT MANAGER

PROJECT MANAGER

PROJECT MANAGER

2001-2003

8,500,000,000 RIALS (1.3 M USD)

,

16

Page 20: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

DATE COMPANY

POSITION

DURATION

CLIENT

AMOUNT OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT OF

CONTRACT

POSITION

DURATION

CLIENT

AMOUNT OF

CONTRACT

37,000,000,000 RIALS (17.9 M USD)

SITE MANAGER

1991-1992

2,500,000,000 RIALS (2.5 M USD)

MANAGER OF SITE ENGINEERING

OFFICE

1987-1990

NATIONAL IRANIAN GAS CO.

NATIONAL IRANIAN GAS CO.

7,500,000,000 RIALS (9.4 M USD)

GH.KARIMI, CIVIL ENGINEER ( M.S. FROM TEHRAN UNIVERSITY )

OFFSHORE FACILITIES OF TAHERI PORT AND

CONDENSATE TANKS

CONSTRUCTION OF WATER TREATMENT

AND WATER RESERVOIRS OF JAM - TOHID

TOWN / IRAN

UNDER GROUND PIPING, CIVIL & MECHANICAL

WORKS OF COOLING WATER PLANT, POWER

PLANT, WASTE WATER PLANT, STEEL STORAGE

TANKS & AUXILIARY BUILDINGS

(ROOM/SUBSTATIONS/PUMP HOUSED) OF TABRIZ

PETROCHEMICAL CO-TABRIZ / IRAN

1986-1996

PROJECTS & POSITIONS

PROJECT

PROJECT

PROJECT

TABRIZ PETROCHEMICAL CO.

SITE MANAGER

RADIRA CO.

1993-1997

17

Page 21: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PERIOD COMPANY

POSITION

DURATION

CLIENT

POSITION

DURATION

POSITION

DURATION

CLIENT

POSITION

DURATION

CLIENT

4 - EXPERIENCES

4-1- MANAGERS EXPERINCES

1996-JUNE

2006

4-1- F.ZAHEDI,INDUSTRIAL ENGINEER ( B.S. FROM ELM-O-SANAT UNIVERSITY )

PROJECTS & POSITIONS

2006 -SUNE

NOW

PAYBAST CO. (SHARE HOLDER

& MEMBER OF THE BOARD)POSITION TECHNICAL & ENG. MANAGER

JAHANPARS ENG. & CONS. CO.

PROJECT DARQUAIN FIELD DEVELOPMENT PROJECT

HEAD OF PLANNING & TECHNICAL OFFICE FOR

SUPPORTING FOLLOWING PROJECTS: AMAK

PROJECT SIRRI A & E FIELD DEVELOPMENT

BORZOYEH PETROCHEMICAL COMPLEX

PROJECT GACHSARAN GAS INJECTION PROJECT

PROJECT

PLANNING & PROJECT CONTROL MANAGER

1992-1996OIL INDUSTRIES ENG. & CONS.

CO. (OIEC)

PROJECT BANDAR ABBAS REFINERY

N.I.O.C SOUTH FIELD

N.I.O.C

1992-1996

SITE MANAGER

2003-2006

ENI IRAN BV

1998-2000

SITE MANAGER

1996-1998

TECHNICAL OFFICE MANAGER

,

18

Page 22: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PERIOD COMPANY

POSITION

DURATION

CLIENT

POSITION

DURATION

POSITION

DURATION

1986-1989MINISTRY OF REUOLATIONARY

GAURDSPROJECT FABRICATION OF ONSHORE STRUCTURE

1989-1990

PROJECT ESFAHAN REFINERY LUB OIL COMPLEX

PLANNING MANAGER

MINISTRY OF ROAD LOCATION YASOUDJ CITY

1989-1990

1986-1989

4-1- F.ZAHEDI, INDUSTRIAL ENGINEER ( B.S. FROM ELM-O-SANAT UNIVERSITY )

PROJECTS & POSITIONS

PLANNING SUPERVISOR

PREVENTIVE MAINTENANCE PLANNING ENG.

1990-1992CHAGALESH / FOOSTER

WEELER JOINT VENTURE

N.I.O.C.

1990-1992

19

Page 23: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

4-2- COMPANYS REFRENCES

20

,

Page 24: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : METHANO UNIT OF VENIRAN APADANA PETROCHEMICAL

CLIENT : VENIRAN APADANA PETROCHEMICAL

PROJECT DESCRIPTION : EXECUTION OF CONCRETE PIPE RACK OF

METHANO UNIT OF VANIRAN APADANA

PETROCHEMICAL

PROJECT DURATION : 12 MONTHS

START DATE : FEBRUARY 2015

MAJOR QUANTITIES OF THE WORK:

CONCRETE : 15,000 M3

FORMWORK : 40,000 M2

REBAR : 2,500 TON

21/1

Page 25: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/2

Page 26: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAM : PHASE12, SOUTHPARS OFFICES AND OBSERVATION

GALLARY POWER & WATER SYSTEM

CLIENT : PETROPARS

PROJECT DESCRIPTION : MATERIAL PROCURMENT, CONSTRUCTION &

ERECTION OF POWER & WATER SYSTEM FOR

PROJECT OFFICES & OBSERVATION GALLARY

PROJECT DURATION : 5 MONTHS

START DATE : DECEMBER 2014

MAJOR QUANTITIES OF THE WORK:

CABLE PULLING : 13,300 M

ERECTION & COMMISSIONING & MODIFY

OF POWER DISTRIBUTION PANNEL : 10 SET

POLTETHILEN PIPING : 500 M

ERECTION & COMMISSIONING

OF TRANSFORMER : 1 SET

21/3

Page 27: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/4

Page 28: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : SIRAF METHANOL UNIT

CLIENT : SIRAF ENERGY

PROJECT DESCRIPTION : CIVIL WORKS OF SIRAF METHANOL UNIT

PROJECT DURATION : 15 MONTHS

START DATE : OCTOBER 2013

(Due to client financial & Technical problems project has stopped)

MAJOR QUANTITIES OF THE WORK:

EXCAVATION : 45,000 M3

BACKFILL : 70,000 M3

CONCRETE : 30,000 M3

FORMWORK : 92,000 M2

REBAR : 2,400 TON

21/5

Page 29: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : EXPANSION AND UPGRADING SHAZAND

ARAK REFINERY

CLIENT : CONSORTIUM OF SAZEH , ODCC AND

SEI COMPANIES

PROJECT DESCRIPTION : EXECUTION OF REMAINING A/G PIPING

WORKS IN UNIT 45

PROJECT DURATION : 18 MONTHS

DATE OF PROVISIONAL

ACCEPTANCE : May 2013

MAJOR QUANTITIES OF THE WORK:

SUPPORT WEIGHT : 285 TON

PIPING : 55,000 IN-DIA

PAINTING : 24,500 M2

BUILDINGS & SITE : 1,950 M2

ELECTRICAL / INSTRUMENT CABLING : 39,000 M

INSTRUMENT DEVICE : 50 SET

21/6

Page 30: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/7

Page 31: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

4-2- COMPANYS REFRENCES

• PROJECT NAME : GAS TURBINE GENERATORUNIT 4&5 OF

IRAN LNG

• CLIENT : NEYR-PERSE COMPANY

• PROJECT DESCRIPTION : ERECTION AND PRE-COMMISSIONING

OF GAS TURBINE GENERATOR

UNIT 4 & 5 OF IRAN LNG.

• ROJECT DURATION : 8 MONTHS

• DATE OF PROVISIONAL

ACCEPTANCE : March 2011

• MAJOR QUANTITIES OF THE WORK:

• ALL RELATED WORKS OF GTG 160 MW : 2 SET

21/8

,

Page 32: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : phase 12- south Pars – Epc1 – Construction of NIB

CLIENT : NASR Consortium

PROJECT DESCRIPTION : Construction of industrial steel structure and

building consist of civil, electrical, mechanical work

for Main Workshop, Lorry & Car maintenance ,

Substation, Pipe rack, Concrete, Dyke, Sleepers,

Ditch, Culvert, …

PROJECT DURATION : 14 MONTH

DATE OF PROVISIONAL

ACCEPTANCE : March 2011

MAJOR QUANTITIES OF THE WORK:

BUILDING : 14,000 m2

CONCRETE : 14,000 m3

FORMWORK : 31,000 m2

REBAR : 1,200 ton

STEEL STRUCTURE ERECTION ; 1,400 ton

SAND BLAST & PAINTING : 25,000 m2

21/9

Page 33: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/10

Page 34: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/11

Page 35: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : Condensate Tanks EPC1 – phase 12

CLIENT : Consortium NASR

PROJECT DESCRIPTION : Mechanical Erection Sand blast painting &

Hydro test of 4 Tanks With 100,000 m3 Capacity,

One Tank with 23000 m3 Capacity & 5 utility tanks

PROJECT DURATION : 15 MONTH

PROGRESS : 98 %

MAJOR QUANTITIES OF THE WORK:

TANK ERECTION : 8,800 TON

SAND BLAST & PAINTING : 120,000 m2

21/12

Page 36: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/13

Page 37: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/14

Page 38: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : LIGHT NAPHTA HAYDROTREATING &

ISOMERIZATION PROJECT (joint with Radira)

CLIENT : CHAGALESH CONSULTING ENGINEERS

PROJECT DESCRIPTION : CIVIL, MECHANICAL, ELECTRICAL &

INSTRUMENT WORKS OF LNHAIP

PROJECT DURATION : 22+18 MONTH

DATE OF PROVISIONAL

ACCEPTANCE : March 2011

MAJOR QUANTITIES OF THE WORK:

CONCRETE : 22,000 m3

FORMWORK : 40,000 m2

REBAR : 2,500 ton

C.S. PIPING : 197,000 in-dia

EQUIPMENT ERECTION : 5,400 ton

STEEL STRUCTURE ERECTION : 1,100 ton

ELECTRICAL / INSTRUMENT CABLING :459 km

INSTRUMENT DEVICE : 2,900 set

SAND BLAST & PAINTING : 31,000 m2

PIPING INSULATION : 30,000 ml

21/15

Page 39: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/16

Page 40: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/17

Page 41: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/18

Page 42: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/19

Page 43: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : Foundation of Ethylene tank ILAM Petrochemical –

Olephine No.13 (joint with Radira)

CLIENT : STEEM Co.

PROJECT DESCRIPTION : Construction of Dobell wall Foundation

PROJECT DURATION : 6 MONTH

PROGRESS : Temporary handover

DATE OF COMPLETION : 2008

MAJOR QUANTITIES OF THE WORK:

CONCRETE : 1,700 m3

FORMWORK : 530 m2

REBAR : 230 ton

21/20

Page 44: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/21

Page 45: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : phase12. south Pars – EPC1 - PPl Camp

(joint with Radira)

CLIENT : NASR Consortium

PROJECT DESCRIPTION : Construction of PetroPars Engineering Camp

Consist of ( Bedrooms Camp, Restaurant, Clinic, Mosque, Shop, … )

PROJECT DURATION : 8 MONTH

PROGRESS : Permanent handover

MAJOR QUANTITIES OF THE WORK:

CONCRETE : 5,000 m3

FORMWORK : 9,000 m2

REBAR : 400 ton

STEEL STRUCTURE ERECTION : 280 ton

21/22

Page 46: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/23

Page 47: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : BANDAR ABBAS GAS CONDENSATE

REFINARY – RENOVATION OF PIONEER

CAMP / BOSTANOO CAMP

CLIENT : PERSIAN GULF STAR OIL COMPANY

(PGSOC – GGIL )

PROJECT DESCRIPTION : REFURBISHMENT OF 25000 SM OF BUILDINGS

PROJECT DURATION : 12 MONTHS

DATE OF COMPLETION : 2008, JUNE

MAJOR QUANTITIES OF THE WORK:

SITE WORKS : 10,000 M2

PLASTER WORKS : 60,000 M2

HVAC : 700 SET

CERAMIC TILE : 20,000 M2

WATER PROOFING WORKS : 10,000 M2

PAINTING : 100,000 M2

21/24

Page 48: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : SEGREGATE , PROCESS AND STORAGE

OF LPG IN LAVAN ISLAND (joint with Radira)

CLIENT : CHAGALESH CONSULTING ENGINEERS

PROJECT DESCRIPTION : EXECUTING OF MECHANICAL ,ELECTRICAL

& INSTRUMENT WORKS.

PROJECT DURATION :18 MONTHS

MAJOR QUANTITIES OF THE WORK:

C.S PIPING : 25,000 IN.DIA

EQUIPMENT ERECTION : 250 TON

ST. STRACTURAL ERECTION : 120 TON

ELECTRICAL INSTRUMENT CABLING : 65 KM

INSTRUMENT CALIBRATION & ERECTION : 215 SET

SAND BLAST & PAINTING : 7,000 M2

PIPING INSULATION : 7,500 M2

EQUIPMENT INSULATION : 300 M2

21/25

Page 49: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/26

Page 50: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : SEGREGATE , PROCESS AND STORAGE OF

LPG IN LAVAN ISLAND ( joint with Radira )

CLIENT : CHAGALESH CONSULTING ENGINEERS

PROJECT DESCRIPTION : EXECUTING OF EQUIPMENT FOUNDATION ,

CONTROL ROOM,SUBSTATION & SITE CIVIL

WORKS.

PROJECT DURATION : 12 MONTHS

MAJOR QUANTITIES OF THE WORK:

EARTHWORKS : 7,500 M3

CONCRETE : 1,800 M3

FORMWORKS : 2,500 M2

REBAR WORKS : 350 TONS

BUILDING : 250 M2

21/27

Page 51: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : KERMANSHAH CITRIC ACID PLANT

CLIENT : KIMIA GHARB GOSTAR COMPANY

PROJECT DESCRIPTION : MECHANICAL, ELECTRICAL AND

INSTRUMENTATION WORKS OF

KERMANSHAH CITRIC ACID PLANT

PROJECT DURATION : 14 MONTHS

DATE OF COMPLETION : 2006

MAJOR QUANTITIES OF THE WORK:

C.S. PIPING : 15,000 INCH- DIA

S.S. PIPING : 50,000 INCH- DIA

EQUIPMENT ERECTION : 700 TONS

CABLING : 35 KM

ELEC./INSTR. EQUIPMENT : 1100 SET

SAND BLASTING / PAINTING :10,000 m2

INSULLATION :7,500 m2

21/28

Page 52: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/29

Page 53: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/30

Page 54: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

• PROJECT NAME : KERMANSHAH CITRIC ACID PLANT

• CLIENT : KIMIA GHARB GOSTAR COMPNY

• PROJECT DESCRIPTION : CONSTRUCTION OF KERMANSHAH

CITRIC ACID INDUSTRIAL WASTE

WATER TREATMENT PLANT AND ADMIN.

BUILDING

• PROJECT DURATION : 12 MONTHS

• DATE OF COMPLETION : 2006

• MAJOR QUANTITIES OF THE WORK:

• EARTHWORKS : 15,000 M3

• FORMWORKS : 4,000 M2

• REBAR WORKS : 350 TONS

• CONCRETE : 4,000 M3

21/31

Page 55: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

PROJECT NAME : TABRIZ PETROCHEMICAL PLANT

CLIENT : TABRIZ PETROCHEMICAL COMPLEX

PROJECT DESCRIPTION : ERECTION OF STORAGE TANKS

OF T.P.C

PROJECT DURATION : 12 MONTHS

DATE OF COMPLETION : 1997

MAJOR QUANTITIES OF THE WORK:

TANK ERRECTION : 1,200 TON

C.S. PIPING : 24, 200 INCH- DIA

CABLING : 10 KM

SAND BLASTING / PAINTING :36,000 m2

HOT INSULLATION :16,000 m2

21/32

Page 56: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

21/33

Page 57: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

5- QUALITY MANAGEMENT

22

Page 58: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

5 – QUALITY MANAGEMENT:

THE AIM OF COPMANY IS PROVIDING SERVICES ACCORDING TO

THE CONTRACT, WITH CONSIDERATION OF UPDATED LOCAL AS

WELL AS INTERNATIONAL CODES AND STANDARDS IN PROJECTS.

PAYBAST ENDEVOURS TO ACHIEVE FOLOWING GOALS WITH

APPLAYING QUALITY MANAGEMENT SYSTEMS:

• SAFE PERFORMANCE OF THE WORK.

• SATISFACTION OF THE CLIENTS

• IMPROVEMENT OF WORKMANSHIP QUALITY

• DOCUMENTATION OF EXECUTED WORKS

• INCREASING THE EFFICIENCY

“PAYBAST IS TRYING TO ADAPT ITS QUALITY MANEGMENT

SYSTEM ON THE BASIS OF THE QUALITY MANAGEMENT OF ISO”

23

Page 59: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

6 – COMPANY RESOURCES

6-1- MANPOWER

6-2- CONSTRUCTION EQUIPMENT AND MACHINERY

24

Page 60: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

6-1- MANPOWER

25

Page 61: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

ITEM. DESCRIPTION NO.

1 MANAGEMENT , TECHNICIAN & CELERC 9

2 FORM WORKER 40

3 REBAR WORKER 30

4 MASON 10

5 CONCRETE WORKER 20

6 STEEL WORKER 15

7 ERECTOR 8

8 EQUIPMENT ERECTOR 10

9 MILWRAIGHT 4

10 FITTER 20

11 WELDER 30

12 SCAFFOLDER 20

e - PIPING WORKS :

d - MECHANICAL WORKS :

6 - 1 - MAN POWER

a - HOM OFFICE

b - CIVIL & BUILDING WORKS :

c - STEEL STRUCTURE WORKS :

Page 62: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

ITEM. DESCRIPTION NO.

13 ELECTRICIAN 20

14 INSTRUMENT TECHNICIAN 15

15 SAND BLASTER 10

16 PAINTER 4

17 INSULATER 20

285

6 - 1 - MAN POWER

f - ELECTRICAL & INSTRUMENTATION WORKS :

g - PAINTING , SAND BLAST & INSULATION WORKS :

TOTAL

Page 63: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

6-2- CONSTRUCTION EQUIPMENT AND MACHINERY

26

Page 64: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

NO. DESCRIPTION UNIT CAPACITY MODEL QTY1 Rough Terrain Crane No. 45 ton KATO 1

2 Rough Terrain Crane No. 25 ton KATO 3

3 Truck Crane No. 10 ton M.S.A 1

4 Truck Crane No. 3 ton KHAVAR 2

5 Fork Lift No. 10 ton Clark 1

6 Louder No. 625 HEPCO 1

7 Dump Truck No. 16 ton DANG FONG 1

8 Truck Mixer No. 8 - 9 m3 BENZ-MACK 2

9 Truck Mixer No. 7 m3 HOWO - DANG FONG 2

10 Tractor With Trailer No. TABRIZ CO. 3

11 Batching Plant No. 35 m3 in hour BEHNAM SAANAT 1

12 Mobile Concrete Pump No. 36 meter h POITZ MASTER 1

13 Cement Silo No. 80 ton JAHAN SAMT 4

14 Air Compressor No. 250 CFM TABRIZ CO. 2

15 Air Compressor No. 800 CMF Ingersoll-Rand 1

16 Compactor No. 3 ton HEPKO DOBELL 2

17 Diesel generator No. 250 KVA VOLVO 8

18 Diesel generator No. 160 KVA VOLVO 9

19 Diesel generator No. 60 KVA PERKINZ 9

20Welding Machine (

Rectifier )No. 500/600 Amp.

KARA/KHAZAR TRANSFO

110

21Plasma Cutting

MachineNo. 2

22Auto-Welding Machine for

bottom plate of Tank No. GAM ELECTRIK 3

23Auto-Welding Machine for

Tank horizontal shell No. LINKOLN 2

24 Sand blast Equipment No. 3

25 Airless No. 2

26Pipe Bender up to 2

InchNo. 2

27 Threading Machine No. 2

6-2 - CONSTRUCTION EQUIPMENT AND MACHINERY

Page 65: PAYBAST CO. ( PJS )paybastco.com/Downloads/ENGLISH REZOME , - Bahman 94.pdf · table of contents: page 1 –general information 1 2 –services and field of activities 2 3 –organization

NO. DESCRIPTION UNIT CAPACITY MODEL QTY6-2 - CONSTRUCTION EQUIPMENT AND MACHINERY

28 4" Filling Pump No. 1

29 2" Submerge Pump No. 4

30 Test Pump No. 50 - 200 bar 6

31 Bar Cutting Maching No. FARS GALEB 1

32 Bar Cutting Maching No. FARS GALEB 2

33 Betonier No. PARS ARIAN 2

34 Vibrator No. 8

35 Container No. 20/40 foot 6

36 Protocabin No. 20/40 foot 14

37 Steel form work ton 300

38 Scaffolding Material ton 200

39Total Station ( survey

instrument )No. 3

40Nivoo. ( survey

instrument )No. 6

41 Grinding Machine No. 45

42 Magnetic Drill No. 4

43 Shop Drill No. 2

44 Oxygen Cylinder No. 60

45 Argon Cylinder No. 50

46 Pickup No. 5

47 Car No. 6